Sign in

Spring City Phase - I

SANDSTONE INFRA INDIA PRIVATE LIMITED · Sangareddy · RERA P01100003171

SPRING CITY PHASE - I is a plotted development / open residential layout at Sultanpur, Ameenpur mandal, Sangareddy district. The registered promoter is SANDSTONE INFRA INDIA PRIVATE LIMITED. The registered site area is 80233.02 sq.m, including 13081.11 sq.m affected by master-plan road widening, with a net site area of 67151.91 sq.m; the record does not disclose a complete plot count or plot-size range. It is registered with TG-RERA as P01100003171, and its proposed completion date is 22/06/2023.

More from Sandstone Infra India Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 22 Jun 2023 - check its extension on TG-RERA
39documents on file - each fact links to its page
3court cases on this project's land (survey 457, Sultanpur)
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSPRING CITY PHASE - I RERA record
Project typePlotted development / open residential layout RERA record RERA filing
Phase / registered portionPhase I; the TG-RERA certificate identifies this phase. The precise phase boundary beyond the listed survey land is not separately described in the supplied record. RERA record
TG-RERA registrationP01100003171; granted 24/07/2021, valid through 22/06/2023. The supplied certificate says registration was not extended. Registration validity is distinct from the completion deadline. RERA record Approvals record
Registered promoterSANDSTONE INFRA INDIA PRIVATE LIMITED, a private limited company. RERA record Corporate record
RERA statusThe filed registration period has expired; no extension is evidenced in the supplied material. This states the record, not the project's present physical condition. Approvals record

Land and geographic identity

ItemRecord
LocalitySultanpur; the layout approval also describes the area as Sultanpur-ORRGC / Outer Ring Road Growth Corridor. RERA record
Revenue villageSULTANPUR; approval documents render it as Sultanpur-ORRGC. RERA record RERA filing
MandalAMEENPUR; approval documents render it as Ameenpur-ORRGC. RERA record RERA filing
DistrictSangareddy; approval document also spells it “Sanga Reddy.” RERA record
PIN502319 RERA record
Project survey numbers383, 384, 385, 386, 387, 388, 455, 456 & 457 (Parts). The RERA filing also renders these as 383/384/385/386/387/388/455/456&457 (Parts). Subdivisions are not specified in the registered project identity. RERA record RERA filing
Registered site areaTotal site area 80233.02 sq.m; master-plan-road-affected area 13081.11 sq.m; net site area 67151.91 sq.m. RERA filing
BoundariesNorth, south, east and west: “NEIGHBORS LAND” in the RERA filing. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalLayout Permit 000063/LO/Plg/HMDA/2020, dated 22 June, 2020; application/file reference 023691/ZOC/LT/U6/HMDA/15052019. The supplied layout document describes the instrument as a draft layout letter/plan recording technical approval and forwarding it for local-authority release. Approvals record
Approved built-up areaNot disclosed in the supplied record; this is a plotted layout, not a building scheme. RERA filing
Buildings / floorsBuilding count, floor configuration and building parking levels are not disclosed; the approved proposal is an open-plot layout.
Layout road networkThe approval records layout roads of 16849.32 sq.m and road widths including 36 Mts, 24 mts and 18 mts; the plan extracts also show 9.14m and 12.19m road-width references.
Approved vs RERA-declared plot countNo complete plot count is established by the supplied RERA records. The drawing-derived layout record says plot information is incomplete. Layout record

Offering and status

ItemRecord
Unit typePlots; no apartment or villa configuration is evidenced. RERA record RERA filing
RERA-filed plot size rangeNot available in the supplied RERA unit data. RERA record RERA unit table
Booked / available plotsNot disclosed in the supplied data. RERA unit table
Construction stageNo independently verified site inspection or current construction-stage report is supplied. The RERA amenity data records percentage progress for certain infrastructure items, but it does not establish current on-site completion. RERA amenities
Original completion deadline22/06/2023, as declared in Form B and the TG-RERA certificate.
Revised completion dateNo extension or revised date is evidenced in the supplied material. Approvals record
Occupancy / completion certificateNo occupancy or completion certificate is evidenced. For this plotted layout, the supplied material does not identify an OC or completion certificate scope. Document index Approvals record

2. The project story

SPRING CITY PHASE - I is registered with TG-RERA as a plotted residential development at Sultanpur village, Ameenpur mandal, Sangareddy district. The registered land description covers survey numbers 383, 384, 385, 386, 387, 388, 455, 456 and 457 (Parts). The HMDA layout material records an overall site area of 80233.02 sq.m, including 13081.11 sq.m affected by master-plan road widening, and a net site area of 67151.91 sq.m. RERA record RERA filing

The filed plan is for an open layout, not buildings or apartments. It allocates land to plotted area, roads, open space and social infrastructure; HMDA’s document also identifies infrastructure and handover conditions associated with the draft layout approval.

The promoter declared a completion deadline of 22/06/2023. No supplied evidence establishes the present physical stage through an independent site visit, or documents a revised completion date or completion/occupancy certificate. The RERA-filed amenity progress percentages are reported filing data, not independent verification. RERA amenities

3. Master plan, architecture & building design

The HMDA technical-approval material describes a residential open layout. Its land-use statement records 42885.84 sq.m of plotted area, 16849.32 sq.m of layout roads, 5697.13 sq.m of open space, and 1719.63 sq.m of social-infrastructure area, within the 67151.91 sq.m net site area. The plan also identifies 13081.11 sq.m as master-plan-road affected within the total site area of 80233.02 sq.m.

The RERA layout extraction describes roads of 36 m, 24 m and 18 m; other plan text includes 9.14 m and 12.19 m road-width references. These are plan-recorded dimensions, not a survey of roads as currently built.

HMDA’s document identifies 31 plots—numbers 141 to 144, 151 to 154, 161 to 169, and 170 to 183—with a total area of 6493.1 sq.m mortgaged to the Metropolitan Commissioner, HMDA under mortgage deed 7908/2020 dated 25/02/2020. The approval conditions state that these plots are not to be sold while mortgaged and describe infrastructure-completion and release steps.

The available layout drawing is not a complete plot schedule: the drawing-derived record reports that plot details are incomplete and no plot-size measurements were extracted. No buildings, floor plans, building footprint, residential/commercial building split, or tower arrangement are evidenced. Layout record Floor plans

4. Homes, configurations & floor plans

This is a plotted development. The supplied evidence does not provide RERA-filed plot counts, plot-by-plot sizes, or booked and available plot counts. The layout-derived record states that plot information is incomplete and that no plot sizes were measured. RERA record RERA unit table Layout record

The vendor record lists two plot sizes, 1503 Sq.Ft. and 2610 Sq.Ft.; these are vendor-supplied figures, not established here as RERA-filed or verified against the approved layout. Promoter website

Floor-plan review does not yield home measurements: the supplied floor-plan record covers three drawings, of which two have no flats and one scan is pending; no carpet-area measurements were made. Carpet-area concepts for apartments do not apply to the plot offering. Floor plans

5. Parking & vehicle circulation

No approved or RERA-filed parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is established by the supplied material. The project is a plotted layout; the available plan evidence describes road areas and widths, but does not establish parking bays as exclusive plot rights.

The vendor record mentions “Open Parking,” but it does not provide a count or a plot allocation, and is not evidence of a sanctioned or delivered parking scheme. Promoter website

6. Amenities, recreation & open spaces

The layout approval identifies open space and social infrastructure, while the RERA amenity record supplies reported progress percentages for selected layout infrastructure. These percentages are filing data; no independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Plotted area42885.84 sq.mHMDA layout approval materialApproved-plan allocation; completion not independently verified
Layout roads16849.32 sq.mHMDA layout approval materialInternal Roads & Footpaths: 70% in RERA amenity record; not independently verified RERA amenities
Open space / park5697.13 sq.mHMDA layout approval materialGreen Strip/TOT LOT/Park: 0%; aggregate recreational open space: 40% in RERA amenity record; not independently verified RERA amenities
Social infrastructure1719.63 sq.mHMDA layout approval materialNo completion percentage supplied for this specific area
Water supplyNo size or capacity suppliedRERA amenity record RERA amenities15% reported
SewerageNo system capacity suppliedRERA amenity record RERA amenities10% reported
Storm-water drainsNo system capacity suppliedRERA amenity record RERA amenities58% reported
Street lightingNo quantity suppliedRERA amenity record RERA amenities0% reported
Water conservation / rainwater harvestingNo quantity or capacity suppliedRERA amenity record RERA amenities0% reported
Community buildingsNo size or facility description suppliedRERA amenity record RERA amenities0% reported

7. Utilities, building services & safety

HMDA’s layout conditions require arrangements for potable/drinking-water connectivity, underground ducting of utilities and services, an underground storm-water drainage system, paved footpaths, a transformer yard in the area earmarked for utilities, and LED street lighting. These are approval conditions; the supplied record does not independently establish that they have been completed.

The RERA amenity record reports water supply at 15%, sewerage at 10%, storm-water drains at 58%, and electrical meter room/sub-station/receiving station at 0%. It also records solid-waste management and sewage/sullage treatment and disposal at 0%, water conservation/rainwater harvesting at 0%, and fire protection/fire-safety requirements at 0%. These are reported progress fields, not proof of present operation or statutory compliance. RERA amenities

No capacities, water source or storage volume, treatment-plant specification, backup-power provision, fire-system detail, security system, accessibility design, or emergency-access specification is established by the supplied project record.

8. Location, access & connectivity

The registered location is Sultanpur village, Ameenpur mandal, Sangareddy district, Telangana, PIN 502319. The project is identified in the HMDA approval material as being in the Outer Ring Road Growth Corridor (ORRGC). RERA record

The supplied location record gives a nearest sampled Outer Ring Road interchange distance of 7.9 km (approx.). The project layout approval also records proposed internal roads and road widths; it does not establish their present condition. No public-transport routes or other measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SANDSTONE INFRA INDIA PRIVATE LIMITED, identified as a company/private limited company. The promoter’s supplied address is SREE RAMAKRISHNA TOWERS, Sultanpur, Ameenpur, Sangareddy, 502319. The project record lists SRILAXMI YERUVA as authorized signatory and names CHANDRASEKHARA REDDY MALIKIREDDY, HARIPRASAD REDDY CHENNURU and VENKATRAM REDDY PENUBOLU as directors. Corporate record Parties record RERA filing

In Form B dated 11th day of JUNE, 2021, the promoter declared legal title and that the land was free from encumbrances, and undertook to complete the project by 22/06/2023. Those are promoter declarations in the registration filing. The supplied record contains no revised completion date, registration-extension evidence, independent construction inspection, or completion/occupancy certificate. Approvals record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA certificate P01100003171Form C registration for SPRING CITY PHASE - I, dated 24/07/2021, with validity ending 22/06/2023; no extension is shown in the supplied certificate.
HMDA layout approval materialTechnical approval for a proposed residential open layout under 000063/LO/Plg/HMDA/2020, dated 22 June, 2020, associated with application/file reference 023691/ZOC/LT/U6/HMDA/15052019. The document records draft-layout status and conditions, and says the permission is not proof of land title.
Layout drawing / planDraft layout plan showing the listed survey numbers, site-area allocation, road and open-space information, and HMDA mortgage plots.
Mortgage record noted in HMDA materialMortgage deed 7908/2020, dated 25/02/2020, covering the specified 31 plots and 6493.1 sq.m in favour of the Metropolitan Commissioner, HMDA.
Master-plan-road gift deed noted in HMDA materialGift deed document 13090/2020, dated 19/05/2020, for master-plan-road affected area in favour of Sultanpur Gram Panchayat; the approval material states an extent of 11890.17 sq.m.
NALA conversion reference noted in HMDA materialProceedings A2/6069/2018 are referenced in the approval document; the underlying order is not included in the supplied document set.
Promoter Form B declarationAffidavit-cum-declaration by M. Chandra Shekar Reddy on behalf of the promoter, dated 11th day of JUNE, 2021, including the promoter’s title, encumbrance and completion declarations.
Commencement / building approvals and OCThe supplied records do not establish a building commencement certificate for buildings or an occupancy/completion certificate; the project is documented as a plotted layout. One OCR record is not legible enough to identify an approval instrument.

Frequently asked questions

Is SPRING CITY PHASE - I registered with Telangana RERA?

Yes. SPRING CITY PHASE - I is registered with the Telangana Real Estate Regulatory Authority as P01100003171; the registration status is New Project.

Who is the developer of SPRING CITY PHASE - I?

The promoter named in the RERA registration is SANDSTONE INFRA INDIA PRIVATE LIMITED.

Where is SPRING CITY PHASE - I located?

SPRING CITY PHASE - I is in Sultanpur, AMEENPUR, Sangareddy, Telangana (502319).

When will SPRING CITY PHASE - I be completed?

The promoter's proposed date of completion filed with RERA is 22/06/2023. This is the promoter's declaration, not a guarantee.

More projects in Sultanpur