Shanmukha Developers
SHANMUKHA DEVELOPERS · Hanamkonda · RERA P00300006987
SHANMUKHA DEVELOPERS is a plotted development in Rampur, Khazipet Mandal, Warangal Urban District. The registered promoter developing it is SHANMUKHA DEVELOPERS, a partnership. The registered land area is 24,768.39 sq m total and 24,591.59 sq m net; the layout identifies 83 plots, with drawing-derived plot sizes ranging from 154.02 sq m to 288.85 sq m. It is registered under TG-RERA No. P00300006987, and its proposed completion date is 23/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SHANMUKHA DEVELOPERS RERA record |
| Project type | Plotted development / plotted layout RERA record |
| Phase or registered portion | TG-RERA registration covers plots 1–83; a separately identified phase is not disclosed |
| TG-RERA registration | P00300006987, Form ‘C’, granted under section 5; issued 19/09/2023 Approvals record |
| Registration validity | 19/09/2023 to 23/11/2025; certificate records that it was not extended Approvals record |
| Registered promoter | SHANMUKHA DEVELOPERS, a partnership RERA record Corporate record |
| RERA status | The project record labels it On-Going Project. The registered completion date has passed; current registration status or any later extension is not established by the supplied record RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Rampur RERA record RERA filing |
| Revenue village | Rampur; the layout approval calls it “Rampur Revenue Village” RERA record |
| Mandal | Khazipet in the project identity record; the approval and registration certificate use different mandal descriptions, so the registered parcel’s mandal should be confirmed against the underlying land records RERA record |
| District | Warangal Urban RERA record |
| PIN | 506151 RERA record |
| Survey numbers and subdivisions | 44/AA/5/2, 44/AA/5/1, 44/AA/7/2, 44/AA/6, 44/AA/7/1 RERA record |
| Registered site extent | TG-RERA land record: 24,768.39 sq m total and 24,591.59 sq m net; 176.80 sq m is stated as affected by road widening/FTL/Nala widening RERA filing |
| Layout approval’s extent description | The tentative layout approval states 6 Acer 4.82 Gts 29623 Sq. Yds |
| Boundaries | North, east and west: agriculture land of others; south: 60 FEET ROAD RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | GWMC Municipality/Municipal Corporation Approvals record |
| Principal layout approval | Tentative layout approval 0269/LO/3006/2022, dated 23 November, 2022; application 003813/LO/DTCP/3006/0143/2022 Approvals record |
| Approved built-up area | 14,266.72 sq m is listed as approved built-up area in the project filing; its application to this plotted layout is not further explained in the supplied material RERA filing |
| Layout and plot count | Tentative layout drawing/approval identifies 83 plots; a final layout release is not included in the supplied evidence |
| Building or floor configuration | Not disclosed; this is a plotted layout, and no building configuration is established by the supplied record |
| Parking | No project-wide parking count or parking-level arrangement is disclosed RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots 1–83 |
| Plot sizes | The approved drawing’s software-read plot schedule covers 83 plots, from 154.02 sq m to 288.85 sq m; the source says the plot count and sizes should be checked against the drawing Layout record |
| Booked and available plots | Counts are not established in the supplied data RERA filing |
| Declared development progress | 70% completeness is recorded; this is a project-record figure, not an independently verified site measurement RERA record |
| Completion date | Original and revised proposed completion date: 23/11/2025 RERA record |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the record does not establish a final layout release RERA record |
2. The project story
SHANMUKHA DEVELOPERS is registered as a plotted development in Rampur Revenue Village, Warangal Urban District, across the five survey numbers and subdivisions listed above. Its registered offering is plots 1–83, rather than apartments or villas. The project filing identifies Khazipet as the mandal, while the layout approval refers to GWMC Mandal and the registration certificate to Hanamkonda; the precise administrative description should be checked against the parcel records. RERA record
The tentative layout plan allocates land to plots, roads, open space, utilities and social infrastructure. The project record reports 70% completeness, but the supplied evidence does not independently verify the current on-site stage or establish that the layout infrastructure is complete. The promoter’s Form B affidavit undertakes completion by 23/11/2025; no completion/occupancy certificate or final layout release is included in the documents provided. Layout record RERA record
3. Master plan, architecture & building design
The development is organized as a plotted layout, not a documented multi-storey building scheme. The tentative layout approval describes 83 plots and gives the following land-use allocations.
| Layout use | Approval figure | Evidence |
|---|---|---|
| Plotted area | 3 Acer 21.02 Gts 17063 Sq. Yds (58.02%) | |
| Roads | 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) | |
| Open space (park) | 0 Acer 22.03 Gts 2666 Sq. Yds (9.06%) | |
| Social infrastructure | 0 Acer 6.08 Gts 735 Sq. Yds (2.5%) | |
| Utilities | 0 Acer 2.47 Gts 299 Sq. Yds (1.01%) | |
| Mortgage area | 0 Acer 22.62 Gts 2737 Sq. Yds (15.94%) |
The layout data separately reads the drawing’s land-use table as 14,266.7 sq m plotted area, 6,816.89 sq m roads, 2,228.86 sq m parks/open space, 249.6 sq m utilities and 614.85 sq m social infrastructure; these are software-read drawing values, not substitutes for the approval’s printed figures. Layout record
The project record lists 14,266.72 sq m as approved built-up area, but the supplied documents do not explain its scope for this plotted layout. No building footprints, floors, tower heights, lifts or building circulation details are established. The approval requires the developer to provide layout infrastructure, keep roads accessible to neighbouring sites and complete the required works before release of the mortgaged plots and final layout. RERA filing
4. Homes, configurations & floor plans
This is a plotted development. The apartment configurations and sizes in vendor material are not used to describe this registered project. RERA record RERA unit table Promoter website
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots 1–83 | 83 plots in the approved layout record | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The drawing-derived plot schedule identifies 83 plots with software-read sizes ranging from 154.02 sq m (184.2 sq yd) to 288.85 sq m (345.5 sq yd). The median is 167.17 sq m (199.9 sq yd). Size bands read from the drawing are: 60 plots in 150–200 sq yd, 15 in 200–250 sq yd, 4 in 250–300 sq yd and 4 in 300–400 sq yd. These are software-measured drawing extractions and should be verified against the approved layout drawing. Layout record
5. Parking & vehicle circulation
A project-wide parking count, visitor parking provision, accessible spaces, EV charging, parking allocation to individual plots and vehicle-entry arrangement are not disclosed in the supplied record. The tentative layout identifies roads as 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) and requires roads to be opened for access to neighbouring sites.
The approval records Plot No. 73,72,83,82,81,80,78,77,76,75,74,79 as mortgaged to the Municipality/Municipal Corporation under Mortgage Deed No. 26708/2022, with stated extent 0 Acer 22.62 Gts 2737 Sq. Yds. This is recorded as a municipal layout mortgage, not as buyer parking allocation.
6. Amenities, recreation & open spaces
The layout approval requires the applicant to carry out infrastructure and amenity works. The RERA filing also marks a number of layout features as available, but supplies 0% progress for each listed amenity; that does not establish delivery or independent completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Approval reserves 0 Acer 22.03 Gts 2666 Sq. Yds (9.06%) | No independently verified completion evidence supplied | |
| Social infrastructure site | 0 Acer 6.08 Gts 735 Sq. Yds (2.5%) | Reserved in tentative layout; delivery status not established | |
| Internal roads and footpaths | Layout road area: 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) | RERA amenities | RERA amenity entry shows 0%; completion not independently verified |
| Community buildings | No size or facility detail supplied | RERA amenities | Progress shown as 0% |
| Green strip / tot lot / park | Listed in RERA amenity record; no separate size or quantity supplied | RERA amenities | Marked “YES”; progress shown as 0% |
7. Utilities, building services & safety
The tentative layout approval names planned utility infrastructure, but the supplied record does not establish installed capacity or completed operation. It requires an overhead tank or sump, a septic tank as applicable, and rainwater-harvesting pits; it also lists utility land for water reservoir, septic tank/STP, transformer and solid-waste management.
| Record evidence | Water reservoir, internal water-supply pipelines and overhead tank appear in the approval’s infrastructure list |
|---|---|
| Status limitation | Capacity, source, treatment and completion are not supplied |
| Record evidence | Septic tank/common septic tank or STP, underground drainage lines and storm-water drains appear in the approval |
|---|---|
| Status limitation | No capacity, commissioning or completion evidence supplied |
| Record evidence | Electric transformer and street lights are listed RERA amenities |
|---|---|
| Status limitation | Supply capacity and installation status not established |
| Record evidence | Rainwater-harvesting pits are required/listed RERA amenities |
|---|---|
| Status limitation | Quantity and completion status not supplied |
| Record evidence | Solid-waste management is listed in the approval RERA amenities |
|---|---|
| Status limitation | Facility details and operating status not supplied |
| Record evidence | RERA amenity list contains fire-protection and fire-safety requirements; the layout approval requires roads to remain open for accessibility RERA amenities |
|---|---|
| Status limitation | No fire-system design, clearance or accessibility-specific facilities are documented |
8. Location, access & connectivity
The registered project location is Rampur, Khazipet, Warangal Urban District, PIN 506151, with the site bounded on the south by a 60 FEET ROAD. The layout approval describes Rampur Revenue Village and requires layout roads to be open for access to neighbouring sites. RERA record RERA filing
The supplied location data includes a cadastral-parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The source does not provide a route or establish this as a verified travel distance. Location record
9. Developer & development status
The registered promoter is SHANMUKHA DEVELOPERS, identified in the project records as a partnership. The supplied corporate identifier is GSTIN 36AEQFS5626C1ZT. The RERA record lists partners RAGHAVA REDDY GEEDA and ANNAREDDY YALLA, and authorized signatory GOPINATH MANCHIKATLA. Corporate record Parties record
The project’s declared completion date was 23/11/2025, and the record states 70% completeness. These are filing/declaration figures; the supplied evidence does not independently verify current construction or infrastructure progress. No current official contact details or promoter website are supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ for P00300006987, issued 19/09/2023, valid through 23/11/2025 |
| Tentative layout approval | Approval 0269/LO/3006/2022, dated 23 November, 2022, issued by GWMC Municipality/Municipal Corporation; application 003813/LO/DTCP/3006/0143/2022 |
| Layout drawing | Drawing-derived layout data identifies 83 plots and records roads, park/open space, utilities, social infrastructure and municipal mortgage plots Layout record |
| Form B promoter declaration | Dated 07 August 2023; declares title, no encumbrances, and completion by 23/11/2025 |
| Mortgage record in layout approval | Mortgage Deed No. 26708/2022; specified plots are recorded in favour of the Municipality/Municipal Corporation pending completion and release conditions |
| Completion/final layout records | No completion or occupancy certificate, or final layout release, is included in the supplied evidence Document index |
1. Project at a glance
Project identity
Registered project name: SHANMUKHA DEVELOPERS
Project type: Plotted development / plotted layout
Phase or registered portion: TG-RERA registration covers plots 1–83; a separately identified phase is not disclosed
TG-RERA registration: P00300006987, Form ‘C’, granted under section 5; issued 19/09/2023
Registration validity: 19/09/2023 to 23/11/2025; certificate records that it was not extended
Registered promoter: SHANMUKHA DEVELOPERS, a partnership
RERA status: The project record labels it On-Going Project. The registered completion date has passed; current registration status or any later extension is not established by the supplied record
Land and geographic identity
Locality: Rampur
Revenue village: Rampur; the layout approval calls it “Rampur Revenue Village”
Mandal: Khazipet in the project identity record; the approval and registration certificate use different mandal descriptions, so the registered parcel’s mandal should be confirmed against the underlying land records
District: Warangal Urban
PIN: 506151
Survey numbers and subdivisions: 44/AA/5/2, 44/AA/5/1, 44/AA/7/2, 44/AA/6, 44/AA/7/1
Registered site extent: TG-RERA land record: 24,768.39 sq m total and 24,591.59 sq m net; 176.80 sq m is stated as affected by road widening/FTL/Nala widening
Layout approval’s extent description: The tentative layout approval states 6 Acer 4.82 Gts 29623 Sq. Yds
Boundaries: North, east and west: agriculture land of others; south: 60 FEET ROAD
Development identity
Sanctioning authority: GWMC Municipality/Municipal Corporation
Principal layout approval: Tentative layout approval 0269/LO/3006/2022, dated 23 November, 2022; application 003813/LO/DTCP/3006/0143/2022
Approved built-up area: 14,266.72 sq m is listed as approved built-up area in the project filing; its application to this plotted layout is not further explained in the supplied material
Layout and plot count: Tentative layout drawing/approval identifies 83 plots; a final layout release is not included in the supplied evidence
Building or floor configuration: Not disclosed; this is a plotted layout, and no building configuration is established by the supplied record
Parking: No project-wide parking count or parking-level arrangement is disclosed
Offering and status
Offering: Plots 1–83
Plot sizes: The approved drawing’s software-read plot schedule covers 83 plots, from 154.02 sq m to 288.85 sq m; the source says the plot count and sizes should be checked against the drawing
Booked and available plots: Counts are not established in the supplied data
Declared development progress: 70% completeness is recorded; this is a project-record figure, not an independently verified site measurement
Completion date: Original and revised proposed completion date: 23/11/2025
Occupancy/completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the record does not establish a final layout release
2. The project story
SHANMUKHA DEVELOPERS is registered as a plotted development in Rampur Revenue Village, Warangal Urban District, across the five survey numbers and subdivisions listed above. Its registered offering is plots 1–83, rather than apartments or villas. The project filing identifies Khazipet as the mandal, while the layout approval refers to GWMC Mandal and the registration certificate to Hanamkonda; the precise administrative description should be checked against the parcel records.
The tentative layout plan allocates land to plots, roads, open space, utilities and social infrastructure. The project record reports 70% completeness, but the supplied evidence does not independently verify the current on-site stage or establish that the layout infrastructure is complete. The promoter’s Form B affidavit undertakes completion by 23/11/2025; no completion/occupancy certificate or final layout release is included in the documents provided.
3. Master plan, architecture & building design
The development is organized as a plotted layout, not a documented multi-storey building scheme. The tentative layout approval describes 83 plots and gives the following land-use allocations.
| Layout use | Approval figure | Evidence |
|---|---|---|
| Plotted area | 3 Acer 21.02 Gts 17063 Sq. Yds (58.02%) | |
| Roads | 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) | |
| Open space (park) | 0 Acer 22.03 Gts 2666 Sq. Yds (9.06%) | |
| Social infrastructure | 0 Acer 6.08 Gts 735 Sq. Yds (2.5%) | |
| Utilities | 0 Acer 2.47 Gts 299 Sq. Yds (1.01%) | |
| Mortgage area | 0 Acer 22.62 Gts 2737 Sq. Yds (15.94%) |
The layout data separately reads the drawing’s land-use table as 14,266.7 sq m plotted area, 6,816.89 sq m roads, 2,228.86 sq m parks/open space, 249.6 sq m utilities and 614.85 sq m social infrastructure; these are software-read drawing values, not substitutes for the approval’s printed figures.
The project record lists 14,266.72 sq m as approved built-up area, but the supplied documents do not explain its scope for this plotted layout. No building footprints, floors, tower heights, lifts or building circulation details are established. The approval requires the developer to provide layout infrastructure, keep roads accessible to neighbouring sites and complete the required works before release of the mortgaged plots and final layout.
4. Homes, configurations & floor plans
This is a plotted development. The apartment configurations and sizes in vendor material are not used to describe this registered project.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots 1–83 | 83 plots in the approved layout record | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The drawing-derived plot schedule identifies 83 plots with software-read sizes ranging from 154.02 sq m (184.2 sq yd) to 288.85 sq m (345.5 sq yd). The median is 167.17 sq m (199.9 sq yd). Size bands read from the drawing are: 60 plots in 150–200 sq yd, 15 in 200–250 sq yd, 4 in 250–300 sq yd and 4 in 300–400 sq yd. These are software-measured drawing extractions and should be verified against the approved layout drawing.
5. Parking & vehicle circulation
A project-wide parking count, visitor parking provision, accessible spaces, EV charging, parking allocation to individual plots and vehicle-entry arrangement are not disclosed in the supplied record. The tentative layout identifies roads as 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) and requires roads to be opened for access to neighbouring sites.
The approval records Plot No. 73,72,83,82,81,80,78,77,76,75,74,79 as mortgaged to the Municipality/Municipal Corporation under Mortgage Deed No. 26708/2022, with stated extent 0 Acer 22.62 Gts 2737 Sq. Yds. This is recorded as a municipal layout mortgage, not as buyer parking allocation.
6. Amenities, recreation & open spaces
The layout approval requires the applicant to carry out infrastructure and amenity works. The RERA filing also marks a number of layout features as available, but supplies 0% progress for each listed amenity; that does not establish delivery or independent completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Approval reserves 0 Acer 22.03 Gts 2666 Sq. Yds (9.06%) | No independently verified completion evidence supplied | |
| Social infrastructure site | 0 Acer 6.08 Gts 735 Sq. Yds (2.5%) | Reserved in tentative layout; delivery status not established | |
| Internal roads and footpaths | Layout road area: 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) | RERA amenity entry shows 0%; completion not independently verified | |
| Community buildings | No size or facility detail supplied | Progress shown as 0% | |
| Green strip / tot lot / park | Listed in RERA amenity record; no separate size or quantity supplied | Marked “YES”; progress shown as 0% |
7. Utilities, building services & safety
The tentative layout approval names planned utility infrastructure, but the supplied record does not establish installed capacity or completed operation. It requires an overhead tank or sump, a septic tank as applicable, and rainwater-harvesting pits; it also lists utility land for water reservoir, septic tank/STP, transformer and solid-waste management.
| Record evidence | Water reservoir, internal water-supply pipelines and overhead tank appear in the approval’s infrastructure list |
|---|---|
| Status limitation | Capacity, source, treatment and completion are not supplied |
| Record evidence | Septic tank/common septic tank or STP, underground drainage lines and storm-water drains appear in the approval |
|---|---|
| Status limitation | No capacity, commissioning or completion evidence supplied |
| Record evidence | Electric transformer and street lights are listed |
|---|---|
| Status limitation | Supply capacity and installation status not established |
| Record evidence | Rainwater-harvesting pits are required/listed |
|---|---|
| Status limitation | Quantity and completion status not supplied |
| Record evidence | Solid-waste management is listed in the approval |
|---|---|
| Status limitation | Facility details and operating status not supplied |
| Record evidence | RERA amenity list contains fire-protection and fire-safety requirements; the layout approval requires roads to remain open for accessibility |
|---|---|
| Status limitation | No fire-system design, clearance or accessibility-specific facilities are documented |
8. Location, access & connectivity
The registered project location is Rampur, Khazipet, Warangal Urban District, PIN 506151, with the site bounded on the south by a 60 FEET ROAD. The layout approval describes Rampur Revenue Village and requires layout roads to be open for access to neighbouring sites.
The supplied location data includes a cadastral-parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The source does not provide a route or establish this as a verified travel distance.
9. Developer & development status
The registered promoter is SHANMUKHA DEVELOPERS, identified in the project records as a partnership. The supplied corporate identifier is GSTIN 36AEQFS5626C1ZT. The RERA record lists partners RAGHAVA REDDY GEEDA and ANNAREDDY YALLA, and authorized signatory GOPINATH MANCHIKATLA.
The project’s declared completion date was 23/11/2025, and the record states 70% completeness. These are filing/declaration figures; the supplied evidence does not independently verify current construction or infrastructure progress. No current official contact details or promoter website are supplied.
10. Approvals, official records & documents
TG-RERA registration: Form ‘C’ for P00300006987, issued 19/09/2023, valid through 23/11/2025
Tentative layout approval: Approval 0269/LO/3006/2022, dated 23 November, 2022, issued by GWMC Municipality/Municipal Corporation; application 003813/LO/DTCP/3006/0143/2022
Layout drawing: Drawing-derived layout data identifies 83 plots and records roads, park/open space, utilities, social infrastructure and municipal mortgage plots
Form B promoter declaration: Dated 07 August 2023; declares title, no encumbrances, and completion by 23/11/2025
Mortgage record in layout approval: Mortgage Deed No. 26708/2022; specified plots are recorded in favour of the Municipality/Municipal Corporation pending completion and release conditions
Completion/final layout records: No completion or occupancy certificate, or final layout release, is included in the supplied evidence
Frequently asked questions
Is SHANMUKHA DEVELOPERS registered with Telangana RERA?
Yes. SHANMUKHA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P00300006987; the registration status is On-Going Project.
Who is the developer of SHANMUKHA DEVELOPERS?
The promoter named in the RERA registration is SHANMUKHA DEVELOPERS.
Where is SHANMUKHA DEVELOPERS located?
SHANMUKHA DEVELOPERS is in RAMPUR, Khazipet, Hanamkonda, Telangana (506151).
When will SHANMUKHA DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 23/11/2025. This is the promoter's declaration, not a guarantee.