Sri Alekya Developers Tarang City
SRI ALEKYA DEVELOPERS · Nalgonda · RERA P01800001848
SRI ALEKYA DEVELOPERS TARANG CITY is a plotted development in Peddakaparthy, Chityal Mandal, Nalgonda District. The registered promoter is Sri Alekya Developers. The project site is **106675.14 sqmts**, and the draft layout records **323 plots**; plot configurations are not disclosed. Its TG-RERA registration number is **P01800001848**, and the proposed completion date in the RERA header is **22/09/2025**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SRI ALEKYA DEVELOPERS TARANG CITY RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not disclosed. The TG-RERA certificate identifies the registered project and surveys; no separate phase designation is provided. |
| TG-RERA registration | P01800001848 |
| Registration validity | Certificate states five years, from 21/03/2020 through 22/09/2025, unless extended by the Authority. The supplied record says no extension; current registration status requires direct portal verification. Registration validity is distinct from the completion deadline. |
| Registered promoter | Sri Alekya Developers |
| RERA-record status | Header labels the project “New Project”; the supplied certificate records the above registration period. Current status is not established by the materials supplied. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | Peddakaparthy RERA record RERA filing |
| Locality | Not separately disclosed; the RERA certificate lists Peddakaparthy. |
| Mandal / district / PIN | Chityal / Nalgonda / 508114 RERA record |
| Project surveys, as stated in the TG-RERA certificate | 739 PART, 745 PART, 746 PART, 747 PART |
| Survey notation in the filed land details | 739 PART,745 PART,746 PART,747 PART, RERA filing |
| Site extent | The RERA land-details record states total area and net area of 106675.14 sqmts, with affected area recorded as 0. RERA filing |
| Boundaries | East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); the draft technical layout pattern is communicated for Peddakaparthy Gram Panchayat. Approvals record |
| Principal layout approval reference | TLP.No. 201/2019/H; file/proceedings reference Lr.Roc No 14901/162/2 019/H. Approvals record |
| Approval date | The supplied approval extraction gives 23-09.204g, which is not a reliably readable date. The project-information field separately records 23/09/2019 as the approved date. Approvals record RERA filing |
| Layout scale recorded in draft approval | 323 plots; the draft approval allocates land to plotted area, roads, open space and mortgage area. |
| Approved built-up area | RERA project information records 65332.45 sqmts. No building/tower count or sanctioned floor configuration is supplied. RERA filing |
| Mortgage area | RERA project information records 10117.14 sqmts. The draft layout identifies mortgage plots as 166 to 192 & 272 to 289. RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied project record; this is a plotted layout, and no building-level configuration is provided. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots; the draft layout records 323 plots. Unit-wise plot inventory, plot-size schedule, bookings and availability are not supplied. |
| Construction / development stage | No independently verified site progress or current construction stage is supplied. The draft layout makes final layout release conditional on completing development works and meeting stated conditions. |
| Completion dates | The RERA header gives proposed completion 22/09/2025; the Form B declarations state 19/09/2025. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied documents. The project is a plotted layout; the available record does not establish an OC or final layout release. Document index |
2. The project story
Tarang City is registered as a plotted-development project in Peddakaparthy village, Chityal Mandal, Nalgonda District. Its TG-RERA certificate identifies surveys 739 PART, 745 PART, 746 PART and 747 PART and records the promoter as Sri Alekya Developers.
The DTCP communication describes a draft technical layout pattern for 323 plots, with designated areas for plots, roads, open space and plots to be mortgaged to the Gram Panchayat. It describes infrastructure and development works to be carried out by the layout owner, and says that proposals for final layout are to follow completion of those works and compliance with the conditions. This is a description of the approval record, not confirmation that the works have been completed.
The supplied materials do not establish present site progress, plot-by-plot sales or availability, or whether a final layout has been released. The RERA-recorded proposed completion date is shown in the overview table; a separate Form B declaration also states a completion undertaking. Neither is independent evidence of completed development. RERA record
3. Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or building plan set. The RERA land-details record states 106675.14 sqmts for both total and net area and records 0 affected area. The project information separately records 65332.45 sqmts approved built-up area, but the supplied materials do not define its scope or provide building drawings that would explain it. These area figures are therefore kept as separately filed measurements. RERA filing RERA filing
The draft technical layout pattern records 323 plots and the following land-use allocations:
| Layout component | Filed figure |
|---|---|
| Site area reserved for Open Space (Park) | 10%; Ac. 2.636 Cents 12758.24 Sq.yards |
| Roads area | 28.76%; Ac. 7.58 Cents 36687.20 Sq.yards |
| Plotted area | 61.25%; Ac. 16.144 Cents 78136.96 S. ards |
| Mortgage area | 15.48%; Ac. 2.50 Cents 12100.00 Sq.yards; Plot Nos 166 to 192 & 272 to 289 |
The approval extraction includes numerous survey notations associated with the draft layout, but some are garbled or inconsistent in transcription. The complete project survey identity used in the TG-RERA certificate is listed in the first table; the approval’s extracted survey list is available in the cited document.
No approved building count, floors, parking levels, plot-size schedule, detailed road widths, or final layout drawing is included in the supplied extracts. The approval is expressly identified as a draft technical layout pattern and describes later steps for final layout release.
4. Homes, configurations & floor plans
The evidenced offering is plots, not apartment configurations. The draft layout records 323 plots, but a plot-by-plot size schedule, saleable areas, booked/available counts and individual plot dimensions are not supplied.
The supplied floor-plan record contains two drawings, both scans pending; no carpet areas were measured. Apartment-style carpet-area or loading comparisons are therefore not available for this plotted project. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 323 in draft layout | Not supplied | Not supplied | Not supplied | Not applicable / not measured | Not supplied |
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is disclosed in the supplied materials. The project is a plotted layout, and no parking levels, ramps, EV charging provision or exclusive parking rights are established here. RERA filing
The draft approval records a road network and requires roads to be opened for access to neighbouring sites. This does not establish individual plot parking arrangements.
6. Amenities, recreation & open spaces
The RERA amenity record lists several layout infrastructure and facility categories, but its progress entries are 0; the record does not establish that these facilities are complete. The draft approval also specifies development works and open-space allocation. No independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 10%; Ac. 2.636 Cents 12758.24 Sq.yards | Draft layout allocation | Amenity record shows progress 0; completion not independently verified. RERA amenities |
| Internal roads and footpaths | Listed as available: YES; no dimensions supplied | RERA amenity record RERA amenities | Progress 0; completion not independently verified. |
| Community buildings | Listed; no size or specification supplied | RERA amenity record RERA amenities | Progress 0; completion not independently verified. |
| Green strip / tot lot / park | Listed as available: YES; no separate size supplied | RERA amenity record RERA amenities | Progress 0; completion not independently verified. |
| Other recreation facilities | No specific sports or clubhouse facility is identified in the supplied records | RERA amenities Document index | Not established. |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The record supplies no capacities or detailed engineering specifications, and the progress values shown are 0. RERA amenities
The draft approval sets out development works including road formation and side drains, nala channelization, greenery and avenue planting, rainwater-harvesting pits, street lighting and electricity facilities, and provision of a disposal system and water supply. It also requires house sullage to be disposed of so it does not run into or stagnate on adjacent streets, with effluent treated as required by the concerned Health Officer before entering drains or channels. These are approval conditions, not evidence of completed installations or statutory compliance.
No water source or storage capacity, treatment-plant capacity, electrical backup, lift provision, fire-system specification, CCTV/access-control detail, or accessibility design is supplied. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Peddakaparthy village, Chityal Mandal, Nalgonda District, PIN 508114. The RERA land record lists the northern boundary as ROAD and the other three boundaries as OTHERS LAND. RERA record RERA filing
The location record gives an approximate distance of 37.9 km to the nearest sampled Outer Ring Road interchange. No other independently sourced approach-road, public-transport or landmark distances are supplied. Location record
9. Developer & development status
The TG-RERA certificate names Sri Alekya Developers as the registered promoter and lists its office as Village: L.B. Nagar-I, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. The project record identifies the organization type as Company. A corporate registration number and verified contact details are not provided in the supplied record. RERA filing
The draft layout communication names M/s Sri Alekya Developers as layout owner/developer and identifies K. Venkateshwar Reddy as its representative in that document. The Form B declarations state a completion undertaking of 19/09/2025. These are document assertions; no current construction progress or independent completion verification is supplied.
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate — P01800001848 | Form C records registration under section 5, the project name, promoter, project surveys and stated validity from 21/03/2020 to 22/09/2025. |
| DTCP draft technical layout communication — TLP.No. 201/2019/H | Draft technical layout pattern for a proposed 323-plot layout at Peddakaparthy; includes allocations and conditions for development and later final layout release. |
| Form B affidavit-cum-declarations | Promoter declarations on title basis, encumbrances, project funds and completion undertaking; these are promoter statements, not independent verification. |
| Layout-plan document requested in RERA file | The supplied document register includes a request for a letter of layout approval or stamped layout plan; the corresponding file is not extracted as an approved final layout in the available materials. Document index |
| Occupancy / completion certificate or final layout release | Not present in the supplied documents. Document index |
The DTCP communication says that the draft permission is not proof of land title and describes conditions for development and subsequent final-layout processing. Full approval terms and land-title analysis are addressed in their respective report sections.
1. Project at a glance
Project identity
Registered name: SRI ALEKYA DEVELOPERS TARANG CITY
Project type: Plotted development / plotted layout
Phase / registered portion: Phase not disclosed. The TG-RERA certificate identifies the registered project and surveys; no separate phase designation is provided.
TG-RERA registration: P01800001848
Registration validity: Certificate states five years, from 21/03/2020 through 22/09/2025, unless extended by the Authority. The supplied record says no extension; current registration status requires direct portal verification. Registration validity is distinct from the completion deadline.
Registered promoter: Sri Alekya Developers
RERA-record status: Header labels the project “New Project”; the supplied certificate records the above registration period. Current status is not established by the materials supplied.
Land and geographic identity
Revenue village: Peddakaparthy
Locality: Not separately disclosed; the RERA certificate lists Peddakaparthy.
Mandal / district / PIN: Chityal / Nalgonda / 508114
Project surveys, as stated in the TG-RERA certificate: 739 PART, 745 PART, 746 PART, 747 PART
Survey notation in the filed land details: 739 PART,745 PART,746 PART,747 PART,
Site extent: The RERA land-details record states total area and net area of 106675.14 sqmts, with affected area recorded as 0.
Boundaries: East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: OTHERS LAND.
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); the draft technical layout pattern is communicated for Peddakaparthy Gram Panchayat.
Principal layout approval reference: TLP.No. 201/2019/H; file/proceedings reference Lr.Roc No 14901/162/2 019/H.
Approval date: The supplied approval extraction gives 23-09.204g, which is not a reliably readable date. The project-information field separately records 23/09/2019 as the approved date.
Layout scale recorded in draft approval: 323 plots; the draft approval allocates land to plotted area, roads, open space and mortgage area.
Approved built-up area: RERA project information records 65332.45 sqmts. No building/tower count or sanctioned floor configuration is supplied.
Mortgage area: RERA project information records 10117.14 sqmts. The draft layout identifies mortgage plots as 166 to 192 & 272 to 289.
Buildings / floors / parking levels: Not disclosed in the supplied project record; this is a plotted layout, and no building-level configuration is provided.
Offering and status
Offering: Plots; the draft layout records 323 plots. Unit-wise plot inventory, plot-size schedule, bookings and availability are not supplied.
Construction / development stage: No independently verified site progress or current construction stage is supplied. The draft layout makes final layout release conditional on completing development works and meeting stated conditions.
Completion dates: The RERA header gives proposed completion 22/09/2025; the Form B declarations state 19/09/2025.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied documents. The project is a plotted layout; the available record does not establish an OC or final layout release.
2. The project story
Tarang City is registered as a plotted-development project in Peddakaparthy village, Chityal Mandal, Nalgonda District. Its TG-RERA certificate identifies surveys 739 PART, 745 PART, 746 PART and 747 PART and records the promoter as Sri Alekya Developers.
The DTCP communication describes a draft technical layout pattern for 323 plots, with designated areas for plots, roads, open space and plots to be mortgaged to the Gram Panchayat. It describes infrastructure and development works to be carried out by the layout owner, and says that proposals for final layout are to follow completion of those works and compliance with the conditions. This is a description of the approval record, not confirmation that the works have been completed.
The supplied materials do not establish present site progress, plot-by-plot sales or availability, or whether a final layout has been released. The RERA-recorded proposed completion date is shown in the overview table; a separate Form B declaration also states a completion undertaking. Neither is independent evidence of completed development.
3. Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or building plan set. The RERA land-details record states 106675.14 sqmts for both total and net area and records 0 affected area. The project information separately records 65332.45 sqmts approved built-up area, but the supplied materials do not define its scope or provide building drawings that would explain it. These area figures are therefore kept as separately filed measurements.
The draft technical layout pattern records 323 plots and the following land-use allocations:
Site area reserved for Open Space (Park): 10%; Ac. 2.636 Cents 12758.24 Sq.yards
Roads area: 28.76%; Ac. 7.58 Cents 36687.20 Sq.yards
Plotted area: 61.25%; Ac. 16.144 Cents 78136.96 S. ards
Mortgage area: 15.48%; Ac. 2.50 Cents 12100.00 Sq.yards; Plot Nos 166 to 192 & 272 to 289
The approval extraction includes numerous survey notations associated with the draft layout, but some are garbled or inconsistent in transcription. The complete project survey identity used in the TG-RERA certificate is listed in the first table; the approval’s extracted survey list is available in the cited document.
No approved building count, floors, parking levels, plot-size schedule, detailed road widths, or final layout drawing is included in the supplied extracts. The approval is expressly identified as a draft technical layout pattern and describes later steps for final layout release.
4. Homes, configurations & floor plans
The evidenced offering is plots, not apartment configurations. The draft layout records 323 plots, but a plot-by-plot size schedule, saleable areas, booked/available counts and individual plot dimensions are not supplied.
The supplied floor-plan record contains two drawings, both scans pending; no carpet areas were measured. Apartment-style carpet-area or loading comparisons are therefore not available for this plotted project.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 323 in draft layout | Not supplied | Not supplied | Not supplied | Not applicable / not measured | Not supplied |
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is disclosed in the supplied materials. The project is a plotted layout, and no parking levels, ramps, EV charging provision or exclusive parking rights are established here.
The draft approval records a road network and requires roads to be opened for access to neighbouring sites. This does not establish individual plot parking arrangements.
6. Amenities, recreation & open spaces
The RERA amenity record lists several layout infrastructure and facility categories, but its progress entries are 0; the record does not establish that these facilities are complete. The draft approval also specifies development works and open-space allocation. No independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 10%; Ac. 2.636 Cents 12758.24 Sq.yards | Draft layout allocation | Amenity record shows progress 0; completion not independently verified. |
| Internal roads and footpaths | Listed as available: YES; no dimensions supplied | RERA amenity record | Progress 0; completion not independently verified. |
| Community buildings | Listed; no size or specification supplied | RERA amenity record | Progress 0; completion not independently verified. |
| Green strip / tot lot / park | Listed as available: YES; no separate size supplied | RERA amenity record | Progress 0; completion not independently verified. |
| Other recreation facilities | No specific sports or clubhouse facility is identified in the supplied records | Not established. |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The record supplies no capacities or detailed engineering specifications, and the progress values shown are 0.
The draft approval sets out development works including road formation and side drains, nala channelization, greenery and avenue planting, rainwater-harvesting pits, street lighting and electricity facilities, and provision of a disposal system and water supply. It also requires house sullage to be disposed of so it does not run into or stagnate on adjacent streets, with effluent treated as required by the concerned Health Officer before entering drains or channels. These are approval conditions, not evidence of completed installations or statutory compliance.
No water source or storage capacity, treatment-plant capacity, electrical backup, lift provision, fire-system specification, CCTV/access-control detail, or accessibility design is supplied.
8. Location, access & connectivity
The registered project location is Peddakaparthy village, Chityal Mandal, Nalgonda District, PIN 508114. The RERA land record lists the northern boundary as ROAD and the other three boundaries as OTHERS LAND.
The location record gives an approximate distance of 37.9 km to the nearest sampled Outer Ring Road interchange. No other independently sourced approach-road, public-transport or landmark distances are supplied.
9. Developer & development status
The TG-RERA certificate names Sri Alekya Developers as the registered promoter and lists its office as Village: L.B. Nagar-I, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500035. The project record identifies the organization type as Company. A corporate registration number and verified contact details are not provided in the supplied record.
The draft layout communication names M/s Sri Alekya Developers as layout owner/developer and identifies K. Venkateshwar Reddy as its representative in that document. The Form B declarations state a completion undertaking of 19/09/2025. These are document assertions; no current construction progress or independent completion verification is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate — P01800001848: Form C records registration under section 5, the project name, promoter, project surveys and stated validity from 21/03/2020 to 22/09/2025.
DTCP draft technical layout communication — TLP.No. 201/2019/H: Draft technical layout pattern for a proposed 323-plot layout at Peddakaparthy; includes allocations and conditions for development and later final layout release.
Form B affidavit-cum-declarations: Promoter declarations on title basis, encumbrances, project funds and completion undertaking; these are promoter statements, not independent verification.
Layout-plan document requested in RERA file: The supplied document register includes a request for a letter of layout approval or stamped layout plan; the corresponding file is not extracted as an approved final layout in the available materials.
Occupancy / completion certificate or final layout release: Not present in the supplied documents.
The DTCP communication says that the draft permission is not proof of land title and describes conditions for development and subsequent final-layout processing. Full approval terms and land-title analysis are addressed in their respective report sections.
Frequently asked questions
Is SRI ALEKYA DEVELOPERS TARANG CITY registered with Telangana RERA?
Yes. SRI ALEKYA DEVELOPERS TARANG CITY is registered with the Telangana Real Estate Regulatory Authority as P01800001848; the registration status is New Project.
Who is the developer of SRI ALEKYA DEVELOPERS TARANG CITY?
The promoter named in the RERA registration is SRI ALEKYA DEVELOPERS.
Where is SRI ALEKYA DEVELOPERS TARANG CITY located?
SRI ALEKYA DEVELOPERS TARANG CITY is in Peddakaparthy, Chityal, Nalgonda, Telangana (508114).
When will SRI ALEKYA DEVELOPERS TARANG CITY be completed?
The promoter's proposed date of completion filed with RERA is 22/09/2025. This is the promoter's declaration, not a guarantee.
More projects in Peddakaparthy