Sign in

Shanmukha Developers

SHANMUKHA DEVELOPERS · Hanamkonda · RERA P00300006987

SHANMUKHA DEVELOPERS is a plotted development in Rampur, Khazipet Mandal, Warangal Urban District. The registered promoter developing it is SHANMUKHA DEVELOPERS, a partnership. The registered land area is 24,768.39 sq m total and 24,591.59 sq m net; the layout identifies 83 plots, with drawing-derived plot sizes ranging from 154.02 sq m to 288.85 sq m. It is registered under TG-RERA No. P00300006987, and its proposed completion date is 23/11/2025.

01What we found

Period endedTG-RERA registration ran to 23 Nov 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSHANMUKHA DEVELOPERS RERA record
Project typePlotted development / plotted layout RERA record
Phase or registered portionTG-RERA registration covers plots 1–83; a separately identified phase is not disclosed
TG-RERA registrationP00300006987, Form ‘C’, granted under section 5; issued 19/09/2023 Approvals record
Registration validity19/09/2023 to 23/11/2025; certificate records that it was not extended Approvals record
Registered promoterSHANMUKHA DEVELOPERS, a partnership RERA record Corporate record
RERA statusThe project record labels it On-Going Project. The registered completion date has passed; current registration status or any later extension is not established by the supplied record RERA record Approvals record

Land and geographic identity

ItemProject record
LocalityRampur RERA record RERA filing
Revenue villageRampur; the layout approval calls it “Rampur Revenue Village” RERA record
MandalKhazipet in the project identity record; the approval and registration certificate use different mandal descriptions, so the registered parcel’s mandal should be confirmed against the underlying land records RERA record
DistrictWarangal Urban RERA record
PIN506151 RERA record
Survey numbers and subdivisions44/AA/5/2, 44/AA/5/1, 44/AA/7/2, 44/AA/6, 44/AA/7/1 RERA record
Registered site extentTG-RERA land record: 24,768.39 sq m total and 24,591.59 sq m net; 176.80 sq m is stated as affected by road widening/FTL/Nala widening RERA filing
Layout approval’s extent descriptionThe tentative layout approval states 6 Acer 4.82 Gts 29623 Sq. Yds
BoundariesNorth, east and west: agriculture land of others; south: 60 FEET ROAD RERA filing

Development identity

ItemProject record
Sanctioning authorityGWMC Municipality/Municipal Corporation Approvals record
Principal layout approvalTentative layout approval 0269/LO/3006/2022, dated 23 November, 2022; application 003813/LO/DTCP/3006/0143/2022 Approvals record
Approved built-up area14,266.72 sq m is listed as approved built-up area in the project filing; its application to this plotted layout is not further explained in the supplied material RERA filing
Layout and plot countTentative layout drawing/approval identifies 83 plots; a final layout release is not included in the supplied evidence
Building or floor configurationNot disclosed; this is a plotted layout, and no building configuration is established by the supplied record
ParkingNo project-wide parking count or parking-level arrangement is disclosed RERA filing

Offering and status

ItemProject record
OfferingPlots 1–83
Plot sizesThe approved drawing’s software-read plot schedule covers 83 plots, from 154.02 sq m to 288.85 sq m; the source says the plot count and sizes should be checked against the drawing Layout record
Booked and available plotsCounts are not established in the supplied data RERA filing
Declared development progress70% completeness is recorded; this is a project-record figure, not an independently verified site measurement RERA record
Completion dateOriginal and revised proposed completion date: 23/11/2025 RERA record
Occupancy/completion certificateNo occupancy or completion certificate is supplied. The project is a plotted layout; the record does not establish a final layout release RERA record

2. The project story

SHANMUKHA DEVELOPERS is registered as a plotted development in Rampur Revenue Village, Warangal Urban District, across the five survey numbers and subdivisions listed above. Its registered offering is plots 1–83, rather than apartments or villas. The project filing identifies Khazipet as the mandal, while the layout approval refers to GWMC Mandal and the registration certificate to Hanamkonda; the precise administrative description should be checked against the parcel records. RERA record

The tentative layout plan allocates land to plots, roads, open space, utilities and social infrastructure. The project record reports 70% completeness, but the supplied evidence does not independently verify the current on-site stage or establish that the layout infrastructure is complete. The promoter’s Form B affidavit undertakes completion by 23/11/2025; no completion/occupancy certificate or final layout release is included in the documents provided. Layout record RERA record

3. Master plan, architecture & building design

The development is organized as a plotted layout, not a documented multi-storey building scheme. The tentative layout approval describes 83 plots and gives the following land-use allocations.

Layout useApproval figureEvidence
Plotted area3 Acer 21.02 Gts 17063 Sq. Yds (58.02%)
Roads1 Acer 27.38 Gts 8153 Sq. Yds (27.72%)
Open space (park)0 Acer 22.03 Gts 2666 Sq. Yds (9.06%)
Social infrastructure0 Acer 6.08 Gts 735 Sq. Yds (2.5%)
Utilities0 Acer 2.47 Gts 299 Sq. Yds (1.01%)
Mortgage area0 Acer 22.62 Gts 2737 Sq. Yds (15.94%)

The layout data separately reads the drawing’s land-use table as 14,266.7 sq m plotted area, 6,816.89 sq m roads, 2,228.86 sq m parks/open space, 249.6 sq m utilities and 614.85 sq m social infrastructure; these are software-read drawing values, not substitutes for the approval’s printed figures. Layout record

The project record lists 14,266.72 sq m as approved built-up area, but the supplied documents do not explain its scope for this plotted layout. No building footprints, floors, tower heights, lifts or building circulation details are established. The approval requires the developer to provide layout infrastructure, keep roads accessible to neighbouring sites and complete the required works before release of the mortgaged plots and final layout. RERA filing

4. Homes, configurations & floor plans

This is a plotted development. The apartment configurations and sizes in vendor material are not used to describe this registered project. RERA record RERA unit table Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots 1–8383 plots in the approved layout recordNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

The drawing-derived plot schedule identifies 83 plots with software-read sizes ranging from 154.02 sq m (184.2 sq yd) to 288.85 sq m (345.5 sq yd). The median is 167.17 sq m (199.9 sq yd). Size bands read from the drawing are: 60 plots in 150–200 sq yd, 15 in 200–250 sq yd, 4 in 250–300 sq yd and 4 in 300–400 sq yd. These are software-measured drawing extractions and should be verified against the approved layout drawing. Layout record

5. Parking & vehicle circulation

A project-wide parking count, visitor parking provision, accessible spaces, EV charging, parking allocation to individual plots and vehicle-entry arrangement are not disclosed in the supplied record. The tentative layout identifies roads as 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%) and requires roads to be opened for access to neighbouring sites.

The approval records Plot No. 73,72,83,82,81,80,78,77,76,75,74,79 as mortgaged to the Municipality/Municipal Corporation under Mortgage Deed No. 26708/2022, with stated extent 0 Acer 22.62 Gts 2737 Sq. Yds. This is recorded as a municipal layout mortgage, not as buyer parking allocation.

6. Amenities, recreation & open spaces

The layout approval requires the applicant to carry out infrastructure and amenity works. The RERA filing also marks a number of layout features as available, but supplies 0% progress for each listed amenity; that does not establish delivery or independent completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / open spaceApproval reserves 0 Acer 22.03 Gts 2666 Sq. Yds (9.06%)No independently verified completion evidence supplied
Social infrastructure site0 Acer 6.08 Gts 735 Sq. Yds (2.5%)Reserved in tentative layout; delivery status not established
Internal roads and footpathsLayout road area: 1 Acer 27.38 Gts 8153 Sq. Yds (27.72%)RERA amenitiesRERA amenity entry shows 0%; completion not independently verified
Community buildingsNo size or facility detail suppliedRERA amenitiesProgress shown as 0%
Green strip / tot lot / parkListed in RERA amenity record; no separate size or quantity suppliedRERA amenitiesMarked “YES”; progress shown as 0%

7. Utilities, building services & safety

The tentative layout approval names planned utility infrastructure, but the supplied record does not establish installed capacity or completed operation. It requires an overhead tank or sump, a septic tank as applicable, and rainwater-harvesting pits; it also lists utility land for water reservoir, septic tank/STP, transformer and solid-waste management.

Water
Record evidenceWater reservoir, internal water-supply pipelines and overhead tank appear in the approval’s infrastructure list
Status limitationCapacity, source, treatment and completion are not supplied
Sewerage and drainage
Record evidenceSeptic tank/common septic tank or STP, underground drainage lines and storm-water drains appear in the approval
Status limitationNo capacity, commissioning or completion evidence supplied
Electrical
Record evidenceElectric transformer and street lights are listed RERA amenities
Status limitationSupply capacity and installation status not established
Water conservation
Record evidenceRainwater-harvesting pits are required/listed RERA amenities
Status limitationQuantity and completion status not supplied
Solid waste
Record evidenceSolid-waste management is listed in the approval RERA amenities
Status limitationFacility details and operating status not supplied
Fire and accessibility
Record evidenceRERA amenity list contains fire-protection and fire-safety requirements; the layout approval requires roads to remain open for accessibility RERA amenities
Status limitationNo fire-system design, clearance or accessibility-specific facilities are documented

8. Location, access & connectivity

The registered project location is Rampur, Khazipet, Warangal Urban District, PIN 506151, with the site bounded on the south by a 60 FEET ROAD. The layout approval describes Rampur Revenue Village and requires layout roads to be open for access to neighbouring sites. RERA record RERA filing

The supplied location data includes a cadastral-parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The source does not provide a route or establish this as a verified travel distance. Location record

9. Developer & development status

The registered promoter is SHANMUKHA DEVELOPERS, identified in the project records as a partnership. The supplied corporate identifier is GSTIN 36AEQFS5626C1ZT. The RERA record lists partners RAGHAVA REDDY GEEDA and ANNAREDDY YALLA, and authorized signatory GOPINATH MANCHIKATLA. Corporate record Parties record

The project’s declared completion date was 23/11/2025, and the record states 70% completeness. These are filing/declaration figures; the supplied evidence does not independently verify current construction or infrastructure progress. No current official contact details or promoter website are supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm ‘C’ for P00300006987, issued 19/09/2023, valid through 23/11/2025
Tentative layout approvalApproval 0269/LO/3006/2022, dated 23 November, 2022, issued by GWMC Municipality/Municipal Corporation; application 003813/LO/DTCP/3006/0143/2022
Layout drawingDrawing-derived layout data identifies 83 plots and records roads, park/open space, utilities, social infrastructure and municipal mortgage plots Layout record
Form B promoter declarationDated 07 August 2023; declares title, no encumbrances, and completion by 23/11/2025
Mortgage record in layout approvalMortgage Deed No. 26708/2022; specified plots are recorded in favour of the Municipality/Municipal Corporation pending completion and release conditions
Completion/final layout recordsNo completion or occupancy certificate, or final layout release, is included in the supplied evidence Document index

Frequently asked questions

Is SHANMUKHA DEVELOPERS registered with Telangana RERA?

Yes. SHANMUKHA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P00300006987; the registration status is On-Going Project.

Who is the developer of SHANMUKHA DEVELOPERS?

The promoter named in the RERA registration is SHANMUKHA DEVELOPERS.

Where is SHANMUKHA DEVELOPERS located?

SHANMUKHA DEVELOPERS is in RAMPUR, Khazipet, Hanamkonda, Telangana (506151).

When will SHANMUKHA DEVELOPERS be completed?

The promoter's proposed date of completion filed with RERA is 23/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Rampur