Siri Residency
SIRI DEVELOPERS · Karimnagar · RERA P02700008266
SIRI RESIDENCY is a residential apartment project within Limits Of Municipal Corporation Of Karimnagar, in Karimnagar urban mandal, Karimnagar district. The registered promoter is SIRI DEVELOPERS, a partnership. The project covers 501.00 sq.m and comprises one residential building with a stilt level and 5 upper floors, containing 10 3BHK units with a filed saleable area of 146.88 sq.m per unit. Its TG-RERA registration is P02700008266, and the promoter’s completion undertaking is on or before 07/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | TG-RERA record |
|---|---|
| Registered project name | SIRI RESIDENCY RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration covers the project on Sy. Nos. 1195/A and C |
| TG-RERA registration | P02700008266 RERA record |
| Registration validity | 21 May 2024 to 7 April 2027, as stated in the Form C certificate Approvals record |
| Registered promoter | SIRI DEVELOPERS, a partnership RERA record RERA filing |
| RERA status | Listed as a new project; registration record captured on 10 September 2026 RERA record Approvals record |
| Construction completion date | Promoter’s Form B undertaking: on or before 07/04/2027 |
| Occupancy certificate | No occupancy certificate for the registered SIRI RESIDENCY project is identified in the supplied project records Document index |
Land and geographic identity
| Field | TG-RERA record |
|---|---|
| Locality / address | Within Limits Of Municipal Corporation Of Karimnagar; the approval record describes the site as Santoshnagar, Karimnagar RERA record |
| Revenue village | “Within Limits Of Municipal Corporation Of Karimnagar” in the project identity record; the sanction extract identifies village as “KARIMNAGAR” RERA record Land records |
| Mandal / district / PIN | Karimnagar urban / Karimnagar / 505001 RERA record RERA filing |
| Project survey numbers | SY NO. 1195/A AND C RERA record Land records |
| Registered site extent | 501.00 sq.m; the Form B declaration also states 596.44 Sq.Yards RERA filing |
| Total / net land area | Total 501.00 sq.m; area affected in road widening/FTL/Nala widening 2.30 sq.m; net area 498.70 sq.m, as recorded in the project filing RERA filing |
| Mortgage area | 209.96 sq.m declared in the project record RERA filing |
| Boundaries | East: part of open plot Nos. 1, 2 and 3 of Parkala Prabhar; West: 30 feet wide road; North: Santhoshi Matha Temple; South: H No. 10-1-689 by 1 of M Nagaraju RERA filing |
Development identity
| Field | TG-RERA / filed approval record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation Approvals record |
| Principal building approval | 0026/BP/3011/2024, approved 07 April 2024 Approvals record |
| Related file reference | 000894/BP/DTCP/3011/0019/2024 Approvals record |
| Approved built-up area | 1,288.60 sq.m (residential upper floors); the approval extract separately records 1,563.70 sq.m including parking |
| Building count | One residential building identified as “Building - A (B)” |
| Sanctioned configuration | Stilt + 5 upper floors; height stated as 14.99 m in the approval parameters |
| Parking levels / provision | Stilt is approved for parking; the layout-plan extract records 275.10 sq.m parking area, but gives no reliable count of parking spaces for this registered project |
| Unit counts | Approval/layout extract: 10 units; RERA filing: 10 3BHK units RERA unit table |
| Road-affected area | Approval extract records road-affected area 0; project land filing separately records 2.30 sq.m affected area RERA filing |
Offering and status
| Field | TG-RERA / filed record |
|---|---|
| Filed configuration | 3BHK RERA unit table |
| Filed saleable area | 146.88 sq.m per unit RERA unit table |
| Booked / available | 0 booked; 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so these figures are indicative RERA unit table |
| Construction stage | Not established by the supplied evidence; no independent site-progress verification is provided Document index |
| Original / revised completion dates | The Form B undertaking states completion on or before 07/04/2027; no revised completion date is supplied |
| Registration expiry | 7 April 2027; this is the registration-validity date, not an occupancy certificate or evidence of completion |
| OC status and scope | The supplied OC relates to a different building/project on survey Nos. 483, 498 and 499, not this registered project; no OC for SIRI RESIDENCY on Sy. Nos. 1195/A and C is identified Document index |
2. The project story
SIRI RESIDENCY is registered as a residential apartment project on Sy. Nos. 1195/A and C, within the limits of the Karimnagar Municipal Corporation, Karimnagar urban mandal, Karimnagar district. Its filed land extent is 501.00 sq.m, with a recorded net area of 498.70 sq.m after a stated 2.30 sq.m affected area. The municipal approval and related layout record describe one stilt-and-five-upper-floor apartment building, with 10 units in the project record. RERA record RERA filing
The RERA filing lists ten 3BHK units, all shown as available and none booked in the portal snapshot; the snapshot has no stated retrieval date and should be treated as indicative. The promoter’s Form B undertaking gives a completion target of 7 April 2027. The available evidence does not establish current construction progress or independently verify completion. The registration certificate remains valid through 7 April 2027, but that date is not an OC. No OC for this registered project is identified in the supplied records. RERA unit table Document index
3. Master plan, architecture & building design
The filed project is a single residential building, identified in the approval record as “Building - A (B),” with a stilt level and five upper floors. The approval extract states an approved residential upper-floor area of 1,288.60 sq.m and a stilt area of 272.20 sq.m. A separate filed plan extract records total proposed built-up area of 1,288.60 sq.m excluding parking and 1,563.70 sq.m including parking, with parking area 275.10 sq.m. These are the approval-record area descriptions; they are not carpet or saleable areas.
The recorded site extent is 501.00 sq.m, with 498.70 sq.m net area in the RERA land filing. The layout-plan extract lists vacant plot area as 223.61 sq.m and proposes a building height of 14.99 MT; the principal approval record also states height 14.99 m. The extracts do not establish a reliable architectural account of flats per floor, lift or stair arrangement, building footprint, internal circulation, entrances, or phase organization. RERA filing
The filed plan and municipal approval identify a tot-lot, green strip/planting, rainwater harvesting, a transformer space, a garbage house and a septic tank. These appear as plan or approval provisions; the supplied evidence does not independently establish that they have been completed.
4. Homes, configurations & floor plans
The RERA record identifies ten 3BHK units with a filed saleable area of 146.88 sq.m per unit. The floor-plan drawings were software-measured; those measurements are not RERA disclosures and require review against the drawings. The record does not provide a RERA-filed carpet-area figure. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 146.88 sq.m | Software-measured: 87.5–96.8 sq.m; median 89.8 sq.m | Software estimate: 39% |
The measured 3BHK drawing sample covers eight flat designs. A sample plan labels three bedrooms, living/dining, kitchen, three toilets and two balconies; the living/dining space is labelled 8.91 m × 5.06 m, and the kitchen 3.05 m × 3.09 m. These are drawing-based measurements, not RERA-filed room specifications. Balconies are excluded from the software-measured carpet area; saleable area also includes a share of common areas, so the two measures are not interchangeable. Two measured 3BHK designs are flagged as needing review. RERA unit details Floor plans
5. Parking & vehicle circulation
The municipal approval describes the stilt as a parking level. The filed plan extract records 275.10 sq.m of parking area. A reliable sanctioned parking-space count, resident/visitor allocation, accessible-parking provision, parking allotment by unit, or separate two-wheeler provision is not established in the supplied evidence. The plan’s parking designation does not by itself establish exclusive ownership or allocation of a bay.
No supplied project-specific record establishes parking ramps, internal driveway dimensions, pedestrian separation, or EV charging installation. The layout-plan approval contains a general EV-charging condition for parking places, but the available material does not confirm installed charging facilities at this project.
6. Amenities, recreation & open spaces
The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting and an electrical meter room/substation/receiving station as available, while the listed progress values are 0%. The approval and plan extracts also identify specific provisions. “Available” is a filing status, not independent verification of completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 45.54 sq.m; to be fenced and maintained as greenery under the approval condition | Approval/plan provision; completion not independently verified | |
| Green strip / planting | Greenery on site periphery; plan extract lists “Green Strip” | RERA amenity record says available; progress shown as 0%; not independently verified | |
| Rainwater harvesting | Percolation pit; approval extract states 2 rainwater-harvesting structures | Filed/approval provision; completion not independently verified | |
| Internal roads & footpaths | Listed in RERA amenity record | RERA amenities | Progress shown as 0%; no completion verification |
| Community buildings | Listed in RERA amenity record | RERA amenities | Progress shown as 0%; no specific facility or size established |
| Solid-waste management and disposal | Listed in RERA amenity record; approval requires a garbage house within the premises | RERA amenities | Approval provision; completion not independently verified |
No clubhouse, indoor recreation facility or sports facility is specifically established in the supplied project records. RERA amenities Document index
7. Utilities, building services & safety
The RERA amenity record marks water supply and sewerage as available, and the filed plan identifies a septic tank, water sump and overhead water tank. The evidence does not specify water source, storage capacity, treatment arrangements, STP, sewage-reuse arrangements or storm-water system details. Rainwater harvesting is shown in the plan and approval record, but completion is not independently confirmed. RERA amenities
The plan identifies a distribution transformer and lift machine room; the approval requires transformer space. No lift count, capacity, backup-power system, electrical substation capacity, or installed EV-charging equipment is established.
The municipal approval makes structural and fire-safety requirements the responsibility of the owner, builder/developer and technical professionals. The supplied records do not document project-specific fire systems, fire clearances, escape-stair details, emergency access, CCTV, access control, waste segregation, or accessible routes and facilities.
8. Location, access & connectivity
The registered location is within the limits of the Municipal Corporation of Karimnagar, in Karimnagar urban mandal, Karimnagar district, PIN 505001. The filed approval describes the locality as Santoshnagar, Karimnagar; the land record names the west boundary as a 30 feet wide road and the north boundary as Santhoshi Matha Temple. RERA record RERA filing
The project evidence supplies no verified project-specific distances to transport links or landmarks. No travel-time or connectivity claims are included here. Location record
9. Developer & development status
The registered promoter is SIRI DEVELOPERS, recorded as a partnership, with GSTIN 36AFBFS1616N1ZT. Its registered-office address in the project certificate is recorded only as Karimnagar, PIN 505001; a complete office address, official contact details and website are not established by the TG-RERA project records supplied here. RERA filing Corporate record
The project’s Form B affidavit is signed by Kakkera Sathyanarayana Rao and Jalagam Jagan Mohan Rao on behalf of the promoter. It declares a completion date on or before 07/04/2027. No construction-progress percentage or independent site verification is supplied, and no occupancy certificate for this registered project is identified. Document index
10. Approvals, official records & documents
| Identifier / date | P02700008266; valid 21 May 2024–7 April 2027 |
|---|---|
| Scope and evidence | SIRI RESIDENCY, promoter Siri Developers, Sy. Nos. 1195/A and C |
| Identifier / date | 0026/BP/3011/2024, 7 April 2024 |
|---|---|
| Scope and evidence | Karimnagar Municipal Corporation; residential Building - A (B), stilt + 5 upper floors |
| Identifier / date | 000894/BP/DTCP/3011/0019/2024 |
|---|---|
| Scope and evidence | Filed approval record for the project |
| Identifier / date | TS/015659/2024 |
|---|---|
| Scope and evidence | Filed plan for Sy. Nos. 1195/A&C, stating ten units and stilt + five upper floors |
| Identifier / date | 3 May 2024 |
|---|---|
| Scope and evidence | Promoter declaration of title basis, encumbrance status and completion undertaking |
| Identifier / date | 3011/W25/2018/4166, 18 January 2019 |
|---|---|
| Scope and evidence | Concerns PRAGNYA (3) on survey Nos. 483, 498 and 499; it does not establish OC status for SIRI RESIDENCY on Sy. Nos. 1195/A and C |
| Identifier / date | RERA registration P02700000336; dated 9 February 2024 |
|---|---|
| Scope and evidence | Concerns SIRI RESIDENCY developed by PRAGNYA CONSTRUCTIONS under that registration, not the current registered project identifier |
The supplied project-specific approval record requires an occupancy certificate before occupation and states that the permission does not confer ownership rights. Full approval conditions and title issues are addressed in the relevant report sections.
1. Project at a glance
Project identity
Registered project name: SIRI RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration covers the project on Sy. Nos. 1195/A and C
TG-RERA registration: P02700008266
Registration validity: 21 May 2024 to 7 April 2027, as stated in the Form C certificate
Registered promoter: SIRI DEVELOPERS, a partnership
RERA status: Listed as a new project; registration record captured on 10 September 2026
Construction completion date: Promoter’s Form B undertaking: on or before 07/04/2027
Occupancy certificate: No occupancy certificate for the registered SIRI RESIDENCY project is identified in the supplied project records
Land and geographic identity
Locality / address: Within Limits Of Municipal Corporation Of Karimnagar; the approval record describes the site as Santoshnagar, Karimnagar
Revenue village: “Within Limits Of Municipal Corporation Of Karimnagar” in the project identity record; the sanction extract identifies village as “KARIMNAGAR”
Mandal / district / PIN: Karimnagar urban / Karimnagar / 505001
Project survey numbers: SY NO. 1195/A AND C
Registered site extent: 501.00 sq.m; the Form B declaration also states 596.44 Sq.Yards
Total / net land area: Total 501.00 sq.m; area affected in road widening/FTL/Nala widening 2.30 sq.m; net area 498.70 sq.m, as recorded in the project filing
Mortgage area: 209.96 sq.m declared in the project record
Boundaries: East: part of open plot Nos. 1, 2 and 3 of Parkala Prabhar; West: 30 feet wide road; North: Santhoshi Matha Temple; South: H No. 10-1-689 by 1 of M Nagaraju
Development identity
Sanctioning authority: Karimnagar Municipal Corporation
Principal building approval: 0026/BP/3011/2024, approved 07 April 2024
Related file reference: 000894/BP/DTCP/3011/0019/2024
Approved built-up area: 1,288.60 sq.m (residential upper floors); the approval extract separately records 1,563.70 sq.m including parking
Building count: One residential building identified as “Building - A (B)”
Sanctioned configuration: Stilt + 5 upper floors; height stated as 14.99 m in the approval parameters
Parking levels / provision: Stilt is approved for parking; the layout-plan extract records 275.10 sq.m parking area, but gives no reliable count of parking spaces for this registered project
Unit counts: Approval/layout extract: 10 units; RERA filing: 10 3BHK units
Road-affected area: Approval extract records road-affected area 0; project land filing separately records 2.30 sq.m affected area
Offering and status
Filed configuration: 3BHK
Filed saleable area: 146.88 sq.m per unit
Booked / available: 0 booked; 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so these figures are indicative
Construction stage: Not established by the supplied evidence; no independent site-progress verification is provided
Original / revised completion dates: The Form B undertaking states completion on or before 07/04/2027; no revised completion date is supplied
Registration expiry: 7 April 2027; this is the registration-validity date, not an occupancy certificate or evidence of completion
OC status and scope: The supplied OC relates to a different building/project on survey Nos. 483, 498 and 499, not this registered project; no OC for SIRI RESIDENCY on Sy. Nos. 1195/A and C is identified
2. The project story
SIRI RESIDENCY is registered as a residential apartment project on Sy. Nos. 1195/A and C, within the limits of the Karimnagar Municipal Corporation, Karimnagar urban mandal, Karimnagar district. Its filed land extent is 501.00 sq.m, with a recorded net area of 498.70 sq.m after a stated 2.30 sq.m affected area. The municipal approval and related layout record describe one stilt-and-five-upper-floor apartment building, with 10 units in the project record.
The RERA filing lists ten 3BHK units, all shown as available and none booked in the portal snapshot; the snapshot has no stated retrieval date and should be treated as indicative. The promoter’s Form B undertaking gives a completion target of 7 April 2027. The available evidence does not establish current construction progress or independently verify completion. The registration certificate remains valid through 7 April 2027, but that date is not an OC. No OC for this registered project is identified in the supplied records.
3. Master plan, architecture & building design
The filed project is a single residential building, identified in the approval record as “Building - A (B),” with a stilt level and five upper floors. The approval extract states an approved residential upper-floor area of 1,288.60 sq.m and a stilt area of 272.20 sq.m. A separate filed plan extract records total proposed built-up area of 1,288.60 sq.m excluding parking and 1,563.70 sq.m including parking, with parking area 275.10 sq.m. These are the approval-record area descriptions; they are not carpet or saleable areas.
The recorded site extent is 501.00 sq.m, with 498.70 sq.m net area in the RERA land filing. The layout-plan extract lists vacant plot area as 223.61 sq.m and proposes a building height of 14.99 MT; the principal approval record also states height 14.99 m. The extracts do not establish a reliable architectural account of flats per floor, lift or stair arrangement, building footprint, internal circulation, entrances, or phase organization.
The filed plan and municipal approval identify a tot-lot, green strip/planting, rainwater harvesting, a transformer space, a garbage house and a septic tank. These appear as plan or approval provisions; the supplied evidence does not independently establish that they have been completed.
4. Homes, configurations & floor plans
The RERA record identifies ten 3BHK units with a filed saleable area of 146.88 sq.m per unit. The floor-plan drawings were software-measured; those measurements are not RERA disclosures and require review against the drawings. The record does not provide a RERA-filed carpet-area figure.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 146.88 sq.m | Software-measured: 87.5–96.8 sq.m; median 89.8 sq.m | Software estimate: 39% |
The measured 3BHK drawing sample covers eight flat designs. A sample plan labels three bedrooms, living/dining, kitchen, three toilets and two balconies; the living/dining space is labelled 8.91 m × 5.06 m, and the kitchen 3.05 m × 3.09 m. These are drawing-based measurements, not RERA-filed room specifications. Balconies are excluded from the software-measured carpet area; saleable area also includes a share of common areas, so the two measures are not interchangeable. Two measured 3BHK designs are flagged as needing review.
5. Parking & vehicle circulation
The municipal approval describes the stilt as a parking level. The filed plan extract records 275.10 sq.m of parking area. A reliable sanctioned parking-space count, resident/visitor allocation, accessible-parking provision, parking allotment by unit, or separate two-wheeler provision is not established in the supplied evidence. The plan’s parking designation does not by itself establish exclusive ownership or allocation of a bay.
No supplied project-specific record establishes parking ramps, internal driveway dimensions, pedestrian separation, or EV charging installation. The layout-plan approval contains a general EV-charging condition for parking places, but the available material does not confirm installed charging facilities at this project.
6. Amenities, recreation & open spaces
The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting and an electrical meter room/substation/receiving station as available, while the listed progress values are 0%. The approval and plan extracts also identify specific provisions. “Available” is a filing status, not independent verification of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 45.54 sq.m; to be fenced and maintained as greenery under the approval condition | Approval/plan provision; completion not independently verified | |
| Green strip / planting | Greenery on site periphery; plan extract lists “Green Strip” | RERA amenity record says available; progress shown as 0%; not independently verified | |
| Rainwater harvesting | Percolation pit; approval extract states 2 rainwater-harvesting structures | Filed/approval provision; completion not independently verified | |
| Internal roads & footpaths | Listed in RERA amenity record | Progress shown as 0%; no completion verification | |
| Community buildings | Listed in RERA amenity record | Progress shown as 0%; no specific facility or size established | |
| Solid-waste management and disposal | Listed in RERA amenity record; approval requires a garbage house within the premises | Approval provision; completion not independently verified |
No clubhouse, indoor recreation facility or sports facility is specifically established in the supplied project records.
7. Utilities, building services & safety
The RERA amenity record marks water supply and sewerage as available, and the filed plan identifies a septic tank, water sump and overhead water tank. The evidence does not specify water source, storage capacity, treatment arrangements, STP, sewage-reuse arrangements or storm-water system details. Rainwater harvesting is shown in the plan and approval record, but completion is not independently confirmed.
The plan identifies a distribution transformer and lift machine room; the approval requires transformer space. No lift count, capacity, backup-power system, electrical substation capacity, or installed EV-charging equipment is established.
The municipal approval makes structural and fire-safety requirements the responsibility of the owner, builder/developer and technical professionals. The supplied records do not document project-specific fire systems, fire clearances, escape-stair details, emergency access, CCTV, access control, waste segregation, or accessible routes and facilities.
8. Location, access & connectivity
The registered location is within the limits of the Municipal Corporation of Karimnagar, in Karimnagar urban mandal, Karimnagar district, PIN 505001. The filed approval describes the locality as Santoshnagar, Karimnagar; the land record names the west boundary as a 30 feet wide road and the north boundary as Santhoshi Matha Temple.
The project evidence supplies no verified project-specific distances to transport links or landmarks. No travel-time or connectivity claims are included here.
9. Developer & development status
The registered promoter is SIRI DEVELOPERS, recorded as a partnership, with GSTIN 36AFBFS1616N1ZT. Its registered-office address in the project certificate is recorded only as Karimnagar, PIN 505001; a complete office address, official contact details and website are not established by the TG-RERA project records supplied here.
The project’s Form B affidavit is signed by Kakkera Sathyanarayana Rao and Jalagam Jagan Mohan Rao on behalf of the promoter. It declares a completion date on or before 07/04/2027. No construction-progress percentage or independent site verification is supplied, and no occupancy certificate for this registered project is identified.
10. Approvals, official records & documents
| Identifier / date | P02700008266; valid 21 May 2024–7 April 2027 |
|---|---|
| Scope and evidence | SIRI RESIDENCY, promoter Siri Developers, Sy. Nos. 1195/A and C |
| Identifier / date | 0026/BP/3011/2024, 7 April 2024 |
|---|---|
| Scope and evidence | Karimnagar Municipal Corporation; residential Building - A (B), stilt + 5 upper floors |
| Identifier / date | 000894/BP/DTCP/3011/0019/2024 |
|---|---|
| Scope and evidence | Filed approval record for the project |
| Identifier / date | TS/015659/2024 |
|---|---|
| Scope and evidence | Filed plan for Sy. Nos. 1195/A&C, stating ten units and stilt + five upper floors |
| Identifier / date | 3 May 2024 |
|---|---|
| Scope and evidence | Promoter declaration of title basis, encumbrance status and completion undertaking |
| Identifier / date | 3011/W25/2018/4166, 18 January 2019 |
|---|---|
| Scope and evidence | Concerns PRAGNYA (3) on survey Nos. 483, 498 and 499; it does not establish OC status for SIRI RESIDENCY on Sy. Nos. 1195/A and C |
| Identifier / date | RERA registration P02700000336; dated 9 February 2024 |
|---|---|
| Scope and evidence | Concerns SIRI RESIDENCY developed by PRAGNYA CONSTRUCTIONS under that registration, not the current registered project identifier |
The supplied project-specific approval record requires an occupancy certificate before occupation and states that the permission does not confer ownership rights. Full approval conditions and title issues are addressed in the relevant report sections.
Frequently asked questions
Is SIRI RESIDENCY registered with Telangana RERA?
Yes. SIRI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700008266; the registration status is New Project.
Who is the developer of SIRI RESIDENCY?
The promoter named in the RERA registration is SIRI DEVELOPERS.
Where is SIRI RESIDENCY located?
SIRI RESIDENCY is in WITHIN LIMITS OF MUNICIPAL CORPORATION OF KARIMNAGAR, Karimnagar urban, Karimnagar, Telangana (505001).
When will SIRI RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 07/08/2027. This is the promoter's declaration, not a guarantee.