Sign in

V K Crest Block - C

HARIKA CONSTRUCTIONS & DEVELOPERS · Rangareddy · RERA P02400008138

V K CREST BLOCK - C is a residential apartment project in LAKSHMINAGAR COLONY, Saroornagar Mandal, Ranga Reddy District, being developed by HARIKA CONSTRUCTIONS & DEVELOPERS. The registered site extent is 498.77 sq.m, and the project comprises one building with 1 Stilt + 5 upper floors and 10 homes, all configured as 3BHK. Its TG-RERA registration number is P02400008138, and the RERA project header lists proposed completion as 04/08/2027.

More from Harika Constructions & Developers · 12 projects →

01What we found

RegisteredTG-RERA - valid till 4 Apr 2027
23documents on file - each fact links to its page
2court cases on this project's land (survey 9, Saroornagar-I)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameV K CREST BLOCK - C RERA record
Project type / registered portionResidential apartment project; the registered portion is Block - C. The record identifies one building/block. RERA record RERA filing RERA unit table
TG-RERA registrationP02400008138; registered from 29/04/2024 to 04/04/2027, as recorded in the registration certificate. Registration validity is not the same as the project completion deadline. RERA record Approvals record
Registered promoterHARIKA CONSTRUCTIONS & DEVELOPERS RERA record Corporate record
RERA-recorded statusNew Project RERA record RERA filing

Land and geographic identity

ItemProject record
LocalityLAKSHMINAGAR COLONY RERA record RERA filing
Revenue villageSaroornagar-I (the approval documents also use “Saroornagar” / “SAROOR NAGAR”). RERA record
Mandal / district / PINSaroornagar / Ranga Reddy / 500035 RERA record
Project survey identifier9/1/D(FORMERLY SY. NO.9/1); the building-permit drawing renders it as 9/1/D (FORMERLY SY.NO. 9/1). RERA record Land records
Registered site extentThe RERA project record gives 498.77 sq.m total and 496.21 sq.m net, with 2.56 sq.m affected area. RERA filing Land records
Boundaries in RERA project recordEast: PART OF SAME PLOT; West: 35 WIDE ROAD; North: PART OF SAME PLOT; South: 35 WIDE ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalPermit 5880/GHMC/LBN/2024-BP, dated 04 April, 2024; file 013526/GHMC/6653/LBN2/2023-BP. Approvals record
Approved developmentResidential building, 1 Stilt + 5 upper floors; one proposed building/block.
Approved built-up areaBuilding-permit extraction records Total BUA: 1735.90 sq.m, including parking; Net BUA: 1446.60 sq.m; Parking Area: 289.30 sq.m. The plan extraction separately records Total Proposed Built Up Area Including Parking: 1735.90 and Excluding Parking: 1446.60.
HeightThe plan extraction records 14.90 MT and also states 17.90 mt. from GL; Total Height: 20.90mt.
Unit count10 units in the approved plan and RERA unit record. RERA unit table
Parking levelsStilt parking is identified in the sanctioned configuration; the permit extraction records a total parking area of 289.30. A parking-space count is not supplied.

Offering and status

ItemProject record
RERA-filed configuration3BHK, 10 units; 0 booked and 10 available in the portal data. The booking figures have no supplied as-of date and are indicative only. RERA unit table RERA unit details
RERA-filed saleable area170.0 sq.m per recorded configuration. RERA unit table RERA unit details
Construction stageNo project-specific construction progress percentage or independently verified site-stage report is supplied. RERA amenities
Completion deadlinePromoter’s Form B states completion by 04-APRIL-2027. The RERA project header separately lists proposed completion as 04/08/2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project records; the building-permit conditions require an Occupancy Certificate before occupation. Document index

2. The project story

V K CREST BLOCK - C is a registered residential apartment project on the recorded 9/1/D(FORMERLY SY. NO.9/1) land parcel in Lakshminagar Colony, Saroornagar-I, Saroornagar Mandal, Ranga Reddy District. Its building permit describes one residential building of 1 Stilt + 5 upper floors, with 10 apartments. RERA record Land records

The RERA unit record lists all 10 homes as 3BHK and available, but carries no booking-data as-of date. The available evidence does not establish the current physical construction stage or independently verify completion progress. The promoter’s Form B gives a completion undertaking of 04-APRIL-2027; the project header records 04/08/2027 as proposed completion. No occupancy or completion certificate is included in the supplied records. RERA unit table RERA unit details RERA record Document index

3. Master plan, architecture & building design

The GHMC building-permit records a single residential building, labelled “PROPOSED (T SUBRAHMANYAM),” comprising 1 Stilt + 5 upper floors. The drawing records a plot area of 498.77 sq.m, net plot area of 496.21 sq.m, and a splay area of 2.56. It records approved built-up area as 1,446.60 sq.m excluding parking and 1,735.90 sq.m including parking, with 289.30 sq.m identified as parking area. These are permit figures, not carpet or saleable area.

The drawing extraction identifies a 206.88 “Vacant Plot Area” and a building height of 14.90 MT; it also records height as 17.90 mt. from GL and 20.90mt. total height. A detailed building footprint, floor-by-floor unit distribution, lift and stair counts, and measured open-space schedule are not established in the supplied extracts.

The filed layout/building drawing labels the development as residential and includes the sanctioned floor configuration. It does not provide a complete, reliably extracted description of internal circulation or landscaping. The permit calls for a tot-lot and peripheral greenery, with conditions for their provision and maintenance.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010170.0 sq.mSoftware-measured range: 103.5–128.3 sq.m; median 109.5 sq.m36%

The RERA record lists the 3BHK saleable area as 170.0 sq.m. The carpet figures are software measurements from the approved floor-plan drawing, not RERA-filed measurements; four flat designs were measured, all marked as needing review. The drawing-based median is 109.5 sq.m (also recorded as 1,179 sq.ft). Carpet area, saleable area and any common-area share are distinct measures; the supplied record does not separately itemize balcony, utility or common-area loading for each unit. RERA unit details Floor plans RERA unit table

The extracted typical-floor drawing shows a 3BHK arrangement with living/dining, kitchen, three bedrooms, toilets, wash area, puja space and a balcony. One measured flat’s drawing labels a 1.22 M. WIDE BALC; the supplied room dimensions are drawing measurements and should be checked against the plan. RERA unit details

5. Parking & vehicle circulation

The sanctioned configuration includes a stilt level and the permit extraction records 289.30 sq.m of parking area. The supplied records do not establish a number of car or two-wheeler spaces, visitor or accessible parking, a unit-wise parking allocation, or mechanical/basement parking. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular apartment.

The approval documents state that the stilt approved for parking is to be used exclusively for vehicle parking and not converted or misused for another purpose; they also require Electric Vehicle Charging Infrastructure in building parking places. No project-specific EV charger count or installation status is supplied.

6. Amenities, recreation & open spaces

Tot-lot / green strip
Description / sizeTot-lot is named in the plan conditions; the permit extraction also records “Tot Lot NA.” The drawing instructions require it to be fenced and maintained as greenery.
Declared progress / verified statusRequired/conditioned in the plan record; no completion evidence supplied.
Peripheral greenery / tree planting
Description / sizeTree planting along the periphery and in front of the premises; peripheral greenery to be maintained.
Declared progress / verified statusPlan condition; no completion evidence supplied.
Rainwater harvesting
Description / sizeRainwater-harvesting structure/percolation pit; permit extraction specifies 1 pit.
Declared progress / verified statusSanctioned/required provision; no completion evidence supplied.
Garbage house
Description / sizeGarbage house to be made within the premises.
Declared progress / verified statusPlan condition; no completion evidence supplied.

The RERA amenity record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station and recreational open space. The supplied entries generally show 0% progress; they do not establish physical completion. RERA amenities

7. Utilities, building services & safety

ServiceEvidence in project record
WaterThe permit extraction specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. The RERA amenity record marks water supply “YES”; source and current service status are not supplied. RERA amenities
Sewerage and drainageThe RERA amenity record marks sewerage “YES” and lists storm-water drains and treatment/disposal of sewage and sullage water, but the supplied record does not establish an STP capacity, reuse arrangement or completion status. RERA amenities
Rainwater managementA rainwater-harvesting structure/percolation pit is specified; the permit extraction records 1 pit.
ElectricalThe permit requires space for a transformer and lists generator and emergency lighting in the plan extraction. The RERA amenity record marks electrical meter room/sub-station/receiving station “YES.” Capacity and installed/operational status are not supplied. RERA amenities
Lifts and circulationNo lift count, capacity, service-lift details or accessible-circulation measurements are established in the supplied project records.
Fire and life safetyThe plan extraction lists fire extinguishers, hose reel/down comer and automatic sprinkler system. The building-permit conditions make fire-safety provisions and an Occupancy Fire NOC part of the approval process; no project-specific Fire NOC or completed-system evidence is supplied.
Waste and digital infrastructureA garbage house is specified, and the permit conditions address construction-and-demolition waste disposal and broadband/digital-connectivity infrastructure. CCTV, access control and waste-system completion are not established by the RERA amenity data. RERA amenities
AccessibilityNo project-specific ramp or accessible-circulation details are supplied.

8. Location, access & connectivity

The registered location is LAKSHMINAGAR COLONY, Saroornagar-I, Saroornagar Mandal, Ranga Reddy District, PIN 500035. The building-permit drawing describes the site as within Lakshminagar Colony, Saroornagar Circle, GHMC, and identifies existing and proposed roads of 10.67 MT in the drawing extraction, as well as an 18 mt. road width condition for the site abutting that road. RERA record

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 9.3 km. The record does not provide measured distances to public transport or other landmarks, or verified travel times. Location record

9. Developer & development status

The registered promoter is HARIKA CONSTRUCTIONS & DEVELOPERS, recorded as a partnership. The RERA record lists GSTIN 36AAHFH3062Q1ZY; its project record does not supply a verified registered-office address or official contact details for this overview. Corporate record RERA filing Parties record

The filed building permit identifies SUREDDI VENKATESWARA RAO and SUREDDI SURESH as applicants, represented by the promoter as A.G.P.A. holder, with T. Subrahmanyam acting for the partnership. The promoter’s Form B states that completion is undertaken by 04-APRIL-2027. No independent construction-progress verification is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400008138; from 29/04/2024 to 04/04/2027
What the supplied record establishesForm C certificate for V K CREST BLOCK - C, naming Harika Constructions & Developers as promoter.
GHMC building permit order
Identifier / date5880/GHMC/LBN/2024-BP, 04 April, 2024; file 013526/GHMC/6653/LBN2/2023-BP
What the supplied record establishesConditional permission for residential construction of 1 Stilt + 5 upper floors.
Filed building-permit plan / drawing
Identifier / dateApplication TS/071974/2023
What the supplied record establishesPlan extraction records the residential building, site and development parameters, unit count and specified amenities/services.
Promoter Form B declaration
Identifier / dateProject completion undertaking: 04-APRIL-2027
What the supplied record establishesPromoter declaration concerning title basis, encumbrance statement, funds, approvals and completion undertaking.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe permit states an Occupancy Certificate is required before occupation; no project-specific issued certificate is included in the reviewed records.

The supplied RERA filing identifies the site survey as 9/1/D(FORMERLY SY. NO.9/1). The overview is limited to the project records and extracts listed above; it does not independently verify on-site construction or facility completion. RERA record Land records

Other registrations of V K Crest

Frequently asked questions

Is V K CREST BLOCK - C registered with Telangana RERA?

Yes. V K CREST BLOCK - C is registered with the Telangana Real Estate Regulatory Authority as P02400008138; the registration status is New Project.

Who is the developer of V K CREST BLOCK - C?

The promoter named in the RERA registration is HARIKA CONSTRUCTIONS & DEVELOPERS.

Where is V K CREST BLOCK - C located?

V K CREST BLOCK - C is in LAKSHMINAGAR COLONY, Saroornagar-I, Saroornagar, Rangareddy, Telangana (500035).

When will V K CREST BLOCK - C be completed?

The promoter's proposed date of completion filed with RERA is 04/08/2027. This is the promoter's declaration, not a guarantee.

More projects in Saroornagar I