SHUBHAM ENCLAVE is a plotted development at Kandukur village, Kandukur Mandal, Ranga Reddy District, developed by registered promoter TSR CONSTRUCTIONS AND DEVELOPERS. The total site area is 35937.3 sq.m, with a net site area of 35241.97 sq.m; the record describes a layout with plots and does not state a plot count or plot-size configurations. The project is registered under TG-RERA **P02400002268**, with registration validity ending 10/02/2023; the Form B declaration undertakes completion by 05/03/2023.

01What we found

Period endedTG-RERA registration ran to 10 Feb 2023 - check its extension on TG-RERA
8documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSHUBHAM ENCLAVE RERA record
Project typePlotted development / open-plot layout RERA record
Phase / registered portionNot separately identified; the registration is for SHUBHAM ENCLAVE
TG-RERA registrationP02400002268
Registration validity30/10/2020 to 10/02/2023; the supplied certificate records no extension
Registered promoterTSR CONSTRUCTIONS AND DEVELOPERS (also written “Tsr Constructions And Developers” in the certificate) RERA record
RERA status in supplied recordRegistration certificate issued; registration validity ended 10/02/2023. Current status is not independently verified in the supplied material.

Land and geographic identity

FieldRecord
Locality / revenue villageKandukur village RERA record
MandalKandukur RERA record
DistrictRanga Reddy (the approval document also spells it “Rangareddy”) RERA record
PIN500077 RERA record
Project survey numbersOLD 735 and NEW 539, Kandukur RERA record
Total site area35937.3 sq.m RERA filing
Road-affected area695.33 sq.m RERA filing
Net site area35241.97 sq.m RERA filing
Boundaries in RERA filingEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the approval records delegation to Kandukur Gram Panchayat
Principal approvalDraft layout approval 000037/LO/Plg/HMDA/2019, dated 11 February, 2019 Approvals record
Application number000427/SMD/LT/U2/HMDA/19122016
Approved built-up areaNot disclosed in the supplied project record; this is a plotted layout, not a building scheme. RERA filing
Plotted area18298.46 sq.m in the RERA filing RERA filing
Buildings / floorsNo tower, block, basement, stilt, podium or floor configuration is recorded in the supplied layout evidence.
Roads and land allocation in approval documentLayout road area 12726.58 sq.m; open space (park) 2831.46 sq.m; social infrastructure 1245.07 sq.m; amenities area 0
Parking / plots reserved as mortgagePlot Nos. 48 to 64 (17 plots), with mortgage extent recorded as 2826.45 sq.m in the approval letter

Offering and status

FieldRecord
Unit typePlots; no plot count, plot-size schedule, or RERA-filed saleable-size range is available in the supplied material. RERA record RERA filing
Booked / available countsNot disclosed in the supplied data.
Construction stageProject completeness is recorded as 80%, but the supplied material does not identify the measurement date or independently verify site progress. RERA record
Completion datesRERA certificate completion/validity end: 10/02/2023; Form B declaration completion undertaking: 05/03/2023.
Occupancy / completion certificateNot supplied; no OC or completion certificate is evidenced in the supplied documents.
Registration vs completionRegistration validity and the separate Form B completion undertaking are as stated above; neither establishes that an OC was issued.

2. The project story

SHUBHAM ENCLAVE is registered as a plotted development at Kandukur village, Kandukur Mandal, Ranga Reddy District, on land identified as OLD 735 and NEW 539. The filed site information gives a total area of 35937.3 sq.m, including 695.33 sq.m affected by road widening, and a net area of 35241.97 sq.m. RERA record RERA filing

The project record describes a layout rather than apartment buildings or villas. HMDA’s draft-layout approval records roads, open space and social-infrastructure land, and identifies plots 48 to 64 as mortgaged to HMDA; the letter says those plots may not be sold while mortgaged. The layout approval also calls for development works and handover conditions before final layout release.

The project completeness figure is 80% in the supplied identity record. It is not accompanied by a dated progress certificate or an independent site inspection, so it should be read as a recorded progress figure, not independently verified completion. No occupancy or completion certificate is supplied. RERA record Document index

3. Master plan, architecture & building design

The approved scheme is a plotted layout. The HMDA approval records a 35241.97 sq.m net site area, comprising 18298.46 sq.m plotted area, 12726.58 sq.m layout roads, 2831.46 sq.m open space (park), and 1245.07 sq.m social infrastructure; amenities area is recorded as 0 in the approval’s land-use schedule.

The approval letter specifies road widths of 18 mts and above and requires roads to be opened for access to neighbouring sites. Its conditions include handing over road and open-space areas by registered gift deed before final layout release. The proposed-plan drawing additionally labels road connections and park areas, but its OCR identifies the drawing as a proposed layout plan and does not show an approval stamp, number or date in the extracted text.

No building footprints, floor plans, tower heights, apartment layouts or building-floor configuration are evidenced. The plan’s listed utilities and landscape features are described in the facilities sections below. The supplied drawing set contains two drawings, both classified as having no flats; no software-measured floor-plan areas are available. Floor plans

4. Homes, configurations & floor plans

This is a plotted project; the supplied RERA material does not provide plot-wise inventory, plot-size bands, booked/available counts or a RERA-filed saleable-area schedule. Accordingly, a unit-configuration table cannot be populated with verified RERA figures. RERA record RERA filing Document index

A third-party vendor record contains plot-area entries, but they are not TG-RERA-filed unit data and are not used here as the project’s registered offering. No apartment floor plans or software-measured carpet areas are available. Promoter website Floor plans

5. Parking & vehicle circulation

The supplied record does not establish resident or visitor parking counts, parking levels, vehicle-entry arrangements, EV charging, or plot-by-plot parking allocations. Because this is a plotted layout, the evidence should not be read as an apartment parking schedule.

The HMDA draft-layout approval identifies plots 48 to 64 as mortgaged in favour of HMDA and states that the applicant shall not sell those plots while they remain mortgaged. This is a layout mortgage condition, not evidence of purchaser-specific parking allocation.

6. Amenities, recreation & open spaces

Park / open space
Description / size2831.46 sq.m recorded as open space (park) in the layout approval; the proposed-plan drawing labels a ladies park and children park.
Evidence sourceHMDA approval schedule and proposed-plan drawing
Declared progress / verified statusNo completion percentage or independent completion verification supplied.
Social infrastructure
Description / size1245.07 sq.m
Evidence sourceHMDA approval schedule
Declared progress / verified statusNo facility-by-facility description or completion evidence supplied.
Rainwater-harvesting pits
Description / sizeListed among approval-document utilities; also labelled on the proposed-plan drawing.
Evidence sourceHMDA approval document and proposed-plan drawing
Declared progress / verified statusNo completion evidence supplied.
Community buildings
Description / sizeIncluded as an amenity category in the RERA filing; no description or size supplied. RERA amenities
Evidence sourceRERA-filed amenity fields
Declared progress / verified statusProgress shown as 0%; not independently verified.
Green strip / tot lot / park
Description / sizeListed in the RERA amenity schedule. RERA amenities
Evidence sourceRERA-filed amenity fields
Declared progress / verified statusProgress shown as 0%; not independently verified.

The RERA-filed amenity schedule also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, electrical meter/substation/receiving station, and aggregate recreational open space. The schedule shows 0% progress for its entries; that is a filed progress value, not an independent site verification. RERA amenities

7. Utilities, building services & safety

The HMDA approval document lists a common septic tank / STP, over head tank, transformer, park development, and rain water harvesting pits. It does not supply capacities or establish that these works are complete.

The RERA filing lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, street lighting, water conservation/rainwater harvesting, energy management, fire protection, solid-waste management, and electrical meter/substation/receiving-station provision. Each supplied amenity progress field is 0%; no independent commissioning, capacity, statutory clearance or operational evidence is included. RERA amenities

No building-specific lifts, accessibility arrangements, fire escape stairs, CCTV, backup-power capacity, or security-system specifications are established in the supplied TG-RERA records. Document index RERA amenities

8. Location, access & connectivity

The registered location is Kandukur village, Kandukur Mandal, Ranga Reddy District, PIN 500077. The supplied cadastral parcel centroid is 17.62073, 78.98939. RERA record Location record

The HMDA approval specifies layout roads 18 mts and above and requires roads to be opened to neighbouring sites. The proposed-plan drawing labels a “PRO 200' WIDE ROAD,” an “EXISTING 60' WIDE ROAD,” a “30'-0"(9.14M) WIDE ROAD,” a “15’ CONNECTIVITY ROAD,” a “PRO 30' WIDE ROAD,” and an “EXI 16' WIDE ROAD”; these are drawing labels and are not presented here as independently verified current road conditions.

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 37.9 km. No public-transport routes or verified journey times are supplied. Location record

9. Developer & development status

The registered promoter is TSR CONSTRUCTIONS AND DEVELOPERS, identified in the project record as a partnership. The supplied partnership deed is dated 31 August 2017. The certificate lists the promoter office as Village: Mailardevpally, Mandal: Rajendranagar, District: Ranga Reddy, PIN 500077; the project identity record separately gives a Kandukur address. RERA record Corporate record

The Form B affidavit is dated 05 March 2020 and names TSR CONSTRUCTIONS & DEVELOPERS and THOKALA KARUNAKAR REDDY as declarants. It undertakes completion by 05/03/2023 and includes project-fund and pending-approval declarations. These are promoter declarations, not independent verification of title, funding use or completion.

The project record states 80% completeness without a progress date or independent site verification. The TG-RERA certificate records validity to 10/02/2023, while the supplied record does not include an extension order or an occupancy/completion certificate. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM “C” certificate for SHUBHAM ENCLAVE, registration P02400002268, issued 30/10/2020; valid to 10/02/2023.
HMDA layout approvalDraft layout letter 000037/LO/Plg/HMDA/2019, dated 11 February, 2019; application 000427/SMD/LT/U2/HMDA/19122016.
Layout drawingProposed layout plan for SY.NO.Old-735/New-539, Kandukur; extracted text does not show an approval authority, approval number or date.
Promoter declarationForm B affidavit-cum-declaration dated 05 March 2020.
Title reportRERA-filed title-report document, with material described in the supplied extraction as relating to land at Kandukur.
Encumbrance statementRERA-filed statement for Survey No. 539; its searched-period details and entries are in the supplied record.
Completion / occupancy certificateNot supplied.

The HMDA approval letter states that the layout permission is not proof of land title and makes final layout release subject to development and handover conditions. The supplied evidence does not include a final layout-release document or an occupancy/completion certificate.

Frequently asked questions

Is SHUBHAM ENCLAVE registered with Telangana RERA?

Yes. SHUBHAM ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400002268; the registration status is New Project.

Who is the developer of SHUBHAM ENCLAVE?

The promoter named in the RERA registration is TSR CONSTRUCTIONS AND DEVELOPERS.

Where is SHUBHAM ENCLAVE located?

SHUBHAM ENCLAVE is in kandukur, Rangareddy, Telangana (500077).

When will SHUBHAM ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 10/02/2023. This is the promoter's declaration, not a guarantee.

More projects in Kandukur