Sign in

Sri Sri Arcades

Smt. R. LAKSHMI PADMAVATHI & OTHERS · Yadadri Bhuvanagiri · RERA P02000008086

SRI SRI ARCADES is a plotted development in Gangasanipally, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is Smt. R. LAKSHMI PADMAVATHI & OTHERS. The registered land area is 50,990.39 sq m, and the filed draft layout plan describes 146 residential plots; plot-size configurations are not supplied. The TG-RERA registration number is P02000008086, and the proposed completion date is 13/02/2025.

01What we found

Period endedTG-RERA registration ran to 13 Feb 2025 - check its extension on TG-RERA
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered nameSRI SRI ARCADES RERA record
Project typePlotted development; the RERA record identifies the category as plot. RERA record RERA filing
Phase / registered portionThe record identifies the project land as Sy. Nos. 190/P, 191/P, 192/P & 193/P; a separate phase name or phase number is not disclosed. RERA record
TG-RERA registrationP02000008086 RERA record Approvals record
Registration validity19/04/2024 to 13/02/2025, as stated on the Form C certificate. This is the registration-validity period, not a statement of current registration status. Approvals record
Registered promoterSmt. R. LAKSHMI PADMAVATHI & OTHERS RERA record Corporate record
RERA statusThe supplied record labels the project On-Going Project. RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / project addressGangasanipally; the RERA header also records Bhongir as locality. RERA record RERA filing
Revenue village(s)Gangasanipally is recorded in the project identity and RERA certificate. The filed layout documents also refer to Raigiri Revenue Village; the records do not establish whether this is a separate project village or a related revenue-area description. RERA record
MandalBhongir; approval documents also use Bhuvanagiri Mandal. RERA record RERA filing
DistrictYadadri Bhuvanagiri; approval documents use Yadadri-Bhuvanagiri District. RERA record
PIN508116 RERA record RERA filing
All project survey numbers190/P, 191/P, 192/P & 193/P RERA record Land records
Registered site extentThe RERA land record states 50,990.39 sq m total area, 3,197.01 sq m affected by road widening/FTL of tanks/nala widening, and 47,793.38 sq m net area. RERA filing Land records
Layout-plan area figuresThe filed draft layout plan states Ac. 12.60 cents gross area and Ac. 11.81 cents layout area; it also records 57160.40 sq yds layout area.
BoundariesEast: Neighbours Land; West: Road; North: Neighbours Land; South: Neighbours Land. RERA filing

Development identity

FieldProject record
Sanctioning authorityYadagirigutta Temple Development Authority (YTDA); the filed draft-layout communication is by the Director of Town and Country Planning. Approvals record
Principal layout reference01/2021/YTDA; the filed document identifies a technically approved draft layout plan, subject to conditions. Approvals record
Approval dateThe supplied approval record gives -02-2021; the day is not available in that field. Approvals record
Approved built-up areaThe RERA filing lists 30,136.94 sq m as approved built-up area. For this plotted development, the supplied material does not explain how this figure applies to plot construction. RERA filing
Plot count146 plots in the filed draft layout plan.
Towers, floors and parking levelsNot applicable to the plotted-layout description in the supplied records; no tower, floor-configuration or parking-level schedule is provided.
Unit count: approved / RERA-declaredThe draft layout plan states 146 plots. No separate RERA inventory schedule with booked and available plot counts is supplied.

Offering and status

FieldProject record
OfferingResidential plots; individual plot-size bands and a RERA-filed saleable-size range are not supplied.
Booked / available plotsNot disclosed in the supplied records.
Construction stageRERA status is “On-Going Project”; the supplied evidence does not independently verify current site progress. RERA record
Completion timelineThe header lists proposed and revised proposed completion as 13/02/2025. The 2024 Form-B declaration also undertakes completion by 13th FEBRUARY 2025. RERA record
Registration validity19/04/2024 to 13/02/2025; this is distinct from completion progress and occupancy status.
Occupancy / completion certificateNo project completion or occupancy certificate is identified in the supplied documents. The project is a plotted layout, and the supplied record does not specify an OC scope by plot or phase. Document index

The project story

SRI SRI ARCADES is recorded with TG-RERA as a plotted development in Gangasanipally, Bhongir, Yadadri Bhuvanagiri, on land identified as Sy. Nos. 190/P, 191/P, 192/P & 193/P. The filed draft technical layout plan describes 146 residential plots and allocates parts of the layout to plots, roads, open space, social infrastructure and utilities. RERA record Land records

The registration certificate records the project as valid from 19/04/2024 to 13/02/2025, while the RERA record gives 13/02/2025 as the proposed and revised completion date. These dates describe registration validity and the stated completion timeline respectively; neither establishes that development is complete. No site-verified construction-progress report or completion/occupancy certificate is included in the supplied material. RERA record Document index

Master plan, architecture & building design

The submitted layout material describes a 146-plot residential layout. The filed draft technical plan allocates land as follows: plotted area 36043.48 Syd / 30136.94 Sqm (63.06%); roads 14568.40 Syd / 12181.04 Sqm (25.49%); social infrastructure 1427.80 Syd / 1193.82 Sqm (2.50%); open space 4288.24 Syd / 3585.52 Sqm (7.50%); and utilities 832.48 Syd / 696.06 Sqm (1.45%). The same plan notes a Nala buffer of Ac 0.36 cents. These are filed layout-plan allocations, not a survey of completed works.

The plan shows roads labelled 30'-0" wide and 40’-0” wide, and an existing 30'-0" road to be widened to 164'-0" (50M) wide as per the master plan. It also identifies 5519.00 Sq.Yds—stated as 15.31%—as mortgage plots, specifically Plot Nos. 42 to 55 and 86 to 97.

No building or tower arrangement, plot-size schedule, individual building footprint, apartment floor plan, or FSI-counted-area figure is provided. The RERA filing’s approved built-up-area entry is 30,136.94 sq m; the supplied records do not provide a further breakdown of that figure. RERA filing Floor plans

Homes, configurations & floor plans

The project is a plotted development, not an apartment inventory in the supplied records. The draft layout plan states 146 plots, but plot-size bands, plot-wise dimensions, booked/available inventory and RERA-filed saleable areas are not available here.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots146 in the filed draft layout planNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

Five floor-plan drawings are listed, but all 5 are pending scan review and 0 have been measured. The drawing-derived carpet-area assessment is therefore unavailable. Floor plans

Parking & vehicle circulation

The supplied layout evidence identifies internal roads, but does not give a count of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual plots, EV charging, or a dedicated parking arrangement. No spaces-per-plot ratio can be established from the available records.

The draft plan labels internal roads 30'-0" wide and 40’-0” wide and records an existing 30'-0" road to be widened to 164'-0" (50M) as per the master plan. These are plan notations; the supplied material does not independently verify completion of the road works.

Amenities, recreation & open spaces

The RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot lot/park, street lighting, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES / 100%. These are recorded amenity-status fields, not independent site verification. RERA amenities

Park / open space
Description / sizeFiled layout allocates 4288.24 Syd / 3585.52 Sqm (7.50%); the plan labels a site reserved for open space (park).
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record marks green strip/tot lot/park YES / 100%; completion is not independently verified.
Social infrastructure
Description / size1427.80 Syd / 1193.82 Sqm (2.50%) allocated in the filed draft layout.
Declared progress / verified statusLayout allocation shown; delivery status not independently verified.
Internal roads and footpaths
Description / sizeRoad area 14568.40 Syd / 12181.04 Sqm (25.49%) in the filed plan.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record marks YES / 100%; completion is not independently verified.
Avenue plantation
Description / sizeListed as a layout-development item.
Declared progress / verified statusSpecified in the filed plan conditions; no independent completion evidence supplied.
Community buildings
Description / sizeNo facility or size is specified.
Evidence sourceRERA amenities
Declared progress / verified statusThe RERA amenity record shows 0%.
Aggregate recreational open space
Description / sizeNo separate delivered-area status is supplied beyond the layout allocation above.
Evidence sourceRERA amenities
Declared progress / verified statusThe RERA amenity record shows 0% for this field.

Utilities, building services & safety

The filed draft-layout conditions describe road formation with black top, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits. These are specified development works; the supplied documents do not independently establish their present operational status.

The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station as YES / 100%. It records 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements. No capacities, water-source details beyond the filed “assured water supply source,” or system-performance tests are supplied. RERA amenities

No building lifts, fire-escape configuration, accessibility features, CCTV/security system or detailed waste-management arrangement is described in the available project records. Document index RERA amenities

Location, access & connectivity

The registered project location is Gangasanipally, Bhongir, Yadadri Bhuvanagiri, PIN 508116. The registration certificate associates the project with Gangasanipally, and the filed layout documents identify the project survey numbers and local-area descriptions. RERA record

The filed draft plan shows road access and internal road widths, including the existing 30'-0" road noted for widening to 164'-0" (50M) as per the master plan. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 23.1 km. No public-transport details, additional landmark distances or travel-time estimates are supplied. Location record

Developer & development status

The TG-RERA registered promoter is Smt. R. LAKSHMI PADMAVATHI & OTHERS; the RERA filing describes the organization type as Others and the arrangement as JOINT DEVELOPMENT. The supplied record does not identify a company or other incorporated legal-entity type, corporate registration number, registered-office address, official project website or project contact details. RERA record RERA filing Corporate record

The project is marked “On-Going Project” in the RERA record. The promoter’s Form-B declaration dated April 2024 undertakes completion by 13th FEBRUARY 2025; the supplied evidence does not independently verify physical progress or completion. RERA record

Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate, P02000008086Form C certificate for SRI SRI ARCADES; it states validity from 19/04/2024 to 13/02/2025.
Draft technical layout plan, 01/2021/YTDAFiled plan for a 146-plot residential layout, with land-use allocations and conditions; the document describes draft technical layout approval.
DTCP/YTDA communication, file DTCP-VCEL/5/2019-VIG-DTCP, proceedings Lr.Roc.No.2384/2019/YTDACommunication concerning the proposed layout and further action on final-layout release; the supplied extraction says it does not itself grant final layout approval.
Grama Panchayat record, ROC. NO. 2384/2019/YTDAOCR identifies a Grama Panchayat document dated 13-02-2021, but does not clearly identify its instrument or approved development details.
Form-B promoter declarationAuthorized signatory declares the project land and promoter undertakings, including the stated completion date of 13th FEBRUARY 2025.
Layout development conditionsFiled plan conditions list infrastructure works and conditions relating to roads, open space, utilities, nala buffer and mortgage plots.

The supplied documents do not include an occupancy or completion certificate, a project-specific final-layout release, or independent confirmation that the listed layout works have been completed.

Frequently asked questions

Is SRI SRI ARCADES registered with Telangana RERA?

Yes. SRI SRI ARCADES is registered with the Telangana Real Estate Regulatory Authority as P02000008086; the registration status is On-Going Project.

Who is the developer of SRI SRI ARCADES?

The promoter named in the RERA registration is Smt. R. LAKSHMI PADMAVATHI & OTHERS.

Where is SRI SRI ARCADES located?

SRI SRI ARCADES is in Bhongir, Gangasanipally, Yadadri Bhuvanagiri, Telangana (508116).

When will SRI SRI ARCADES be completed?

The promoter's proposed date of completion filed with RERA is 13/02/2025. This is the promoter's declaration, not a guarantee.

More projects in Gangasanipally