Chandras Green Park
CHANDRA GROUPS · Medchal-Malkajgiri · RERA P02200002803
CHANDRAS GREEN PARK is a plotted development of residential plots in Turkapally, Shamirpet mandal, Medchal-Malkajgiri district. The registered promoter is Chandra Groups. The site area is 213977.53 Sq.m, and the final-layout drawing records 754 plots; no tower or floor configuration is supplied. The TG-RERA registration number is P02200002803, and the proposed completion date is 04/01/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CHANDRAS GREEN PARK |
| Project type | Plotted development; HMDA’s final layout letter describes a residential open-plot layout. RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the listed layout land. |
| TG-RERA registration | P02200002803 |
| Registration validity | 30/04/2021 to 04/01/2024; the certificate states two years and says validity is subject to extension by the Authority. The supplied registration record says extended: false. Approvals record |
| Registered promoter | Chandra Groups, recorded as a proprietorship; proprietor named in HMDA records: Avula Chandra Sekhar Reddy. Corporate record |
| RERA status shown in the supplied record | The registration period shown has ended; no extension is recorded in the supplied data. This is distinct from the project’s stated completion deadline and any completion/occupancy certification. Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Turkapally / Turkapalle; HMDA documents also describe the area as “Extended area of erstwhile HUDA (HMDA).” RERA record |
| Revenue village | Turkapally (also rendered Turkapalle or Thurkapally in supplied records). RERA record |
| Mandal | Shamirpet RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 508116 RERA record |
| Project survey numbers / subdivisions | 594/A/AA, 595P, 596, 597, 613, 614, 614/1, 614/2, 615/1/1, 615/1/2, 616 and 617P |
| Site extent | Total site area 213977.53 Sq.m; HMDA final-layout letter records 2,11,781.21 Sqm. The final layout drawing records net layout area 211382.66. These figures are as stated in the respective records. Layout record |
| Boundary details | East: ROAD WIDTH 60; west: SURVEY NO 596 594P; north: CTS NO; south: SURVEY NO 596 599 600 601 612 618 619. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal layout permit | 000011/LO/Plg/HMDA/2021, dated 05 January 2021; HMDA’s final layout release is dated 18 November 2022. |
| Approved built-up area | Not stated in the supplied layout records; this is a plotted layout, not a building scheme. |
| Buildings / floors | No project-wide building, tower or floor configuration is supplied. The final-layout letter says individual building permissions are to be considered separately. |
| Plots | Final-layout drawing records 754 plots. The count is drawing-derived and should be checked against the approved drawing; complete plot-by-plot sizes are not supplied. Layout record |
| HMDA-mortgaged plots in draft-layout record | 138 plots, extent 18421.49 Sq.mtrs, and a further 46 plots, extent 6205 Sq.mtrs; the final-layout letter records relinquishment deeds for mortgaged plots. |
| RERA-declared unit count / approved unit count | No RERA unit inventory or separate approved unit count is supplied. The project is registered as plotted development. RERA record |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots; the final-layout letter restricts building sites to residential dwelling-house use. |
| Booked / available counts | Not supplied. RERA unit table |
| Construction / development stage | No independently verified current site-progress measurement is supplied. HMDA’s draft approval required development works within three years; the RERA filing gives proposed completion as 04/01/2024. RERA record |
| Completion dates | RERA filing: proposed completion 04/01/2024. No revised completion date is supplied. RERA record |
| Completion / occupancy certificate | No project completion certificate or occupancy certificate is supplied. The available approval records concern the layout; building permissions are to be considered separately. Document index |
2. The project story
Chandras Green Park is a residential plotted layout registered with TG-RERA as P02200002803, covering land identified in Turkapally village, Shamirpet mandal, Medchal-Malkajgiri district. Its registered survey identity is 594/A/AA, 595P, 596, 597, 613, 614, 614/1, 614/2, 615/1/1, 615/1/2, 616 and 617P. RERA record
HMDA’s records show draft layout approval dated 05 January 2021 and a final layout release dated 18 November 2022. The final drawing identifies 754 plots and residential use; the final-layout letter provides that individual building permissions are considered separately. The plotted count is drawing-derived, and the supplied record does not include a complete plot schedule or current sold/unsold inventory. Layout record
The RERA filing states a proposed completion date of 04/01/2024. The supplied evidence does not establish current construction or infrastructure progress through an independently verified site inspection, nor does it include a project completion/occupancy certificate. RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. HMDA’s final-layout drawing records a net layout area of 211382.66, with 122810.31 identified as plotted area, 64637.59 as road area, 18620.16 as organized open-space/park/utility area and 5316.99 as social-infrastructure area. The drawing also identifies a 1793.95 road-widening/reservation area. Figures are reproduced as labelled in the drawing; they are not independently recalculated here.
The final drawing shows a road network with labelled road widths including 60.00, 18.0M, 12.0M, 9.0M, and an existing 5.40M road proposed to be widened to 9.14M. It also labels open areas, utility areas, social-infrastructure areas, a green-belt area of 402.37, and an accessory-use area of 18.00.
The earlier draft-layout record lists a total site area of 213977.53 Sq.m, net area of 211781.21 Sq.m, plotted area of 122810.21, road area of 64637.60, organized open-space/park area of 18620.16, social-infrastructure area of 5316.99, and amenity area of 2196.32 Sq.m. These are the draft-layout document’s stated figures.
The RERA registration identifies the project as plotted development; no apartment carpet or saleable area, FSI-counted area, gross built-up area, tower count or building-floor plan is supplied. The final-layout letter states that individual building permissions are to be considered separately. RERA record
4. Homes, configurations & floor plans
The registered offering is residential plots. The supplied RERA record does not provide a plot-by-plot inventory, plot-size range, booked/available count or RERA-filed saleable-area schedule. The final-layout drawing states 754 plots, but the supplied layout extraction notes that plot sizes are not fully captured; it should not be treated as a complete plot schedule. RERA record RERA unit table Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 754 shown on final-layout drawing; drawing-derived count | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
No flat floor plans or software-measured carpet areas are available for this plotted development. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not state a sanctioned parking-space count, visitor or accessible parking provision, or parking allotment arrangements. The layout drawing shows internal roads and footpaths as required infrastructure, but it does not establish exclusive parking rights for any plot. RERA amenities
HMDA’s final-layout letter requires roads to remain open for public access and says no compound wall is permitted that would block access to neighbouring lands. The final drawing labels several road widths, including 60.00, 18.0M, 12.0M and 9.0M.
6. Amenities, recreation & open spaces
The layout records identify open space, social infrastructure, utilities and green areas. These are layout provisions, not evidence that each facility is complete or currently operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 18620.16 in the final-layout drawing | Shown in approved layout; current development status not verified | |
| Social infrastructure area | 5316.99 in the final-layout drawing | Shown in approved layout; use/facilities and current status not specified | |
| Green belt | 402.37 | Shown in drawing; current planting status not verified | |
| Open areas | Drawing labels include 841.88 SQ.MTS., 661.50 SQ.MTS., 4572.22 SQ.MTS, 1226.08 SQ.MTS, 5343.02 SQ.MTS., 1238.57 SQ.MTS., 1657.58 SQ.MTS. and 568.47 SQ.MTS. | Drawing labels; current status not verified | |
| Utility areas | Drawing labels include 578.94 SQ.MTS., 339.82 SQ.MTS., 594.78 SQ.MTS. and 594.90 SQ.MTS. | Drawing labels; current status not verified | |
| Community buildings | RERA amenity record shows 0% | RERA amenities | RERA-listed progress field; no completion evidence supplied |
| Clubhouse, spa, gym, play areas and jogging paths | Promoter/vendor marketing mentions these facilities; no corresponding project-specific sanctioned or RERA-delivery evidence is supplied here. | Promoter website | Marketing claim only; not independently verified |
7. Utilities, building services & safety
HMDA’s draft-layout conditions call for potable-water connectivity, underground utility ducting, underground storm-water drainage, street lighting, a transformer yard, solid-waste disposal space, source segregation, a bio-compost unit, rainwater harvesting, avenue planting and cycle tracks. These are approval conditions and do not establish completed or operational services.
The final layout drawing labels sewage, water-supply and storm-water lines; an overhead tank; transformer; 207 percolation pits; cycle track 2.00M wide; and septic-tank capacities shown as 147.9KL and 512.88KLD. The drawing also labels sump parts at 1,47,300 LI each. These are drawing labels, not independently verified operating capacities or completion claims.
HMDA’s final-layout letter states that the layout has water-supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structures and other civic amenities, and assigns maintenance of those services to the local body. No supplied document establishes current service operation, fire-safety clearance, accessibility facilities, CCTV/security, or electrical backup.
8. Location, access & connectivity
The project’s official revenue location is Turkapally village, Shamirpet mandal, Medchal-Malkajgiri district, PIN 508116. The supplied geocode is 17.6723242, 78.5930042. RERA record Location record
The layout records show an abutting road width of 60.00 and identify road widths including 60.0m, 18.0M, 12.0M, 9.0M, and an existing 5.40M road proposed to be widened to 9.14M. The final-layout letter requires roads to remain open for public access.
The nearest sampled Outer Ring Road interchange is listed at approximately 12.9 km. This is a supplied distance estimate; no travel time or public-transport detail is available. Location record
9. Developer & development status
The TG-RERA record names Chandra Groups as promoter. The organization is recorded as a proprietorship, with Avula Chandra Sekhar Reddy identified as proprietor and authorized signatory in project records. The supplied record does not establish a separate corporate registration number or a complete, verified registered-office address. Corporate record
The RERA filing proposes completion by 04/01/2024. No revised completion timeline or independently verified current progress report is supplied. The registration certificate shows validity through 04/01/2024 and the supplied registration record marks it as not extended. RERA record Approvals record
10. Approvals, official records & documents
| Identifier / date | P02200002803, issued 30/04/2021; stated validity to 04/01/2024 |
|---|---|
| What it records | Form C registration for CHANDRAS GREEN PARK, subject to stated conditions including the separate-account requirement. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, 05 January 2021; file 038019/MED/LT/U6/HMDA/10082020 |
|---|---|
| What it records | Draft residential open-layout approval and development conditions for the listed survey numbers. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, dated 05-01-2021 |
|---|---|
| What it records | Proposed residential draft layout, land-use schedule and mortgage-plot information. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, dated 18 November 2022; file 056139/LT/MED/FLT/U6/HMDA/05082022 |
|---|---|
| What it records | Final residential layout release; states roads/open spaces were taken over through gift-deed records and identifies residential use and other conditions. |
| Identifier / date | Final layout; drawing extraction identifies 754 plots |
|---|---|
| What it records | Shows plot arrangement, roads, open spaces, social infrastructure and utility labels. |
| Identifier / date | Dated 30-3-202L in extraction |
|---|---|
| What it records | An allotment-letter record with the allottee and plot unspecified in the supplied extraction. |
| Identifier / date | Dated 3l-03-2021 in extraction |
|---|---|
| What it records | Promoter declaration concerning title basis, encumbrances, project funds and pending approvals. |
The supplied records include layout approvals, but no project completion certificate, occupancy certificate, or individual building permission is provided. The final-layout letter says individual building permissions are to be considered separately. Document index
1. Project at a glance
Project identity
Registered project name: CHANDRAS GREEN PARK
Project type: Plotted development; HMDA’s final layout letter describes a residential open-plot layout.
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the listed layout land.
TG-RERA registration: P02200002803
Registration validity: 30/04/2021 to 04/01/2024; the certificate states two years and says validity is subject to extension by the Authority. The supplied registration record says extended: false.
Registered promoter: Chandra Groups, recorded as a proprietorship; proprietor named in HMDA records: Avula Chandra Sekhar Reddy.
RERA status shown in the supplied record: The registration period shown has ended; no extension is recorded in the supplied data. This is distinct from the project’s stated completion deadline and any completion/occupancy certification.
Land and geographic identity
Locality: Turkapally / Turkapalle; HMDA documents also describe the area as “Extended area of erstwhile HUDA (HMDA).”
Revenue village: Turkapally (also rendered Turkapalle or Thurkapally in supplied records).
Mandal: Shamirpet
District: Medchal-Malkajgiri
PIN: 508116
Project survey numbers / subdivisions: 594/A/AA, 595P, 596, 597, 613, 614, 614/1, 614/2, 615/1/1, 615/1/2, 616 and 617P
Site extent: Total site area 213977.53 Sq.m; HMDA final-layout letter records 2,11,781.21 Sqm. The final layout drawing records net layout area 211382.66. These figures are as stated in the respective records.
Boundary details: East: ROAD WIDTH 60; west: SURVEY NO 596 594P; north: CTS NO; south: SURVEY NO 596 599 600 601 612 618 619.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout permit: 000011/LO/Plg/HMDA/2021, dated 05 January 2021; HMDA’s final layout release is dated 18 November 2022.
Approved built-up area: Not stated in the supplied layout records; this is a plotted layout, not a building scheme.
Buildings / floors: No project-wide building, tower or floor configuration is supplied. The final-layout letter says individual building permissions are to be considered separately.
Plots: Final-layout drawing records 754 plots. The count is drawing-derived and should be checked against the approved drawing; complete plot-by-plot sizes are not supplied.
HMDA-mortgaged plots in draft-layout record: 138 plots, extent 18421.49 Sq.mtrs, and a further 46 plots, extent 6205 Sq.mtrs; the final-layout letter records relinquishment deeds for mortgaged plots.
RERA-declared unit count / approved unit count: No RERA unit inventory or separate approved unit count is supplied. The project is registered as plotted development.
Offering and status
Offering: Residential plots; the final-layout letter restricts building sites to residential dwelling-house use.
Booked / available counts: Not supplied.
Construction / development stage: No independently verified current site-progress measurement is supplied. HMDA’s draft approval required development works within three years; the RERA filing gives proposed completion as 04/01/2024.
Completion dates: RERA filing: proposed completion 04/01/2024. No revised completion date is supplied.
Completion / occupancy certificate: No project completion certificate or occupancy certificate is supplied. The available approval records concern the layout; building permissions are to be considered separately.
2. The project story
Chandras Green Park is a residential plotted layout registered with TG-RERA as P02200002803, covering land identified in Turkapally village, Shamirpet mandal, Medchal-Malkajgiri district. Its registered survey identity is 594/A/AA, 595P, 596, 597, 613, 614, 614/1, 614/2, 615/1/1, 615/1/2, 616 and 617P.
HMDA’s records show draft layout approval dated 05 January 2021 and a final layout release dated 18 November 2022. The final drawing identifies 754 plots and residential use; the final-layout letter provides that individual building permissions are considered separately. The plotted count is drawing-derived, and the supplied record does not include a complete plot schedule or current sold/unsold inventory.
The RERA filing states a proposed completion date of 04/01/2024. The supplied evidence does not establish current construction or infrastructure progress through an independently verified site inspection, nor does it include a project completion/occupancy certificate.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. HMDA’s final-layout drawing records a net layout area of 211382.66, with 122810.31 identified as plotted area, 64637.59 as road area, 18620.16 as organized open-space/park/utility area and 5316.99 as social-infrastructure area. The drawing also identifies a 1793.95 road-widening/reservation area. Figures are reproduced as labelled in the drawing; they are not independently recalculated here.
The final drawing shows a road network with labelled road widths including 60.00, 18.0M, 12.0M, 9.0M, and an existing 5.40M road proposed to be widened to 9.14M. It also labels open areas, utility areas, social-infrastructure areas, a green-belt area of 402.37, and an accessory-use area of 18.00.
The earlier draft-layout record lists a total site area of 213977.53 Sq.m, net area of 211781.21 Sq.m, plotted area of 122810.21, road area of 64637.60, organized open-space/park area of 18620.16, social-infrastructure area of 5316.99, and amenity area of 2196.32 Sq.m. These are the draft-layout document’s stated figures.
The RERA registration identifies the project as plotted development; no apartment carpet or saleable area, FSI-counted area, gross built-up area, tower count or building-floor plan is supplied. The final-layout letter states that individual building permissions are to be considered separately.
4. Homes, configurations & floor plans
The registered offering is residential plots. The supplied RERA record does not provide a plot-by-plot inventory, plot-size range, booked/available count or RERA-filed saleable-area schedule. The final-layout drawing states 754 plots, but the supplied layout extraction notes that plot sizes are not fully captured; it should not be treated as a complete plot schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 754 shown on final-layout drawing; drawing-derived count | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
No flat floor plans or software-measured carpet areas are available for this plotted development.
5. Parking & vehicle circulation
The supplied evidence does not state a sanctioned parking-space count, visitor or accessible parking provision, or parking allotment arrangements. The layout drawing shows internal roads and footpaths as required infrastructure, but it does not establish exclusive parking rights for any plot.
HMDA’s final-layout letter requires roads to remain open for public access and says no compound wall is permitted that would block access to neighbouring lands. The final drawing labels several road widths, including 60.00, 18.0M, 12.0M and 9.0M.
6. Amenities, recreation & open spaces
The layout records identify open space, social infrastructure, utilities and green areas. These are layout provisions, not evidence that each facility is complete or currently operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 18620.16 in the final-layout drawing | Shown in approved layout; current development status not verified | |
| Social infrastructure area | 5316.99 in the final-layout drawing | Shown in approved layout; use/facilities and current status not specified | |
| Green belt | 402.37 | Shown in drawing; current planting status not verified | |
| Open areas | Drawing labels include 841.88 SQ.MTS., 661.50 SQ.MTS., 4572.22 SQ.MTS, 1226.08 SQ.MTS, 5343.02 SQ.MTS., 1238.57 SQ.MTS., 1657.58 SQ.MTS. and 568.47 SQ.MTS. | Drawing labels; current status not verified | |
| Utility areas | Drawing labels include 578.94 SQ.MTS., 339.82 SQ.MTS., 594.78 SQ.MTS. and 594.90 SQ.MTS. | Drawing labels; current status not verified | |
| Community buildings | RERA amenity record shows 0% | RERA-listed progress field; no completion evidence supplied | |
| Clubhouse, spa, gym, play areas and jogging paths | Promoter/vendor marketing mentions these facilities; no corresponding project-specific sanctioned or RERA-delivery evidence is supplied here. | Marketing claim only; not independently verified |
7. Utilities, building services & safety
HMDA’s draft-layout conditions call for potable-water connectivity, underground utility ducting, underground storm-water drainage, street lighting, a transformer yard, solid-waste disposal space, source segregation, a bio-compost unit, rainwater harvesting, avenue planting and cycle tracks. These are approval conditions and do not establish completed or operational services.
The final layout drawing labels sewage, water-supply and storm-water lines; an overhead tank; transformer; 207 percolation pits; cycle track 2.00M wide; and septic-tank capacities shown as 147.9KL and 512.88KLD. The drawing also labels sump parts at 1,47,300 LI each. These are drawing labels, not independently verified operating capacities or completion claims.
HMDA’s final-layout letter states that the layout has water-supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structures and other civic amenities, and assigns maintenance of those services to the local body. No supplied document establishes current service operation, fire-safety clearance, accessibility facilities, CCTV/security, or electrical backup.
8. Location, access & connectivity
The project’s official revenue location is Turkapally village, Shamirpet mandal, Medchal-Malkajgiri district, PIN 508116. The supplied geocode is 17.6723242, 78.5930042.
The layout records show an abutting road width of 60.00 and identify road widths including 60.0m, 18.0M, 12.0M, 9.0M, and an existing 5.40M road proposed to be widened to 9.14M. The final-layout letter requires roads to remain open for public access.
The nearest sampled Outer Ring Road interchange is listed at approximately 12.9 km. This is a supplied distance estimate; no travel time or public-transport detail is available.
9. Developer & development status
The TG-RERA record names Chandra Groups as promoter. The organization is recorded as a proprietorship, with Avula Chandra Sekhar Reddy identified as proprietor and authorized signatory in project records. The supplied record does not establish a separate corporate registration number or a complete, verified registered-office address.
The RERA filing proposes completion by 04/01/2024. No revised completion timeline or independently verified current progress report is supplied. The registration certificate shows validity through 04/01/2024 and the supplied registration record marks it as not extended.
10. Approvals, official records & documents
| Identifier / date | P02200002803, issued 30/04/2021; stated validity to 04/01/2024 |
|---|---|
| What it records | Form C registration for CHANDRAS GREEN PARK, subject to stated conditions including the separate-account requirement. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, 05 January 2021; file 038019/MED/LT/U6/HMDA/10082020 |
|---|---|
| What it records | Draft residential open-layout approval and development conditions for the listed survey numbers. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, dated 05-01-2021 |
|---|---|
| What it records | Proposed residential draft layout, land-use schedule and mortgage-plot information. |
| Identifier / date | 000011/LO/Plg/HMDA/2021, dated 18 November 2022; file 056139/LT/MED/FLT/U6/HMDA/05082022 |
|---|---|
| What it records | Final residential layout release; states roads/open spaces were taken over through gift-deed records and identifies residential use and other conditions. |
| Identifier / date | Final layout; drawing extraction identifies 754 plots |
|---|---|
| What it records | Shows plot arrangement, roads, open spaces, social infrastructure and utility labels. |
| Identifier / date | Dated 30-3-202L in extraction |
|---|---|
| What it records | An allotment-letter record with the allottee and plot unspecified in the supplied extraction. |
| Identifier / date | Dated 3l-03-2021 in extraction |
|---|---|
| What it records | Promoter declaration concerning title basis, encumbrances, project funds and pending approvals. |
The supplied records include layout approvals, but no project completion certificate, occupancy certificate, or individual building permission is provided. The final-layout letter says individual building permissions are to be considered separately.
Frequently asked questions
Is CHANDRAS GREEN PARK registered with Telangana RERA?
Yes. CHANDRAS GREEN PARK is registered with the Telangana Real Estate Regulatory Authority as P02200002803; the registration status is New Project.
Who is the developer of CHANDRAS GREEN PARK?
The promoter named in the RERA registration is CHANDRA GROUPS.
Where is CHANDRAS GREEN PARK located?
CHANDRAS GREEN PARK is in TURKAPALLE, Turkapally, Shamirpet, Medchal-Malkajgiri, Telangana (508116).
When will CHANDRAS GREEN PARK be completed?
The promoter's proposed date of completion filed with RERA is 04/01/2024. This is the promoter's declaration, not a guarantee.
More projects in Turkapally