SUNRISE SANKALPA is a plotted residential open-layout development in SHABAD, Shabad mandal, Ranga Reddy district, developed by the registered promoter SUNRISE DEVELOPERS. It has a total site area of 43,329.71 sq.m and a net site area of 41,323.71 sq.m; the supplied records do not state a tower or block count, floors, a complete plot count or plot-size configurations. The project offers residential plots and is registered under TG-RERA number P02400010744. The promoter’s stated completion date is 28-10-2028.

01What we found

RegisteredTG-RERA - valid till 28 Oct 2028
31documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Shabad, Shabad, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameSUNRISE SANKALPA RERA record
Project typePlotted residential open-layout development RERA record
Phase / registered portionNot identified as a numbered phase; registration is for the project on the listed Shabad survey land
TG-RERA registrationP02400010744
Registration validity29/10/2025 to 28/10/2028, unless extended by the Authority
Registered promoterSUNRISE DEVELOPERS
RERA statusRegistered; the supplied certificate states the validity period above

Land and geographic identity

ItemProject record
LocalitySHABAD RERA record
Revenue villageShabad RERA record
MandalShabad RERA record
DistrictRanga Reddy RERA record
PIN509217 RERA record
Project survey numbers / subdivisions1853/P, 1854, 1855/P, 1877/P, 1878/P, 1973/P, 1974/P, 1975/P
Total site area43,329.71 sq.m
Net site area41,323.71 sq.m
Boundaries stated in the RERA project informationEast: EXISTING ROAD; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approval000058/LO/Plg/HMDA/2025, dated 06-10-2025; the filed approval is described as a draft layout permission
Application / file number056192/SKP/LT/U6/HMDA/10082022
Approved built-up areaNot stated in the supplied evidence; this is a plotted layout, not a building scheme RERA filing
Buildings / floors / parking levelsNo building count, floor configuration, or parking-level schedule is supplied
Layout area allocationPlotted area: 25,177.10 sq.m; layout roads: 11,661.86 sq.m; organized open space/park/utility area: 3,451.47 sq.m; social infrastructure: 1,033.14 sq.m; amenity area: 174.11 sq.m
RERA-declared plot count / plot-size scheduleNot available in the supplied RERA data RERA filing

Offering and status

ItemProject record
Unit typeResidential plots
Plot-size rangeNot disclosed in the supplied evidence RERA filing
Booked / available plotsNot disclosed in the supplied evidence RERA filing
Construction / development stageThe supplied RERA amenity record reports progress figures for certain infrastructure items; no independent site verification or overall project-completion percentage is provided RERA amenities
Promoter’s stated completion date28-10-2028 in the Form B declaration
RERA registration expiry28/10/2028, unless extended; this is distinct from the completion undertaking
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The project record concerns a plotted layout Document index

2. The project story

SUNRISE SANKALPA is a proposed residential plotted layout in Shabad village, Shabad mandal, Ranga Reddy district. The TG-RERA certificate identifies the project and its survey land, while the HMDA-filed drawing describes a residential open layout over a net site area of 41,323.71 sq.m.

The layout plan identifies residential plots, internal roads, organized open space/park and utility area, social infrastructure, and amenity land. HMDA’s supplied letter is a draft layout permission and sets out further development and handover steps before final layout release. It records 24 plots, Nos. 55 to 78, mortgaged to HMDA; the letter says those plots are not to be sold while mortgaged.

The RERA filing includes a partially completed allotment-letter form, but it does not identify a particular allottee or plot. The supplied records do not establish a complete plot inventory, individual plot sizes, bookings, or an independently verified construction status. RERA filing

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project. The filed HMDA layout plan gives a total site area of 43,329.71 sq.m and a net layout area of 41,323.71 sq.m. It records 25,177.10 sq.m as plotted area, 11,661.86 sq.m as layout road area, 3,451.47 sq.m as organized open space/park/utility area, 1,033.14 sq.m as social infrastructure area, and 174.11 sq.m as amenity area.

The approved drawing is identified as a residential open layout. The supplied approval record also describes a 30.00-wide abutting road and identifies a proposed 90m road affected area; the plan records 442.63 sq.m of road-widening area, while the filed letter states that 442.64 sq.m was handed over by registered gift deed.

No apartment or building floor plans, building footprints, floor configurations, tower heights, or building-level common-area schedule are supplied. The drawing-derived record contains two layout sheets and no measured flat plans; plot arrangements and individual plot dimensions are not available in the supplied software-measurement output. Floor plans Layout record

4. Homes, configurations & floor plans

The project offers residential plots. The supplied RERA material does not provide a verified count of saleable plots, plot-size bands, booked or available counts, or individual plot areas. The layout drawing refers to 24 mortgaged plots, Plot Nos. 55 to 78, with a total mortgage area of 3,885.47 sq.m; the approval letter states that these plots are not to be sold while mortgaged.

No flat configurations, RERA saleable-area figures, or software-measured carpet areas apply in the supplied evidence. The software drawing record reports two layout sheets and no measured flat plans. Floor plans

5. Parking & vehicle circulation

No parking count, visitor or accessible parking provision, parking allocation, or vehicle-space schedule is provided for the layout. The plan records layout roads of 11,661.86 sq.m and notes that roads are to be opened for access to neighbouring sites; it does not establish individual plot owners’ parking rights or exclusive parking spaces.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / park / utility area3,451.47 sq.m combined in the layout area statementRERA-filed layout allocation; not independently verified as completed
Social infrastructure area1,033.14 sq.mRERA-filed layout allocation; no facility specification or completion evidence supplied
Amenity area174.11 sq.m in the layout planRERA-filed allocation; no facility specification or completion evidence supplied
Park developmentPark area is listed in the HMDA layout recordRequired / described in the layout record; no independent completion verification supplied
Community buildingsNo size or facility description supplied; RERA amenities record shows 0%RERA amenitiesDeclared progress: 0%
Green strip / tot lot / parkNo size or facility description supplied; RERA amenities record shows 0%RERA amenitiesDeclared progress: 0%

The RERA amenity record lists the following items at 10% progress: internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, rainwater harvesting, an electrical meter room/sub-station/receiving station, and aggregate recreational open space. This is a filed progress record, not independent verification of delivered facilities. RERA amenities

7. Utilities, building services & safety

The HMDA-filed draft layout letter lists proposed common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, street lights, park development, rainwater-harvesting pits, a utilities area, and a social-infrastructure area. These are approval-record descriptions; the supplied evidence does not provide capacities, completion certificates, or independent confirmation that the facilities are operational.

The RERA amenity progress record shows treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. See the listed 10% progress items under Amenities, recreation & open spaces. RERA amenities

No separate evidence supplies water-source or storage capacity, treated-water reuse, electrical backup capacity, EV charging, accessibility provisions, security systems, or building fire/life-safety design. RERA amenities

8. Location, access & connectivity

The registered project location is Shabad village, Shabad mandal, Ranga Reddy district, PIN 509217. The cadastral parcel centroid supplied for the location is 17.1727976411294, 78.13523956522656. RERA record Cadastral map

The filed layout record identifies an abutting road width of 30.00 and a proposed 90m road affected area. A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 31.9 km; the source labels this as an approximate sampled distance, not a travel-time claim. Location record

9. Developer & development status

The registered promoter is SUNRISE DEVELOPERS, identified in the project material as a partnership. Its RERA-filed address is Ward No-3, Seetharampuram Colony, Shabad, Shabad, Ranga Reddy, 509217. The supplied project records identify JONNALA KALYAN/KALYAAN as an authorized signatory and MADINENI VENKATA SATYANARAYANA CHOWDARY as a partner/managing partner. Corporate record Parties record

The promoter’s Form B declaration, dated 17 NOV 2025, undertakes completion by 28-10-2028 and states that 70% of amounts realized will be deposited in a separate scheduled-bank account. These are promoter declarations.

The supplied RERA record does not state plot-wise booking or availability, and no independent site inspection or verified overall construction-progress figure is provided. The registration certificate requires quarterly updates through the completion date stated in the Form B declaration. RERA filing

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C certificate for SUNRISE SANKALPA, registration P02400010744, identifying the promoter, location, survey numbers, and registration validity from 29/10/2025 to 28/10/2028.
HMDA layout plan / letterDraft residential open-layout record, approval number 000058/LO/Plg/HMDA/2025, dated 06-10-2025, for the listed Shabad survey numbers; the record sets out area allocations and conditions.
HMDA application / file056192/SKP/LT/U6/HMDA/10082022. The supplied HMDA document describes forwarding the draft plans to Shabad Grampanchayath and requiring development works and subsequent steps before final layout release.
HMDA mortgageMortgage deed 5025/2025, dated 25/08/2025, for Plot Nos. 55 to 78, area 3,885.47 sq.m, in favour of the Metropolitan Commissioner, HMDA.
Road-affected land giftGift deed 5026/2025, dated 25.08.2025, for the road-affected area under the proposed 90m road; the filed HMDA letter records 442.64 sq.m and refers to a local-body confirmation letter dated 06.09.2025.
Promoter declarationForm B declaration for the project, dated 17 NOV 2025, including the promoter’s completion undertaking and other RERA declarations.
Occupancy / completion certificateNone supplied; the project evidence concerns a plotted layout. Document index

Frequently asked questions

Is SUNRISE SANKALPA registered with Telangana RERA?

Yes. SUNRISE SANKALPA is registered with the Telangana Real Estate Regulatory Authority as P02400010744; the registration status is New Project.

Who is the developer of SUNRISE SANKALPA?

The promoter named in the RERA registration is SUNRISE DEVELOPERS.

Where is SUNRISE SANKALPA located?

SUNRISE SANKALPA is in SHABAD, Rangareddy, Telangana (509217).

When will SUNRISE SANKALPA be completed?

The promoter's proposed date of completion filed with RERA is 28/02/2029. This is the promoter's declaration, not a guarantee.