Sign in

Sree Shankarpalli Hills-III

SWATHI PROMOTERS PRIVATE LIMITED · Sangareddy · RERA P01100004659

SREE SHANKARPALLI HILLS-III is a plotted development in Munidevunipally, Kondapur Mandal, Sangareddy District, developed by registered promoter SWATHI PROMOTERS PRIVATE LIMITED. The final-layout record states a site extent of Ac. 23-14.8 Guntas or Ac.23.37 Cents; 113110.80 Sq. Yds., and 262 plots; no plot configurations are stated in the RERA unit data. The project is registered under TG-RERA number P01100004659, with proposed completion on 01/06/2025.

More from Swathi Promoters Pvt Ltd · 12 projects →

01What we found

Period endedTG-RERA registration ran to 1 Jun 2025 - check its extension on TG-RERA
32documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Munidevpally, Kondapur, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered projectSREE SHANKARPALLI HILLS-III RERA record
Project type / phasePlotted development; registered project portion is not separately described as a phase in the supplied record. RERA record
TG-RERA numberP01100004659 RERA record
Registration validityIssued 27/06/2022; stated valid through 01/06/2025, unless extended by the Authority. The certificate records no extension. Registration validity is distinct from the completion date and from layout/occupancy certification. Approvals record
Registered promoterSWATHI PROMOTERS PRIVATE LIMITED RERA record Corporate record
RERA status in supplied recordThe registration certificate states its validity ended on 01/06/2025 and does not record an extension; current registration status is not established by the supplied material. Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageMunidevunipally; the filing also uses MUNIDEVPALLY and Munidevunipalle. RERA record RERA filing
Mandal / district / PINKONDAPUR / Sangareddy / 502295. RERA record
Project survey numbers and subdivisions160/P, 161/P, 162/P, 165/P, 166/P & 193/P. RERA record Land records
Site extentAc. 23-14.8 Guntas or Ac.23.37 Cents; 113110.80 Sq. Yds. in the final-layout record.
Net layout areaAc. 22.263 Cents; 107752.92 Sq. Yds.
RERA land-area fieldsTotal area 94575.03 sqmts; affected in road widening/FTL of tanks/nala widening 4479.87 sqmts; net area 90095.16 sqmts. RERA filing
Boundaries recorded in RERA filingEast: OTHERS LAND AND EXISTING LAYOUT; West: OTHERS LAND; North: NALA AND OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning (DTCP); final technical layout pattern delegated to Munidevunipally Gram Panchayat. Approvals record
Principal layout approvalTLP.No.195/2022/H, final Technical Layout Pattern approved 22-02-2024. Approvals record
Approved layout extent and composition262 plots; open space 10.00 % (Ac. 2.227 Cents; 10778.68 Sq. Yds.), road area 33.55 % (Ac. 7.470 Cents; 36154.80 Sq. Yds.), plotted area 56.45 % (Ac. 12.566 Cents; 60819.44 Sq. Yds.).
Building count, approved built-up area and floor configurationNot disclosed as project-wide building specifications in the supplied material; this is a plotted layout, with individual building permissions addressed separately in the final-layout conditions.
Parking provisionNo project-wide sanctioned parking count or allocation is supplied. Approvals record RERA amenities

Offering and status

FieldRecord
Unit type / countPlots; final-layout record states 262 plots.
RERA-filed plot size range / inventory countsNot supplied in the available RERA unit data. RERA unit table
Completion dateThe RERA project information states proposed completion 01/06/2025. Form B separately contains a promoter completion undertaking of 01.01.2025. RERA filing
Layout completion / occupancy recordA project-filed Architect’s Certificate identifies an occupancy certificate issued by DTCP, Hyderabad, dated 22-02-2024, with number DTCP�HYDM/LOUT/2/2024-WNGL-DTCP. Its stated scope is the plotted layout; the supplied record does not provide a plot-by-plot or building-specific occupancy schedule.
Declared works progressThe Architect’s Certificate dated 19-04-2024 reports progress percentages for proposed internal/external development works, but the supplied extract does not include the individual percentages.
Independent site verificationNot supplied. The available progress information is a filed architect certificate, not an independent site inspection.

2. The project story

SREE SHANKARPALLI HILLS-III is a plotted residential layout at Munidevunipally in Kondapur Mandal, Sangareddy District, covering the filed survey parcels 160/P, 161/P, 162/P, 165/P, 166/P and 193/P. The final-layout record describes 262 plots and allocates land to plots, roads and open space; it also records nala and buffer areas. RERA record Land records

The project’s final Technical Layout Pattern is recorded as approved on 22-02-2024. A separate filed architect’s certificate dated 19-04-2024 reports work on internal and external development items, but the supplied extract does not show the item-by-item progress figures and does not establish independent on-site completion. The filed project certificate identifies a DTCP occupancy certificate dated 22-02-2024; the supplied documents do not specify a separate occupancy status for each plot or any individual building.

The RERA record describes the project’s proposed completion date as 01/06/2025. This is separate from the registration certificate’s validity end date and from the final-layout and occupancy documents. RERA filing

3. Master plan, architecture & building design

The approved plan is a plotted layout, not a multi-storey building scheme in the supplied record. The final-layout document records 262 plots across a layout area of Ac. 23-14.8 Guntas or Ac.23.37 Cents; 113110.80 Sq. Yds. It identifies a net layout area of Ac. 22.263 Cents; 107752.92 Sq. Yds., with 10.00 % open space, 33.55 % roads and 56.45 % plotted area.

The same record identifies nala area of Ac. 0.354 Cents; 1713.36 Sq. Yds. and buffer area of Ac. 0.753 Cents; 3644.52 Sq. Yds. It records that roads and open spaces were taken over by registered deed and refers to Gift Deed 5845/2022 and Relinquishment Deed 8412/2023.

The final-layout conditions describe residential use, generally limiting sites to detached single-family dwelling houses; they also state that individual building permissions are to be considered separately. No approved building elevations, floor plans, building counts, floor configurations or approved built-up area are supplied for individual homes.

4. Homes, configurations & floor plans

The project offering recorded in the final-layout document is 262 plots. The available RERA unit data does not provide plot-size bands, plot-wise saleable areas, booked/available counts or a complete inventory schedule. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots262 sanctioned-layout plotsNot suppliedNot suppliedNot suppliedNot applicableNot supplied

The vendor record lists a “Residential Plot” configuration of plot 147 sqyd, but that is vendor-supplied information, not a RERA-filed plot-size schedule. Promoter website The supplied drawing review reports two drawings, with 0 measured, 2 scans pending, and no measured carpet areas; it therefore provides no software-measured plot or home dimensions. Floor plans

5. Parking & vehicle circulation

The supplied records do not establish a project-wide parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or EV charging. The approved layout conditions require roads to remain open for access to neighbouring lands and prohibit a compound wall or fencing around the site under the draft-layout conditions; no detailed driveway, vehicle-entry or internal circulation schedule is provided in the supplied extracts. RERA amenities

The vendor lists “Open Parking,” but gives no number or allocation details; this is a vendor-listed feature, not evidence of a sanctioned or exclusively allotted space. Promoter website

6. Amenities, recreation & open spaces

The filed layout and architect records identify layout-level services and open space. The amenities progress data records percentages for some items, but these are declared progress values rather than independently verified completion. RERA amenities

Open space / park
Description / size10.00 %; Ac. 2.227 Cents; 10778.68 Sq. Yds.
Evidence sourceFinal layout
Declared progress / verified statusProvided for in the approved layout; no independent completion verification supplied.
Internal roads and footpaths
Description / sizeLayout roads; final-layout record allocates 33.55 % to roads.
Evidence sourceFinal layout; progress schedule RERA amenities
Declared progress / verified status30% declared for Internal Roads & Footpaths; independently unverified.
Green strip / tot lot / park
Description / sizeSize not stated in the supplied progress entry.
Evidence sourceProgress schedule RERA amenities
Declared progress / verified status30% declared; independently unverified.
Community buildings
Description / sizeNo size or facility details supplied.
Evidence sourceArchitect’s certificate and progress schedule RERA amenities
Declared progress / verified statusIncluded in the architect’s list of development works; progress entry is 0%.
Jogging and strolling track
Description / sizeSize and location not stated.
Evidence sourceVendor listing Promoter website
Declared progress / verified statusVendor-listed; no RERA progress or independent completion evidence supplied.
Outdoor tennis courts
Description / sizeQuantity, dimensions and location not stated.
Evidence sourceVendor listing Promoter website
Declared progress / verified statusVendor-listed; no RERA progress or independent completion evidence supplied.
Meditation area
Description / sizeSize and location not stated.
Evidence sourceVendor listing Promoter website
Declared progress / verified statusVendor-listed; no RERA progress or independent completion evidence supplied.

7. Utilities, building services & safety

The final-layout document lists water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structures among the layout’s civic provisions. The draft-layout document also lists protected water supply, sewerage disposal and rainwater-harvesting pits. These are plan/approval records; they do not by themselves establish completed or operational service.

Water
Supplied evidenceWater supply; draft plan describes protected water supply.
Status shown in supplied recordListed in layout records; the progress schedule records 0% for Water Supply. No source, storage capacity or treatment details supplied. RERA amenities
Sewerage and drainage
Supplied evidenceSewerage and drainage disposal systems; architect’s works list also refers to chambers, lines, septic tank/STP and storm-water drains.
Status shown in supplied recordListed in filed plans/certificate; the progress schedule records 0% for sewerage and storm-water drains. No capacity or reuse details supplied. RERA amenities
Rainwater harvesting
Supplied evidenceRainwater-harvesting structure/pits listed.
Status shown in supplied recordFiled layout provision; progress schedule records 0% for water conservation/rainwater harvesting. RERA amenities
Electrical supply and lighting
Supplied evidenceStreet lighting, electricity facilities and electrical meter room/sub-station/receiving station appear in the filed records.
Status shown in supplied recordListed as proposed layout works; progress schedule records 0% for Street Lighting and for the electrical meter room/sub-station/receiving station. No electrical capacity or backup details supplied. RERA amenities
Waste management
Supplied evidenceSolid-waste management and disposal appears in the architect’s works list and progress schedule.
Status shown in supplied recordProgress entry is 0%; no operating details supplied. RERA amenities
Fire and life safety
Supplied evidenceFire protection and fire-safety requirements appear in the architect’s works list and progress schedule.
Status shown in supplied recordProgress entry is 0%; no system specification or clearance details supplied. RERA amenities
Accessibility / security
Supplied evidenceNo approved accessible-circulation details or RERA-filed security system particulars supplied.
Status shown in supplied recordNot established by the supplied project documents.

8. Location, access & connectivity

The registered location is MUNIDEVPALLY, KONDAPUR, Sangareddy District, Telangana, PIN 502295. The RERA filing gives locality as MUNIDEVUNIPALLY and the final-layout document names Munidevunipally Gram Panchayat. RERA record

A cadastral parcel centroid is recorded at 17.48415, 78.03562. The location record identifies the nearest sampled Outer Ring Road interchange at approximately 24.3 km. Cadastral map Location record No other measured access distances or public-transport details are supplied by the project location data. Vendor-listed travel times and nearby landmarks are not treated here as RERA-verified project connectivity. Promoter website

9. Developer & development status

The registered legal promoter is SWATHI PROMOTERS PRIVATE LIMITED, a private limited company; the supplied corporate identifier is GSTIN 36AAJCS9335A1ZC. The promoter address in the project filing is FLAT NO 402, SVSS NIVAS, CZECH COLONY, MUNIDEVUNIPALLY, Kondapur, Sangareddy, 502295. Corporate record RERA filing

The registration certificate separately prints the promoter office as Village: Mandal: AMEERPET, District: Hyderabad, Pin: 500018. The project documents identify architect Rajesh Nagula, licence CA/98/23838, and structural consultant D Manasa in the architect’s certificate.

The project information states proposed completion 01/06/2025; Form B contains a promoter undertaking of 01.01.2025. The supplied registration certificate states validity through 01/06/2025 and records no extension. The filed architect certificate identifies an occupancy certificate dated 22-02-2024, while the separate architect’s progress certificate is dated 19-04-2024. These documents describe distinct registration, completion, progress and occupancy records; no independent site verification is supplied. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100004659; issued 27/06/2022, valid through 01/06/2025 unless extended
What the supplied document recordsForm C registration for SREE SHANKARPALLI HILLS-III; no extension is recorded in the supplied certificate.
Draft Technical Layout Pattern
Identifier / dateTLP.No.195/2022/H; approved 18-05-2018
What the supplied document recordsDraft layout approval for the specified survey parcels, with conditions including development works, mortgage of saleable plots, later final-layout approval and required NOCs.
Final Technical Layout Pattern
Identifier / dateTLP.No.195/2022/H; approved 22-02-2024; file DTCP-HYDM/LOUT/2/2024-WNGL-DTCP
What the supplied document recordsFinal layout record for 262 plots, land-use allocation and stated layout conditions.
Final-layout release record
Identifier / dateTLP.No.195/2022/H; 22-02-2024
What the supplied document recordsRecords approved final layout and states roads and open spaces were taken over by registered deed; cites Gift Deed 5845/2022 and Relinquishment Deed 8412/2023.
Architect’s works certificate
Identifier / date19-04-2024
What the supplied document recordsArchitect’s Certificate (F1) for the registered project; reports proposed internal and external works, but the supplied extract omits the individual progress percentages.
Architect’s completion / occupancy record
Identifier / dateDTCP�HYDM/LOUT/2/2024-WNGL-DTCP; 22-02-2024
What the supplied document recordsFiled architect certificate identifies a DTCP occupancy certificate for the project; the supplied extract does not provide a plot-wise or building-wise schedule.
Form B promoter declaration
Identifier / dateDeclaration date transcribed as 24-os-2o22
What the supplied document recordsPromoter declaration includes a completion undertaking of 01.01.2025 and states the land is free from encumbrances. The project registration number is not stated in this document.

Frequently asked questions

Is SREE SHANKARPALLI HILLS-III registered with Telangana RERA?

Yes. SREE SHANKARPALLI HILLS-III is registered with the Telangana Real Estate Regulatory Authority as P01100004659; the registration status is New Project.

Who is the developer of SREE SHANKARPALLI HILLS-III?

The promoter named in the RERA registration is SWATHI PROMOTERS PRIVATE LIMITED.

Where is SREE SHANKARPALLI HILLS-III located?

SREE SHANKARPALLI HILLS-III is in MUNIDEVUNIPALLY, MUNIDEVPALLY, KONDAPUR, Sangareddy, Telangana (502295).

When will SREE SHANKARPALLI HILLS-III be completed?

The promoter's proposed date of completion filed with RERA is 01/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Munidevpally