Sai Towers Block C
SAI BUILDERS AND DEVELOPERS · Nizamabad · RERA P03100001686
Sai Towers Block C is a residential apartment project in Manik Bhandar village, Makloor mandal, Nizamabad district. The registered promoter is SAI BUILDERS AND DEVELOPERS. The project covers 697.7 m² and comprises one residential detached building with 1 Stilt + 5 upper floors and 10 3BHK units, each with a filed saleable area of 185.8 m². Its TG-RERA registration number is P03100001686, granted on 18/02/2020, and the promoter-declared completion date is 31/12/2021.
More from Sai Builders And Developers · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Sai Towers Block C RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | Block C; the registration certificate names “Sai Towers Block C.” RERA record |
| TG-RERA registration | P03100001686; granted under section 5, effective 18/02/2020 to 31/12/2021. Registration validity is distinct from the completion deadline. RERA record |
| Registered promoter | SAI BUILDERS AND DEVELOPERS; the project record identifies the organization type as partnership. RERA record Corporate record |
| RERA status | Registration certificate recorded; no extension is recorded in the supplied certificate data. This does not establish current construction or occupancy status. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Manikbhandar / Manik Bhandar; the building permit describes the site locality as Green Park Colony_W2. RERA record |
| Revenue village | Manik Bhandar (also rendered “Manikbhandar” in filed records). RERA record Land records |
| Mandal | MAKLOOR RERA record Land records |
| District | Nizamabad RERA record Land records |
| PIN | 503003 RERA record |
| Project survey numbers | 667/A, 667/AA, 667/E, 668/A, 668/AA and 668/D. Land records |
| Registered site extent | 697.7 m²; the filed land record gives total and net area as 697.70 m². Land records |
| Boundaries | East: 30 Feet Wide road; West: Open Place of M Laxma Reddy and Others; North: Block B of Sai Towers; South: Block D of Sai Towers. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Nizamabad Municipal Corporation Approvals record |
| Principal building approval | Building Permit Order 3072/W2/2019/3728, approved 23 December, 2019. Approvals record |
| Approved built-up area | 1,759.30 m² for residential upper floors, as extracted from the permit. |
| Building count / arrangement | One residential detached building, identified in the permit as Building - A (SAI BUILDERS). |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; 0 cellar; stated building height 14.98 m. The permit also lists “Ground floor: 1 floor” alongside five upper floors and one stilt; it does not provide a clearer separate ground-floor configuration in the supplied extraction. |
| Parking level | Stilt parking; the permit extraction records 323.16 for stilt parking, without a unit or parking-space count in that entry. |
| Unit count | 1 building unit in the RERA land details; 10 total residential units in the RERA unit record. The sanctioned apartment count is not separately established by the supplied permit extraction. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units. RERA unit table |
| Filed saleable area | 185.8 m² per unit. RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Promoter-declared completion date | 31/12/2021 in the project record and Form B declaration. RERA record |
| Revised completion date | Not disclosed in the supplied evidence. RERA record |
| Construction stage | No independently verified construction-stage or site-progress evidence supplied. The project record’s 90% completeness is a record-completeness indicator, not a construction-progress measurement. RERA record |
| Occupancy / completion certificate | Not supplied in the reviewed documents; certificate status for this registered portion is therefore not established by this evidence pack. The building permit requires an occupancy certificate before occupation. Document index |
2. The project story
Sai Towers Block C is registered as a residential apartment project on a 697.7 m² site in Manik Bhandar village, Makloor mandal, Nizamabad district. The registered land description identifies survey numbers 667/A, 667/AA, 667/E, 668/A, 668/AA and 668/D. The site is described as adjoining a 30-foot-wide road to the east, an open place to the west, and Blocks B and D of Sai Towers to the north and south. RERA record Land records RERA filing
The municipal permit describes one detached residential building, Building A, with a stilt and five upper floors. TG-RERA lists ten 3BHK units for the project; its portal-derived booking figures show zero booked and ten available, but the record does not state when those counts were captured. These are filing/portal-record figures, not a current sales confirmation. RERA unit table
The promoter declared a completion deadline of 31/12/2021. No verified construction-progress report, site inspection, completion certificate or occupancy certificate is included here, so the evidence does not establish whether the building is under construction, complete, or fit for occupation. Document index
3. Master plan, architecture & building design
The supplied building permit identifies a single detached residential building on a 697.7 m² site, with 1,759.30 m² recorded for residential upper floors and 323.16 recorded for stilt parking. The extracted permit states 1 Stilt + 5 upper floors, a height of 14.98 m, and no cellar. It does not establish a separate podium, the floor-by-floor unit arrangement, building footprint, number of flats per floor, lifts, stairs, or detailed circulation.
The permit lists setback entries of Front 4.15 m, Front 3.5 m, Rear 3.5 m and Side I 3.5 m; it does not clarify the two front entries in the supplied extraction. It also includes conditions concerning a tot-lot, peripheral greenery, rainwater harvesting, transformer space, a garbage house and stilt parking. The supplied evidence does not give dimensions or a drawing-based area breakdown for these features.
The 185.8 m² per-unit figure is the TG-RERA-filed saleable area. It is distinct from the 1,759.30 m² approved upper-floor area and from software-measured carpet-area estimates; no FSI-counted area is supplied. RERA unit table Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 185.8 m² | Median 130.5 m²; measured range 118.1–143.7 m² | 30% |
The unit count, booking figures and saleable area are TG-RERA record values; the booking data has no stated as-of date. Carpet-area figures and loading are software measurements from the submitted floor-plan drawings, not RERA-filed measurements, and the drawing-based measurement is flagged as needing review. The median carpet figure is not a measurement for every individual unit. RERA unit table RERA unit details Floor plans
The measured typical-floor drawing for flat “02” labels a master bedroom, bedroom, guest room, hall, kitchen, three toilets, puja area and balcony. The supplied room measurements include a hall of 8.46 m × 9.64 m, master bedroom of 4.0 m × 4.07 m, bedroom of 3.94 m × 4.07 m, guest room of 3.0 m × 3.94 m, and kitchen of 2.37 m × 2.73 m. These are software-read dimensions from the drawing, not RERA disclosures; verify them against the original drawing. RERA unit details
Carpet area refers to usable area within the apartment, while the filed saleable area is a different area measure that may include a share of common areas. The supplied floor-plan note says the software-measured carpet area is smaller than the filed saleable area; no separate balcony-area figure is supplied. Floor plans RERA unit table
5. Parking & vehicle circulation
The sanctioned permit describes stilt parking and records 323.16 for that area, but the extracted entry does not identify its measurement unit or provide a sanctioned count of car or two-wheeler spaces. A vendor-supplied listing mentions “Open Parking”; that is a third-party/vendor claim, not evidence of an approved count or delivered provision. Promoter website
The building permit states that the stilt approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The supplied evidence does not establish visitor or accessible parking, parking allocation to particular apartments, a separate parking level, ramps or driveway details, pedestrian separation, EV charging, or exclusive ownership rights in any drawn bay.
6. Amenities, recreation & open spaces
| Description / size | Size not supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Listed as available; reported progress is 0%. Completion is not independently verified. RERA amenities |
| Description / size | Size/capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed in the record; no delivery or operating status independently verified. RERA amenities |
| Description / size | System/capacity not specified |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Sewerage and storm-water drains are listed; stated progress is 0%. STP or septic-tank details are not established. RERA amenities |
| Description / size | Area and facilities not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed in the record; the permit requires a fenced tot-lot maintained as greenery before occupancy certification. Completion is not verified. RERA amenities |
| Description / size | Quantity/specification not supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Listed; stated progress is 0%. RERA amenities |
| Description / size | Facilities/capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; stated progress is 0%. The permit also requires a garbage house within the premises. Completion is not verified. RERA amenities |
| Description / size | Percolation pit required; size not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; the permit requires a rainwater-harvesting structure. Completion is not verified. RERA amenities |
| Description / size | Details and capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; the permit requires space for a transformer. Completion is not verified. RERA amenities |
| Description / size | Quantity and area not supplied |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-listed only; not independently verified or established as a sanctioned count. Promoter website |
The supplied amenity record contains 14 categories; some are listed without an “available” value, and all progress percentages shown are 0%. Clubhouse, indoor recreation, sports facilities and community-building details are not established by the supplied evidence. RERA amenities
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, solid-waste management and an electrical meter room/substation/receiving station. The building permit separately requires a rainwater-harvesting percolation pit, transformer space and a garbage house. These are filed or sanctioned provisions; the evidence does not establish their construction, capacity, operation or maintenance. RERA amenities
The permit states that public water and electricity connections will be provided only on production of an occupancy certificate. It also requires an occupancy certificate before occupation and refers to fire-safety installations under the National Building Code of India, 2005, with services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied records do not specify water source or storage, STP capacity, backup power, lift count or capacity, fire-system design, escape-stair configuration, CCTV, access controls, or accessibility features.
8. Location, access & connectivity
The registered project location is Manikbhandar, Manik Bhandar village, Makloor mandal, Nizamabad district, Telangana 503003. The municipal permit describes the site locality as Green Park Colony_W2. The filed boundaries identify a 30 Feet Wide road on the east, an open place on the west, and Sai Towers Blocks B and D to the north and south. RERA record Land records
The location dataset gives an approximate sampled distance of 126.1 km to the nearest sampled Outer Ring Road interchange. This is a dataset distance, not a stated travel time; no other measured approach-road or public-transport distances are supplied. Location record
9. Developer & development status
The registered promoter is SAI BUILDERS AND DEVELOPERS, identified in the project record as a partnership. Its listed address is Venkatasai Residency, Kanteshwar, Manikbhandar, Makloor, Nizamabad, 503003. Thirupathi Reddy is listed as authorized signatory; the supplied record also names partners, but provides no corporate registration number, official contact details or official website. Corporate record Parties record
In Form B, M. Thirupathi Reddy, identified as managing partner, declared that the promoter had legal title to the land, that it was free from encumbrances, and that the project would be completed by 31.12.2021. These are promoter declarations in the filed affidavit, not independent verification of title, encumbrances or completion.
The supplied project record does not establish current construction progress, a revised completion schedule, or an occupancy certificate for Block C. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P03100001686; issued 18/02/2020 |
|---|---|
| What the supplied record establishes | Form C names Sai Towers Block C, records validity through 31/12/2021, and includes a separate-account condition. |
| Identifier / date | 3072/W2/2019/3728; 23 December, 2019 |
|---|---|
| What the supplied record establishes | Nizamabad Municipal Corporation permit for one detached residential building, 1 Stilt + 5 upper floors, on the project survey numbers. |
| Identifier / date | Filed by M. Thirupathi Reddy |
|---|---|
| What the supplied record establishes | Includes promoter declarations on title, encumbrances, completion by 31.12.2021, and project-fund arrangements. |
| Identifier / date | RERA document 91063, titled “Letter of layout approval or Layout plan…” |
|---|---|
| What the supplied record establishes | The supplied extract is not available; drawing-derived unit measurements are separately identified as software measurements from this document. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | Certificate status is not established in the reviewed evidence. The building permit makes occupancy certification a condition before occupation. Document index |
1. Project at a glance
Project identity
Registered project name: Sai Towers Block C
Project type: Residential apartment project
Phase / registered portion: Block C; the registration certificate names “Sai Towers Block C.”
TG-RERA registration: P03100001686; granted under section 5, effective 18/02/2020 to 31/12/2021. Registration validity is distinct from the completion deadline.
Registered promoter: SAI BUILDERS AND DEVELOPERS; the project record identifies the organization type as partnership.
RERA status: Registration certificate recorded; no extension is recorded in the supplied certificate data. This does not establish current construction or occupancy status.
Land and geographic identity
Locality: Manikbhandar / Manik Bhandar; the building permit describes the site locality as Green Park Colony_W2.
Revenue village: Manik Bhandar (also rendered “Manikbhandar” in filed records).
Mandal: MAKLOOR
District: Nizamabad
PIN: 503003
Project survey numbers: 667/A, 667/AA, 667/E, 668/A, 668/AA and 668/D.
Registered site extent: 697.7 m²; the filed land record gives total and net area as 697.70 m².
Boundaries: East: 30 Feet Wide road; West: Open Place of M Laxma Reddy and Others; North: Block B of Sai Towers; South: Block D of Sai Towers.
Development identity
Sanctioning authority: Nizamabad Municipal Corporation
Principal building approval: Building Permit Order 3072/W2/2019/3728, approved 23 December, 2019.
Approved built-up area: 1,759.30 m² for residential upper floors, as extracted from the permit.
Building count / arrangement: One residential detached building, identified in the permit as Building - A (SAI BUILDERS).
Sanctioned floor configuration: 1 Stilt + 5 upper floors; 0 cellar; stated building height 14.98 m. The permit also lists “Ground floor: 1 floor” alongside five upper floors and one stilt; it does not provide a clearer separate ground-floor configuration in the supplied extraction.
Parking level: Stilt parking; the permit extraction records 323.16 for stilt parking, without a unit or parking-space count in that entry.
Unit count: 1 building unit in the RERA land details; 10 total residential units in the RERA unit record. The sanctioned apartment count is not separately established by the supplied permit extraction.
Offering and status
RERA-filed configuration: 3BHK; 10 units.
Filed saleable area: 185.8 m² per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Promoter-declared completion date: 31/12/2021 in the project record and Form B declaration.
Revised completion date: Not disclosed in the supplied evidence.
Construction stage: No independently verified construction-stage or site-progress evidence supplied. The project record’s 90% completeness is a record-completeness indicator, not a construction-progress measurement.
Occupancy / completion certificate: Not supplied in the reviewed documents; certificate status for this registered portion is therefore not established by this evidence pack. The building permit requires an occupancy certificate before occupation.
2. The project story
Sai Towers Block C is registered as a residential apartment project on a 697.7 m² site in Manik Bhandar village, Makloor mandal, Nizamabad district. The registered land description identifies survey numbers 667/A, 667/AA, 667/E, 668/A, 668/AA and 668/D. The site is described as adjoining a 30-foot-wide road to the east, an open place to the west, and Blocks B and D of Sai Towers to the north and south.
The municipal permit describes one detached residential building, Building A, with a stilt and five upper floors. TG-RERA lists ten 3BHK units for the project; its portal-derived booking figures show zero booked and ten available, but the record does not state when those counts were captured. These are filing/portal-record figures, not a current sales confirmation.
The promoter declared a completion deadline of 31/12/2021. No verified construction-progress report, site inspection, completion certificate or occupancy certificate is included here, so the evidence does not establish whether the building is under construction, complete, or fit for occupation.
3. Master plan, architecture & building design
The supplied building permit identifies a single detached residential building on a 697.7 m² site, with 1,759.30 m² recorded for residential upper floors and 323.16 recorded for stilt parking. The extracted permit states 1 Stilt + 5 upper floors, a height of 14.98 m, and no cellar. It does not establish a separate podium, the floor-by-floor unit arrangement, building footprint, number of flats per floor, lifts, stairs, or detailed circulation.
The permit lists setback entries of Front 4.15 m, Front 3.5 m, Rear 3.5 m and Side I 3.5 m; it does not clarify the two front entries in the supplied extraction. It also includes conditions concerning a tot-lot, peripheral greenery, rainwater harvesting, transformer space, a garbage house and stilt parking. The supplied evidence does not give dimensions or a drawing-based area breakdown for these features.
The 185.8 m² per-unit figure is the TG-RERA-filed saleable area. It is distinct from the 1,759.30 m² approved upper-floor area and from software-measured carpet-area estimates; no FSI-counted area is supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 185.8 m² | Median 130.5 m²; measured range 118.1–143.7 m² | 30% |
The unit count, booking figures and saleable area are TG-RERA record values; the booking data has no stated as-of date. Carpet-area figures and loading are software measurements from the submitted floor-plan drawings, not RERA-filed measurements, and the drawing-based measurement is flagged as needing review. The median carpet figure is not a measurement for every individual unit.
The measured typical-floor drawing for flat “02” labels a master bedroom, bedroom, guest room, hall, kitchen, three toilets, puja area and balcony. The supplied room measurements include a hall of 8.46 m × 9.64 m, master bedroom of 4.0 m × 4.07 m, bedroom of 3.94 m × 4.07 m, guest room of 3.0 m × 3.94 m, and kitchen of 2.37 m × 2.73 m. These are software-read dimensions from the drawing, not RERA disclosures; verify them against the original drawing.
Carpet area refers to usable area within the apartment, while the filed saleable area is a different area measure that may include a share of common areas. The supplied floor-plan note says the software-measured carpet area is smaller than the filed saleable area; no separate balcony-area figure is supplied.
5. Parking & vehicle circulation
The sanctioned permit describes stilt parking and records 323.16 for that area, but the extracted entry does not identify its measurement unit or provide a sanctioned count of car or two-wheeler spaces. A vendor-supplied listing mentions “Open Parking”; that is a third-party/vendor claim, not evidence of an approved count or delivered provision.
The building permit states that the stilt approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The supplied evidence does not establish visitor or accessible parking, parking allocation to particular apartments, a separate parking level, ramps or driveway details, pedestrian separation, EV charging, or exclusive ownership rights in any drawn bay.
6. Amenities, recreation & open spaces
| Description / size | Size not supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Listed as available; reported progress is 0%. Completion is not independently verified. |
| Description / size | Size/capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed in the record; no delivery or operating status independently verified. |
| Description / size | System/capacity not specified |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Sewerage and storm-water drains are listed; stated progress is 0%. STP or septic-tank details are not established. |
| Description / size | Area and facilities not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed in the record; the permit requires a fenced tot-lot maintained as greenery before occupancy certification. Completion is not verified. |
| Description / size | Quantity/specification not supplied |
|---|---|
| Evidence source | TG-RERA amenities record |
| Declared progress / verified status | Listed; stated progress is 0%. |
| Description / size | Facilities/capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; stated progress is 0%. The permit also requires a garbage house within the premises. Completion is not verified. |
| Description / size | Percolation pit required; size not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; the permit requires a rainwater-harvesting structure. Completion is not verified. |
| Description / size | Details and capacity not supplied |
|---|---|
| Evidence source | TG-RERA amenities record and building permit |
| Declared progress / verified status | Listed; the permit requires space for a transformer. Completion is not verified. |
| Description / size | Quantity and area not supplied |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-listed only; not independently verified or established as a sanctioned count. |
The supplied amenity record contains 14 categories; some are listed without an “available” value, and all progress percentages shown are 0%. Clubhouse, indoor recreation, sports facilities and community-building details are not established by the supplied evidence.
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, solid-waste management and an electrical meter room/substation/receiving station. The building permit separately requires a rainwater-harvesting percolation pit, transformer space and a garbage house. These are filed or sanctioned provisions; the evidence does not establish their construction, capacity, operation or maintenance.
The permit states that public water and electricity connections will be provided only on production of an occupancy certificate. It also requires an occupancy certificate before occupation and refers to fire-safety installations under the National Building Code of India, 2005, with services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied records do not specify water source or storage, STP capacity, backup power, lift count or capacity, fire-system design, escape-stair configuration, CCTV, access controls, or accessibility features.
8. Location, access & connectivity
The registered project location is Manikbhandar, Manik Bhandar village, Makloor mandal, Nizamabad district, Telangana 503003. The municipal permit describes the site locality as Green Park Colony_W2. The filed boundaries identify a 30 Feet Wide road on the east, an open place on the west, and Sai Towers Blocks B and D to the north and south.
The location dataset gives an approximate sampled distance of 126.1 km to the nearest sampled Outer Ring Road interchange. This is a dataset distance, not a stated travel time; no other measured approach-road or public-transport distances are supplied.
9. Developer & development status
The registered promoter is SAI BUILDERS AND DEVELOPERS, identified in the project record as a partnership. Its listed address is Venkatasai Residency, Kanteshwar, Manikbhandar, Makloor, Nizamabad, 503003. Thirupathi Reddy is listed as authorized signatory; the supplied record also names partners, but provides no corporate registration number, official contact details or official website.
In Form B, M. Thirupathi Reddy, identified as managing partner, declared that the promoter had legal title to the land, that it was free from encumbrances, and that the project would be completed by 31.12.2021. These are promoter declarations in the filed affidavit, not independent verification of title, encumbrances or completion.
The supplied project record does not establish current construction progress, a revised completion schedule, or an occupancy certificate for Block C.
10. Approvals, official records & documents
| Identifier / date | P03100001686; issued 18/02/2020 |
|---|---|
| What the supplied record establishes | Form C names Sai Towers Block C, records validity through 31/12/2021, and includes a separate-account condition. |
| Identifier / date | 3072/W2/2019/3728; 23 December, 2019 |
|---|---|
| What the supplied record establishes | Nizamabad Municipal Corporation permit for one detached residential building, 1 Stilt + 5 upper floors, on the project survey numbers. |
| Identifier / date | Filed by M. Thirupathi Reddy |
|---|---|
| What the supplied record establishes | Includes promoter declarations on title, encumbrances, completion by 31.12.2021, and project-fund arrangements. |
| Identifier / date | RERA document 91063, titled “Letter of layout approval or Layout plan…” |
|---|---|
| What the supplied record establishes | The supplied extract is not available; drawing-derived unit measurements are separately identified as software measurements from this document. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | Certificate status is not established in the reviewed evidence. The building permit makes occupancy certification a condition before occupation. |
Other registrations of Sai Towers
Frequently asked questions
Is Sai Towers Block C registered with Telangana RERA?
Yes. Sai Towers Block C is registered with the Telangana Real Estate Regulatory Authority as P03100001686; the registration status is New Project.
Who is the developer of Sai Towers Block C?
The promoter named in the RERA registration is SAI BUILDERS AND DEVELOPERS.
Where is Sai Towers Block C located?
Sai Towers Block C is in manikbhandar, Manik Bhandar, MAKLOOR, Nizamabad, Telangana (503003).
When will Sai Towers Block C be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2021. This is the promoter's declaration, not a guarantee.