SRI ACHYUTA GRAND is a plotted development in Gowdavelly, Medchal Mandal, Medchal-Malkajgiri District. The registered promoter is KANKULA INFRA STRUCTURES AND DEVELOPERS LLP. The RERA land record states a total area of 38,342.02 sq m; the project is an open-plot residential layout, with no tower or block count, floor configuration, total plot count, or plot-size schedule disclosed. It is registered under TG-RERA number P02200001729, and the promoter’s Form B undertakes completion by 23/12/2022.

More from Kankula Infra Structures And Developers LLP · 2 projects →

01What we found

Period endedTG-RERA registration ran to 23 Dec 2022 - check its extension on TG-RERA
15documents on file - each fact links to its page
2court cases on this project's land (survey 555, 556, Gowdavelly)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Gowdavelly, Medchal, Medchal-Malkajgiri · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered nameSRI ACHYUTA GRAND RERA record
Project typePlotted development / residential open-plot layout RERA record
Phase or registered portionNo separate phase name is disclosed; the registration and final-layout record identify the plotted project on Survey Nos. 555/2 and 556/1.
TG-RERA registrationP02200001729
Registration validity18/02/2020–23/12/2022; the supplied certificate records no extension. Registration validity is distinct from the promoter’s completion undertaking and from occupancy/completion certification.
Registered promoterKANKULA INFRA STRUCTURES AND DEVELOPERS LLP RERA record Corporate record
RERA status in supplied recordThe project is identified as “New Project”; the registration certificate records a fixed validity ending 23/12/2022 and no extension. A current active-registration status is not supplied. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageGowdavelly; the HMDA approval identifies the site as Gowdavelly-ORRGC village. RERA record
MandalMedchal; the HMDA document also describes the location as Medchal-ORRGC. RERA record
DistrictMedchal-Malkajgiri RERA record
PIN501401 RERA record
Project survey numbers555/2 and 556/1 RERA record
Registered site extent38,342.02 sq m total; 718.35 sq m affected by road widening/FTL/nala widening; 37,623.67 sq m net, as stated in the RERA land record. RERA filing Land records
HMDA layout area statement38,342.02 sq m total site area; 718.37 sq m master-plan road-affected area; 37,623.65 sq m net site area in the HMDA layout documents.
Boundaries in RERA recordNorth: ROAD; south, east and west: OTHER LAND. RERA filing Land records

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the final layout letter records release to the Gowdevelly Gram Panchayat for action.
Principal layout approvalFinal Layout Permit 000362/LO/Plg/HMDA/2019; the final-layout letter records approval date 28 April, 2021 and references the permit dated 02 January, 2020. Approvals record
Approved built-up area22,986.80 sq m is recorded as approved built-up area in the RERA land record. The supplied material does not explain its calculation or identify individual buildings. RERA filing
Development formOpen-plot residential layout; no tower/block count or sanctioned floor configuration is supplied. The final-layout condition says building sites are for residential dwelling houses, with individual building permission to be considered separately.
Plot count / unit countNo RERA-declared total plot count or plot-size schedule is supplied. The draft HMDA letter refers to 18 mortgaged plots, not the total project inventory.
ParkingNo project-wide parking-space count or plot-wise parking allocation is supplied. RERA amenities Document index

Offering and status

ItemProject record
Unit typePlots; individual plot dimensions, size bands and inventory counts are not disclosed in the supplied RERA data. RERA record Promoter website
Booked / availableNot disclosed in the supplied project inventory data. Document index
Construction / development stageThe RERA record labels the project “New Project”; no current, independently verified site-progress report is supplied. RERA record RERA amenities
Completion dateThe promoter’s Form B undertakes completion by 23/12/2022. This is a promoter declaration, not evidence of completion.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The evidence instead includes an HMDA final layout letter for an open-plot layout. Document index

The project story

SRI ACHYUTA GRAND is registered as a plotted residential development on Survey Nos. 555/2 and 556/1 in Gowdavelly, Medchal Mandal, Medchal-Malkajgiri District. Its documented form is an open-plot layout, rather than an apartment or tower development. The RERA certificate identifies the project and registration, while HMDA’s final-layout letter records the residential layout approval. RERA record

The HMDA layout area statement divides the net site into plotted area, layout roads, open space/park and social infrastructure. The final-layout letter also records that roads and open spaces were taken over by the Local Authority by registered gift deed. These are approval-record statements; the supplied evidence does not establish the present on-site condition or independently verify delivery or maintenance of the layout works.

The promoter declared a completion undertaking of 23/12/2022 in Form B. No current site inspection, progress certification, or completion/occupancy certificate is supplied, so the present development and possession status cannot be confirmed from this evidence. Document index

Master plan, architecture & building design

The supplied sanctioned-plan evidence concerns a residential open-plot layout. HMDA’s final-layout letter identifies Survey Nos. 555/2 and 556/1 and an extent of 37,623.65 Sqm; the accompanying draft layout area statement specifies the component areas below.

Layout componentArea stated in HMDA draft layoutEvidence status
Total site area38,342.02 sq mHMDA layout statement
Master-plan road-affected area718.37 sq mHMDA layout statement
Net site area37,623.65 sq mHMDA layout statement
Plotted area22,987.28 sq mHMDA layout statement
Layout road area10,566.24 sq mHMDA layout statement
Open space / park3,113.70 sq mHMDA layout statement
Social infrastructure956.86 sq mHMDA layout statement
Amenities area0HMDA layout statement

The RERA land record separately states total area 38,342.02 sq mts, affected area 718.35 sq mts, and net area 37,623.67 sq mts. The layout drawing’s area statement is a source-recorded figure, not a software-measured plot schedule. RERA filing Land records Layout record

No building count, building footprint, floor configuration, tower arrangement, or plot-by-plot dimensions are supplied. The final-layout conditions provide for individual residential-building permissions to be considered separately; they do not establish that houses have been constructed or approved.

Homes, configurations & floor plans

This is a plotted project, and the supplied RERA material does not provide a plot inventory schedule with total plot count, plot-size bands, booked/available counts, or RERA-filed plot areas. A blank provisional allotment-letter template is on file but does not establish a specific allotment. Document index

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

The supplied layout drawing has one sheet, but the plot-extraction record says plot details are incomplete and no plot sizes were measured from the drawing. The separate floor-plan processing record reports no measured drawings and two scans pending; it does not provide a plot schedule. Layout record Floor plans

Parking & vehicle circulation

No sanctioned project-wide count for car or two-wheeler spaces, visitor or accessible parking, or plot-wise parking allocation is supplied. The draft HMDA layout letter records layout roads of 10,566.24 sq m and states that roads are to remain open for accessibility to neighbouring sites; it does not specify driveway widths beyond the 18 mts road-width entry in the draft-plan extraction.

A plot drawing or a marketing description does not establish an exclusive parking entitlement. The supplied evidence does not document parking allotments to individual purchasers. Document index Promoter website

Amenities, recreation & open spaces

Clubhouse / indoor

Indoor facilities
Description / sizeNo clubhouse or indoor-facility provision is identified in the supplied HMDA final-layout record or RERA amenity data.
Evidence sourceRERA amenities
Declared progress / verified statusNot established.

Sports / recreation

Walking tracks, swimming pool, gym and children’s play area
Description / sizeListed in vendor-supplied material; no size or quantity stated.
Evidence sourcePromoter website
Declared progress / verified statusMarketing claims; not established as sanctioned or completed. The brochure extraction is not confirmed as this project’s brochure.

Landscape / open space

Open space / park
Description / size3,113.70 sq m in the HMDA draft layout area statement; the final-layout letter records roads and open spaces taken over by the Local Authority by registered gift deed.
Declared progress / verified statusApproval-recorded provision and takeover statement; present condition and maintenance are not independently verified.
Green strip / tot lot / park
Description / sizeListed in RERA amenity data without a stated area or progress figure.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field; no completion verification supplied.

Convenience / community

Social infrastructure
Description / size956.86 sq m in the HMDA draft layout area statement.
Declared progress / verified statusLayout provision; no specific facility, capacity or current completion status is supplied.
Community buildings
Description / sizeListed in RERA amenity data without a stated size or progress figure.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field; no completion verification supplied.

The vendor list also mentions parks, landscaping, avenue planting and walking tracks, but these are marketing-source claims, not evidence of delivered facilities. Promoter website

Utilities, building services & safety

The HMDA draft layout conditions and RERA amenity data identify several proposed or recorded site services. The evidence does not establish present operational status, capacities or independent completion verification. RERA amenities

Water
Evidence in supplied recordThe HMDA final-layout letter describes the layout as provided with water supply; the draft letter calls for arrangements for potable/drinking-water supply.
Status limitationSource-recorded provision; source, storage capacity and current supply are not stated.
Sewerage and drainage
Evidence in supplied recordThe final-layout letter describes sewerage and drainage-disposal systems; RERA amenity data lists sewerage infrastructure and treatment/disposal of sewage and sullage water. RERA amenities
Status limitationThe draft letter’s amenity extraction lists a common septic tank/STP, but no capacity or operating evidence is supplied.
Storm-water / rainwater
Evidence in supplied recordRERA amenity data lists storm-water drains and rainwater harvesting; the HMDA final-layout letter refers to a rainwater-harvesting structure. RERA amenities
Status limitationNo capacity, location or completion verification supplied.
Electrical / lighting
Evidence in supplied recordRERA amenity data lists an electrical meter room, sub-station or receiving station; the HMDA final-layout letter records street lighting. RERA amenities
Status limitationNo supply capacity, backup provision or operating status supplied.
Solid waste
Evidence in supplied recordRERA amenity data lists solid-waste management and disposal; the draft HMDA conditions require a garbage-segregation mechanism. RERA amenities
Status limitationNo operating details or completion verification supplied.
Fire and life safety
Evidence in supplied recordListed in RERA amenity data. RERA amenities
Status limitationNo project-specific fire system details or clearance are supplied.
Accessibility / circulation
Evidence in supplied recordThe final-layout letter says roads are to be kept open for free public access and no compound wall is permitted.
Status limitationNo separate accessible route, ramp or pedestrian-separation details are supplied.

The layout approval describes site-level infrastructure; it is not evidence that any individual dwelling has received building permission or that a statutory safety clearance has been obtained.

Location, access & connectivity

The registered location is Gowdavelly, Medchal Mandal, Medchal-Malkajgiri District, PIN 501401; HMDA’s documents refer to Gowdavelly-ORRGC village. RERA record

The supplied location record identifies the nearest sampled Outer Ring Road interchange at 0.6 km (approx.). Location record No official public-transport stops, approach-road distances, or verified travel times are supplied. The vendor material lists connectivity and travel-time claims, but these are not treated here as independently verified location measurements. Promoter website

Developer & development status

The registered promoter is KANKULA INFRA STRUCTURES AND DEVELOPERS LLP, an LLP. The project is registered under TG-RERA number P02200001729. Corporate record

The RERA certificate lists a promoter-office address as Village: Mandal: District: Ranga Reddy, Pin: 500100; the supplied record does not provide a complete street address or a verified official project contact. A separate marketing source identifies ASPIREALTY and provides its own contact details, but that brochure is not confirmed as this project’s RERA-filed document; it is not used to identify the registered promoter.

The promoter’s Form B declaration undertakes completion by 23/12/2022. No phase-wise construction progress, revised completion date, or occupancy/completion certificate is supplied. Document index

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200001729; issued 18/02/2020; valid through 23/12/2022
What the supplied document establishesForm C records the project name, promoter, registration period and registration conditions.
HMDA draft layout letter
Identifier / dateApproval/permit 000362/LO/Plg/HMDA/2019; dated 23 December, 2019
What the supplied document establishesDraft open-plot layout proposal for Survey Nos. 555/2 and 556/1, forwarded for further action; it records a mortgage over specified plots and is not a final layout release.
HMDA final layout letter
Identifier / date000362/LO/Plg/HMDA/2019; letter date 28 April, 2021
What the supplied document establishesFinal residential layout letter for Survey Nos. 555/2 and 556/1; records layout conditions and road/open-space takeover statement.
RERA Form B declaration
Identifier / date24/12/2019
What the supplied document establishesPromoter declaration concerning land title and encumbrances, project funds, approvals and completion undertaking.
Layout area statement
Identifier / dateHMDA drawing/document
What the supplied document establishesProvides the site, plotted, road, open-space and social-infrastructure areas listed above.
Provisional allotment-letter template
Identifier / dateNo completed buyer/unit details
What the supplied document establishesBlank template; does not evidence a specific plot allotment.

The supplied evidence does not include a plot-by-plot approved inventory schedule, an individual building-permission schedule, or an occupancy/completion certificate. Document index

Frequently asked questions

Is SRI ACHYUTA GRAND registered with Telangana RERA?

Yes. SRI ACHYUTA GRAND is registered with the Telangana Real Estate Regulatory Authority as P02200001729; the registration status is New Project.

Who is the developer of SRI ACHYUTA GRAND?

The promoter named in the RERA registration is KANKULA INFRA STRUCTURES AND DEVELOPERS LLP.

Where is SRI ACHYUTA GRAND located?

SRI ACHYUTA GRAND is in GOWDAVELLI, Gowdavelly, Medchal, Medchal-Malkajgiri, Telangana (501401).

When will SRI ACHYUTA GRAND be completed?

The promoter's proposed date of completion filed with RERA is 23/12/2022. This is the promoter's declaration, not a guarantee.