Sri Chaitanya Estates
BOINPALLY NARSINGA RAO, BOINPALLY UMA RANI · Karimnagar · RERA P02700006899
SRI CHAITANYA ESTATES is a plotted development in Nagunur, Karimnagar -I mandal, Karimnagar district, developed by registered promoters BOINPALLY NARSINGA RAO and BOINPALLY UMA RANI. The registered site extent is 38,701.16 sq. m., and the approved layout records 124 plots, with software-read plot sizes of 117.84–416.38 sq. m. TG-RERA registration number P02700006899 was granted under section 5, with validity from 08/09/2023 to 19/04/2025. The promoter’s Form B declares completion by 19th APRIL, 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI CHAITANYA ESTATES RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration covers the plotted layout |
| TG-RERA registration | P02700006899; granted under section 5 |
| Registration validity | 08/09/2023 to 19/04/2025; no extension is recorded in the supplied certificate |
| Registered promoter | BOINPALLY NARSINGA RAO, BOINPALLY UMA RANI RERA record |
| RERA status | Certificate records the registration and its stated validity period. Current registration status after 19/04/2025 is not established by the supplied evidence. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Nagunur / NAGUNUR RERA record |
| Revenue village | Nagunur Land records |
| Mandal | Karimnagar -I RERA record |
| District | Karimnagar RERA record |
| PIN | 505415 in the RERA certificate |
| Project survey numbers and subdivisions | 458/A, 460, 464/A, 459/2/1 Land records |
| Registered site extent | 38,701.16 sq. m. RERA filing |
| Land-area figures as recorded | Total area: 38,701.16 sq. m.; area affected in road widening/FTL of tanks/nala widening: 9,822.33 sq. m.; net area: 28,878.83 sq. m. RERA filing |
| Boundary—East | Land of B Srinivas Rao RERA filing |
| Boundary—West | 30M wide road RERA filing |
| Boundary—North | 20M wide road RERA filing |
| Boundary—South | Land of B Srinivas Rao RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Satavahana Urban Development Authority (Karimnagar) |
| Principal approval | Draft Technical Layout Pattern, approval no. Draft - TLP.NO.3145/Nagunur/2021/0624 UDA; approved 19 April 2022 Approvals record |
| File number | Lr.Roc.No.3145/Nagunur/2021/0624 Approvals record |
| Approved built-up area | 23,991.18 sq. m. is recorded as “Approved Built up Area” in the project fields; the layout approval also records 23,991.18 sq. m. as plotted area. RERA filing |
| Plots | 124 plots, as recorded in the layout approval and layout drawing extraction Layout record |
| Buildings / floors / parking levels | Not applicable to the evidenced plotted layout; no building-floor or structured-parking configuration is supplied. Layout record |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots RERA record RERA filing |
| Plot count and sizes | Software-read layout schedule: 124 plots; 117.84–416.38 sq. m. (140.9–498.0 sq. yd.); verify against the approved drawing. Layout record |
| Booked / available counts | Not supplied. RERA filing |
| Completion deadline | Promoter’s Form B declares completion by 19th APRIL, 2025. |
| Registration validity vs. completion deadline | The RERA certificate’s stated validity ends 19/04/2025; the Form B completion undertaking also states 19th APRIL, 2025. These are distinct recorded dates/commitments. |
| Construction / development stage | The RERA-filed amenity entries carry no progress percentages. A third-party vendor record labels the project “Completed”; this is not independent site verification. RERA amenities Promoter website |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence. For this plotted development, the evidence does not establish a project-wide or phase-specific certificate status. Document index |
2. The project story
SRI CHAITANYA ESTATES is a plotted layout in Nagunur village, Karimnagar -I mandal, Karimnagar district, on the registered survey parcels 458/A, 460, 464/A and 459/2/1. The layout approval identifies a 38,701.16 sq. m. site and a 124-plot development. Its stated boundaries are a 30M-wide road to the west, a 20M-wide road to the north, and land of B Srinivas Rao to the east and south. RERA record Land records
The approved layout allocation records 23,991.18 sq. m. as plotted area, 9,822.33 sq. m. as roads, 3,495.42 sq. m. as park/open space, 387.47 sq. m. as utility area and 1,003.67 sq. m. as social infrastructure. The approval also identifies plots reserved as mortgage security in favour of the Vice-Chairman, SUDA-Satavahana. Layout record
The promoter undertook to complete the project by 19th APRIL, 2025 in Form B. No RERA-filed progress percentage or completion certificate is supplied here, so the development stage and completion of the approved works cannot be independently confirmed from this evidence. The vendor’s “Completed” label is a third-party record, not verified site evidence. RERA amenities Promoter website
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or tower development. The sanctioned layout communication records a total layout area of 38,701.16 sq. m. and 124 plots. Its land-use figures are: plotted area 23,991.18 sq. m.; roads 9,822.33 sq. m.; park/open space 3,495.42 sq. m.; utility area 387.47 sq. m.; and social infrastructure 1,003.67 sq. m. Layout record
The drawing extraction reports that the 124 plot schedule is complete and that the sum of plot areas matches the plotted-area figure in the drawing’s area statement. Software-read plot sizes range from 117.84 to 416.38 sq. m.; these drawing-derived measurements should be checked against the approved plan. Layout record
The layout approval calls for roads 18 metres and above, and identifies a 15% mortgage area of 3,631.6 sq. m. in plots, held in favour of the Vice-Chairman, SUDA-Satavahana as security for development obligations. The approval describes a proposed programme of road formation, drainage, water-supply infrastructure, electrical lines and street lighting, park development, avenue planting and rainwater-harvesting pits. The supplied evidence does not describe building footprints, floors, towers or architectural plans. RERA filing
4. Homes, configurations & floor plans
The offering evidenced in the registration and approved layout is plots, not flats. No RERA-filed plot-wise booking or availability counts are supplied. RERA filing Layout record
| Plot information | Record |
|---|---|
| Total plots | 124, as recorded in the approved layout extraction Layout record |
| Software-read size range | 117.84–416.38 sq. m. (140.9–498.0 sq. yd.) Layout record |
| Software-read size bands | 100–150 sq. yd.: 4 plots; 150–200: 39; 200–250: 41; 250–300: 30; 300–400: 4; 400–500: 6 Layout record |
| Booked / available plots | Not supplied RERA filing |
The drawing measurements are software-read from the approved layout and are not a substitute for the plot areas in the final conveyance or an individual plot’s registered schedule. Apartment saleable area, carpet area, and loading are not applicable to the supplied plotted-development information. Layout record
5. Parking & vehicle circulation
No dedicated parking count, visitor or accessible parking provision, parking allocation, or vehicle-parking plan is supplied. The approval records layout roads of 18 metres and above and the site boundaries include a 30M-wide road to the west and a 20M-wide road to the north. It does not establish individual plot access arrangements or parking rights. Land records
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 3,495.42 sq. m.; approval states 9.03% | Layout record | Approved allocation; completion not independently verified |
| Social infrastructure | 1,003.67 sq. m.; approval states 2.59% | Layout record | Approved allocation; facility details and completion not supplied |
| Avenue plantation | Listed as part of the layout development works | Required/proposed work; progress not supplied | |
| Park development | Listed as part of the layout development works | Required/proposed work; progress not supplied | |
| Community buildings | Listed in RERA amenity fields without description or progress | RERA amenities | Progress not supplied |
| Green strip / tot lot / park | RERA amenity entry marked “YES”; no progress percentage supplied | RERA amenities | Filed availability entry; delivery not independently verified |
No clubhouse, indoor recreation, sports facilities, facility sizes or capacities are identified in the supplied evidence. The third-party vendor record also lists internal roads and footpaths, water supply, sewerage, street lighting and a park; these are not treated as proof of completion. Promoter website
7. Utilities, building services & safety
The approved layout communication describes the following development works:
| Evidence in the record | Internal water-supply pipelines, overhead tank and an assured water-supply source are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; source, capacity and completion are not supplied |
| Evidence in the record | Storm-water drains, underground drainage lines and a common septic tank / STP are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; capacity and completion are not supplied |
| Evidence in the record | Rainwater-harvesting pits are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; quantity and completion are not supplied |
| Evidence in the record | Electrical supply lines, transformer and street lights are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; capacity and completion are not supplied |
| Evidence in the record | RERA amenity fields list solid-waste management, energy management and fire protection/fire-safety requirements without technical details or progress. RERA amenities |
|---|---|
| Status established by supplied evidence | Details and implementation status not supplied |
| Evidence in the record | No security, CCTV, accessibility or pedestrian-separation specifications are supplied. Document index |
|---|---|
| Status established by supplied evidence | Not established |
These are approval or RERA-listed provisions; the supplied evidence does not independently verify installation, operation or statutory clearance. RERA amenities
8. Location, access & connectivity
The registered location is Nagunur village, Karimnagar -I mandal, Karimnagar district, PIN 505415, across survey numbers 458/A, 460, 464/A and 459/2/1. The stated site boundaries identify a 30M-wide road on the west and a 20M-wide road on the north. RERA record Land records
A location record gives the project coordinates as 18.4348122, 79.1328042 and lists the Outer Ring Road nearest sampled interchange at approximately 113.0 km. This is a supplied distance estimate; no travel time, public-transport service, or additional landmark distances are provided. Location record
9. Developer & development status
The registered promoters are BOINPALLY NARSINGA RAO and BOINPALLY UMA RANI. The RERA record labels the organisation type “Others”; a corporate entity type is not established in the supplied evidence. The RERA certificate records a promoter office location in Karimnagar, PIN 505001, without a complete street address. RERA record Corporate record
The promoter’s Form B declares a completion date of 19th APRIL, 2025. The supplied RERA amenity records do not state progress percentages, and no independent site-progress report or completion certificate is included. A third-party vendor record describes the project as completed, but does not establish independently verified completion. RERA amenities Promoter website
10. Approvals, official records & documents
| Record | Evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C for SRI CHAITANYA ESTATES, registration P02700006899; records survey numbers 458/A, 460, 464/A and 459/2/1, promoter names, and validity from 08/09/2023 to 19/04/2025. |
| Draft Technical Layout Pattern approval | Satavahana Urban Development Authority (Karimnagar), Draft - TLP.NO.3145/Nagunur/2021/0624 UDA, approved 19 April 2022; file Lr.Roc.No.3145/Nagunur/2021/0624. Records the 124-plot layout, land-use allocations, development works and mortgage condition. |
| Form B declaration | Promoter declaration concerning title, encumbrances and project completion by 19th APRIL, 2025. |
| Layout drawing | Two layout sheets are recorded; plot schedule and area figures are software-read from the drawing and should be checked against the drawing itself. Layout record |
| Completion / occupancy certificate | Not present in the supplied evidence. Document index |
The supplied approval communication is for a Draft Technical Layout Pattern and includes conditions relating to development works and subsequent final layout release. The evidence pack does not include a final layout-release document.
1. Project at a glance
Project identity
Registered project name: SRI CHAITANYA ESTATES
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; registration covers the plotted layout
TG-RERA registration: P02700006899; granted under section 5
Registration validity: 08/09/2023 to 19/04/2025; no extension is recorded in the supplied certificate
Registered promoter: BOINPALLY NARSINGA RAO, BOINPALLY UMA RANI
RERA status: Certificate records the registration and its stated validity period. Current registration status after 19/04/2025 is not established by the supplied evidence.
Land and geographic identity
Locality: Nagunur / NAGUNUR
Revenue village: Nagunur
Mandal: Karimnagar -I
District: Karimnagar
PIN: 505415 in the RERA certificate
Project survey numbers and subdivisions: 458/A, 460, 464/A, 459/2/1
Registered site extent: 38,701.16 sq. m.
Land-area figures as recorded: Total area: 38,701.16 sq. m.; area affected in road widening/FTL of tanks/nala widening: 9,822.33 sq. m.; net area: 28,878.83 sq. m.
Boundary—East: Land of B Srinivas Rao
Boundary—West: 30M wide road
Boundary—North: 20M wide road
Boundary—South: Land of B Srinivas Rao
Development identity
Sanctioning authority: Satavahana Urban Development Authority (Karimnagar)
Principal approval: Draft Technical Layout Pattern, approval no. Draft - TLP.NO.3145/Nagunur/2021/0624 UDA; approved 19 April 2022
File number: Lr.Roc.No.3145/Nagunur/2021/0624
Approved built-up area: 23,991.18 sq. m. is recorded as “Approved Built up Area” in the project fields; the layout approval also records 23,991.18 sq. m. as plotted area.
Plots: 124 plots, as recorded in the layout approval and layout drawing extraction
Buildings / floors / parking levels: Not applicable to the evidenced plotted layout; no building-floor or structured-parking configuration is supplied.
Offering and status
Unit type: Plots
Plot count and sizes: Software-read layout schedule: 124 plots; 117.84–416.38 sq. m. (140.9–498.0 sq. yd.); verify against the approved drawing.
Booked / available counts: Not supplied.
Completion deadline: Promoter’s Form B declares completion by 19th APRIL, 2025.
Registration validity vs. completion deadline: The RERA certificate’s stated validity ends 19/04/2025; the Form B completion undertaking also states 19th APRIL, 2025. These are distinct recorded dates/commitments.
Construction / development stage: The RERA-filed amenity entries carry no progress percentages. A third-party vendor record labels the project “Completed”; this is not independent site verification.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence. For this plotted development, the evidence does not establish a project-wide or phase-specific certificate status.
2. The project story
SRI CHAITANYA ESTATES is a plotted layout in Nagunur village, Karimnagar -I mandal, Karimnagar district, on the registered survey parcels 458/A, 460, 464/A and 459/2/1. The layout approval identifies a 38,701.16 sq. m. site and a 124-plot development. Its stated boundaries are a 30M-wide road to the west, a 20M-wide road to the north, and land of B Srinivas Rao to the east and south.
The approved layout allocation records 23,991.18 sq. m. as plotted area, 9,822.33 sq. m. as roads, 3,495.42 sq. m. as park/open space, 387.47 sq. m. as utility area and 1,003.67 sq. m. as social infrastructure. The approval also identifies plots reserved as mortgage security in favour of the Vice-Chairman, SUDA-Satavahana.
The promoter undertook to complete the project by 19th APRIL, 2025 in Form B. No RERA-filed progress percentage or completion certificate is supplied here, so the development stage and completion of the approved works cannot be independently confirmed from this evidence. The vendor’s “Completed” label is a third-party record, not verified site evidence.
3. Master plan, architecture & building design
This is a plotted layout rather than an apartment or tower development. The sanctioned layout communication records a total layout area of 38,701.16 sq. m. and 124 plots. Its land-use figures are: plotted area 23,991.18 sq. m.; roads 9,822.33 sq. m.; park/open space 3,495.42 sq. m.; utility area 387.47 sq. m.; and social infrastructure 1,003.67 sq. m.
The drawing extraction reports that the 124 plot schedule is complete and that the sum of plot areas matches the plotted-area figure in the drawing’s area statement. Software-read plot sizes range from 117.84 to 416.38 sq. m.; these drawing-derived measurements should be checked against the approved plan.
The layout approval calls for roads 18 metres and above, and identifies a 15% mortgage area of 3,631.6 sq. m. in plots, held in favour of the Vice-Chairman, SUDA-Satavahana as security for development obligations. The approval describes a proposed programme of road formation, drainage, water-supply infrastructure, electrical lines and street lighting, park development, avenue planting and rainwater-harvesting pits. The supplied evidence does not describe building footprints, floors, towers or architectural plans.
4. Homes, configurations & floor plans
The offering evidenced in the registration and approved layout is plots, not flats. No RERA-filed plot-wise booking or availability counts are supplied.
Total plots: 124, as recorded in the approved layout extraction
Software-read size range: 117.84–416.38 sq. m. (140.9–498.0 sq. yd.)
Software-read size bands: 100–150 sq. yd.: 4 plots; 150–200: 39; 200–250: 41; 250–300: 30; 300–400: 4; 400–500: 6
Booked / available plots: Not supplied
The drawing measurements are software-read from the approved layout and are not a substitute for the plot areas in the final conveyance or an individual plot’s registered schedule. Apartment saleable area, carpet area, and loading are not applicable to the supplied plotted-development information.
5. Parking & vehicle circulation
No dedicated parking count, visitor or accessible parking provision, parking allocation, or vehicle-parking plan is supplied. The approval records layout roads of 18 metres and above and the site boundaries include a 30M-wide road to the west and a 20M-wide road to the north. It does not establish individual plot access arrangements or parking rights.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 3,495.42 sq. m.; approval states 9.03% | Approved allocation; completion not independently verified | |
| Social infrastructure | 1,003.67 sq. m.; approval states 2.59% | Approved allocation; facility details and completion not supplied | |
| Avenue plantation | Listed as part of the layout development works | Required/proposed work; progress not supplied | |
| Park development | Listed as part of the layout development works | Required/proposed work; progress not supplied | |
| Community buildings | Listed in RERA amenity fields without description or progress | Progress not supplied | |
| Green strip / tot lot / park | RERA amenity entry marked “YES”; no progress percentage supplied | Filed availability entry; delivery not independently verified |
No clubhouse, indoor recreation, sports facilities, facility sizes or capacities are identified in the supplied evidence. The third-party vendor record also lists internal roads and footpaths, water supply, sewerage, street lighting and a park; these are not treated as proof of completion.
7. Utilities, building services & safety
The approved layout communication describes the following development works:
| Evidence in the record | Internal water-supply pipelines, overhead tank and an assured water-supply source are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; source, capacity and completion are not supplied |
| Evidence in the record | Storm-water drains, underground drainage lines and a common septic tank / STP are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; capacity and completion are not supplied |
| Evidence in the record | Rainwater-harvesting pits are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; quantity and completion are not supplied |
| Evidence in the record | Electrical supply lines, transformer and street lights are specified. |
|---|---|
| Status established by supplied evidence | Specified as layout works; capacity and completion are not supplied |
| Evidence in the record | RERA amenity fields list solid-waste management, energy management and fire protection/fire-safety requirements without technical details or progress. |
|---|---|
| Status established by supplied evidence | Details and implementation status not supplied |
| Evidence in the record | No security, CCTV, accessibility or pedestrian-separation specifications are supplied. |
|---|---|
| Status established by supplied evidence | Not established |
These are approval or RERA-listed provisions; the supplied evidence does not independently verify installation, operation or statutory clearance.
8. Location, access & connectivity
The registered location is Nagunur village, Karimnagar -I mandal, Karimnagar district, PIN 505415, across survey numbers 458/A, 460, 464/A and 459/2/1. The stated site boundaries identify a 30M-wide road on the west and a 20M-wide road on the north.
A location record gives the project coordinates as 18.4348122, 79.1328042 and lists the Outer Ring Road nearest sampled interchange at approximately 113.0 km. This is a supplied distance estimate; no travel time, public-transport service, or additional landmark distances are provided.
9. Developer & development status
The registered promoters are BOINPALLY NARSINGA RAO and BOINPALLY UMA RANI. The RERA record labels the organisation type “Others”; a corporate entity type is not established in the supplied evidence. The RERA certificate records a promoter office location in Karimnagar, PIN 505001, without a complete street address.
The promoter’s Form B declares a completion date of 19th APRIL, 2025. The supplied RERA amenity records do not state progress percentages, and no independent site-progress report or completion certificate is included. A third-party vendor record describes the project as completed, but does not establish independently verified completion.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for SRI CHAITANYA ESTATES, registration P02700006899; records survey numbers 458/A, 460, 464/A and 459/2/1, promoter names, and validity from 08/09/2023 to 19/04/2025.
Draft Technical Layout Pattern approval: Satavahana Urban Development Authority (Karimnagar), Draft - TLP.NO.3145/Nagunur/2021/0624 UDA, approved 19 April 2022; file Lr.Roc.No.3145/Nagunur/2021/0624. Records the 124-plot layout, land-use allocations, development works and mortgage condition.
Form B declaration: Promoter declaration concerning title, encumbrances and project completion by 19th APRIL, 2025.
Layout drawing: Two layout sheets are recorded; plot schedule and area figures are software-read from the drawing and should be checked against the drawing itself.
Completion / occupancy certificate: Not present in the supplied evidence.
The supplied approval communication is for a Draft Technical Layout Pattern and includes conditions relating to development works and subsequent final layout release. The evidence pack does not include a final layout-release document.
Frequently asked questions
Is SRI CHAITANYA ESTATES registered with Telangana RERA?
Yes. SRI CHAITANYA ESTATES is registered with the Telangana Real Estate Regulatory Authority as P02700006899; the registration status is New Project.
Who is the developer of SRI CHAITANYA ESTATES?
The promoter named in the RERA registration is BOINPALLY NARSINGA RAO, BOINPALLY UMA RANI.
Where is SRI CHAITANYA ESTATES located?
SRI CHAITANYA ESTATES is in NAGUNUR, Karimnagar -I, Karimnagar, Telangana (505415).
When will SRI CHAITANYA ESTATES be completed?
The promoter's proposed date of completion filed with RERA is 19/04/2025. This is the promoter's declaration, not a guarantee.
More projects in Nagunur