Kshetra
RIDGE HOMES LLP · Sangareddy · RERA P01100009098
KSHETRA is a plotted development in Terpole, Kondapur Mandal, Sangareddy District, developed by registered promoter RIDGE HOMES LLP. The TG-RERA registration record lists a land area of 123226.77 sq. m; the layout approval record identifies 131 plots, with no apartment towers, floors or plot configurations specified. Its TG-RERA registration number is P01100009098, and the promoter’s Form-B declaration gives a completion undertaking of 13th August 2026.
More from Ridge Homes LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | KSHETRA RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration describes the project on Survey Nos. 224/P and 225/P |
| TG-RERA registration | P01100009098 |
| Registration validity | 13/08/2024 to 13/08/2026, a stated two-year validity; this is the registration period, not a completion certificate |
| Registered promoter | RIDGE HOMES LLP Corporate record |
| RERA status in supplied record | The registration certificate is on file. The registration period shown ended on 13/08/2026; no extension order is included in the supplied evidence. A later architect’s certificate states completion, as described below. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Terpole; the approval records also identify Terpole Gram Panchayat |
| Mandal | Kondapur |
| District | Sangareddy |
| PIN | 502001 RERA record |
| Project survey numbers | 224/P and 225/P |
| Registered site extent | The RERA registration record lists 123226.77 sq. m total and net area. The filed draft-layout approval states Ac. 30-18 Guntas; 147378.00 Sq. Yds. Land records |
| Boundaries | North: “EXISITING 40 WIDE ROAD”; South, East and West: “OTHER LAND” Land records |
| Cadastral location reference | Survey 224/P centroid: 17.518084082826977, 78.0135097414668; this is a survey-level cadastral reference, not a boundary survey of the whole registered site Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Principal final layout approval | HMDA Final Layout Permit 2466/HMDA/SWFL/2026, dated 27/08/2026 |
| Earlier layout approval record | DTCP draft layout Draft - TLP.No.135/2024/H, dated 13-08-2024; subsequent proceedings TLP.NO. 135/2024/H, dated 05.11.2024, released the draft pattern subject to conditions |
| Approved built-up area | Not disclosed in the supplied plotted-layout records; building floor plans or a built-up-area schedule are not supplied Approvals record Document index |
| Development scale | 131 plots in the layout record; no apartment towers or building-floor configuration is specified |
| Sanctioned land-use figures | HMDA final-layout record: total net layout 122743.53; plotted area 85314.7; road area 24257.34; open space 12213.02; buffer area 958.07. Figures are as recorded in the filed final layout letter. |
| Parking provision | The HMDA final-layout record lists common parking area as 0.0; no individual plot parking schedule is supplied |
Offering and status
| Item | Project record |
|---|---|
| RERA-recorded offering | Plots; RERA record identifies the project as a plotted development RERA record RERA filing |
| Plot count | 131 plots in the layout approval record |
| Plot-size schedule | Not disclosed in the supplied TG-RERA project and layout extracts Document index |
| Booked / available plots | Counts not supplied in the evidence reviewed RERA filing Document index |
| Construction / development status | TG-RERA amenity data reports progress percentages for selected layout infrastructure items; these are reported progress figures, not independent site verification. An architect’s Form-1A dated 27-08-2026 states the project is completed in all aspects. RERA amenities |
| Completion date | Form-B declaration undertakes completion by 13th August 2026. This is distinct from registration validity. |
| Completion / occupancy record | A final HMDA layout letter is dated 27/08/2026, and the architect’s Form-1A states completion. No separate building occupancy certificate is included; the project is a plotted layout. |
2. The project story
KSHETRA is registered with TG-RERA as a plotted development on Survey Nos. 224/P and 225/P in Terpole, Kondapur Mandal, Sangareddy District. The filed layout records describe a 131-plot development, rather than an apartment or tower project. The registration identifies the project land as 123226.77 sq. m; the layout approval documents also state their respective layout extents and land-use schedules. Land records
The approval record proceeds from a DTCP draft technical layout pattern dated 13-08-2024, through proceedings dated 05.11.2024, to an HMDA final layout permit dated 27/08/2026. The final-layout letter records 131 plots and states that roads, open spaces, social infrastructure and utilities were taken over by the local authority under the cited gift deed; it also records a later relinquishment deed concerning mortgaged plots.
The promoter’s Form-B declaration gives a completion undertaking of 13 August 2026. A later architect’s Form-1A, dated 27-08-2026, states that the project is completed in all aspects. These are, respectively, a promoter declaration and an architect’s certification; the supplied material does not independently verify physical site conditions.
3. Master plan, architecture & building design
The project is a plotted layout. The supplied final-layout record identifies 131 plots and allocates the net layout as follows: plotted area 85314.7, roads 24257.34, open space 12213.02, and buffer area 958.07 (figures as stated in the document; no unit is attached to these individual entries in the extracted schedule). It also lists social infrastructure, common parking, utilities, amenities and green belt at 0.
The earlier DTCP draft-layout record gives a separate land-use schedule: layout area Ac. 30.45 Cents; 147378.00 Sq. Yds.; net layout area Ac. 30.0875 Cents; 145623.50 Sq. Yds.; open space Ac. 3.01 Cents; 14568.40 Sq. Yds. (10.00%); roads Ac. 6.006 Cents; 29069.04 Sq. Yds. (19.96%); plotted area Ac. 21.072 Cents; 101988.48 Sq. Yds. (70.04%); and mortgage area Ac. 3.307 Cents; 16005.88 Sq. Yds. (15.69%).
The supplied records do not provide a plot-by-plot schedule, building footprints, floor plans, building heights, or apartment-style circulation and floor configuration. The HMDA final-layout letter states that each plot is for construction of a residential dwelling house and restricts other uses as described in the document.
4. Homes, configurations & floor plans
The RERA-filed offering is plots in a 131-plot layout. No TG-RERA plot-wise inventory, plot-size schedule, booked/available count, or RERA saleable-area schedule is supplied, so a configuration table with those values cannot be completed from the evidence reviewed. Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 131 in the layout record | Not supplied | Not supplied | Not supplied | Not applicable to plots | Not supplied |
The floor-plan dataset contains two drawings, but both are scans pending measurement; no software-measured carpet or room measurements are available. Floor plans
5. Parking & vehicle circulation
The HMDA final-layout record lists common parking area as 0.0. The earlier draft-layout approval schedules road area and requires roads to remain open for accessibility to neighbouring sites; it does not provide a vehicle-space count or plot-specific parking allocation. No visitor, accessible, mechanical, or EV parking provision is established by the supplied records.
6. Amenities, recreation & open spaces
The project’s TG-RERA amenity record identifies layout infrastructure items and their reported progress. These percentages are filed progress data; they are not independent confirmation that facilities are complete. The approval documents also specify development works and open-space obligations. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Layout circulation | TG-RERA amenity record | 25% reported; not independently verified RERA amenities |
| Green strip / tot lot / park | Open-space/green area item; no facility size supplied in this record | TG-RERA amenity record | 0% reported RERA amenities |
| Aggregate recreational open space | No separate size stated in the amenity record | TG-RERA amenity record | 0% reported RERA amenities |
| Community buildings | No building details or size supplied | TG-RERA amenity record | 0% reported RERA amenities |
| Open space | HMDA final-layout record states 12213.02; earlier draft-layout record states Ac. 3.01 Cents; 14568.40 Sq. Yds. (10.00%) | Final layout and draft layout | Final-layout record says open spaces were taken over by the Local Authority under the cited gift deed; no independent site inspection is supplied |
No TG-RERA evidence in the supplied material establishes a clubhouse, gym, pool, sports courts or other indoor recreation facility as an approved or delivered project amenity.
7. Utilities, building services & safety
The final-layout letter lists water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures as civic amenities for the layout, and states that roads, open spaces, social infrastructure and utilities were taken over by the local authority under the cited gift deed. It does not give capacities or independently verify operational performance.
| Evidence in the record | TG-RERA amenity item “Water Supply”; final-layout letter also lists water supply RERA amenities |
|---|---|
| Reported progress / status | 30% reported in TG-RERA amenity data; not independently verified RERA amenities |
| Evidence in the record | TG-RERA records “Sewerage (Chamber, Lines, Septic Tank, STP)” and “Treatment And Disposal Of Sewage And Sullage Water”; final-layout letter lists sewerage and drainage disposal systems RERA amenities |
|---|---|
| Reported progress / status | 0% reported for each relevant TG-RERA amenity item; no capacity or operational verification supplied RERA amenities |
| Evidence in the record | TG-RERA amenity item “Storm Water Drains” RERA amenities |
|---|---|
| Reported progress / status | 15% reported; not independently verified RERA amenities |
| Evidence in the record | TG-RERA amenity item “Water Conservation, Rain water Harvesting”; approval record also lists rainwater-harvesting pits/structures RERA amenities |
|---|---|
| Reported progress / status | 10% reported in TG-RERA amenity data; not independently verified RERA amenities |
| Evidence in the record | Draft approval requires street lighting and electricity facilities; TG-RERA lists an electrical meter room/sub-station/receiving station RERA amenities |
|---|---|
| Reported progress / status | Electrical item 15% reported; street lighting 0% reported RERA amenities |
| Evidence in the record | TG-RERA lists solid-waste management and disposal RERA amenities |
|---|---|
| Reported progress / status | 0% reported RERA amenities |
| Evidence in the record | TG-RERA lists fire protection and fire-safety requirements RERA amenities |
|---|---|
| Reported progress / status | 0% reported; no system details or compliance certification supplied RERA amenities |
| Evidence in the record | Draft approval requires roads to be open for accessibility to neighbouring sites; no accessible-route details supplied |
|---|---|
| Reported progress / status | No independent verification supplied |
8. Location, access & connectivity
The registered revenue location is Terpole, Kondapur Mandal, Sangareddy District, Telangana, PIN 502001, on Survey Nos. 224/P and 225/P. The filed land record describes the north boundary as “EXISITING 40 WIDE ROAD”; the other three boundaries are recorded as “OTHER LAND.” Land records
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 26.2 km. This is the only measured connectivity distance supplied for this section; the evidence does not provide public-transport details or verified travel times. Location record
9. Developer & development status
The registered legal promoter is RIDGE HOMES LLP, an LLP. Its supplied corporate identifier is GSTIN 36AAZFR9237R1ZR. The project registration certificate names the promoter, and the project Form-B declaration is signed by Sri. P. Sri Rama Raju as authorized signatory for “M/s. RIDGE HOMES LLP AND OTHERS.” Corporate record
The supplied project records give the promoter’s address as Flat No. 301, Ayyappa Towers, 6th Phase, Terpole, Kondapur, Sangareddy, PIN 502001. An official project contact or telephone number is not provided. RERA record Parties record
The Form-B completion undertaking states 13th August 2026. The architect’s Form-1A, dated 27-08-2026, states completion in all aspects. The certificate identifies architect SYED ZAMEER HASAN (COA Registration No. CA/2013/61075) and consultant engineer RAVITEJA CH (License No. AM317397).
10. Approvals, official records & documents
| Identifier / date | P01100009098; valid 13/08/2024–13/08/2026 |
|---|---|
| What the supplied document records | Form C registration for KSHETRA, naming RIDGE HOMES LLP and stating the project location and survey numbers |
| Identifier / date | Draft - TLP.No.135/2024/H; 13-08-2024; file Lr.Roc.No.16098/99/2024/e-Panchayat |
|---|---|
| What the supplied document records | Draft layout pattern for 131 plots on Survey Nos. 224/P and 225/P, with land-use schedule and conditions |
| Identifier / date | TLP.NO. 135/2024/H; 05.11.2024 |
|---|---|
| What the supplied document records | Proceedings releasing the draft technical layout pattern, subject to stated conditions |
| Identifier / date | 6233/2024; 11/09/2024 |
|---|---|
| What the supplied document records | Final-layout letter states roads, open spaces, social infrastructure and utilities were taken over by the local authority under this deed |
| Identifier / date | 5332/2026; 25/08/2026 |
|---|---|
| What the supplied document records | Final-layout letter records relinquishment concerning plots measuring 13382.84 Sq.mtrs in favour of the Metropolitan Commissioner, HMDA |
| Identifier / date | 2466/HMDA/SWFL/2026; 27/08/2026 |
|---|---|
| What the supplied document records | Final layout letter for the 131-plot layout at Terpole |
| Identifier / date | 27-08-2026 |
|---|---|
| What the supplied document records | Architect states the project is completed in all aspects and identifies final layout certificate 2466/HMDA/SWFL/2026 |
| Identifier / date | October 2024 |
|---|---|
| What the supplied document records | Promoter declaration includes the completion undertaking and project-account declarations |
The supplied file includes the above registration, layout-approval and completion-related records. No building-wise commencement certificate, plot-wise inventory schedule, plot-size schedule or separate building occupancy certificate is supplied.
1. Project at a glance
Project identity
Registered project name: KSHETRA
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; registration describes the project on Survey Nos. 224/P and 225/P
TG-RERA registration: P01100009098
Registration validity: 13/08/2024 to 13/08/2026, a stated two-year validity; this is the registration period, not a completion certificate
Registered promoter: RIDGE HOMES LLP
RERA status in supplied record: The registration certificate is on file. The registration period shown ended on 13/08/2026; no extension order is included in the supplied evidence. A later architect’s certificate states completion, as described below.
Land and geographic identity
Locality / revenue village: Terpole; the approval records also identify Terpole Gram Panchayat
Mandal: Kondapur
District: Sangareddy
PIN: 502001
Project survey numbers: 224/P and 225/P
Registered site extent: The RERA registration record lists 123226.77 sq. m total and net area. The filed draft-layout approval states Ac. 30-18 Guntas; 147378.00 Sq. Yds.
Boundaries: North: “EXISITING 40 WIDE ROAD”; South, East and West: “OTHER LAND”
Cadastral location reference: Survey 224/P centroid: 17.518084082826977, 78.0135097414668; this is a survey-level cadastral reference, not a boundary survey of the whole registered site
Development identity
Principal final layout approval: HMDA Final Layout Permit 2466/HMDA/SWFL/2026, dated 27/08/2026
Earlier layout approval record: DTCP draft layout Draft - TLP.No.135/2024/H, dated 13-08-2024; subsequent proceedings TLP.NO. 135/2024/H, dated 05.11.2024, released the draft pattern subject to conditions
Approved built-up area: Not disclosed in the supplied plotted-layout records; building floor plans or a built-up-area schedule are not supplied
Development scale: 131 plots in the layout record; no apartment towers or building-floor configuration is specified
Sanctioned land-use figures: HMDA final-layout record: total net layout 122743.53; plotted area 85314.7; road area 24257.34; open space 12213.02; buffer area 958.07. Figures are as recorded in the filed final layout letter.
Parking provision: The HMDA final-layout record lists common parking area as 0.0; no individual plot parking schedule is supplied
Offering and status
RERA-recorded offering: Plots; RERA record identifies the project as a plotted development
Plot count: 131 plots in the layout approval record
Plot-size schedule: Not disclosed in the supplied TG-RERA project and layout extracts
Booked / available plots: Counts not supplied in the evidence reviewed
Construction / development status: TG-RERA amenity data reports progress percentages for selected layout infrastructure items; these are reported progress figures, not independent site verification. An architect’s Form-1A dated 27-08-2026 states the project is completed in all aspects.
Completion date: Form-B declaration undertakes completion by 13th August 2026. This is distinct from registration validity.
Completion / occupancy record: A final HMDA layout letter is dated 27/08/2026, and the architect’s Form-1A states completion. No separate building occupancy certificate is included; the project is a plotted layout.
2. The project story
KSHETRA is registered with TG-RERA as a plotted development on Survey Nos. 224/P and 225/P in Terpole, Kondapur Mandal, Sangareddy District. The filed layout records describe a 131-plot development, rather than an apartment or tower project. The registration identifies the project land as 123226.77 sq. m; the layout approval documents also state their respective layout extents and land-use schedules.
The approval record proceeds from a DTCP draft technical layout pattern dated 13-08-2024, through proceedings dated 05.11.2024, to an HMDA final layout permit dated 27/08/2026. The final-layout letter records 131 plots and states that roads, open spaces, social infrastructure and utilities were taken over by the local authority under the cited gift deed; it also records a later relinquishment deed concerning mortgaged plots.
The promoter’s Form-B declaration gives a completion undertaking of 13 August 2026. A later architect’s Form-1A, dated 27-08-2026, states that the project is completed in all aspects. These are, respectively, a promoter declaration and an architect’s certification; the supplied material does not independently verify physical site conditions.
3. Master plan, architecture & building design
The project is a plotted layout. The supplied final-layout record identifies 131 plots and allocates the net layout as follows: plotted area 85314.7, roads 24257.34, open space 12213.02, and buffer area 958.07 (figures as stated in the document; no unit is attached to these individual entries in the extracted schedule). It also lists social infrastructure, common parking, utilities, amenities and green belt at 0.
The earlier DTCP draft-layout record gives a separate land-use schedule: layout area Ac. 30.45 Cents; 147378.00 Sq. Yds.; net layout area Ac. 30.0875 Cents; 145623.50 Sq. Yds.; open space Ac. 3.01 Cents; 14568.40 Sq. Yds. (10.00%); roads Ac. 6.006 Cents; 29069.04 Sq. Yds. (19.96%); plotted area Ac. 21.072 Cents; 101988.48 Sq. Yds. (70.04%); and mortgage area Ac. 3.307 Cents; 16005.88 Sq. Yds. (15.69%).
The supplied records do not provide a plot-by-plot schedule, building footprints, floor plans, building heights, or apartment-style circulation and floor configuration. The HMDA final-layout letter states that each plot is for construction of a residential dwelling house and restricts other uses as described in the document.
4. Homes, configurations & floor plans
The RERA-filed offering is plots in a 131-plot layout. No TG-RERA plot-wise inventory, plot-size schedule, booked/available count, or RERA saleable-area schedule is supplied, so a configuration table with those values cannot be completed from the evidence reviewed.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 131 in the layout record | Not supplied | Not supplied | Not supplied | Not applicable to plots | Not supplied |
The floor-plan dataset contains two drawings, but both are scans pending measurement; no software-measured carpet or room measurements are available.
5. Parking & vehicle circulation
The HMDA final-layout record lists common parking area as 0.0. The earlier draft-layout approval schedules road area and requires roads to remain open for accessibility to neighbouring sites; it does not provide a vehicle-space count or plot-specific parking allocation. No visitor, accessible, mechanical, or EV parking provision is established by the supplied records.
6. Amenities, recreation & open spaces
The project’s TG-RERA amenity record identifies layout infrastructure items and their reported progress. These percentages are filed progress data; they are not independent confirmation that facilities are complete. The approval documents also specify development works and open-space obligations.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Layout circulation | TG-RERA amenity record | 25% reported; not independently verified |
| Green strip / tot lot / park | Open-space/green area item; no facility size supplied in this record | TG-RERA amenity record | 0% reported |
| Aggregate recreational open space | No separate size stated in the amenity record | TG-RERA amenity record | 0% reported |
| Community buildings | No building details or size supplied | TG-RERA amenity record | 0% reported |
| Open space | HMDA final-layout record states 12213.02; earlier draft-layout record states Ac. 3.01 Cents; 14568.40 Sq. Yds. (10.00%) | Final layout and draft layout | Final-layout record says open spaces were taken over by the Local Authority under the cited gift deed; no independent site inspection is supplied |
No TG-RERA evidence in the supplied material establishes a clubhouse, gym, pool, sports courts or other indoor recreation facility as an approved or delivered project amenity.
7. Utilities, building services & safety
The final-layout letter lists water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures as civic amenities for the layout, and states that roads, open spaces, social infrastructure and utilities were taken over by the local authority under the cited gift deed. It does not give capacities or independently verify operational performance.
| Evidence in the record | TG-RERA amenity item “Water Supply”; final-layout letter also lists water supply |
|---|---|
| Reported progress / status | 30% reported in TG-RERA amenity data; not independently verified |
| Evidence in the record | TG-RERA records “Sewerage (Chamber, Lines, Septic Tank, STP)” and “Treatment And Disposal Of Sewage And Sullage Water”; final-layout letter lists sewerage and drainage disposal systems |
|---|---|
| Reported progress / status | 0% reported for each relevant TG-RERA amenity item; no capacity or operational verification supplied |
| Evidence in the record | TG-RERA amenity item “Storm Water Drains” |
|---|---|
| Reported progress / status | 15% reported; not independently verified |
| Evidence in the record | TG-RERA amenity item “Water Conservation, Rain water Harvesting”; approval record also lists rainwater-harvesting pits/structures |
|---|---|
| Reported progress / status | 10% reported in TG-RERA amenity data; not independently verified |
| Evidence in the record | Draft approval requires street lighting and electricity facilities; TG-RERA lists an electrical meter room/sub-station/receiving station |
|---|---|
| Reported progress / status | Electrical item 15% reported; street lighting 0% reported |
| Evidence in the record | TG-RERA lists solid-waste management and disposal |
|---|---|
| Reported progress / status | 0% reported |
| Evidence in the record | TG-RERA lists fire protection and fire-safety requirements |
|---|---|
| Reported progress / status | 0% reported; no system details or compliance certification supplied |
| Evidence in the record | Draft approval requires roads to be open for accessibility to neighbouring sites; no accessible-route details supplied |
|---|---|
| Reported progress / status | No independent verification supplied |
8. Location, access & connectivity
The registered revenue location is Terpole, Kondapur Mandal, Sangareddy District, Telangana, PIN 502001, on Survey Nos. 224/P and 225/P. The filed land record describes the north boundary as “EXISITING 40 WIDE ROAD”; the other three boundaries are recorded as “OTHER LAND.”
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 26.2 km. This is the only measured connectivity distance supplied for this section; the evidence does not provide public-transport details or verified travel times.
9. Developer & development status
The registered legal promoter is RIDGE HOMES LLP, an LLP. Its supplied corporate identifier is GSTIN 36AAZFR9237R1ZR. The project registration certificate names the promoter, and the project Form-B declaration is signed by Sri. P. Sri Rama Raju as authorized signatory for “M/s. RIDGE HOMES LLP AND OTHERS.”
The supplied project records give the promoter’s address as Flat No. 301, Ayyappa Towers, 6th Phase, Terpole, Kondapur, Sangareddy, PIN 502001. An official project contact or telephone number is not provided.
The Form-B completion undertaking states 13th August 2026. The architect’s Form-1A, dated 27-08-2026, states completion in all aspects. The certificate identifies architect SYED ZAMEER HASAN (COA Registration No. CA/2013/61075) and consultant engineer RAVITEJA CH (License No. AM317397).
10. Approvals, official records & documents
| Identifier / date | P01100009098; valid 13/08/2024–13/08/2026 |
|---|---|
| What the supplied document records | Form C registration for KSHETRA, naming RIDGE HOMES LLP and stating the project location and survey numbers |
| Identifier / date | Draft - TLP.No.135/2024/H; 13-08-2024; file Lr.Roc.No.16098/99/2024/e-Panchayat |
|---|---|
| What the supplied document records | Draft layout pattern for 131 plots on Survey Nos. 224/P and 225/P, with land-use schedule and conditions |
| Identifier / date | TLP.NO. 135/2024/H; 05.11.2024 |
|---|---|
| What the supplied document records | Proceedings releasing the draft technical layout pattern, subject to stated conditions |
| Identifier / date | 6233/2024; 11/09/2024 |
|---|---|
| What the supplied document records | Final-layout letter states roads, open spaces, social infrastructure and utilities were taken over by the local authority under this deed |
| Identifier / date | 5332/2026; 25/08/2026 |
|---|---|
| What the supplied document records | Final-layout letter records relinquishment concerning plots measuring 13382.84 Sq.mtrs in favour of the Metropolitan Commissioner, HMDA |
| Identifier / date | 2466/HMDA/SWFL/2026; 27/08/2026 |
|---|---|
| What the supplied document records | Final layout letter for the 131-plot layout at Terpole |
| Identifier / date | 27-08-2026 |
|---|---|
| What the supplied document records | Architect states the project is completed in all aspects and identifies final layout certificate 2466/HMDA/SWFL/2026 |
| Identifier / date | October 2024 |
|---|---|
| What the supplied document records | Promoter declaration includes the completion undertaking and project-account declarations |
The supplied file includes the above registration, layout-approval and completion-related records. No building-wise commencement certificate, plot-wise inventory schedule, plot-size schedule or separate building occupancy certificate is supplied.
Frequently asked questions
Is KSHETRA registered with Telangana RERA?
Yes. KSHETRA is registered with the Telangana Real Estate Regulatory Authority as P01100009098; the registration status is New Project.
Who is the developer of KSHETRA?
The promoter named in the RERA registration is RIDGE HOMES LLP.
Where is KSHETRA located?
KSHETRA is in TERPOLE, KONDAPUR, Sangareddy, Telangana (502001).
When will KSHETRA be completed?
The promoter's proposed date of completion filed with RERA is 13/12/2026. This is the promoter's declaration, not a guarantee.
More projects in Terpole