Sign in

Tranquil City

SAMYUKTHA DEVELOPERS · Rangareddy · RERA P02400009206

TRANQUIL CITY is a plotted development in CHOWLAPPLY, Farooqnagar, Ranga Reddy. It is being developed by the registered promoter SAMYUKTHA DEVELOPERS. The project has a RERA-filed land area of 44,337 sq. m and the filed draft-layout approval extraction states 141 residential plots; plot-size configurations are not disclosed. Its TG-RERA registration number is P02400009206, and the proposed completion date in the RERA project fields is 25/01/2027.

01What we found

RegisteredTG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Chowlapally, Farooqnagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameTRANQUIL CITY RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration covers the project and the listed survey numbers
TG-RERA registrationP02400009206
Registration validity26/09/2024 to 25/09/2026, unless extended by the Authority
Registered promoterSAMYUKTHA DEVELOPERS
RERA statusRegistered project; the supplied evidence does not establish an extension or later registration status

Land and geographic identity

FieldProject record
LocalityCHOWLAPPLY RERA record
Revenue villageChowlapally; the filed layout document also describes the location as Mondoniraithanda, Chowllapally Revenue Village RERA record
Mandal / district / PINFarooqnagar / Ranga Reddy / 509410 RERA record
Project survey numbers and subdivisions377, 378/P, 379/P, 380, 381/P, 382, 383/P, 384/P
Additional survey number shown in draft layout document376 2
RERA-filed total and net area44,337 sq. m; net area 44,337.00 sq. m RERA filing
Draft-layout stated extentAc. 10.956 Cents; 53,027.04 Sq. Yds
Boundaries in RERA land detailsNorth: 60-0 WIDEROAD; South, East and West: NEIGHBOURS LAND RERA filing

Development identity

FieldProject record
Sanctioning authority shown in the project recordDTCP; the filed draft technical layout documents identify the Director of Town and Country Planning, Government of Telangana, with development conditions involving Mondoniraithanda Gram Panchayat RERA filing
Principal layout referenceT.L.P. No/40./ 2024/ H; the filed document is described as a draft technical layout pattern
Related approval referenceDraft - TLP.No.1502024/H, dated 26-09-2024
Plots141 plots stated in the filed draft-layout approval extraction
Land-use distribution in filed draft layoutLayout area: Ac. 10.956 Cents; 53,027.04 Sq. Yds. Open space (park): 10.00%, Ac. 1.096 Cents; 5,304.64 Sq. Yds. Roads: 28.35%, Ac. 3.106 Cents; 15,033.04 Sq. Yds. Plotted area: 61.65%, Ac. 6.754 Cents; 32,689.36 Sq. Yds
Mortgage area stated in draft layout15.41% of saleable area, Ac. 1.041 Cents; 5,038.44 Sq. Yds, shown as Plot Nos. 30 to 53 for the Gram Panchayat
Approved built-up area27,332 sq. m reported in the RERA project fields; a building count or floor configuration is not disclosed in the supplied evidence RERA filing
Buildings / floors / parking levelsNot disclosed; this is a plotted layout and the supplied project records do not specify building or parking-level configurations Document index

Offering and status

FieldProject record
OfferingResidential plots; the RERA-filed layout identifies 141 plots RERA filing
Plot size range, booked and available countsNot disclosed in the supplied RERA evidence Document index
Completion deadline25/01/2027 in the RERA project fields; Form B separately records a promoter undertaking of 25/09/2026 RERA filing
Construction / development stageThe supplied amenity schedule records 0% for the listed items; this is a filed progress figure, not independent site verification RERA amenities
Occupancy / completion certificateNot disclosed in the supplied evidence; no project completion or occupancy certificate is included Document index

The registration validity date, the stated project completion dates and the absence of a supplied completion/occupancy certificate are distinct record items; none by itself establishes physical completion or current on-site status.

2. The project story

  • TRANQUIL CITY is registered as a plotted development in the Chowlapally revenue-village area of Farooqnagar Mandal, Ranga Reddy District. The project record identifies survey numbers 377, 378/P, 379/P, 380, 381/P, 382, 383/P and 384/P. The filed draft technical layout also lists “376 2”; its relationship to the registered survey schedule is not explained in the supplied material.
  • The filed layout approval extraction describes a 10.956-acre layout with 141 plots, roads, a 10% park/open-space allocation and a mortgage area comprising Plot Nos. 30 to 53. The document also sets development and release conditions, including completion of layout works and subsequent release of the mortgaged plots. It describes a draft technical layout pattern and states that it does not prove land title.
  • The registration record gives a proposed completion date of 25/01/2027. The Form B declaration contains a promoter undertaking to complete by 25/09/2026. No independent site inspection or verified construction-progress evidence is supplied; the RERA amenity schedule reports 0% progress for its listed items. RERA filing RERA amenities

3. Master plan, architecture & building design

This is a plotted layout, not a building or apartment scheme in the supplied project records. The draft-layout extraction gives a total layout extent of Ac. 10.956 Cents; 53,027.04 Sq. Yds, allocated as follows:

Layout componentFiled area / share
Site reserved for open space (park)10.00%; Ac. 1.096 Cents; 5,304.64 Sq. Yds
Roads28.35%; Ac. 3.106 Cents; 15,033.04 Sq. Yds
Plotted area61.65%; Ac. 6.754 Cents; 32,689.36 Sq. Yds
Mortgage area on plotted land15.41%; Ac. 1.041 Cents; 5,038.44 Sq. Yds, Plot Nos. 30 to 53

The filed draft-layout records list road widths of 40'-0" and 33'-0". They also require roads to be opened for access to neighbouring sites. The extracted material does not provide plot-by-plot dimensions, block arrangement, a building footprint, or a detailed utility/landscape drawing.

The RERA fields report an approved built-up area of 27,332 sq. m, but the supplied evidence does not explain its scope or provide a corresponding building schedule. No building count, floors, tower heights, parking levels or apartment-floor plans are disclosed. The available three floor-plan drawings remain unmeasured scans and are not applicable evidence of plot configurations. RERA filing Floor plans

4. Homes, configurations & floor plans

The registered project is a plotted development. The filed draft-layout approval extraction states a total of 141 plots, but plot-size bands, plot-by-plot areas, and booked or available counts are not provided.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots141 plots stated in draft-layout extractionNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

No RERA-filed plot-size schedule or plot-specific saleable-area schedule is present in the supplied evidence. No apartment carpet-area or loading data is applicable or supplied. The drawing set is reported as three unmeasured scans, with no software measurements available. Floor plans

5. Parking & vehicle circulation

The supplied project records do not disclose parking-space counts, visitor or accessible parking, individual plot parking allocations, or a parking plan. This is a plotted layout; the drawn or reserved plot area should not be treated as proof of an exclusive parking allocation. Document index

The draft layout states road widths of 40'-0" and 33'-0" and requires roads to be opened for access to neighbouring sites. It also includes a condition that no compound wall or fencing be constructed around the site. The supplied documents do not specify vehicle entry/exit locations, internal driveway dimensions beyond the stated road widths, pedestrian segregation or EV charging.

6. Amenities, recreation & open spaces

The RERA-filed amenity schedule lists the following facilities and reports 0% progress for each item; it marks internal roads and footpaths, green strip/tot lot/park, water conservation/rainwater harvesting and aggregate recreational open space as “YES.” These are filed disclosures, not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkLayout plan reserves 10.00% open space: Ac. 1.096 Cents; 5,304.64 Sq. YdsRERA amenities“YES” in amenity schedule; 0% progress; not independently verified
Aggregate recreational open spaceArea not separately stated in the amenity scheduleRERA amenities“YES”; 0% progress; not independently verified
Internal roads and footpathsRoad area stated as 28.35%, Ac. 3.106 Cents; 15,033.04 Sq. YdsRERA amenities“YES” in amenity schedule; 0% progress; not independently verified
Community buildingsNo size or capacity statedRERA amenities0% progress; not independently verified
Water conservation / rainwater harvestingRainwater-harvesting pits are listed as a layout conditionRERA amenities“YES” in amenity schedule; 0% progress; not independently verified
Sewerage and sewage/sullage treatment and disposalSystem details and capacity not statedRERA amenities0% progress; not independently verified
Solid-waste management and disposalDetails not statedRERA amenities0% progress; not independently verified
Street lightingListed in the layout conditions and amenity scheduleRERA amenities0% progress; not independently verified
Energy managementDetails not statedRERA amenities0% progress; not independently verified
Fire protection and fire-safety requirementsDetails not statedRERA amenities0% progress; not independently verified
Electrical meter room, sub-station or receiving stationDetails not statedRERA amenities0% progress; not independently verified

The promoter’s brochure additionally markets features including a children’s play area, 24/7 security, entrance arch, overhead water tank and underground services. These are brochure claims, not evidence of construction or delivery.

7. Utilities, building services & safety

The filed draft-layout conditions call for protected water supply, a sewerage-disposal system, storm-water drains and channelisation of nalas, rainwater-harvesting pits, street lighting and electricity facilities. The documents do not provide design capacities, connection or commissioning evidence, or independent verification of these works.

ServiceEvidence and status
Water“Protected water supply system” appears as a draft-layout condition; the RERA amenity schedule lists water supply but records 0% progress. Source, storage and treatment details are not disclosed. RERA amenities
Sewerage and drainageDraft-layout conditions call for sewerage disposal and storm-water drains/channelisation; the amenity schedule lists sewerage and sewage/sullage treatment and disposal at 0% progress. System type and capacity are not disclosed. RERA amenities
Rainwater managementRainwater-harvesting pits are listed as a condition and the amenity schedule marks water conservation/rainwater harvesting “YES,” with 0% progress. RERA amenities
Electricity and lightingStreet lighting and electricity facilities are listed as layout conditions; the amenity schedule records street lighting and energy management at 0% progress. No supply capacity or backup details are disclosed. RERA amenities
Waste managementSolid-waste management and disposal is listed in the amenity schedule at 0% progress; arrangements are not described. RERA amenities
Fire and safetyFire-protection and fire-safety requirements are listed in the amenity schedule at 0% progress; specific equipment, access provisions or clearances are not supplied. RERA amenities
Security / accessibilityThe brochure markets security features; no RERA-filed security design or accessible-circulation details are supplied. Document index

8. Location, access & connectivity

The project is recorded at Chowlapally, Farooqnagar Mandal, Ranga Reddy District, PIN 509410. The cadastral parcel centroid supplied for the location is 17.040352934885156, 78.13190073611177. RERA record Cadastral map

The nearest sampled Outer Ring Road interchange is listed at approximately 38.1 km. No travel time, public-transport information or further measured distances to landmarks are supplied. Location record

9. Developer & development status

The registered promoter is SAMYUKTHA DEVELOPERS, identified in the project fields as a partnership. Its supplied GSTIN is 36AFCFS7868D1ZN. The named partner is NELLURI ANIL KUMAR and the authorized signatory is PANDUGA SUDHAKAR. RERA filing Corporate record Parties record

The RERA certificate gives the promoter address as Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, PIN 500032. The promoter website recorded in the evidence is https://samyukthadevelopers.com/tranquil-city-details/; the brochure lists [email protected]. Parties record

The RERA record proposes completion by 25/01/2027. Form B contains a separate promoter undertaking for completion by 25/09/2026. The supplied evidence does not establish which date, if either, has subsequently been revised by TG-RERA. The registration certificate records validity through 25/09/2026 unless extended by the Authority. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for TRANQUIL CITY, registration P02400009206; promoter SAMYUKTHA DEVELOPERS; validity 26/09/2024 to 25/09/2026 unless extended.
Draft technical layout patternDirector of Town and Country Planning, Government of Telangana; T.L.P. No/40./ 2024/ H; file C.NO. 20044/420 / 2024 /E.P; describes a 10.956-acre layout and 141 plots.
Related draft-layout approval referenceDraft - TLP.No.1502024/H, dated 26-09-2024; lists conditions for plot mortgage, roads, open space, utilities and subsequent release of the final layout.
Promoter declarationForm B declaration by PANDUGA SUDHAKAR for SAMYUKTHA DEVELOPERS, including title and encumbrance declarations, fund obligations and a completion undertaking of 25/09/2026.
Completion / occupancy recordNo completion certificate or occupancy certificate is included in the supplied project documents. Document index
Other project-filed evidenceEncumbrance statement; title-search report; title-related filings; and brochure.

The filed layout document states that it is legally valid only upon release/approval by the concerned Gram Panchayat and fulfilment of its conditions, and that the draft-layout permission does not prove land title. The supplied evidence does not include a Gram Panchayat final-layout release or a completion/occupancy certificate.

Frequently asked questions

Is TRANQUIL CITY registered with Telangana RERA?

Yes. TRANQUIL CITY is registered with the Telangana Real Estate Regulatory Authority as P02400009206; the registration status is New Project.

Who is the developer of TRANQUIL CITY?

The promoter named in the RERA registration is SAMYUKTHA DEVELOPERS.

Where is TRANQUIL CITY located?

TRANQUIL CITY is in CHOWLAPPLY, Chowlapally, Farooqnagar, Rangareddy, Telangana (509410).

When will TRANQUIL CITY be completed?

The promoter's proposed date of completion filed with RERA is 25/01/2027. This is the promoter's declaration, not a guarantee.

More projects in Chowlapally