SAI PARMESHWARI TOWERS is a residential apartment project at DUBBA, NIZAMABAD EAST (NEW), Nizamabad, on GURBABADI ROAD, BESIDE CWC GODOWNS, DUBBA, NIZAMABAD. The registered promoter is Pavan Attal Associates. The project has a site area of 1,308.75 sq m and one building with 1 Stilt + 5 upper floors, comprising 15 homes: 3 2BHK units and 12 3BHK units. It is registered under TG-RERA number P03100004131, and the promoter’s completion undertaking is 27/10/2024.

More from Pavan Attal Associates · 3 projects →

01What we found

Period endedTG-RERA registration ran to 27 Oct 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dubba, Nizamabad East, Nizamabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameSAI PARMESHWARI TOWERS RERA record
Project typeResidential apartment project; the RERA filing records one proposed building and 15 units. RERA filing RERA filing RERA unit table
Phase / registered portionThe record identifies a single registered project; a separate phase designation is not disclosed. RERA record
TG-RERA registrationP03100004131, granted under section 5; registration certificate issued 15/02/2022.
Registration validity15/02/2022–27/10/2024. This is the registration validity period, not a statement that construction was completed or an occupancy certificate issued.
Registered promoterPavan Attal Associates; the filing identifies the organization type as Proprietorship. RERA record RERA filing Corporate record
RERA status in supplied recordThe registration certificate records validity through 27/10/2024 and says extension would be subject to Authority action. No extension is shown in the supplied evidence. Approvals record

Land and geographic identity

FieldProject record
Locality / site descriptionDUBBA; GURBABADI ROAD, BESIDE CWC GODOWNS, NIZAMABAD. The certificate lists the locality as “DUBBA, NIZAMABAD EAST (NEW).” RERA record
Revenue villageDUBBA in the RERA project identity and land details. The building-construction approval separately prints “NIZAMABAD” as its village entry. RERA filing RERA filing
MandalNIZAMABAD EAST (NEW) RERA record RERA filing
District / PINNizamabad; 503002 in the project identity and registration certificate. RERA record
Project survey number(s)Survey No. 3171. No subdivision is stated in the supplied project identity. RERA filing Land records
Site areaRERA land details state 1,308.75 sq m total area and 1,308.75 sq m net area. The building approval separately states site area 1,308.75 m² and net area 1,300.05 m². RERA filing
Boundaries recorded in RERA land detailsEast: ROAD WIDE 40-0; West: ROAD WIDE 33-0; South: ROAD WIDE 60-0; North: -OTHER LAND. RERA filing

Development identity

FieldProject record
Sanctioning authorityNizamabad Municipality/Municipal Corporation; the RERA filing names DTCP as the authority for the plan approval. Approvals record
Principal approvalBuilding approval 0003/BP/3072/2021, dated 27 October, 2021. The approval also gives file no. 001657/BP/DTCP/3072/0004/2021.
Approved built-up area3,401.33 sq m in the RERA filing. The approval document’s stated areas are residential upper floors 2,756.80 m² and stilt 607.42 m²; these are figures as stated in the respective records. RERA filing
Building count and floorsOne building is recorded in the RERA land details. The building approval specifies 1 Stilt + 5 upper floors, with stated height 14.98 m. RERA filing
Parking levels / sanctioned parking countThe approval says the cellar and stilts approved in the plan are to be used exclusively for vehicle parking; a sanctioned parking-space count is not available in the supplied approval extraction.
Unit counts15 total units in the RERA unit record: 12 3BHK and 3 2BHK. The approved-plan total is also recorded as one building unit in the land-details field; a separate approved apartment count is not supplied. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configurations and saleable areas2BHK: 3 units, 108.04 sq m each as recorded. 3BHK: 12 units, 237.0 sq m each as recorded. RERA unit table
Booked / availableRERA portal counts read in the supplied record show 0 booked and 3 available 2BHK units, and 0 booked and 12 available 3BHK units. These counts have no stated as-of date and are indicative. RERA unit table
Construction stageThe supplied evidence does not establish current physical construction progress. RERA amenity progress fields show 0% for listed items; this is a filed progress indication, not independent site verification. RERA amenities
Completion datesThe promoter’s Form B declaration undertakes completion by 27/10/2024; the RERA certificate also ends on that date. No revised completion date is supplied.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. Document index

2. The project story

  • SAI PARMESHWARI TOWERS is recorded with TG-RERA as a residential apartment project on Survey No. 3171, at DUBBA, Nizamabad East (New), Nizamabad, with the site described in the building approval as GURBABADI ROAD, BESIDE CWC GODOWNS, DUBBA, NIZAMABAD. The RERA record identifies one building on a site of 1,308.75 sq m. RERA record RERA filing
  • The building approval describes a residential building of 1 Stilt + 5 upper floors and a height of 14.98 m. The RERA unit schedule records 15 homes: 12 3BHK units and 3 2BHK units. RERA unit table
  • The project’s registered completion undertaking was 27/10/2024, and the RERA certificate’s validity ended on that date. The supplied material does not establish whether the building is currently under construction, complete, or occupied, and does not include an occupancy or completion certificate. Accordingly, the filed deadline and registration period should not be read as evidence of physical completion or permission to occupy. Document index

3. Master plan, architecture & building design

  • The approval document records one residential building on a site area of 1,308.75 m², with a stated net area of 1,300.05 m². The RERA filing gives approved built-up area as 3,401.33 sq m; the building approval separately lists 2,756.80 m² for residential upper floors and 607.42 m² for the stilt. These figures are reported as stated, without treating them as interchangeable area measures. RERA filing
  • The sanctioned configuration is 1 Stilt + 5 upper floors, with stated height 14.98 m. The approval extraction does not establish the number of flats on each floor, stair or lift configuration, entrances, circulation arrangement, landscaping scheme, or detailed building footprint.
  • The approval records a Tot-lot (67.01 m²) and 8 rain water harvesting pits. It also requires a space for a transformer and a garbage house for dry/wet waste segregation. The supplied material does not provide enough drawing-derived detail to characterize other common areas or the site’s internal arrangement.

4. Homes, configurations & floor plans

  • The RERA unit record lists 3 2BHK units and 12 3BHK units. The supplied floor-plan drawing was software-measured for the 2BHK configuration only; those measurements are not RERA-filed carpet-area disclosures and require review against the drawing. No software-measured 3BHK carpet area is available. RERA unit table Floor plans
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK303108.04 sq mSoftware-measured: median 78.2 sq m; range 63.2–93.2 sq m across measured designs28% software-measured
3BHK12012237.0 sq mNot availableNot available

RERA unit table Floor plans

  • For one measured 2BHK drawing, the room schedule includes a hall, two bedrooms, dining/kitchen, foyer, two toilets and a balcony. The balcony is identified as excluded from the software-measured carpet area. The measured room dimensions and areas are drawing-derived and should be checked against the drawing itself. RERA unit details
  • Carpet area is the net usable floor area within a home, while a saleable-area figure may include the home’s share of common areas; a balcony is separately identified in the measurement record. The project data does not provide a RERA-filed carpet-area figure for these units. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The building approval states that the cellar and stilts approved in the plan are for parking exclusively and are not to be converted to another use. Its extraction does not provide a count of sanctioned parking spaces or a confirmed number of cellar levels.
  • The RERA filing records 292.83 sq m as mortgage area, and the approval states that the mortgaged area will be released on submission of completion and occupancy certificates. This is not a parking allocation schedule. RERA filing
  • No project-specific resident, visitor, accessible or EV parking counts, ramp or driveway details, pedestrian-separation plan, or unit-by-unit parking allocation are available in the supplied evidence. A vendor record mentions open parking and covered parking, including “Covered Parking (22 units),” but that is not established by the supplied sanctioned parking-count record. Promoter website

6. Amenities, recreation & open spaces

Tot-lot
Description / size67.01 m²
Evidence sourceBuilding approval
Declared progress / verified statusSanction-document entry; delivery not independently verified.
Rainwater harvesting
Description / size8 rain water harvesting pits
Evidence sourceBuilding approval; RERA amenities filing
Declared progress / verified statusRequired in the approval; RERA filing marks water conservation/rainwater harvesting “YES” and progress 0%. No independent completion verification. RERA amenities
Water supply
Description / sizeRERA amenities filing: “YES”
Evidence sourceRERA amenities filing
Declared progress / verified statusFiled as available; progress 0%. RERA amenities
Sewerage
Description / sizeRERA amenities filing lists “Sewerage (Chamber, Lines, Septic Tank, STP)” as “YES”
Evidence sourceRERA amenities filing
Declared progress / verified statusFiled as available; progress 0%; the specific installed system is not independently established. RERA amenities
Storm-water drains
Description / sizeListed in the RERA amenities filing
Evidence sourceRERA amenities filing
Declared progress / verified statusProgress 0%; delivery not independently verified. RERA amenities
Internal roads and footpaths
Description / sizeListed in the RERA amenities filing
Evidence sourceRERA amenities filing
Declared progress / verified statusProgress 0%; delivery not independently verified. RERA amenities
Green strip / tot-lot / park
Description / sizeListed in the RERA amenities filing; the approval separately specifies a Tot-lot
Evidence sourceRERA amenities filing; building approval
Declared progress / verified statusRERA progress 0%; no independent completion verification. RERA amenities
Street lighting
Description / sizeListed in the RERA amenities filing
Evidence sourceRERA amenities filing
Declared progress / verified statusProgress 0%; delivery not independently verified. RERA amenities
Community buildings
Description / sizeListed in the RERA amenities filing
Evidence sourceRERA amenities filing
Declared progress / verified statusProgress 0%; specific facility details and delivery are not supplied. RERA amenities
Solid-waste management
Description / sizeApproval requires a garbage house with dry/wet waste segregation; also listed in the RERA amenities filing
Evidence sourceBuilding approval; RERA amenities filing
Declared progress / verified statusRequirement is recorded in the approval; completion is not independently verified. RERA progress 0%. RERA amenities
Energy management and electrical meter room / sub-station / receiving station
Description / sizeListed in the RERA amenities filing; approval requires transformer space
Evidence sourceRERA amenities filing; building approval
Declared progress / verified statusRERA progress 0%; installed status is not independently verified. RERA amenities
Fire protection and fire safety
Description / sizeListed in the RERA amenities filing
Evidence sourceRERA amenities filing
Declared progress / verified statusProgress 0%; no independent verification or detailed system specification supplied. RERA amenities
  • No clubhouse, indoor recreation facility, sports facility, or separately specified community capacity is evidenced in the supplied project records. RERA amenities Document index

7. Utilities, building services & safety

  • The RERA filing marks water supply, sewerage and storm-water drains as available, while showing 0% progress for the listed facilities. The approval requires 8 rain water harvesting pits. No capacities, water source, storage volume, treatment details, sewage-treatment specification, reuse scheme, or storm-water design are supplied. RERA amenities
  • The approval requires space for a transformer, and the RERA amenities filing lists an electrical meter room/sub-station/receiving station. It does not establish installed electrical equipment, backup generation, or capacity. RERA amenities
  • No lift count, service lift, lift capacity, fire-system specification, escape-stair arrangement, fire-service access details, CCTV/security system, accessibility features, or waste-processing capacity is established in the supplied evidence. The amenities filing lists fire protection and safety, but records progress as 0%; that entry alone does not establish completion or statutory compliance. RERA amenities Document index
  • The building approval also states that public water-supply and electricity connections will be provided only on production of an occupancy certificate. This is an approval condition, not confirmation that those connections or an occupancy certificate have been obtained.

8. Location, access & connectivity

  • The project’s RERA identity places it in DUBBA, NIZAMABAD EAST (NEW) mandal, Nizamabad district, PIN 503002. The building approval describes the site as GURBABADI ROAD, BESIDE CWC GODOWNS, DUBBA, NIZAMABAD. The RERA land record lists road boundaries to the east, west and south, with widths stated as 40-0, 33-0 and 60-0, respectively; the evidence does not explain the unit convention for these recorded widths. RERA record RERA filing
  • The supplied location record includes a geocode whose descriptive label places it in Jeedimetla, Hyderabad, and an approximate Outer Ring Road interchange distance of 9.2 km. Those location-record details are not tied in the supplied evidence to the registered Nizamabad project site and are therefore not used as project connectivity facts. Location record

9. Developer & development status

  • The registered promoter is PAVAN ATTAL ASSOCIATES, identified in the RERA filing as a Proprietorship. The filing names ATTAL PAVAN as authorized signatory. The recorded promoter address is B, DEVI ROAD, GURBABADI ROAD BESIDE CWC GODOWNS DUBBA, NIZAMABAD, NIZAMABAD EAST (NEW), Nizamabad, 503002. A company registration number or other corporate identifier is not supplied. Corporate record Parties record
  • The Form B affidavit is signed by Pavan Attal as authorized signatory and declares that the project would be completed by 27/10/2024. The RERA certificate records registration validity through the same date. The evidence supplied does not establish current construction progress, an extension, project completion, or OC issuance. Document index

10. Approvals, official records & documents

RecordWhat it establishes in the supplied evidence
TG-RERA certificate, P03100004131Form C registration under section 5 for SAI PARMESHWARI TOWERS; issued 15/02/2022, valid through 27/10/2024 as stated in the certificate.
Building approval 0003/BP/3072/2021Building-construction approval dated 27 October, 2021, issued by Nizamabad Municipality/Municipal Corporation; one residential building, 1 Stilt + 5 upper floors, stated height 14.98 m. File no. 001657/BP/DTCP/3072/0004/2021.
Other numbers printed on the building approvalLayout / Sub Divn. No. C/NIZA/012863/2021; Notarised Affidavit No. 849 dated 05 October, 2021; Transaction Ref. TS/3574/2021.
Form B declarationPromoter declaration including a completion undertaking of 27/10/2024 and a statement that the land is free from encumbrances.
Layout plan filingThe RERA document list includes a layout-plan document, but the supplied extraction is not available for review. Document index
Occupancy / completion certificateNot present in the supplied project documents. Document index
  • The evidence index identifies a designated bank account with Axis Bank, Nizamabad, account masked as *8934, IFSC UTIB0000291; the supplied material does not include a bank statement or independent confirmation of account operation. Parties record

Frequently asked questions

Is SAI PARMESHWARI TOWERS registered with Telangana RERA?

Yes. SAI PARMESHWARI TOWERS is registered with the Telangana Real Estate Regulatory Authority as P03100004131; the registration status is New Project.

Who is the developer of SAI PARMESHWARI TOWERS?

The promoter named in the RERA registration is PAVAN ATTAL ASSOCIATES.

Where is SAI PARMESHWARI TOWERS located?

SAI PARMESHWARI TOWERS is in NIZAMABAD, DUBBA, NIZAMABAD EAST (NEW), Telangana (503002).

When will SAI PARMESHWARI TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 27/10/2024. This is the promoter's declaration, not a guarantee.