Sr Constructions 2
SR CONSTRUCTIONS · Sangareddy · RERA P02400001427
SR CONSTRUCTIONS 2 is a residential apartment project in Ameenpur, AMEENPUR Mandal, Sangareddy District. The registered promoter developing it is SR CONSTRUCTIONS, a partnership firm. The project covers 452.06 sq. m and comprises one building described as 1Stilt + 4 Upper floors, with 12 2BHK apartments. It is registered under TG-RERA P02400001427, with proposed completion on 09/11/2023.
More from Sr Constructions · 26 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SR CONSTRUCTIONS 2 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The RERA record describes one building and does not identify a separate phase. RERA filing |
| TG-RERA registration | P02400001427; granted under section 5. RERA record |
| Registration validity | 25/11/2019 to 09/11/2023; certificate states three years and no extension is recorded in the supplied evidence. This is the registration period, not a statement of the construction deadline or OC status. RERA record |
| Registered promoter | SR CONSTRUCTIONS; partnership firm. RERA record RERA filing |
| RERA status | Listed as “On-Going Project.” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Ameenpur / AMEENPUR RERA record RERA filing |
| Revenue village | Ameenpur in the project identity and RERA record; the HMDA intimation spells it “Ameenapur.” RERA record |
| Mandal / district / PIN | AMEENPUR / Sangareddy / 502032 RERA record |
| Project survey numbers | 182, 183, 184, 185, 186, 187, 188 and 189 in the HMDA intimation and title material; the RERA certificate records 182187. |
| Site identification | Plot Nos. 30,31; HMDA intimation describes the site as 452.06 Sq. Mt. RERA filing |
| Registered land extent | 452.06 sq. m total and net area; affected area recorded as 0. RERA filing |
| Boundaries | East: PLOT NO 32; West: PLOT NO 29; North: PLOT NO 45 46; South: ROAD WIDTH 12. RERA filing |
Development identity
| Field | Record |
|---|---|
| Authority / principal record | Hyderabad Metropolitan Development Authority (HMDA); application No. 002548/SKP/R1/U6/HMDA/03082017, dated 03/08/2017. The supplied document is an intimation to pay charges and meet conditions—not approval or permission to develop. Approvals record |
| Approved built-up area | Not established as finally approved in the supplied evidence. The HMDA intimation lists 1008.6 sq.mts built up area as a proposed/sanctioned parameter, while expressly saying the document is not approval. |
| Building and floors | One building is recorded in the RERA land details. The HMDA intimation describes a residential apartment building with 1Stilt + 4 Upper floors; this is in an intimation, not a final approval. RERA filing |
| Parking levels | Stilt is mentioned in the HMDA intimation. Parking count, arrangement and allocation are not established in the supplied project record. |
| Unit count | RERA record: 1 total building unit; unit filing records 12 2BHK apartments. The supplied documents do not explain the “building unit” field’s relationship to the apartment count. RERA filing RERA unit details |
Offering and status
| Field | Record |
|---|---|
| RERA-filed offering | 2BHK, 12 units; filed saleable area 97.39 sq.m per unit. RERA unit details RERA unit table |
| Booked / available | 0 booked / 12 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table |
| Construction stage | RERA status is “On-Going Project”; no independently verified site-progress evidence is supplied. RERA record RERA amenities |
| Completion dates | Original and revised proposed completion: 09/11/2023. The promoter’s Form B also undertakes completion by 9/11/2023. RERA record |
| Occupancy / completion certificate | Not disclosed in the supplied project materials; no OC or completion certificate is provided. Document index |
2. The project story
SR CONSTRUCTIONS 2 is registered as a residential apartment project in Ameenpur, AMEENPUR Mandal, Sangareddy District, on Plot Nos. 30,31. The RERA filing describes one building and identifies the land as Survey Nos. 182–189 in the submitted HMDA intimation and title material. The project parcel centroid is supplied at 17.41528, 78.35459. RERA record RERA filing Location record
The RERA unit record lists twelve 2BHK apartments, with none recorded as booked and twelve as available when the portal data was read; the record has no as-of date. The promoter’s declared completion date was 09/11/2023, and the project remains labelled “On-Going Project” in the supplied RERA record. No verified construction-progress report, current site inspection, or occupancy/completion certificate is provided, so physical completion and occupation status cannot be confirmed here. RERA record RERA unit details RERA unit table Document index
The supplied HMDA document describes a proposed residential building with one stilt and four upper floors, but it is an intimation to pay charges and satisfy conditions for further processing; it expressly is not permission for development.
3. Master plan, architecture & building design
The project record identifies a 452.06 sq. m site and one building. The HMDA intimation refers to 1008.6 sq.mts built up area and a proposed 1Stilt + 4 Upper floors configuration, but expressly states that it is not approval of the proposal or development permission. No final sanctioned plan or approved building drawings are available in the supplied materials to establish the approved built-up area, footprint, floor layouts, building height, flats per floor, circulation, or common/open-space arrangement. RERA filing Document index
Three drawing records are noted: one scan is pending and two contain no flats; none has been software-measured. Accordingly, no drawing-based room, floor-plan, or carpet-area measurements can be reported. Floor plans
The HMDA intimation includes conditions referring to a proposed 30 Mtrs compound wall and handover of 126.39 Sq.Mts ( 12.53 %) of built-up area to the MC, HMDA, but these are conditions in the processing intimation, not evidence that the work or handover was completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 12 | 0 | 12 | 97.39 sq.m per unit | Not measured | Not supplied |
Unit counts, booking figures and saleable area are from the RERA filing; the booking counts are indicative because the portal record has no as-of date. No measured carpet area is available: the supplied floor-plan records show no measured drawings. RERA saleable area should not be treated as carpet area; the supplied evidence does not quantify any common-area loading or balcony/utility area. RERA unit details RERA unit table Floor plans
5. Parking & vehicle circulation
The HMDA intimation describes a stilt floor, but the supplied evidence does not establish sanctioned parking counts, visitor or accessible spaces, parking allocation to specific apartments, ramps, internal driveways, or pedestrian separation. The RERA-filed unit record marks the units as mortgaged; that does not establish a parking allotment. Any parking figures or facilities in third-party listings are not treated here as RERA-filed or sanctioned provision. RERA unit table Promoter website
6. Amenities, recreation & open spaces
The RERA amenity record lists fourteen items. The supplied progress values are 0 where shown; “available: YES” is a recorded field, not independent verification that a facility is built or operating. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or further detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Water Supply | Available: YES; capacity/source not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Available: YES; capacity not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Storm Water Drains | No size or further detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Available: YES; area not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Street Lighting | No further detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Community Buildings | No size or further detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | No system capacity or detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Solid Waste Management and Disposal | No system detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Water Conservation, Rain water Harvesting | Available: YES; system/quantity not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Energy management | Available: YES; system detail not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | No system detail supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Available: YES; capacity not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity record RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage/septic tank/STP, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES,” but reports 0% progress for those amenity entries. It provides no capacities, source details, equipment specifications, or independent verification of installation or operation. RERA amenities
The HMDA processing intimation requires an STP and septic tank as per standard specification and refers to fire-service department norms; it does not establish that the facilities have been installed or that statutory compliance has been achieved. The same intimation states that HMWS and SB and A.P. Transco were not to provide permanent connections until an occupancy certificate was produced.
No project-specific evidence is supplied for water storage/treatment, sewer reuse, storm-water design, electrical backup, lifts, fire systems or escape stairs, waste segregation, security/CCTV, or accessibility provisions. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Ameenpur, AMEENPUR Mandal, Sangareddy District, PIN 502032, with Plot Nos. 30,31 and the stated boundaries recorded in the RERA filing. RERA record RERA filing
The supplied location record identifies Financial District (Nanakramguda) at 1.2 km. It provides no approach-road or public-transport details. Location record
9. Developer & development status
The registered promoter is SR CONSTRUCTIONS, identified as a partnership firm. A request letter to TG-RERA gives firm number 67 OF 2016, and the Registrar of Firms acknowledgement states that S R CONSTRUCTIONS was entered in the Register of Firms as No: 67 of 2016 at Medak. The supplied evidence does not provide a verified corporate identifier or registered office for the project promoter. RERA filing
The RERA filing names D GANGAREDDY as a partner and duvvuri sanjeevreddy as an authorized signatory. The Form B declaration by SANJEEVREDDY, identified as managing partner, states a completion undertaking of 9/11/2023. These are promoter-filed details and declarations, not independent verification of current construction status. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | FORM “C” registration certificate for SR CONSTRUCTIONS 2, No. P02400001427, dated 25/11/2019; valid through 09/11/2023. |
| HMDA project record | Application No. 002548/SKP/R1/U6/HMDA/03082017, dated 03/08/2017. The document is an intimation to pay charges and fulfill conditions for further processing; it expressly is not approval or development permission. |
| Title material | Sub-legal opinion dated 14/3/2019 concerning Plot Nos. 30 and 31 in Survey Nos. 182 to 189, measuring 452.06 Sq. Mtrs.; title-report extraction states its conclusion is subject to verification of original documents. |
| Promoter declaration | Form B affidavit-cum-declaration by SANJEEVREDDY, including promoter declarations on title, encumbrances and completion by 9/11/2023. |
| Building/layout plans | The supplied record includes an HMDA intimation and references to plan/layout document uploads, but no final approved building or layout plan is available in the extracted evidence. Document index |
| Occupancy/completion certificate | Not supplied; OC/completion status is therefore not established by the documents reviewed. Document index |
1. Project at a glance
Project identity
Registered project name: SR CONSTRUCTIONS 2
Project type: Residential apartment project
Phase / registered portion: The RERA record describes one building and does not identify a separate phase.
TG-RERA registration: P02400001427; granted under section 5.
Registration validity: 25/11/2019 to 09/11/2023; certificate states three years and no extension is recorded in the supplied evidence. This is the registration period, not a statement of the construction deadline or OC status.
Registered promoter: SR CONSTRUCTIONS; partnership firm.
RERA status: Listed as “On-Going Project.”
Land and geographic identity
Locality: Ameenpur / AMEENPUR
Revenue village: Ameenpur in the project identity and RERA record; the HMDA intimation spells it “Ameenapur.”
Mandal / district / PIN: AMEENPUR / Sangareddy / 502032
Project survey numbers: 182, 183, 184, 185, 186, 187, 188 and 189 in the HMDA intimation and title material; the RERA certificate records 182187.
Site identification: Plot Nos. 30,31; HMDA intimation describes the site as 452.06 Sq. Mt.
Registered land extent: 452.06 sq. m total and net area; affected area recorded as 0.
Boundaries: East: PLOT NO 32; West: PLOT NO 29; North: PLOT NO 45 46; South: ROAD WIDTH 12.
Development identity
Authority / principal record: Hyderabad Metropolitan Development Authority (HMDA); application No. 002548/SKP/R1/U6/HMDA/03082017, dated 03/08/2017. The supplied document is an intimation to pay charges and meet conditions—not approval or permission to develop.
Approved built-up area: Not established as finally approved in the supplied evidence. The HMDA intimation lists 1008.6 sq.mts built up area as a proposed/sanctioned parameter, while expressly saying the document is not approval.
Building and floors: One building is recorded in the RERA land details. The HMDA intimation describes a residential apartment building with 1Stilt + 4 Upper floors; this is in an intimation, not a final approval.
Parking levels: Stilt is mentioned in the HMDA intimation. Parking count, arrangement and allocation are not established in the supplied project record.
Unit count: RERA record: 1 total building unit; unit filing records 12 2BHK apartments. The supplied documents do not explain the “building unit” field’s relationship to the apartment count.
Offering and status
RERA-filed offering: 2BHK, 12 units; filed saleable area 97.39 sq.m per unit.
Booked / available: 0 booked / 12 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative.
Construction stage: RERA status is “On-Going Project”; no independently verified site-progress evidence is supplied.
Completion dates: Original and revised proposed completion: 09/11/2023. The promoter’s Form B also undertakes completion by 9/11/2023.
Occupancy / completion certificate: Not disclosed in the supplied project materials; no OC or completion certificate is provided.
2. The project story
SR CONSTRUCTIONS 2 is registered as a residential apartment project in Ameenpur, AMEENPUR Mandal, Sangareddy District, on Plot Nos. 30,31. The RERA filing describes one building and identifies the land as Survey Nos. 182–189 in the submitted HMDA intimation and title material. The project parcel centroid is supplied at 17.41528, 78.35459.
The RERA unit record lists twelve 2BHK apartments, with none recorded as booked and twelve as available when the portal data was read; the record has no as-of date. The promoter’s declared completion date was 09/11/2023, and the project remains labelled “On-Going Project” in the supplied RERA record. No verified construction-progress report, current site inspection, or occupancy/completion certificate is provided, so physical completion and occupation status cannot be confirmed here.
The supplied HMDA document describes a proposed residential building with one stilt and four upper floors, but it is an intimation to pay charges and satisfy conditions for further processing; it expressly is not permission for development.
3. Master plan, architecture & building design
The project record identifies a 452.06 sq. m site and one building. The HMDA intimation refers to 1008.6 sq.mts built up area and a proposed 1Stilt + 4 Upper floors configuration, but expressly states that it is not approval of the proposal or development permission. No final sanctioned plan or approved building drawings are available in the supplied materials to establish the approved built-up area, footprint, floor layouts, building height, flats per floor, circulation, or common/open-space arrangement.
Three drawing records are noted: one scan is pending and two contain no flats; none has been software-measured. Accordingly, no drawing-based room, floor-plan, or carpet-area measurements can be reported.
The HMDA intimation includes conditions referring to a proposed 30 Mtrs compound wall and handover of 126.39 Sq.Mts ( 12.53 %) of built-up area to the MC, HMDA, but these are conditions in the processing intimation, not evidence that the work or handover was completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 12 | 0 | 12 | 97.39 sq.m per unit | Not measured | Not supplied |
Unit counts, booking figures and saleable area are from the RERA filing; the booking counts are indicative because the portal record has no as-of date. No measured carpet area is available: the supplied floor-plan records show no measured drawings. RERA saleable area should not be treated as carpet area; the supplied evidence does not quantify any common-area loading or balcony/utility area.
5. Parking & vehicle circulation
The HMDA intimation describes a stilt floor, but the supplied evidence does not establish sanctioned parking counts, visitor or accessible spaces, parking allocation to specific apartments, ramps, internal driveways, or pedestrian separation. The RERA-filed unit record marks the units as mortgaged; that does not establish a parking allotment. Any parking figures or facilities in third-party listings are not treated here as RERA-filed or sanctioned provision.
6. Amenities, recreation & open spaces
The RERA amenity record lists fourteen items. The supplied progress values are 0 where shown; “available: YES” is a recorded field, not independent verification that a facility is built or operating.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or further detail supplied | RERA amenity record | 0%; not independently verified |
| Water Supply | Available: YES; capacity/source not supplied | RERA amenity record | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Available: YES; capacity not supplied | RERA amenity record | 0%; not independently verified |
| Storm Water Drains | No size or further detail supplied | RERA amenity record | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Available: YES; area not supplied | RERA amenity record | 0%; not independently verified |
| Street Lighting | No further detail supplied | RERA amenity record | 0%; not independently verified |
| Community Buildings | No size or further detail supplied | RERA amenity record | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | No system capacity or detail supplied | RERA amenity record | 0%; not independently verified |
| Solid Waste Management and Disposal | No system detail supplied | RERA amenity record | 0%; not independently verified |
| Water Conservation, Rain water Harvesting | Available: YES; system/quantity not supplied | RERA amenity record | 0%; not independently verified |
| Energy management | Available: YES; system detail not supplied | RERA amenity record | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | No system detail supplied | RERA amenity record | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Available: YES; capacity not supplied | RERA amenity record | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity record | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage/septic tank/STP, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES,” but reports 0% progress for those amenity entries. It provides no capacities, source details, equipment specifications, or independent verification of installation or operation.
The HMDA processing intimation requires an STP and septic tank as per standard specification and refers to fire-service department norms; it does not establish that the facilities have been installed or that statutory compliance has been achieved. The same intimation states that HMWS and SB and A.P. Transco were not to provide permanent connections until an occupancy certificate was produced.
No project-specific evidence is supplied for water storage/treatment, sewer reuse, storm-water design, electrical backup, lifts, fire systems or escape stairs, waste segregation, security/CCTV, or accessibility provisions.
8. Location, access & connectivity
The registered project location is Ameenpur, AMEENPUR Mandal, Sangareddy District, PIN 502032, with Plot Nos. 30,31 and the stated boundaries recorded in the RERA filing.
The supplied location record identifies Financial District (Nanakramguda) at 1.2 km. It provides no approach-road or public-transport details.
9. Developer & development status
The registered promoter is SR CONSTRUCTIONS, identified as a partnership firm. A request letter to TG-RERA gives firm number 67 OF 2016, and the Registrar of Firms acknowledgement states that S R CONSTRUCTIONS was entered in the Register of Firms as No: 67 of 2016 at Medak. The supplied evidence does not provide a verified corporate identifier or registered office for the project promoter.
The RERA filing names D GANGAREDDY as a partner and duvvuri sanjeevreddy as an authorized signatory. The Form B declaration by SANJEEVREDDY, identified as managing partner, states a completion undertaking of 9/11/2023. These are promoter-filed details and declarations, not independent verification of current construction status.
10. Approvals, official records & documents
TG-RERA registration: FORM “C” registration certificate for SR CONSTRUCTIONS 2, No. P02400001427, dated 25/11/2019; valid through 09/11/2023.
HMDA project record: Application No. 002548/SKP/R1/U6/HMDA/03082017, dated 03/08/2017. The document is an intimation to pay charges and fulfill conditions for further processing; it expressly is not approval or development permission.
Title material: Sub-legal opinion dated 14/3/2019 concerning Plot Nos. 30 and 31 in Survey Nos. 182 to 189, measuring 452.06 Sq. Mtrs.; title-report extraction states its conclusion is subject to verification of original documents.
Promoter declaration: Form B affidavit-cum-declaration by SANJEEVREDDY, including promoter declarations on title, encumbrances and completion by 9/11/2023.
Building/layout plans: The supplied record includes an HMDA intimation and references to plan/layout document uploads, but no final approved building or layout plan is available in the extracted evidence.
Occupancy/completion certificate: Not supplied; OC/completion status is therefore not established by the documents reviewed.
Frequently asked questions
Is SR CONSTRUCTIONS 2 registered with Telangana RERA?
Yes. SR CONSTRUCTIONS 2 is registered with the Telangana Real Estate Regulatory Authority as P02400001427; the registration status is On-Going Project.
Who is the developer of SR CONSTRUCTIONS 2?
The promoter named in the RERA registration is SR CONSTRUCTIONS.
Where is SR CONSTRUCTIONS 2 located?
SR CONSTRUCTIONS 2 is in AMEENPUR, Sangareddy, Telangana (502032).
When will SR CONSTRUCTIONS 2 be completed?
The promoter's proposed date of completion filed with RERA is 09/11/2023. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur