Rutadhama-M M Residency
RUTADHAMACONSTRUCTIONS · Hyderabad · RERA P02500008582
RUTADHAMA-M M RESIDENCY is a residential apartment project in Himayatnagar, Himayatha Nagar Mandal, Hyderabad District. The registered promoter developing it is RUTADHAMACONSTRUCTIONS, a partnership in the RERA record. The project has a land area of 1047.90 sq. m and one building with 1 Cellar + 1 Stilt + 5 upper floors, comprising 15 THREE BED ROOM apartments. It is registered under TG-RERA number P02500008582, and the RERA project-information record gives a proposed completion date of 16/08/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | RUTADHAMA-M M RESIDENCY RERA record |
| Project type / registered portion | Residential apartment project; one building is recorded. Phase or separately registered portion: not disclosed. RERA record RERA filing |
| TG-RERA registration | P02500008582. The certificate states validity from 01/08/2024 to 16/04/2027, unless extended by the Authority. Approvals record |
| RERA status | Registration certificate on file; live status beyond the certificate’s stated validity is not established by the supplied record. Approvals record |
| Registered promoter | RUTADHAMACONSTRUCTIONS, a partnership in the RERA record. RERA record RERA filing |
| RERA-declared completion | 16/08/2027 in the project information record. The promoter’s Form B separately states an undertaking to complete by 16TH April 2027. These are reported as distinct filed items; the record does not establish a revised deadline. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site description | Himayatnagar in the RERA identity record; building-permit documents describe the site as New Nallakunta, Hyderabad. RERA record RERA filing |
| Revenue village | Himayatnagar in the RERA identity record. The building-permit extraction identifies Amberpet as village. The supplied documents therefore do not establish one consistent revenue-village identity for the site. RERA record |
| Mandal / district / PIN | Himayatha Nagar / Hyderabad / 500029 in the RERA identity and certificate record. The permit extraction names Amberpet Mandal and Hyderabad District. RERA record |
| Survey numbers / subdivisions | 573 (old Survey No. 495) in the filed building-plan description; the RERA land record does not disclose survey numbers. The building-permit extraction lists survey numbers 573 and 495. Project door/plot identifiers filed in RERA: 2-2-1136/7/2/A, 2-2-1136/7/2/A/1, 2-2-21136/7/2/B/1, 2-2-1136/7/2/B. RERA filing |
| Site extent | RERA total area 1047.90 sq. m, road-widening affected area 14.80 sq. m, and net area 1033.10 sq. m. The permit documents state net plot area 1033.11 sq. m. RERA filing |
| Boundaries in RERA record | North: ROAD; South: ROAD; East and West: EXITING BUILDING (as recorded). RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | 0685/GHMC/SEC/2024-BP, approved 16 April, 2024. The plan extraction also records file no. 68/str/engg/TP10/ghmc and file no. 001362/GHMC/0652/SEC1/2024-BP. Approvals record |
| Building count and configuration | One residential building: 1 Cellar + 1 Stilt + 5 upper floors. The permit states building height 14.75 MT. RERA filing |
| Approved built-up area | The plan extraction records 2239.55 sq. m proposed built-up area excluding parking, 3097.55 sq. m including parking, and also a separate 3177.97 sq. m “total proposed built up area” entry. These are the plan’s separately labelled figures. |
| Parking | Permit extraction records proposed parking area 858.00 sq. m and 17 cars proposed; another permit entry states total parking area 870.9. The plan describes the cellar and stilt as approved for parking. |
| Units | 15 apartments in the RERA unit record and building-plan extraction. The plan says the sanctioned unit count must not be increased without prior GHMC approval. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | THREE BED ROOM; 15 units, 0 booked, 15 available, and filed saleable area 178.0 sq. m. Booking counts are portal-derived and have no as-of date in the supplied record. RERA unit table RERA unit table |
| Construction stage | The project is recorded as New Project. The supplied material does not provide independently verified site progress or a construction-stage percentage. RERA filing RERA amenities |
| Completion dates | RERA project-information field: 16/08/2027. Form B undertaking: 16TH April 2027. GHMC permit: construction to be completed before 16 April, 2027. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an Occupancy Certificate before occupation. |
2. The project story
RUTADHAMA-M M RESIDENCY is registered as a residential apartment project under TG-RERA registration P02500008582. The RERA record identifies the project with Himayatnagar, Hyderabad; the filed building-plan material describes the property as New Nallakunta, Hyderabad, and the permit extraction names Amberpet Mandal. The records supplied do not establish a single consistent revenue-village description. RERA record
The sanctioned development is one apartment building with a cellar, stilt and five upper floors, comprising 15 dwelling units. The RERA inventory lists all 15 as three-bedroom units, with none booked and 15 available on the portal record, which has no stated as-of date. RERA unit table
The project is recorded as a new project, and the supplied file contains building-permit and plan records rather than evidence of completed construction. No independently verified construction progress or occupancy certificate is supplied. The permit requires an Occupancy Certificate before occupation. RERA filing
3. Master plan, architecture & building design
The GHMC plan describes one residential building on a site recorded in the RERA land details as 1047.90 sq. m total, including 14.80 sq. m affected by road widening, with 1033.10 sq. m net area. The plan extraction records net plot area as 1033.11 sq. m. RERA filing
The sanctioned arrangement is 1 Cellar + 1 Stilt + 5 upper floors, with a stated building height of 14.75 MT. The plan records proposed built-up area of 2239.55 sq. m excluding parking, 3097.55 sq. m including parking, and a separate total proposed built-up-area entry of 3177.97 sq. m. The documents do not label these figures as carpet area or saleable area.
The plan lists a vacant plot area of 557.64 and identifies a tot-lot, green strip, rainwater harvesting/percolating well, transformer space and garbage house. It does not provide sufficiently clear information in the supplied extraction to describe flat distribution by floor, lift or stair arrangements, common-area layout, or the extent and arrangement of landscaping.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 15 THREE BED ROOM apartments, with 0 booked and 15 available, and saleable area of 178.0 sq. m. The portal booking count has no as-of date in the supplied record. RERA unit table RERA unit table
The approved floor-plan drawing was software-measured for six 3BHK flat designs. The measured carpet-area range is 107.9–110.8 sq. m, with a median of 110.7 sq. m; these are drawing-based measurements, not RERA-filed carpet areas, and the measurement record says review is needed. Floor plans RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Three-bedroom / 3BHK | 15 | 0 | 15 | 178.0 sq. m | 107.9–110.8 sq. m; median 110.7 sq. m (software-measured) | 38% (software-derived record) |
The drawing’s sample flat labels dining, drawing room, kitchen, master bedroom, two other bedrooms, toilets, foyer areas and utility areas. Its room dimensions are drawing-derived and relate to one flat shown on the typical floors; verify against the plan before relying on them. RERA unit details
“Saleable area” is the RERA-filed unit-area figure; the carpet figures above are software measurements of drawing geometry, not RERA disclosures. The supplied measurement record cautions that the RERA saleable area also includes the home’s share of common areas. RERA unit table Floor plans
5. Parking & vehicle circulation
The building plan identifies the cellar and stilt for parking and records 17 cars proposed and proposed parking area of 858.00 sq. m. A separate permit entry gives total parking area as 870.9. These are sanctioned-plan figures; no unit-wise parking allocation, visitor or accessible-space count, two-wheeler count, or exclusive allotment documentation is supplied.
The permit requires the approved cellar and stilt parking areas to be used for vehicle parking and not converted or misused. Although the plan includes a condition concerning EV charging infrastructure, the supplied record does not establish the number or location of chargers installed or delivered.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 site-infrastructure and facility categories. Each progress field shown in the supplied record is 0%; this is a declared record, not independent verification of on-site completion. The building-plan extraction also identifies a tot-lot, green strip, rainwater-harvesting provision, transformer space and garbage house. RERA amenities
| Description / size | The plan requires a tot-lot to be fenced and maintained as greenery, and a peripheral green strip; no size is supplied. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan RERA amenities |
| Declared progress / verified status | 0% in RERA amenity record; completion not independently verified. |
| Description / size | Listed; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no size or specific building identified. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA amenity record says “YES”; no source, capacity or delivery status is supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | Listed; RERA record says “YES” for sewerage, without system capacity or specific treatment details. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0% progress fields; completion not independently verified. |
| Description / size | Listed; no specification supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA record says “YES”; plan specifies rainwater harvesting/percolating well and the permit records 6 rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan and permit RERA amenities |
| Declared progress / verified status | 0% progress field; installation/completion not independently verified. |
| Description / size | Listed; plan requires a garbage house within the premises. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan RERA amenities |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | RERA record says “YES”; plan requires transformer space. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan RERA amenities |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | Listed; the permit states an occupancy fire NOC is to be obtained before issue of the Occupancy Certificate. |
|---|---|
| Evidence source | RERA amenity record; GHMC permit RERA amenities |
| Declared progress / verified status | 0% progress field; no NOC or completed fire installation is supplied. |
| Description / size | Listed; no system details supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no area supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
The supplied vendor listing also mentions kids’ play areas, yoga areas and indoor games; these are promoter-marketed/third-party listing claims, not established as sanctioned or delivered facilities in the supplied project record. Promoter website
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting/water conservation, and an electrical meter room/substation/receiving station as available, but shows 0% progress in the corresponding progress fields. It does not specify water source or storage capacity, a sewage-treatment capacity, reuse arrangements, electrical supply or backup capacity. RERA amenities
The GHMC plan requires rainwater harvesting/percolating provision, transformer space and a garbage house. The permit records 6 rainwater-harvesting pits. These are plan provisions; the supplied record does not independently establish installation or operation.
The building-plan documents require plumbing, fire-safety, lift and electrical installations to be executed under qualified technical supervision. The permit requires an occupancy fire NOC before issue of the Occupancy Certificate. No lift count or capacity, fire-system specifications, issued fire NOC, backup-power details, CCTV/security arrangements, or accessibility provisions are established in the supplied project evidence.
8. Location, access & connectivity
The RERA identity record places the project in Himayatnagar, Himayatha Nagar Mandal, Hyderabad District, PIN 500029. The filed plan describes the site as New Nallakunta, Hyderabad; the building-permit extraction identifies Amberpet Mandal and village. The supplied record does not provide a verified approach-road description or public-transport details. RERA record RERA filing
The land record gives roads on the north and south boundaries. The plan extraction lists road widths of 6.00M, 7.62M, 12.0M and 9.00 MT; the building permit also refers to 18 mt. road widths. RERA filing
The location record provides a measured distance of 1.2 km to Financial District (Nanakramguda). The supplied location data does not establish travel time or public-transit connectivity. Location record
9. Developer & development status
The registered promoter is RUTADHAMACONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAOFR1097A1Z7. The RERA certificate lists its registered-office location as Himayatha Nagar, Hyderabad, PIN 500029. The supplied record names REKA SRINIVAS as an authorized signatory; a project authorization document identifies REKHA SRINIVAS. RERA record RERA filing Corporate record Parties record
The project is recorded as a new project and one building is covered in the supplied plan material. No independently verified construction progress is supplied. The RERA record gives a proposed completion date of 16/08/2027; Form B states 16TH April 2027, and the GHMC permit says construction is to be completed before 16 April, 2027. No occupancy or completion certificate is supplied. RERA filing
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for RUTADHAMA-M M RESIDENCY, registration P02500008582; stated validity 01/08/2024–16/04/2027, unless extended. |
| GHMC building permit | Approval 0685/GHMC/SEC/2024-BP, approved 16 April, 2024; permit file no. 001362/GHMC/0652/SEC1/2024-BP. |
| Building plan | GHMC plan for a residential building with one cellar, one stilt and five upper floors; identifies Survey No. 573 (old Survey No. 495) in the plan description and records 15 units. |
| Promoter declaration | Form B declaration by REKHA SRINIVAS for M/s. RUTADHAMA CONSTRUCTIONS, including a completion undertaking of 16TH April 2027. |
| Encumbrance details | RERA-filed encumbrance statement is available as document 451262. |
| Other supporting filing | Declaration concerning proposed allotment letter, agreement for sale and conveyance-deed terms is on file. |
The supplied approval records include conditions requiring commencement and completion notices and an Occupancy Certificate before occupation. The table above indexes key project records; it is not a statement that every approval condition has been discharged.
1. Project at a glance
Project identity
Registered project name: RUTADHAMA-M M RESIDENCY
Project type / registered portion: Residential apartment project; one building is recorded. Phase or separately registered portion: not disclosed.
TG-RERA registration: P02500008582. The certificate states validity from 01/08/2024 to 16/04/2027, unless extended by the Authority.
RERA status: Registration certificate on file; live status beyond the certificate’s stated validity is not established by the supplied record.
Registered promoter: RUTADHAMACONSTRUCTIONS, a partnership in the RERA record.
RERA-declared completion: 16/08/2027 in the project information record. The promoter’s Form B separately states an undertaking to complete by 16TH April 2027. These are reported as distinct filed items; the record does not establish a revised deadline.
Land and geographic identity
Locality / site description: Himayatnagar in the RERA identity record; building-permit documents describe the site as New Nallakunta, Hyderabad.
Revenue village: Himayatnagar in the RERA identity record. The building-permit extraction identifies Amberpet as village. The supplied documents therefore do not establish one consistent revenue-village identity for the site.
Mandal / district / PIN: Himayatha Nagar / Hyderabad / 500029 in the RERA identity and certificate record. The permit extraction names Amberpet Mandal and Hyderabad District.
Survey numbers / subdivisions: 573 (old Survey No. 495) in the filed building-plan description; the RERA land record does not disclose survey numbers. The building-permit extraction lists survey numbers 573 and 495. Project door/plot identifiers filed in RERA: 2-2-1136/7/2/A, 2-2-1136/7/2/A/1, 2-2-21136/7/2/B/1, 2-2-1136/7/2/B.
Site extent: RERA total area 1047.90 sq. m, road-widening affected area 14.80 sq. m, and net area 1033.10 sq. m. The permit documents state net plot area 1033.11 sq. m.
Boundaries in RERA record: North: ROAD; South: ROAD; East and West: EXITING BUILDING (as recorded).
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: 0685/GHMC/SEC/2024-BP, approved 16 April, 2024. The plan extraction also records file no. 68/str/engg/TP10/ghmc and file no. 001362/GHMC/0652/SEC1/2024-BP.
Building count and configuration: One residential building: 1 Cellar + 1 Stilt + 5 upper floors. The permit states building height 14.75 MT.
Approved built-up area: The plan extraction records 2239.55 sq. m proposed built-up area excluding parking, 3097.55 sq. m including parking, and also a separate 3177.97 sq. m “total proposed built up area” entry. These are the plan’s separately labelled figures.
Parking: Permit extraction records proposed parking area 858.00 sq. m and 17 cars proposed; another permit entry states total parking area 870.9. The plan describes the cellar and stilt as approved for parking.
Units: 15 apartments in the RERA unit record and building-plan extraction. The plan says the sanctioned unit count must not be increased without prior GHMC approval.
Offering and status
RERA-filed configuration: THREE BED ROOM; 15 units, 0 booked, 15 available, and filed saleable area 178.0 sq. m. Booking counts are portal-derived and have no as-of date in the supplied record.
Construction stage: The project is recorded as New Project. The supplied material does not provide independently verified site progress or a construction-stage percentage.
Completion dates: RERA project-information field: 16/08/2027. Form B undertaking: 16TH April 2027. GHMC permit: construction to be completed before 16 April, 2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an Occupancy Certificate before occupation.
2. The project story
RUTADHAMA-M M RESIDENCY is registered as a residential apartment project under TG-RERA registration P02500008582. The RERA record identifies the project with Himayatnagar, Hyderabad; the filed building-plan material describes the property as New Nallakunta, Hyderabad, and the permit extraction names Amberpet Mandal. The records supplied do not establish a single consistent revenue-village description.
The sanctioned development is one apartment building with a cellar, stilt and five upper floors, comprising 15 dwelling units. The RERA inventory lists all 15 as three-bedroom units, with none booked and 15 available on the portal record, which has no stated as-of date.
The project is recorded as a new project, and the supplied file contains building-permit and plan records rather than evidence of completed construction. No independently verified construction progress or occupancy certificate is supplied. The permit requires an Occupancy Certificate before occupation.
3. Master plan, architecture & building design
The GHMC plan describes one residential building on a site recorded in the RERA land details as 1047.90 sq. m total, including 14.80 sq. m affected by road widening, with 1033.10 sq. m net area. The plan extraction records net plot area as 1033.11 sq. m.
The sanctioned arrangement is 1 Cellar + 1 Stilt + 5 upper floors, with a stated building height of 14.75 MT. The plan records proposed built-up area of 2239.55 sq. m excluding parking, 3097.55 sq. m including parking, and a separate total proposed built-up-area entry of 3177.97 sq. m. The documents do not label these figures as carpet area or saleable area.
The plan lists a vacant plot area of 557.64 and identifies a tot-lot, green strip, rainwater harvesting/percolating well, transformer space and garbage house. It does not provide sufficiently clear information in the supplied extraction to describe flat distribution by floor, lift or stair arrangements, common-area layout, or the extent and arrangement of landscaping.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 15 THREE BED ROOM apartments, with 0 booked and 15 available, and saleable area of 178.0 sq. m. The portal booking count has no as-of date in the supplied record.
The approved floor-plan drawing was software-measured for six 3BHK flat designs. The measured carpet-area range is 107.9–110.8 sq. m, with a median of 110.7 sq. m; these are drawing-based measurements, not RERA-filed carpet areas, and the measurement record says review is needed.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Three-bedroom / 3BHK | 15 | 0 | 15 | 178.0 sq. m | 107.9–110.8 sq. m; median 110.7 sq. m (software-measured) | 38% (software-derived record) |
The drawing’s sample flat labels dining, drawing room, kitchen, master bedroom, two other bedrooms, toilets, foyer areas and utility areas. Its room dimensions are drawing-derived and relate to one flat shown on the typical floors; verify against the plan before relying on them.
“Saleable area” is the RERA-filed unit-area figure; the carpet figures above are software measurements of drawing geometry, not RERA disclosures. The supplied measurement record cautions that the RERA saleable area also includes the home’s share of common areas.
5. Parking & vehicle circulation
The building plan identifies the cellar and stilt for parking and records 17 cars proposed and proposed parking area of 858.00 sq. m. A separate permit entry gives total parking area as 870.9. These are sanctioned-plan figures; no unit-wise parking allocation, visitor or accessible-space count, two-wheeler count, or exclusive allotment documentation is supplied.
The permit requires the approved cellar and stilt parking areas to be used for vehicle parking and not converted or misused. Although the plan includes a condition concerning EV charging infrastructure, the supplied record does not establish the number or location of chargers installed or delivered.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 site-infrastructure and facility categories. Each progress field shown in the supplied record is 0%; this is a declared record, not independent verification of on-site completion. The building-plan extraction also identifies a tot-lot, green strip, rainwater-harvesting provision, transformer space and garbage house.
| Description / size | The plan requires a tot-lot to be fenced and maintained as greenery, and a peripheral green strip; no size is supplied. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan |
| Declared progress / verified status | 0% in RERA amenity record; completion not independently verified. |
| Description / size | Listed; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no size or specific building identified. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA amenity record says “YES”; no source, capacity or delivery status is supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | Listed; RERA record says “YES” for sewerage, without system capacity or specific treatment details. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0% progress fields; completion not independently verified. |
| Description / size | Listed; no specification supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA record says “YES”; plan specifies rainwater harvesting/percolating well and the permit records 6 rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan and permit |
| Declared progress / verified status | 0% progress field; installation/completion not independently verified. |
| Description / size | Listed; plan requires a garbage house within the premises. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | RERA record says “YES”; plan requires transformer space. |
|---|---|
| Evidence source | RERA amenity record; GHMC plan |
| Declared progress / verified status | 0% progress field; completion not independently verified. |
| Description / size | Listed; the permit states an occupancy fire NOC is to be obtained before issue of the Occupancy Certificate. |
|---|---|
| Evidence source | RERA amenity record; GHMC permit |
| Declared progress / verified status | 0% progress field; no NOC or completed fire installation is supplied. |
| Description / size | Listed; no system details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed; no area supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0%; completion not independently verified. |
The supplied vendor listing also mentions kids’ play areas, yoga areas and indoor games; these are promoter-marketed/third-party listing claims, not established as sanctioned or delivered facilities in the supplied project record.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting/water conservation, and an electrical meter room/substation/receiving station as available, but shows 0% progress in the corresponding progress fields. It does not specify water source or storage capacity, a sewage-treatment capacity, reuse arrangements, electrical supply or backup capacity.
The GHMC plan requires rainwater harvesting/percolating provision, transformer space and a garbage house. The permit records 6 rainwater-harvesting pits. These are plan provisions; the supplied record does not independently establish installation or operation.
The building-plan documents require plumbing, fire-safety, lift and electrical installations to be executed under qualified technical supervision. The permit requires an occupancy fire NOC before issue of the Occupancy Certificate. No lift count or capacity, fire-system specifications, issued fire NOC, backup-power details, CCTV/security arrangements, or accessibility provisions are established in the supplied project evidence.
8. Location, access & connectivity
The RERA identity record places the project in Himayatnagar, Himayatha Nagar Mandal, Hyderabad District, PIN 500029. The filed plan describes the site as New Nallakunta, Hyderabad; the building-permit extraction identifies Amberpet Mandal and village. The supplied record does not provide a verified approach-road description or public-transport details.
The land record gives roads on the north and south boundaries. The plan extraction lists road widths of 6.00M, 7.62M, 12.0M and 9.00 MT; the building permit also refers to 18 mt. road widths.
The location record provides a measured distance of 1.2 km to Financial District (Nanakramguda). The supplied location data does not establish travel time or public-transit connectivity.
9. Developer & development status
The registered promoter is RUTADHAMACONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAOFR1097A1Z7. The RERA certificate lists its registered-office location as Himayatha Nagar, Hyderabad, PIN 500029. The supplied record names REKA SRINIVAS as an authorized signatory; a project authorization document identifies REKHA SRINIVAS.
The project is recorded as a new project and one building is covered in the supplied plan material. No independently verified construction progress is supplied. The RERA record gives a proposed completion date of 16/08/2027; Form B states 16TH April 2027, and the GHMC permit says construction is to be completed before 16 April, 2027. No occupancy or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for RUTADHAMA-M M RESIDENCY, registration P02500008582; stated validity 01/08/2024–16/04/2027, unless extended.
GHMC building permit: Approval 0685/GHMC/SEC/2024-BP, approved 16 April, 2024; permit file no. 001362/GHMC/0652/SEC1/2024-BP.
Building plan: GHMC plan for a residential building with one cellar, one stilt and five upper floors; identifies Survey No. 573 (old Survey No. 495) in the plan description and records 15 units.
Promoter declaration: Form B declaration by REKHA SRINIVAS for M/s. RUTADHAMA CONSTRUCTIONS, including a completion undertaking of 16TH April 2027.
Encumbrance details: RERA-filed encumbrance statement is available as document 451262.
Other supporting filing: Declaration concerning proposed allotment letter, agreement for sale and conveyance-deed terms is on file.
The supplied approval records include conditions requiring commencement and completion notices and an Occupancy Certificate before occupation. The table above indexes key project records; it is not a statement that every approval condition has been discharged.
Frequently asked questions
Is RUTADHAMA-M M RESIDENCY registered with Telangana RERA?
Yes. RUTADHAMA-M M RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500008582; the registration status is New Project.
Who is the developer of RUTADHAMA-M M RESIDENCY?
The promoter named in the RERA registration is RUTADHAMACONSTRUCTIONS.
Where is RUTADHAMA-M M RESIDENCY located?
RUTADHAMA-M M RESIDENCY is in HIMAYATNAGAR, Himayatha Nagar, Hyderabad, Telangana (500029).
When will RUTADHAMA-M M RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 16/08/2027. This is the promoter's declaration, not a guarantee.