Sign in

Jaya Anu Homes

AGASTYA DEVELOPERS · Sangareddy · RERA P01100005218

JAYA ANU HOMES is a plotted development in Aliyabad, Kondapur Mandal, Sangareddy District. The registered promoter is Agastya Developers. The registered site extent is 39,157.34 sq m, and the draft layout approval identifies 127 plots; plot-size configurations are not disclosed in the supplied records. The TG-RERA registration is P01100005218, and the promoter’s declared completion date is 25/04/2024.

01What we found

Period endedTG-RERA registration ran to 25 Apr 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Aliyabad, Kondapur, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameJAYA ANU HOMES
Project typePlotted development / plotted layout RERA record
Phase / registered portionPhase not separately stated. TG-RERA registration identifies survey numbers 43/PART, 44/PART and 45/PART
TG-RERA registrationP01100005218
Registration validity13/10/2022 to 25/04/2024; the certificate records no extension
Registered promoterAgastya Developers
RERA status in supplied recordRegistration certificate on file; stated validity ended 25/04/2024. Current registration status is not independently established by the supplied record

Land and geographic identity

FieldRecord
Locality / revenue villageAliyabad / ALIYABAD; the layout document places the site at Aliyabad Gram Panchayat RERA record
Mandal / district / PINKondapur, Sangareddy, 502306 RERA record
Project survey numbers and subdivisions43/PART, 44/PART and 45/PART
Registered site extentThe supplied TG-RERA project fields record 39,157.34 sq m total and net area RERA filing
Area stated in layout approvalAc. 9-27.04 Guntas or Ac. 9.676 Cents
Boundaries in RERA project fieldsEast: ROAD; West: ROAD AND OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning; the document states delegation to Aliyabad Gram Panchayat
Principal layout approvalDraft - TLP.No.147 /2022/H, approved 27-04-2022; filing also records Lr.Roc.No.16081/537/2022/H/e-Panchayat Approvals record
Approved developmentDraft technical layout pattern for 127 plots
Land-use split in the approvalPlotted area: Ac. 5.544 Cents; 57.31 %; road area: Ac. 3.164 Cents; 32.69 %; open-space park: Ac. 0.968 Cents; 10.00 %
Mortgage provision in the approvalAc. 0.838 Cents; 15.11 %, including Plot Nos. 73 to 78, 87 to 98 and 101; the approval says these plots are not for sale while mortgaged to the Gram Panchayat
Buildings / floors / approved built-up areaNot applicable as a plotted-layout offering in the supplied records; no building count, floor configuration or approved built-up area is stated RERA filing

Offering and status

FieldRecord
Offered unit typePlots; the RERA filing records a plotted development RERA record
RERA plot count127 plots in the draft layout approval
RERA-filed plot-size range / inventory statusNot disclosed in the supplied records; booked and available counts are not provided RERA filing
Construction / development stageNo independently verified site-progress record is supplied. The amenity progress entries show 0 where reported RERA amenities
Completion date declared by promoter25/04/2024 in the Form B declaration
Registration expiry25/04/2024; separate from the completion undertaking
Occupancy / completion certificateNo project occupancy or completion certificate is included in the supplied materials. For this plotted layout, the available approval is a draft layout approval, not an OC Document index

2. The project story

JAYA ANU HOMES is recorded with TG-RERA as a plotted development in Aliyabad, Kondapur Mandal, Sangareddy District. Its registered land identifiers are 43/PART, 44/PART and 45/PART, and the filed project area is 39,157.34 sq m RERA record RERA filing.

The filed layout approval describes a proposed 127-plot layout. It allocates land among plots, roads and a park, and identifies a separate group of plots to be mortgaged to Aliyabad Gram Panchayat as surety for development obligations. The approval also calls for roads, drainage, street lighting, electricity, sewerage disposal, protected water supply and rainwater-harvesting pits. These are approval requirements; the supplied records do not establish that the works have been completed or independently inspected.

The promoter’s Form B affidavit undertakes completion by 25/04/2024. The available materials do not provide a verified current construction or layout-development stage, booked-plot inventory, or an occupancy/completion certificate.

3. Master plan, architecture & building design

This is a plotted layout rather than a building project in the supplied records. The draft technical layout approval identifies 127 plots and the following land-use allocation:

Layout componentArea and share stated in approval
Plotted areaAc. 5.544 Cents; 57.31 %
RoadsAc. 3.164 Cents; 32.69 %
Open-space parkAc. 0.968 Cents; 10.00 %
Mortgage areaAc. 0.838 Cents; 15.11 %

The approval identifies mortgage Plot Nos. 73 to 78, 87 to 98 and 101, and states that mortgaged plots are not to be sold while subject to the mortgage. The approval also requires the roads and park area to be gifted to the Gram Panchayat by registered gift deed before release of the final layout.

The supplied floor-plan package contains two drawings, but both are pending scan review and none has been software-measured. No plot-by-plot arrangement, dimensions, road widths, or detailed drawing-derived measurements can therefore be reported here Floor plans. No building footprint, residential/commercial building distribution, floors, or built-up area is stated in the supplied layout records.

4. Homes, configurations & floor plans

The RERA record identifies a plotted layout with 127 plots; it does not provide a plot-size schedule, plot-type breakdown, or booked/available inventory in the supplied materials RERA filing.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Plots127 in draft layout approvalNot disclosedNot disclosedPlot-wise area not suppliedNot applicableNot supplied

The supplied vendor material describes “Plot” with a saleable range of 1485 - 2949 sq ft; this is a vendor-provided claim, not a RERA-filed plot-size schedule Promoter website. The drawing set has two sheets pending scan review, with no software measurement available Floor plans.

5. Parking & vehicle circulation

The supplied layout approval and RERA project fields do not state a sanctioned parking count, visitor or accessible parking provision, parking arrangement, or plot-specific parking allocation RERA filing. The approval requires roads to be formed and kept open for access to neighbouring sites, but the supplied extracts do not provide road widths, driveway details, or vehicle-circulation drawings. No parking entitlement should be inferred from the plotted-layout record.

6. Amenities, recreation & open spaces

The layout approval allocates Ac. 0.968 Cents; 10.00 % of the layout to open-space park. It lists infrastructure and development works required of the developer. These entries describe approval requirements, not proof of delivery.

Open-space park
Description / sizeAc. 0.968 Cents; 10.00 %; approval calls for the park area to be gifted to the Gram Panchayat by registered gift deed before final-layout release
Evidence sourceDraft layout approval
Declared progress / verified statusRequired by approval; completion and handover not verified
Greenery / avenue plantation
Description / sizeGreenery in the layout, including avenue plantation in public open spaces
Evidence sourceDraft layout approval
Declared progress / verified statusRequired by approval; completion not verified
Fenced open spaces
Description / sizeFencing of open spaces
Evidence sourceDraft layout approval
Declared progress / verified statusRequired by approval; completion not verified
Community buildings
Description / sizeListed in the RERA amenity record; no size or description supplied
Evidence sourceRERA amenity record
Declared progress / verified statusProgress shown as 0; completion not verified RERA amenities
Recreational open space
Description / sizeListed as available in the RERA amenity record; no additional size stated there
Evidence sourceRERA amenity record
Declared progress / verified statusProgress shown as 0; completion not independently verified RERA amenities

Vendor material also lists a park, children’s play area, garden, jogging track, clubhouse, gym and swimming pool, among other facilities. These are vendor-provided descriptions; the supplied layout approval does not establish their sanction or delivery Promoter website.

7. Utilities, building services & safety

The draft layout approval requires infrastructure including protected water supply, sewerage disposal, storm-water drainage and nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. The approval also calls for road formation with side drains and avenue planting. These are stated requirements; the supplied record does not verify installation, capacity, operation or completion.

Water
Evidence in supplied recordProtected water supply system required
Status supported by evidenceApproval requirement; source, storage and capacity not stated
Sewerage / drainage
Evidence in supplied recordSewerage disposal system; drains and nala channelization for storm-water run-off required
Status supported by evidenceApproval requirement; treatment method, capacity and completion not established
Rainwater management
Evidence in supplied recordRainwater-harvesting pits required
Status supported by evidenceApproval requirement; number, capacity and completion not stated
Electricity / lighting
Evidence in supplied recordElectricity facilities and street lighting required
Status supported by evidenceApproval requirement; supply, substation details, backup and completion not established
Fire, waste, security and accessibility
Evidence in supplied recordAmenity record lists fire protection and safety, solid-waste management and disposal; no detailed systems or capacities are supplied
Status supported by evidenceRERA amenity entries show progress 0 where reported; installation and compliance are not verified RERA amenities

8. Location, access & connectivity

The project’s official revenue location in the supplied records is ALIYABAD, Kondapur Mandal, Sangareddy District, PIN 502306. The layout document places it at Aliyabad Gram Panchayat RERA record.

The project’s cadastral centroid is supplied as 17.56740890828608, 78.00371447046722 Cadastral map. The location record lists the nearest sampled Outer Ring Road interchange at approximately 27.5 km; this is a mapped distance, not a travel-time estimate Location record. No further official approach-road, public-transport or landmark distances are supplied.

9. Developer & development status

The registered promoter is Agastya Developers, identified in the project record as a proprietorship. The supplied corporate record names Bhavani Srinivas Babu as proprietor and authorised signatory Corporate record Parties record. The promoter’s Form B declaration is dated 22 day of Sept- 2022, names B Srinivas Babu as declarant, and undertakes completion by 25/04/2024.

The supplied records do not disclose a promoter registration identifier, official project contact details, or a company website. No current project-progress certificate or verified site inspection is included. The approved layout document calls for development works to be undertaken by the layout owner/developer; it does not establish that those works are complete.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for JAYA ANU HOMES, registration P01100005218, issued 13/10/2022, valid through 25/04/2024; registered surveys 43/PART, 44/PART and 45/PART
Layout approvalDraft Technical Layout Pattern, Draft - TLP.No.147 /2022/H, approved 27-04-2022 by the Director of Town and Country Planning; file Lr.Roc.No.16081/537/2022/H/e-Panchayat
Form B promoter declarationForm B affidavit-cum-declaration by B Srinivas Babu, dated 22 day of Sept- 2022, including a completion undertaking of 25/04/2024
Layout plan / drawing reviewTwo floor-plan drawings are listed; both remain pending scan review and none is software-measured. A detailed, reviewed plot-by-plot drawing extraction is not available here Floor plans
Completion / occupancy certificateNo project completion or occupancy certificate is included in the supplied documents Document index

Frequently asked questions

Is JAYA ANU HOMES registered with Telangana RERA?

Yes. JAYA ANU HOMES is registered with the Telangana Real Estate Regulatory Authority as P01100005218; the registration status is New Project.

Who is the developer of JAYA ANU HOMES?

The promoter named in the RERA registration is AGASTYA DEVELOPERS.

Where is JAYA ANU HOMES located?

JAYA ANU HOMES is in ALIYABAD GP, ALIYABAD, KONDAPUR, Sangareddy, Telangana (502306).

When will JAYA ANU HOMES be completed?

The promoter's proposed date of completion filed with RERA is 25/04/2024. This is the promoter's declaration, not a guarantee.

More projects in Kondapur