Svr Towers
S S PROJECTS · Medchal-Malkajgiri · RERA P02200004356
SVR TOWERS is a residential apartment project in Jeedimetla Village, Qutballapur mandal, Medchal-Malkajgiri district, developed by the registered promoter S S PROJECTS, a partnership. The project occupies 710.60 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 29 apartments: 24 2BHK and 5 3BHK. Its TG-RERA registration is P02200004356, issued 04/04/2022, with validity through 25/11/2024; the stated construction completion deadline is before 25 November, 2024.
More from S S Projects · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SVR TOWERS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration certificate identifies SVR TOWERS; no separate phase name or phase number is disclosed. |
| TG-RERA registration | P02200004356, issued 04/04/2022; the certificate states validity from 04/04/2022 through 25/11/2024. The record says it was not extended. RERA record Approvals record |
| Registered promoter | S S PROJECTS, identified as a partnership. RERA record RERA filing |
| RERA status | The filing labels the project “New Project.” The recorded registration validity has ended; current TG-RERA registration status is not established by the supplied evidence. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Jeedimetla Village; the GHMC permit also describes the locality as “Jeedimetla Village-1 -15.” RERA record |
| Revenue village | Jeedimetla-Village; the permit spells the village “JEEDIMETLA.” Land records |
| Mandal | Qutballapur (also rendered “Qutubullapur” in the building permit). RERA record |
| District | Medchal-Malkajgiri (the permit says “MEDCHAL District”). RERA record |
| PIN | 500067 RERA record |
| Survey number / subdivision | Survey No. 219; no subdivision is disclosed for the project parcel. Land records |
| Plot | Plot No. 7 RERA filing |
| Site area | Total and net area: 710.60 sq. m; road-affected and nala-affected areas are each recorded as 0.0 sq. m in the permit. RERA filing |
| Boundaries | East: Plot No. 8; west: Plot No. 6; north: Sy. Nos. 220 and 217; south: road. RERA filing |
| Permit-stated road width | 18 mt. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC); permit delegated to Kukatpally Zone. Approvals record |
| Principal building approval | Building Permit Order 1161/GHMC/KPL/2021-BP, approved 25 November, 2021; file no. 002279/GHMC/1344/KPL2/2021-BP. Approvals record |
| Approved built-up area | 1,774.60 sq. m residential; commercial and “others” are recorded as 0.00. This is the permit’s stated residential area, not a saleable- or carpet-area figure. |
| Building count | One residential building is identified in the permit. |
| Sanctioned configuration | 1 Stilt + 5 upper floors; stated height 14.5 m. No basement or podium is identified in the supplied permit extract. |
| Parking provision in permit | Stilt parking; total parking area 368.65 sq. m and stilt area 368.60 sq. m are recorded. The permit says the approved cellar/stilts for parking must be used exclusively for vehicle parking; the extract records cellar area as 0 0.00. |
| Unit counts | The project filing lists 29 units: 24 2BHK and 5 3BHK. The permit condition says the sanctioned unit count must not be increased without prior GHMC approval; the supplied permit extract does not state its numerical unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 2BHK: 62.31 sq. m; 3BHK: 124.0 sq. m. RERA unit table |
| Portal inventory | 29 total units, shown as 0 booked and 29 available (24 2BHK and 5 3BHK). The portal data supplied has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No current, independently verified construction-stage evidence is supplied. The building permit authorized construction; a promoter-filed declaration undertook completion within 3 Years_from the date of PERMIT. |
| Completion dates | Permit states construction was to commence before 25 May, 2022 and be completed before 25 November, 2024. The RERA certificate’s validity also ends 25/11/2024; neither date establishes actual completion. |
| Occupancy / completion certificate | No occupancy or completion certificate is present in the supplied records. The permit requires an occupancy certificate before occupation. |
2. The project story
SVR TOWERS is a single-building residential apartment development recorded by TG-RERA at Plot No. 7 in Survey No. 219, Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district. The registered site is 710.60 sq. m, and GHMC’s permit describes a residential building with one stilt level and five upper floors. RERA record Land records
The RERA inventory lists 29 apartments: 24 two-bedroom and 5 three-bedroom units. The permit records 1,774.60 sq. m of residential built-up area and provides for stilt parking. These are approval and filing details; the supplied evidence does not establish present construction progress, completion, or occupation. RERA unit table
The RERA registration certificate records validity through 25/11/2024, while the building permit sets the same date as its stated construction completion deadline. No extension order or occupancy/completion certificate is included in the supplied evidence. Registration validity, the permit’s deadline, and actual building completion are distinct matters.
3. Master plan, architecture & building design
The GHMC permit identifies one residential building on a 710.6 sq. m plot, with 1,774.60 sq. m recorded as residential area and 0.00 as commercial and “others.” The permit states the configuration as 1 Stilt + 5 upper floors, a height of 14.5 m, and setbacks of Front 3.5 m, Rear 3.5 m, Side I 3.5 m, Side II 3.5 m.
No basement or podium is identified in the supplied permit extract. It records a stilt parking area of 368.60 sq. m and a total parking area of 368.65 sq. m. Detailed architectural information such as the building footprint, flats per floor, lift and stair arrangements, entrances, internal circulation, landscape design, and open-space layout is not established by the supplied records.
4. Homes, configurations & floor plans
TG-RERA lists 29 apartments in two configurations. The floor-plan drawing for one example of each configuration was software-measured from the submitted plan; those measurements are not RERA-filed area disclosures and should be checked against the drawing. RERA saleable area and drawing-measured carpet area are different measures; saleable area includes a share of common areas. RERA unit table Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Software-measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 62.31 sq. m | 57.9 sq. m (623 sq. ft) | Not supplied |
| 3BHK | 5 | 0 | 5 | 124.0 sq. m | 71.8 sq. m (773 sq. ft) | 42% |
\*The portal inventory has no supplied as-of date; availability is indicative. RERA unit table
The measured 2BHK example’s drawing labels include two bedrooms, a toilet, living room, dining/kitchen, and utility. The measured 3BHK example includes three bedrooms, a living/dining room, kitchen, wash area, and two utility areas. The room dimensions and measurements are drawing-derived, not RERA area disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC permit records stilt parking, with a stated 368.60 sq. m stilt area and 368.65 sq. m total parking area. Its condition requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking without partition walls or rolling shutters; the permit extract records the cellar as 0 0.00. The permit does not provide a parking-space count or identify resident, visitor, accessible, or two-wheeler spaces.
No parking allocation to individual apartments, mechanical parking, parking ramp or circulation details, pedestrian separation, or EV charging provision is established in the supplied records. A parking area in an approval does not by itself establish a buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists site facilities and services, but the entries supplied show 0 progress for the listed items. “YES” indicates availability in that filing field; it does not establish that a facility is complete or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Listed as available; no size supplied. | RERA amenities | Progress 0%; completion not independently verified. |
| Community Buildings | Listed; no description or size supplied. | RERA amenities | Progress 0%; completion not independently verified. |
| Internal Roads & Footpaths | Listed; no dimensions supplied. | RERA amenities | Progress 0%; completion not independently verified. |
| Street Lighting | Listed; no further details supplied. | RERA amenities | Progress 0%; completion not independently verified. |
The building permit separately requires a garbage house within the premises and three rainwater-harvesting pits. These are permit requirements, not evidence of completed facilities.
7. Utilities, building services & safety
The RERA amenities record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Solid Waste Management and Disposal, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as “YES.” The supplied entries show progress of 0%; they do not identify capacities, sources, specifications, or independently verified completion. Storm-water drains, treatment and disposal of sewage and sullage water, energy management, and fire protection/fire safety requirements are also listed, with no further technical details supplied. RERA amenities
The GHMC permit requires three rainwater-harvesting pits, space for a transformer, and a garbage house. It also requires a fire NOC from the Director (EV&DM) before an occupancy certificate can be issued. The permit’s conditions do not establish that these items have been installed or that the fire NOC or occupancy certificate has been obtained.
No evidence supplied establishes water storage or treatment capacity, a sewerage treatment/reuse scheme, electrical backup, lift specifications, fire-system equipment or escape arrangements, CCTV/security systems, or accessible circulation. RERA amenities
8. Location, access & connectivity
The registered location is Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500067. The building permit identifies Plot No. 7 and Survey No. 219, and records an 18 mt. road width. RERA record Land records
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 9.4 km. No other approach-road, public-transport, or landmark distances are established in the supplied project-location evidence. Location record
9. Developer & development status
The registered promoter is S S PROJECTS, identified in the RERA record as a partnership, with GSTIN 36AEMFS2966R1ZX. The named partner is Sampath Reddy Burugula, and Sachin Kumar Marineni is listed as authorized signatory. The supplied evidence does not establish a registered office address or official project contact details. RERA record RERA filing Parties record Corporate record
A Form B declaration dated NOVEMBER, 2021, made by an authorized signatory, states that the promoter would complete the project within 3 Years_from the date of PERMIT and makes other promoter declarations. This is a filed undertaking, not verified construction progress or evidence of actual completion.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate | Form C for SVR TOWERS, registration P02200004356, issued 04/04/2022, with validity through 25/11/2024. |
| GHMC building permit | Building Permit Order 1161/GHMC/KPL/2021-BP, file no. 002279/GHMC/1344/KPL2/2021-BP, approved 25 November, 2021; permits one residential building with 1 Stilt + 5 upper floors. |
| Form B declaration | Promoter-filed declaration dated NOVEMBER, 2021, including the stated completion undertaking and other declarations. |
| Approved floor-plan drawing | Drawing record used for software measurement of one 2BHK and one 3BHK example; the measurements are not RERA-filed disclosures. |
| Occupancy/completion certificate | Not present in the supplied records. The GHMC permit states an occupancy certificate is compulsory before occupation. |
| Layout approval record | No layout approval number is disclosed in the project record; the supplied layout-plan document entry is not extracted. Document index |
The building permit also records permit-specific conditions, including commencement and completion notice requirements, rainwater harvesting, transformer space, garbage-house provision, parking use, and a fire NOC requirement before occupancy certification.
1. Project at a glance
Project identity
Registered name: SVR TOWERS
Project type: Residential apartment project
Phase / registered portion: The registration certificate identifies SVR TOWERS; no separate phase name or phase number is disclosed.
TG-RERA registration: P02200004356, issued 04/04/2022; the certificate states validity from 04/04/2022 through 25/11/2024. The record says it was not extended.
Registered promoter: S S PROJECTS, identified as a partnership.
RERA status: The filing labels the project “New Project.” The recorded registration validity has ended; current TG-RERA registration status is not established by the supplied evidence.
Land and geographic identity
Locality: Jeedimetla Village; the GHMC permit also describes the locality as “Jeedimetla Village-1 -15.”
Revenue village: Jeedimetla-Village; the permit spells the village “JEEDIMETLA.”
Mandal: Qutballapur (also rendered “Qutubullapur” in the building permit).
District: Medchal-Malkajgiri (the permit says “MEDCHAL District”).
PIN: 500067
Survey number / subdivision: Survey No. 219; no subdivision is disclosed for the project parcel.
Plot: Plot No. 7
Site area: Total and net area: 710.60 sq. m; road-affected and nala-affected areas are each recorded as 0.0 sq. m in the permit.
Boundaries: East: Plot No. 8; west: Plot No. 6; north: Sy. Nos. 220 and 217; south: road.
Permit-stated road width: 18 mt.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC); permit delegated to Kukatpally Zone.
Principal building approval: Building Permit Order 1161/GHMC/KPL/2021-BP, approved 25 November, 2021; file no. 002279/GHMC/1344/KPL2/2021-BP.
Approved built-up area: 1,774.60 sq. m residential; commercial and “others” are recorded as 0.00. This is the permit’s stated residential area, not a saleable- or carpet-area figure.
Building count: One residential building is identified in the permit.
Sanctioned configuration: 1 Stilt + 5 upper floors; stated height 14.5 m. No basement or podium is identified in the supplied permit extract.
Parking provision in permit: Stilt parking; total parking area 368.65 sq. m and stilt area 368.60 sq. m are recorded. The permit says the approved cellar/stilts for parking must be used exclusively for vehicle parking; the extract records cellar area as 0 0.00.
Unit counts: The project filing lists 29 units: 24 2BHK and 5 3BHK. The permit condition says the sanctioned unit count must not be increased without prior GHMC approval; the supplied permit extract does not state its numerical unit count.
Offering and status
RERA-filed configurations: 2BHK and 3BHK apartments.
RERA-filed saleable area: 2BHK: 62.31 sq. m; 3BHK: 124.0 sq. m.
Portal inventory: 29 total units, shown as 0 booked and 29 available (24 2BHK and 5 3BHK). The portal data supplied has no as-of date, so these counts are indicative.
Construction stage: No current, independently verified construction-stage evidence is supplied. The building permit authorized construction; a promoter-filed declaration undertook completion within 3 Years_from the date of PERMIT.
Completion dates: Permit states construction was to commence before 25 May, 2022 and be completed before 25 November, 2024. The RERA certificate’s validity also ends 25/11/2024; neither date establishes actual completion.
Occupancy / completion certificate: No occupancy or completion certificate is present in the supplied records. The permit requires an occupancy certificate before occupation.
2. The project story
SVR TOWERS is a single-building residential apartment development recorded by TG-RERA at Plot No. 7 in Survey No. 219, Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district. The registered site is 710.60 sq. m, and GHMC’s permit describes a residential building with one stilt level and five upper floors.
The RERA inventory lists 29 apartments: 24 two-bedroom and 5 three-bedroom units. The permit records 1,774.60 sq. m of residential built-up area and provides for stilt parking. These are approval and filing details; the supplied evidence does not establish present construction progress, completion, or occupation.
The RERA registration certificate records validity through 25/11/2024, while the building permit sets the same date as its stated construction completion deadline. No extension order or occupancy/completion certificate is included in the supplied evidence. Registration validity, the permit’s deadline, and actual building completion are distinct matters.
3. Master plan, architecture & building design
The GHMC permit identifies one residential building on a 710.6 sq. m plot, with 1,774.60 sq. m recorded as residential area and 0.00 as commercial and “others.” The permit states the configuration as 1 Stilt + 5 upper floors, a height of 14.5 m, and setbacks of Front 3.5 m, Rear 3.5 m, Side I 3.5 m, Side II 3.5 m.
No basement or podium is identified in the supplied permit extract. It records a stilt parking area of 368.60 sq. m and a total parking area of 368.65 sq. m. Detailed architectural information such as the building footprint, flats per floor, lift and stair arrangements, entrances, internal circulation, landscape design, and open-space layout is not established by the supplied records.
4. Homes, configurations & floor plans
TG-RERA lists 29 apartments in two configurations. The floor-plan drawing for one example of each configuration was software-measured from the submitted plan; those measurements are not RERA-filed area disclosures and should be checked against the drawing. RERA saleable area and drawing-measured carpet area are different measures; saleable area includes a share of common areas.
| Configuration | Units | Booked | Available* | RERA saleable area | Software-measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 24 | 0 | 24 | 62.31 sq. m | 57.9 sq. m (623 sq. ft) | Not supplied |
| 3BHK | 5 | 0 | 5 | 124.0 sq. m | 71.8 sq. m (773 sq. ft) | 42% |
\*The portal inventory has no supplied as-of date; availability is indicative.
The measured 2BHK example’s drawing labels include two bedrooms, a toilet, living room, dining/kitchen, and utility. The measured 3BHK example includes three bedrooms, a living/dining room, kitchen, wash area, and two utility areas. The room dimensions and measurements are drawing-derived, not RERA area disclosures.
5. Parking & vehicle circulation
The GHMC permit records stilt parking, with a stated 368.60 sq. m stilt area and 368.65 sq. m total parking area. Its condition requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking without partition walls or rolling shutters; the permit extract records the cellar as 0 0.00. The permit does not provide a parking-space count or identify resident, visitor, accessible, or two-wheeler spaces.
No parking allocation to individual apartments, mechanical parking, parking ramp or circulation details, pedestrian separation, or EV charging provision is established in the supplied records. A parking area in an approval does not by itself establish a buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists site facilities and services, but the entries supplied show 0 progress for the listed items. “YES” indicates availability in that filing field; it does not establish that a facility is complete or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Listed as available; no size supplied. | Progress 0%; completion not independently verified. | |
| Community Buildings | Listed; no description or size supplied. | Progress 0%; completion not independently verified. | |
| Internal Roads & Footpaths | Listed; no dimensions supplied. | Progress 0%; completion not independently verified. | |
| Street Lighting | Listed; no further details supplied. | Progress 0%; completion not independently verified. |
The building permit separately requires a garbage house within the premises and three rainwater-harvesting pits. These are permit requirements, not evidence of completed facilities.
7. Utilities, building services & safety
The RERA amenities record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Solid Waste Management and Disposal, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as “YES.” The supplied entries show progress of 0%; they do not identify capacities, sources, specifications, or independently verified completion. Storm-water drains, treatment and disposal of sewage and sullage water, energy management, and fire protection/fire safety requirements are also listed, with no further technical details supplied.
The GHMC permit requires three rainwater-harvesting pits, space for a transformer, and a garbage house. It also requires a fire NOC from the Director (EV&DM) before an occupancy certificate can be issued. The permit’s conditions do not establish that these items have been installed or that the fire NOC or occupancy certificate has been obtained.
No evidence supplied establishes water storage or treatment capacity, a sewerage treatment/reuse scheme, electrical backup, lift specifications, fire-system equipment or escape arrangements, CCTV/security systems, or accessible circulation.
8. Location, access & connectivity
The registered location is Jeedimetla-Village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500067. The building permit identifies Plot No. 7 and Survey No. 219, and records an 18 mt. road width.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 9.4 km. No other approach-road, public-transport, or landmark distances are established in the supplied project-location evidence.
9. Developer & development status
The registered promoter is S S PROJECTS, identified in the RERA record as a partnership, with GSTIN 36AEMFS2966R1ZX. The named partner is Sampath Reddy Burugula, and Sachin Kumar Marineni is listed as authorized signatory. The supplied evidence does not establish a registered office address or official project contact details.
A Form B declaration dated NOVEMBER, 2021, made by an authorized signatory, states that the promoter would complete the project within 3 Years_from the date of PERMIT and makes other promoter declarations. This is a filed undertaking, not verified construction progress or evidence of actual completion.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for SVR TOWERS, registration P02200004356, issued 04/04/2022, with validity through 25/11/2024.
GHMC building permit: Building Permit Order 1161/GHMC/KPL/2021-BP, file no. 002279/GHMC/1344/KPL2/2021-BP, approved 25 November, 2021; permits one residential building with 1 Stilt + 5 upper floors.
Form B declaration: Promoter-filed declaration dated NOVEMBER, 2021, including the stated completion undertaking and other declarations.
Approved floor-plan drawing: Drawing record used for software measurement of one 2BHK and one 3BHK example; the measurements are not RERA-filed disclosures.
Occupancy/completion certificate: Not present in the supplied records. The GHMC permit states an occupancy certificate is compulsory before occupation.
Layout approval record: No layout approval number is disclosed in the project record; the supplied layout-plan document entry is not extracted.
The building permit also records permit-specific conditions, including commencement and completion notice requirements, rainwater harvesting, transformer space, garbage-house provision, parking use, and a fire NOC requirement before occupancy certification.
Frequently asked questions
Is SVR TOWERS registered with Telangana RERA?
Yes. SVR TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02200004356; the registration status is New Project.
Who is the developer of SVR TOWERS?
The promoter named in the RERA registration is S S PROJECTS.
Where is SVR TOWERS located?
SVR TOWERS is in Jeedimetla Village, Jeedimetla-Village, Qutballapur, Medchal-Malkajgiri, Telangana (500067).
When will SVR TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 25/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Jeedimetla






