Sign in

Sri Ayyappa Sai Ram And Jagannadh Residency

SASR INFRASTRUCTURE PRIVATE LIMITED · Sangareddy · RERA P01100007145

SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY is a residential apartment project in Sultanpur, Ameenpur mandal, Sangareddy district, developed by registered promoter SASR INFRASTRUCTURE PRIVATE LIMITED. The project has a land area of 4,739.42 sq.m and one building of I Stilt + 5 Upper floors, with 99 apartments: 84 2BHK and 15 3BHK. It is registered with TG-RERA under P01100007145, and the RERA header records proposed completion as 13/07/2029.

01What we found

RegisteredTG-RERA - valid till 13 Mar 2029
14documents on file - each fact links to its page
2court cases on this project's land (survey 30, Sultanpur)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from mouthshut.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameSRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNew Project; the supplied record describes one building. Separate phase name or phase number is not disclosed. RERA record RERA filing RERA unit table
TG-RERA registrationP01100007145; registration issued 21/10/2023 and recorded as valid through 13/03/2029. The certificate states a five-year validity, subject to extension under the Act and rules; no extension is recorded in the supplied certificate. Registration validity is not the project-completion deadline. RERA record
Registered legal promoterSASR INFRASTRUCTURE PRIVATE LIMITED RERA record Corporate record
RERA statusThe project is recorded as “New Project”; the registration certificate is supplied. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageSultanpur; the project record and filed approvals refer to SULTANPUR / Sultanpur-ORRGC Village. RERA record RERA filing
Mandal / district / PINAmeenpur mandal; Sangareddy district; PIN 502319. RERA record RERA filing
Project survey identifiersSy. No. 30/22 (recorded as “30/22 (The Survey No - 30/22 is Known as ie OLD Survey No - 30/2)”) and Sy. No. 30/2. A filed Gram Panchayat permission also lists Sy. No. 30/32; that identifier is reproduced as recorded. RERA record RERA filing
Site extentRERA land details: total 4,739.42 sq.m, area affected by road widening/FTL/Nala widening 72.70 sq.m, and net area 4,666.72 sq.m. HMDA technical approval and Gram Panchayat permission each state 4,666.71 sq.m. RERA filing
Boundaries (RERA-filed)North: land of Sudhakar Rao in Sy. No. 30 by 23; south: land of Janga Reddy Vijaya Kumar Reddy and others; east: neighbours’ property; west: 100 Feet Road, petrol pump and other land. RERA filing

Development identity

ItemProject record
Principal technical approvalHMDA technical approval 047962/SKP/R1/U6/HMDA/05082021, dated 13/03/2023. The approval states that the plans require sanction by the local Executive Authority in conformity with the technical approval. Approvals record
Local building permissionGram Panchayat–Dayara proceedings GPD/BA/2023, dated 29.09.2023, for a residential building. Approvals record
Approved built-up area9,874.75 sq.m is recorded as “Built up Area” in the HMDA technical approval parameters. The same document separately records 12,451.69 as “Proposed Built-up Area”; the supplied extraction does not state a unit for that latter figure.
Building arrangementOne residential building / one tower is recorded. RERA unit table
Floor configurationThe filed building permissions describe I Stilt + 5 Upper floors. Basement, podium and separate parking-floor counts are not disclosed in the supplied records.
Units99 total in the RERA-derived unit schedule: 84 2BHK and 15 3BHK. RERA unit table RERA unit details
ParkingHMDA approval refers to cellar and stilt areas approved for parking, but the supplied records do not give a sanctioned space count.

Offering and status

ItemProject record
Configurations2BHK and 3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 104.76 sq.m; 3BHK: 139.82 sq.m. RERA unit table RERA unit details
Booked / available2BHK: 9 booked / 75 available; 3BHK: 1 booked / 14 available. Portal counts are indicative: the supplied record gives no as-of date for these counts. RERA unit table RERA unit details
Construction stageA current construction-stage or site-progress report is not supplied. The amenity progress entries supplied are recorded as 0%; they do not establish overall building progress. RERA amenities
Completion datesThe RERA header records proposed completion 13/07/2029; the Form B declaration states completion by 13 March 2029. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The HMDA approval says an occupancy certificate is required before occupation. Document index

2. The project story

This is a residential apartment development registered with TG-RERA as SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY, in Sultanpur, Ameenpur mandal, Sangareddy district. The project record identifies Sy. No. 30/22, with the old-survey reference Sy. No. 30/2; the filed local permission also lists Sy. No. 30/32. The RERA land schedule states a total site area of 4,739.42 sq.m and net area of 4,666.72 sq.m. RERA record RERA filing

The filed approvals describe one residential building of I Stilt + 5 Upper floors. The RERA unit schedule records 99 apartments: 84 2BHK and 15 3BHK. The supplied evidence does not establish the building’s current physical construction stage, and no occupancy or completion certificate is included. Accordingly, the registration and stated completion dates should not be read as evidence that construction is complete or that occupation is certified. RERA unit table Document index

The Form B declaration gives a completion undertaking of 13 March 2029; the RERA header separately records proposed completion as 13/07/2029. These are recorded here as separate filed values. The registration certificate records registration validity through 13/03/2029; that is a distinct registration-validity date. RERA record

3. Master plan, architecture & building design

The HMDA technical approval records a residential building on 4,666.71 Sq. Mt. and identifies a proposed structure of 1 Stilt + 5 floors. The approval parameters list “Built up Area 9874.75” and separately “Proposed Built-up Area 12451.69”; the supplied extraction does not specify a unit for the latter entry. The RERA land schedule records total area 4,739.42 sq.m, affected area 72.70 sq.m, and net area 4,666.72 sq.m. RERA filing

The project record identifies one building and one tower. The supplied material does not provide a readable approved floor-plan extraction establishing floor-by-floor apartment arrangement, number of flats per floor, building footprint, lift or stair count, or the distribution of common and private areas. The layout-plan item in the RERA file is not extracted, so internal roads, landscaping dimensions and open-space area cannot be described from the available drawing record. RERA unit table Document index

The approval lists a mortgage of 988 sq.m of built-up area in the first floor in favour of HMDA and records a separate 72.70 Sq.mtrs area affected by the proposed 30-metre master-plan road as gifted to the Gram Panchayat.

4. Homes, configurations & floor plans

RERA configuration counts and saleable areas are shown below. The carpet figures are software-measured from floor-plan drawing geometry, not RERA-filed carpet-area declarations; the drawing-derived measurement itself is identified as requiring review. RERA saleable area is a different measure and includes the home’s share of common areas, so the two figures should not be treated as interchangeable. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK84975104.76 sq.m60.0–76.5 sq.m; median 68.4 sq.m35%
3BHK15114139.82 sq.m88.7–100.2 sq.m; median 98.7 sq.m29%

The drawing measurement covers 14 2BHK designs and 3 3BHK designs. One measured example labelled 2BHK records a hall, two bedrooms, kitchen and wash area; one measured 3BHK example records a hall, three bedrooms and kitchen. These are software readings from the first-floor plan, not a guarantee that every unit has identical room dimensions or layout. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval says cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not converted to another use. It also requires one entry and one exit, each with a minimum width of 4.5mts and height clearance of 5mts. The filed approval does not provide a parking-space count, visitor or accessible-space count, or a unit-by-unit parking allocation.

No evidence in the supplied project record establishes an EV-charging provision, parking allotment terms for a particular apartment, or whether any drawn bay is exclusively allocated to a buyer. The approval identifies 988 sq.m of first-floor built-up area as mortgaged to HMDA; that is not a parking allocation.

6. Amenities, recreation & open spaces

The RERA amenities schedule lists the following items and records 0% progress for each listed entry. “Available: YES” in that schedule is a recorded availability field, not independent confirmation of completion or current operation. The HMDA technical approval separately names certain site features as conditions or provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkSize not supplied; HMDA approval also lists a “Tot-lot.”RERA amenities schedule; HMDA technical approval RERA amenitiesRERA schedule: 0%; completion not independently verified
Community buildingsNo size or capacity suppliedRERA amenities schedule RERA amenities0%; completion not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenities schedule RERA amenities0%; completion not independently verified

The vendor record also lists a clubhouse, swimming pool, gym, indoor games and children’s play area, among other advertised amenities; no corresponding project-specific approved size or completion evidence is supplied here. Those vendor-listed items are not treated as confirmed, sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The HMDA technical approval requires rainwater-harvesting structures, an ETP, a transformer and a garbage house. It also specifies separate underground and terrace water-storage tanks of 25,000 lts. capacity each for residential buildings. These are approval conditions or requirements; the supplied evidence does not verify installation or operation.

The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting/water conservation and an electrical meter room/sub-station/receiving station as “YES,” while recording 0% progress for the listed schedule items. The record does not provide water-source details, treatment capacity, STP capacity, reuse arrangements, electrical load, generator capacity, lift specifications, CCTV or access-control details as project-filed service specifications. RERA amenities

The HMDA approval requires compliance with Fire Service department norms, provides for automatic sprinklers if basement area exceeds 200 Sq.mts, and requires structural and construction-worker safety measures. These approval conditions do not establish that the relevant systems have been installed or that statutory clearances have been obtained. The available material does not state whether the basement threshold applies to this building.

8. Location, access & connectivity

The registered location is Sultanpur village, Ameenpur mandal, Sangareddy district, PIN 502319. The project boundaries recorded in the RERA land schedule include a 100 Feet Road and Petrol Pump and Others Land on the west. HMDA’s technical approval refers to a proposed 30 mts wide Master plan road affecting 72.70 Sq.mtrs and records that area as gifted to the Gram Panchayat. RERA record RERA filing

A software-derived location point is recorded as parcel centroid 17.57000, 78.31124. The nearest sampled Outer Ring Road interchange is listed at approximately 7.0 km; this is a measured connectivity record, not a travel-time claim. No public-transport route, named access-road sequence or verified travel time is supplied. Location record Cadastral map

9. Developer & development status

The registered promoter is SASR INFRASTRUCTURE PRIVATE LIMITED, a private limited company; the supplied corporate identifier is 36AAWCS6955P1Z0 (GSTIN). The RERA record gives the promoter’s address as H No 1-57/PP/305, Madinaguda, Sultanpur, Ameenpur, Sangareddy, 502319. Corporate record Parties record RERA filing

The Form B affidavit is made by Sri. S. Venkata Ramana Reddy, stated to be authorised by the promoter. The filing identifies landowners Sara Ramesh alias Boreda Ramesh and Boreda Sai Kiran and refers to Development cum General Power of Attorney No. 15738/2023 for the development arrangement.

A current construction-progress certificate or independently verified site report is not supplied. The project’s RERA header records proposed completion as 13/07/2029, while Form B states 13 March 2029; the registration certificate separately records validity through 13/03/2029. No occupancy or completion certificate is included in the reviewed documents. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100007145; issued 21/10/2023
What the supplied record establishesRegistration for the named project, with validity recorded through 13/03/2029, subject to the certificate’s conditions.
HMDA technical approval
Identifier / date047962/SKP/R1/U6/HMDA/05082021; 13/03/2023
What the supplied record establishesTechnical approval for a residential building on the stated survey land; the document says local Executive Authority sanction is required in conformity with the technical plans.
Gram Panchayat building permission
Identifier / dateGPD/BA/2023; 29.09.2023
What the supplied record establishesBuilding permission for a residential I Stilt + 5 Upper floors building, subject to stated conditions.
Form B declaration
Identifier / dateOctober 2023
What the supplied record establishesPromoter declaration includes a completion undertaking of 13th MARCH 2029 and RERA-related undertakings.
Layout plan / floor plan
Identifier / dateRERA-filed item 361137
What the supplied record establishesThe layout-plan item is not extracted; drawing-based unit measurements are available, but are software measurements and require review. Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo such certificate is included in the reviewed project documents. Document index

The RERA registration certificate includes quarterly-update and separate-account conditions. The approval documents also specify conditions for construction, parking, road access, utilities and occupancy; the full conditions remain in the cited source documents.

Frequently asked questions

Is SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY registered with Telangana RERA?

Yes. SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01100007145; the registration status is New Project.

Who is the developer of SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY?

The promoter named in the RERA registration is SASR INFRASTRUCTURE PRIVATE LIMITED.

Where is SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY located?

SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY is in Sultanpur, AMEENPUR, Sangareddy, Telangana (502319).

When will SRI AYYAPPA SAI RAM AND JAGANNADH RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 13/07/2029. This is the promoter's declaration, not a guarantee.

More projects in Sultanpur