singapur county phase-II
HAREENI HOMES · Rangareddy · RERA P02400000782
Singapur County Phase-II is a plotted development in Singapur, Shankarpalle Mandal, Ranga Reddy District, being developed by registered promoter HAREENI HOMES. The project covers 13758.69 sq.m and is a residential-plot layout; the supplied record does not disclose a complete saleable plot count or configuration schedule. It is registered under TG-RERA number P02400000782, with proposed completion of 28/02/2019.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | singapur county phase-II RERA record |
| Project type | Plotted development RERA record |
| Phase / registered portion | Phase-II; the registration is for this named phase. RERA record |
| TG-RERA registration number | P02400000782 RERA record |
| Registration dates shown on certificate | Commencement: 25/05/2019; stated end date: 28/02/2019; stated validity: 0 years. The certificate states that registration may be extended by the Authority, but the supplied record does not show an extension. |
| Registered promoter | HAREENI HOMES (also rendered as “Hareeni Homes” on the certificate) RERA record |
| RERA status | On-Going Project, as recorded in the project header. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Singapur; the layout approval identifies Singapur Village. RERA record |
| Mandal | Shankarpalle; the layout approval uses Shankarpalle Mandal. RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501203 RERA record |
| Project survey number / subdivision | 286/p; the layout draft renders this as 286p. RERA record |
| Registered site extent | 13758.69 sq.m RERA filing |
| Net site area | 13758.69 sq.m RERA filing |
| Boundaries in RERA record | East: 33 feet wide Road; West: Land in Sy no 286 of OFMK Employees association; North: Land in Sy no 286 of Green city duke estate llp; South: Land of Neighbours in sy no 304. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter says plans are forwarded to the Singapur local authority for release. Approvals record |
| Principal approval | Draft layout Letter No. 000177/LO/Plg/HMDA/2018, dated 01 September, 2018. Approvals record |
| Application reference | 013022/SKP/LT/U6/HMDA/25062018 Approvals record |
| Approved built-up area | Not disclosed in the supplied record; this is a plotted layout, not a building scheme in the evidence provided. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied record. Document index |
| Layout land-use figures | Plotted area 8200.82 sq.m; layout road area 3961.40 sq.m; organised open space/park 1241.41 sq.m; social infrastructure 355.07 sq.m; amenities area 0. Layout record |
| Layout plot count and sizes | A complete count and size schedule for saleable plots is not established by the supplied drawing-derived data. Layout record |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots; RERA unit counts and filed saleable-size range are not available in the supplied data. RERA record RERA unit table |
| Booked / available counts | Not disclosed in the supplied data. RERA unit table |
| Construction stage | The project header says On-Going Project and records completeness at 80%; the basis and date for that progress figure are not supplied, so it is not an independently verified site assessment. RERA record |
| Original / revised proposed completion | 28/02/2019 / 28/02/2019 in the project record. RERA record |
| Occupancy / completion certificate | No project completion certificate or occupancy certificate is supplied. The project is plotted development; the available evidence does not establish completion-certificate status for any phase or portion. RERA record Document index |
2. The project story
Singapur County Phase-II is recorded with TG-RERA as a plotted development in revenue village Singapur, Shankarpalle Mandal, Ranga Reddy District, on survey 286/p. Its HMDA-filed layout material describes an open-plot layout on 13758.69 sq.m and allocates land to plots, internal roads, organised open space/park and social infrastructure. RERA record
The project header records 80% completeness and an “On-Going Project” status. These are record-level status entries; no dated independent inspection or site-progress certificate is supplied to establish what works are physically complete. The supplied documents do not establish plot-by-plot availability, bookings or handover status. RERA record RERA unit table Document index
3. Master plan, architecture & building design
The available design evidence concerns a plotted layout rather than apartment blocks or villas. HMDA’s Draft layout Letter identifies survey 286p and a total and net site area of 13758.69 sq.m. Its land-use figures are: plotted area 8200.82 sq.m, layout roads 3961.40 sq.m, organised open space/park 1241.41 sq.m, and social infrastructure 355.07 sq.m; amenities area is recorded as 0. Layout record
The RERA layout-derived record also reports 8 plots, numbered 1-4, 19-22, with a total mortgage area of 1337.87 sq.m in favour of HMDA. The approval document describes these as mortgage plots pending completion of layout works; it is not evidence that these plots are available for sale. Layout record
The supplied material does not establish individual saleable plot dimensions, a full plot schedule, building configuration, or construction design for homes on the plots. The layout drawing’s plot information is incomplete, and its software-read measurements should be checked against the original drawing. Layout record
4. Homes, configurations & floor plans
This is a plotted project. The supplied record does not provide RERA-filed plot counts by configuration, booked or available counts, or a filed saleable-area range. RERA record RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not measured in supplied drawings | Not supplied |
No plot-by-plot size schedule is available in the supplied layout-derived data. The floor-plan record reports three drawings, of which none were measured, one scan is pending and two contain no flats. Therefore, no software-measured plot or home dimensions can be reported. Layout record Floor plans
5. Parking & vehicle circulation
No RERA-filed parking count, plot-specific parking allocation, visitor or accessible parking provision, or parking arrangement is supplied. The HMDA draft layout requires roads to be opened for access to neighbouring sites and says the applicant must not construct a compound wall or fencing around the site; it does not establish a detailed internal-traffic or pedestrian design. Document index
The developer-site material lists open and covered car parking, but these are not established as approved, RERA-filed or allocated facilities in the supplied project record. Promoter website
6. Amenities, recreation & open spaces
Clubhouse / indoor
| Description / size | Layout approval records 355.07 sq.m as social infrastructure; it does not identify this area as a completed community hall. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | The RERA amenity record marks Community Buildings at 0%; no completion verification supplied. |
| Description / size | Listed on developer-site material only; no size or quantity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing claims; not established as sanctioned or delivered in the supplied project record. |
Sports / recreation
| Description / size | Developer-site listings; no size or quantity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing claims; no project-specific completion evidence supplied. |
Landscape / open space
| Description / size | 1241.41 sq.m; the draft approval states this is to be handed over to the local body by registered gift deed before release of final layout plans. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Approved in the draft layout; handover and completed park development are not verified by supplied evidence. |
| Description / size | Marked YES, 100% in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-recorded amenity status; no independent completion verification supplied. |
| Description / size | Listed in the draft layout’s amenities and utilities. |
|---|---|
| Declared progress / verified status | Specified in the draft approval material; completion not verified. |
Convenience / community
| Description / size | 355.07 sq.m (2.58% as stated in the layout document). |
|---|---|
| Declared progress / verified status | Draft layout allocation; the particular facility and completed status are not specified. |
7. Utilities, building services & safety
The HMDA draft layout lists a common septic tank / STP, overhead tank, street lights, transformer and rainwater-harvesting pits. These are features stated in the layout approval material; the supplied documents do not specify capacities or independently verify installation or operation.
The RERA amenity record marks water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, street lighting, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as YES, 100%. It records treatment and disposal of sewage and sullage, solid-waste management, energy management, and fire protection/fire-safety requirements at 0%. These are RERA-recorded percentages, not independent site verification. RERA amenities
No supplied project-specific evidence establishes water source or storage capacity, sewerage-treatment capacity or reuse, electrical backup, EV charging, fire-system specifications, security/CCTV, accessibility provisions, or service capacities. Developer-site listings mention several of these items, but do not establish that they are sanctioned or delivered for this project. Promoter website
8. Location, access & connectivity
The registered location is Singapur, Shankarpalle, Ranga Reddy District, PIN 501203. The RERA-recorded boundaries identify a 33 feet wide Road on the east, adjoining land in survey 286 to the north and west, and neighbouring land in survey 304 to the south. RERA record RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 15.3 km. No other measured distances, public-transport stops or project-specific access times are supplied. Location record
9. Developer & development status
The registered promoter is HAREENI HOMES, identified in the RERA record as a partnership. The project record names VARTHYA SANJEEVA NAIK as partner and VARTHYA DEVULA NAIK as authorised signatory. The supplied record does not establish a company registration number or a verified official project contact or website. Corporate record RERA filing
A Form-B affidavit dated 05 12 2018, signed by V. Devula Naik as promoter, declares a completion undertaking of 30/12 2018 and makes declarations concerning title, encumbrances, approvals, project funds and audits. The project header separately records the proposed and revised completion dates as 28/02/2019 and reports 80% completeness; no dated independent progress assessment is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400000782; issued 25/05/2019 |
|---|---|
| What the supplied record establishes | Form C certificate for Singapur County Phase-II, identifying survey 286/p and the promoter as Hareeni Homes. It states a validity period of 0 years, commencing 25/05/2019 and ending 28/02/2019. |
| Identifier / date | 000177/LO/Plg/HMDA/2018; 01 September, 2018 |
|---|---|
| What the supplied record establishes | Draft layout Letter for an open-plot layout on survey 286p, Singapur; records the layout land-use figures, mortgage plots and conditions for release of final layout plans. |
| Identifier / date | Dated 05 12 2018 |
|---|---|
| What the supplied record establishes | Promoter declaration by V. Devula Naik; includes a declared completion undertaking and project-fund and approval undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the supplied project documents. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied HMDA document is a draft layout letter and states conditions concerning release and handover; evidence of final release or completed handover is not provided. |
1. Project at a glance
Project identity
Registered project name: singapur county phase-II
Project type: Plotted development
Phase / registered portion: Phase-II; the registration is for this named phase.
TG-RERA registration number: P02400000782
Registration dates shown on certificate: Commencement: 25/05/2019; stated end date: 28/02/2019; stated validity: 0 years. The certificate states that registration may be extended by the Authority, but the supplied record does not show an extension.
Registered promoter: HAREENI HOMES (also rendered as “Hareeni Homes” on the certificate)
RERA status: On-Going Project, as recorded in the project header.
Land and geographic identity
Locality / revenue village: Singapur; the layout approval identifies Singapur Village.
Mandal: Shankarpalle; the layout approval uses Shankarpalle Mandal.
District: Ranga Reddy
PIN: 501203
Project survey number / subdivision: 286/p; the layout draft renders this as 286p.
Registered site extent: 13758.69 sq.m
Net site area: 13758.69 sq.m
Boundaries in RERA record: East: 33 feet wide Road; West: Land in Sy no 286 of OFMK Employees association; North: Land in Sy no 286 of Green city duke estate llp; South: Land of Neighbours in sy no 304.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter says plans are forwarded to the Singapur local authority for release.
Principal approval: Draft layout Letter No. 000177/LO/Plg/HMDA/2018, dated 01 September, 2018.
Application reference: 013022/SKP/LT/U6/HMDA/25062018
Approved built-up area: Not disclosed in the supplied record; this is a plotted layout, not a building scheme in the evidence provided.
Buildings, floors and parking levels: Not disclosed in the supplied record.
Layout land-use figures: Plotted area 8200.82 sq.m; layout road area 3961.40 sq.m; organised open space/park 1241.41 sq.m; social infrastructure 355.07 sq.m; amenities area 0.
Layout plot count and sizes: A complete count and size schedule for saleable plots is not established by the supplied drawing-derived data.
Offering and status
Unit type: Residential plots; RERA unit counts and filed saleable-size range are not available in the supplied data.
Booked / available counts: Not disclosed in the supplied data.
Construction stage: The project header says On-Going Project and records completeness at 80%; the basis and date for that progress figure are not supplied, so it is not an independently verified site assessment.
Original / revised proposed completion: 28/02/2019 / 28/02/2019 in the project record.
Occupancy / completion certificate: No project completion certificate or occupancy certificate is supplied. The project is plotted development; the available evidence does not establish completion-certificate status for any phase or portion.
2. The project story
Singapur County Phase-II is recorded with TG-RERA as a plotted development in revenue village Singapur, Shankarpalle Mandal, Ranga Reddy District, on survey 286/p. Its HMDA-filed layout material describes an open-plot layout on 13758.69 sq.m and allocates land to plots, internal roads, organised open space/park and social infrastructure.
The project header records 80% completeness and an “On-Going Project” status. These are record-level status entries; no dated independent inspection or site-progress certificate is supplied to establish what works are physically complete. The supplied documents do not establish plot-by-plot availability, bookings or handover status.
3. Master plan, architecture & building design
The available design evidence concerns a plotted layout rather than apartment blocks or villas. HMDA’s Draft layout Letter identifies survey 286p and a total and net site area of 13758.69 sq.m. Its land-use figures are: plotted area 8200.82 sq.m, layout roads 3961.40 sq.m, organised open space/park 1241.41 sq.m, and social infrastructure 355.07 sq.m; amenities area is recorded as 0.
The RERA layout-derived record also reports 8 plots, numbered 1-4, 19-22, with a total mortgage area of 1337.87 sq.m in favour of HMDA. The approval document describes these as mortgage plots pending completion of layout works; it is not evidence that these plots are available for sale.
The supplied material does not establish individual saleable plot dimensions, a full plot schedule, building configuration, or construction design for homes on the plots. The layout drawing’s plot information is incomplete, and its software-read measurements should be checked against the original drawing.
4. Homes, configurations & floor plans
This is a plotted project. The supplied record does not provide RERA-filed plot counts by configuration, booked or available counts, or a filed saleable-area range.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not measured in supplied drawings | Not supplied |
No plot-by-plot size schedule is available in the supplied layout-derived data. The floor-plan record reports three drawings, of which none were measured, one scan is pending and two contain no flats. Therefore, no software-measured plot or home dimensions can be reported.
5. Parking & vehicle circulation
No RERA-filed parking count, plot-specific parking allocation, visitor or accessible parking provision, or parking arrangement is supplied. The HMDA draft layout requires roads to be opened for access to neighbouring sites and says the applicant must not construct a compound wall or fencing around the site; it does not establish a detailed internal-traffic or pedestrian design.
The developer-site material lists open and covered car parking, but these are not established as approved, RERA-filed or allocated facilities in the supplied project record.
6. Amenities, recreation & open spaces
Clubhouse / indoor
| Description / size | Layout approval records 355.07 sq.m as social infrastructure; it does not identify this area as a completed community hall. |
|---|---|
| Declared progress / verified status | The RERA amenity record marks Community Buildings at 0%; no completion verification supplied. |
| Description / size | Listed on developer-site material only; no size or quantity supplied. |
|---|---|
| Declared progress / verified status | Marketing claims; not established as sanctioned or delivered in the supplied project record. |
Sports / recreation
| Description / size | Developer-site listings; no size or quantity supplied. |
|---|---|
| Declared progress / verified status | Marketing claims; no project-specific completion evidence supplied. |
Landscape / open space
| Description / size | 1241.41 sq.m; the draft approval states this is to be handed over to the local body by registered gift deed before release of final layout plans. |
|---|---|
| Declared progress / verified status | Approved in the draft layout; handover and completed park development are not verified by supplied evidence. |
| Description / size | Marked YES, 100% in the RERA amenity record. |
|---|---|
| Declared progress / verified status | RERA-recorded amenity status; no independent completion verification supplied. |
| Description / size | Listed in the draft layout’s amenities and utilities. |
|---|---|
| Declared progress / verified status | Specified in the draft approval material; completion not verified. |
Convenience / community
| Description / size | 355.07 sq.m (2.58% as stated in the layout document). |
|---|---|
| Declared progress / verified status | Draft layout allocation; the particular facility and completed status are not specified. |
7. Utilities, building services & safety
The HMDA draft layout lists a common septic tank / STP, overhead tank, street lights, transformer and rainwater-harvesting pits. These are features stated in the layout approval material; the supplied documents do not specify capacities or independently verify installation or operation.
The RERA amenity record marks water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, street lighting, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as YES, 100%. It records treatment and disposal of sewage and sullage, solid-waste management, energy management, and fire protection/fire-safety requirements at 0%. These are RERA-recorded percentages, not independent site verification.
No supplied project-specific evidence establishes water source or storage capacity, sewerage-treatment capacity or reuse, electrical backup, EV charging, fire-system specifications, security/CCTV, accessibility provisions, or service capacities. Developer-site listings mention several of these items, but do not establish that they are sanctioned or delivered for this project.
8. Location, access & connectivity
The registered location is Singapur, Shankarpalle, Ranga Reddy District, PIN 501203. The RERA-recorded boundaries identify a 33 feet wide Road on the east, adjoining land in survey 286 to the north and west, and neighbouring land in survey 304 to the south.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 15.3 km. No other measured distances, public-transport stops or project-specific access times are supplied.
9. Developer & development status
The registered promoter is HAREENI HOMES, identified in the RERA record as a partnership. The project record names VARTHYA SANJEEVA NAIK as partner and VARTHYA DEVULA NAIK as authorised signatory. The supplied record does not establish a company registration number or a verified official project contact or website.
A Form-B affidavit dated 05 12 2018, signed by V. Devula Naik as promoter, declares a completion undertaking of 30/12 2018 and makes declarations concerning title, encumbrances, approvals, project funds and audits. The project header separately records the proposed and revised completion dates as 28/02/2019 and reports 80% completeness; no dated independent progress assessment is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400000782; issued 25/05/2019 |
|---|---|
| What the supplied record establishes | Form C certificate for Singapur County Phase-II, identifying survey 286/p and the promoter as Hareeni Homes. It states a validity period of 0 years, commencing 25/05/2019 and ending 28/02/2019. |
| Identifier / date | 000177/LO/Plg/HMDA/2018; 01 September, 2018 |
|---|---|
| What the supplied record establishes | Draft layout Letter for an open-plot layout on survey 286p, Singapur; records the layout land-use figures, mortgage plots and conditions for release of final layout plans. |
| Identifier / date | Dated 05 12 2018 |
|---|---|
| What the supplied record establishes | Promoter declaration by V. Devula Naik; includes a declared completion undertaking and project-fund and approval undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the supplied project documents. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied HMDA document is a draft layout letter and states conditions concerning release and handover; evidence of final release or completed handover is not provided. |
Frequently asked questions
Is singapur county phase-II registered with Telangana RERA?
Yes. singapur county phase-II is registered with the Telangana Real Estate Regulatory Authority as P02400000782; the registration status is On-Going Project.
Who is the developer of singapur county phase-II?
The promoter named in the RERA registration is HAREENI HOMES.
Where is singapur county phase-II located?
singapur county phase-II is in shankarpally mandal, Singapur, Shankarpalle, Rangareddy, Telangana (501203).
When will singapur county phase-II be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2019. This is the promoter's declaration, not a guarantee.
More projects in Singapur