SRI ALEKYA DEVELOPERS TARANG CITY is a plotted development in Peddakaparthy, Chityal Mandal, Nalgonda District. The registered promoter is Sri Alekya Developers. The project site is **106675.14 sqmts**, and the draft layout records **323 plots**; plot configurations are not disclosed. Its TG-RERA registration number is **P01800001848**, and the proposed completion date in the RERA header is **22/09/2025**.

01What we found

Period endedTG-RERA registration ran to 22 Sep 2025 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSRI ALEKYA DEVELOPERS TARANG CITY RERA record
Project typePlotted development / plotted layout RERA record RERA filing
Phase / registered portionPhase not disclosed. The TG-RERA certificate identifies the registered project and surveys; no separate phase designation is provided.
TG-RERA registrationP01800001848
Registration validityCertificate states five years, from 21/03/2020 through 22/09/2025, unless extended by the Authority. The supplied record says no extension; current registration status requires direct portal verification. Registration validity is distinct from the completion deadline.
Registered promoterSri Alekya Developers
RERA-record statusHeader labels the project “New Project”; the supplied certificate records the above registration period. Current status is not established by the materials supplied. RERA record

Land and geographic identity

ItemProject record
Revenue villagePeddakaparthy RERA record RERA filing
LocalityNot separately disclosed; the RERA certificate lists Peddakaparthy.
Mandal / district / PINChityal / Nalgonda / 508114 RERA record
Project surveys, as stated in the TG-RERA certificate739 PART, 745 PART, 746 PART, 747 PART
Survey notation in the filed land details739 PART,745 PART,746 PART,747 PART, RERA filing
Site extentThe RERA land-details record states total area and net area of 106675.14 sqmts, with affected area recorded as 0. RERA filing
BoundariesEast: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: OTHERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityDirector of Town and Country Planning (DTCP); the draft technical layout pattern is communicated for Peddakaparthy Gram Panchayat. Approvals record
Principal layout approval referenceTLP.No. 201/2019/H; file/proceedings reference Lr.Roc No 14901/162/2 019/H. Approvals record
Approval dateThe supplied approval extraction gives 23-09.204g, which is not a reliably readable date. The project-information field separately records 23/09/2019 as the approved date. Approvals record RERA filing
Layout scale recorded in draft approval323 plots; the draft approval allocates land to plotted area, roads, open space and mortgage area.
Approved built-up areaRERA project information records 65332.45 sqmts. No building/tower count or sanctioned floor configuration is supplied. RERA filing
Mortgage areaRERA project information records 10117.14 sqmts. The draft layout identifies mortgage plots as 166 to 192 & 272 to 289. RERA filing
Buildings / floors / parking levelsNot disclosed in the supplied project record; this is a plotted layout, and no building-level configuration is provided. RERA filing

Offering and status

ItemProject record
OfferingPlots; the draft layout records 323 plots. Unit-wise plot inventory, plot-size schedule, bookings and availability are not supplied.
Construction / development stageNo independently verified site progress or current construction stage is supplied. The draft layout makes final layout release conditional on completing development works and meeting stated conditions.
Completion datesThe RERA header gives proposed completion 22/09/2025; the Form B declarations state 19/09/2025. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied documents. The project is a plotted layout; the available record does not establish an OC or final layout release. Document index

2. The project story

Tarang City is registered as a plotted-development project in Peddakaparthy village, Chityal Mandal, Nalgonda District. Its TG-RERA certificate identifies surveys 739 PART, 745 PART, 746 PART and 747 PART and records the promoter as Sri Alekya Developers.

The DTCP communication describes a draft technical layout pattern for 323 plots, with designated areas for plots, roads, open space and plots to be mortgaged to the Gram Panchayat. It describes infrastructure and development works to be carried out by the layout owner, and says that proposals for final layout are to follow completion of those works and compliance with the conditions. This is a description of the approval record, not confirmation that the works have been completed.

The supplied materials do not establish present site progress, plot-by-plot sales or availability, or whether a final layout has been released. The RERA-recorded proposed completion date is shown in the overview table; a separate Form B declaration also states a completion undertaking. Neither is independent evidence of completed development. RERA record

3. Master plan, architecture & building design

This is a plotted layout, not a supplied apartment or building plan set. The RERA land-details record states 106675.14 sqmts for both total and net area and records 0 affected area. The project information separately records 65332.45 sqmts approved built-up area, but the supplied materials do not define its scope or provide building drawings that would explain it. These area figures are therefore kept as separately filed measurements. RERA filing RERA filing

The draft technical layout pattern records 323 plots and the following land-use allocations:

Layout componentFiled figure
Site area reserved for Open Space (Park)10%; Ac. 2.636 Cents 12758.24 Sq.yards
Roads area28.76%; Ac. 7.58 Cents 36687.20 Sq.yards
Plotted area61.25%; Ac. 16.144 Cents 78136.96 S. ards
Mortgage area15.48%; Ac. 2.50 Cents 12100.00 Sq.yards; Plot Nos 166 to 192 & 272 to 289

The approval extraction includes numerous survey notations associated with the draft layout, but some are garbled or inconsistent in transcription. The complete project survey identity used in the TG-RERA certificate is listed in the first table; the approval’s extracted survey list is available in the cited document.

No approved building count, floors, parking levels, plot-size schedule, detailed road widths, or final layout drawing is included in the supplied extracts. The approval is expressly identified as a draft technical layout pattern and describes later steps for final layout release.

4. Homes, configurations & floor plans

The evidenced offering is plots, not apartment configurations. The draft layout records 323 plots, but a plot-by-plot size schedule, saleable areas, booked/available counts and individual plot dimensions are not supplied.

The supplied floor-plan record contains two drawings, both scans pending; no carpet areas were measured. Apartment-style carpet-area or loading comparisons are therefore not available for this plotted project. Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Plots323 in draft layoutNot suppliedNot suppliedNot suppliedNot applicable / not measuredNot supplied

5. Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is disclosed in the supplied materials. The project is a plotted layout, and no parking levels, ramps, EV charging provision or exclusive parking rights are established here. RERA filing

The draft approval records a road network and requires roads to be opened for access to neighbouring sites. This does not establish individual plot parking arrangements.

6. Amenities, recreation & open spaces

The RERA amenity record lists several layout infrastructure and facility categories, but its progress entries are 0; the record does not establish that these facilities are complete. The draft approval also specifies development works and open-space allocation. No independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park10%; Ac. 2.636 Cents 12758.24 Sq.yardsDraft layout allocationAmenity record shows progress 0; completion not independently verified. RERA amenities
Internal roads and footpathsListed as available: YES; no dimensions suppliedRERA amenity record RERA amenitiesProgress 0; completion not independently verified.
Community buildingsListed; no size or specification suppliedRERA amenity record RERA amenitiesProgress 0; completion not independently verified.
Green strip / tot lot / parkListed as available: YES; no separate size suppliedRERA amenity record RERA amenitiesProgress 0; completion not independently verified.
Other recreation facilitiesNo specific sports or clubhouse facility is identified in the supplied recordsRERA amenities Document indexNot established.

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The record supplies no capacities or detailed engineering specifications, and the progress values shown are 0. RERA amenities

The draft approval sets out development works including road formation and side drains, nala channelization, greenery and avenue planting, rainwater-harvesting pits, street lighting and electricity facilities, and provision of a disposal system and water supply. It also requires house sullage to be disposed of so it does not run into or stagnate on adjacent streets, with effluent treated as required by the concerned Health Officer before entering drains or channels. These are approval conditions, not evidence of completed installations or statutory compliance.

No water source or storage capacity, treatment-plant capacity, electrical backup, lift provision, fire-system specification, CCTV/access-control detail, or accessibility design is supplied. RERA amenities Document index

8. Location, access & connectivity

The registered project location is Peddakaparthy village, Chityal Mandal, Nalgonda District, PIN 508114. The RERA land record lists the northern boundary as ROAD and the other three boundaries as OTHERS LAND. RERA record RERA filing

The location record gives an approximate distance of 37.9 km to the nearest sampled Outer Ring Road interchange. No other independently sourced approach-road, public-transport or landmark distances are supplied. Location record

9. Developer & development status

The TG-RERA certificate names Sri Alekya Developers as the registered promoter and lists its office as Village: L.B. Nagar-I, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. The project record identifies the organization type as Company. A corporate registration number and verified contact details are not provided in the supplied record. RERA filing

The draft layout communication names M/s Sri Alekya Developers as layout owner/developer and identifies K. Venkateshwar Reddy as its representative in that document. The Form B declarations state a completion undertaking of 19/09/2025. These are document assertions; no current construction progress or independent completion verification is supplied.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate — P01800001848Form C records registration under section 5, the project name, promoter, project surveys and stated validity from 21/03/2020 to 22/09/2025.
DTCP draft technical layout communication — TLP.No. 201/2019/HDraft technical layout pattern for a proposed 323-plot layout at Peddakaparthy; includes allocations and conditions for development and later final layout release.
Form B affidavit-cum-declarationsPromoter declarations on title basis, encumbrances, project funds and completion undertaking; these are promoter statements, not independent verification.
Layout-plan document requested in RERA fileThe supplied document register includes a request for a letter of layout approval or stamped layout plan; the corresponding file is not extracted as an approved final layout in the available materials. Document index
Occupancy / completion certificate or final layout releaseNot present in the supplied documents. Document index

The DTCP communication says that the draft permission is not proof of land title and describes conditions for development and subsequent final-layout processing. Full approval terms and land-title analysis are addressed in their respective report sections.

Frequently asked questions

Is SRI ALEKYA DEVELOPERS TARANG CITY registered with Telangana RERA?

Yes. SRI ALEKYA DEVELOPERS TARANG CITY is registered with the Telangana Real Estate Regulatory Authority as P01800001848; the registration status is New Project.

Who is the developer of SRI ALEKYA DEVELOPERS TARANG CITY?

The promoter named in the RERA registration is SRI ALEKYA DEVELOPERS.

Where is SRI ALEKYA DEVELOPERS TARANG CITY located?

SRI ALEKYA DEVELOPERS TARANG CITY is in Peddakaparthy, Chityal, Nalgonda, Telangana (508114).

When will SRI ALEKYA DEVELOPERS TARANG CITY be completed?

The promoter's proposed date of completion filed with RERA is 22/09/2025. This is the promoter's declaration, not a guarantee.