Sign in

Mk Township

MARATI · Nagarkurnool · RERA P01600011146

MK TOWNSHIP is a proposed residential plotted development at CHOWTABETLA / CHOUTABETLA SIVAR, in Pentlavelli mandal, Nagarkurnool district. The registered promoter is MARATI MALLIKARJUN. The project covers 14,551.12 sq.m and has 57 individual plots; apartment configurations, towers and floors are not stated. It is registered with TG-RERA under P01600011146, with proposed completion by 23-Apr-2027.

01What we found

RegisteredTG-RERA - valid till 23 Apr 2027
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Choutabetla, Pentlavelli, Nagarkurnool · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameMK TOWNSHIP RERA record
Project typePlotted development / proposed residential layout RERA record RERA filing
Phase or registered portionThe registration is for the plotted project on SY NOS 67/PART AND 68/PART; no separate phase name is disclosed. RERA record
TG-RERA registrationP01600011146; registration certificate Form C records validity from 23/04/2025 to 23/04/2027. This is registration validity, not the project completion deadline. RERA record Approvals record
Registered promoterMARATI MALLIKARJUN (also referred to as MARATI in the project header); legal-entity type is not disclosed in the supplied records. RERA record Corporate record
RERA statusNew Project; a TG-RERA registration certificate is supplied. The supplied certificate does not state that registration has been extended. RERA record

Land and geographic identity

ItemRecord
Locality / site descriptionCHOWTABETLA / CHOUTABETLA SIVAR RERA record
Revenue villageChoutabetla (the layout drawing also describes the site as Choutabetla Sivar). RERA record
MandalPentlavelli (the layout drawing identifies Kollapur Mandal). RERA record
District / PINNagarkurnool / 509102 RERA record
Survey numbers and subdivisionsSY NOS 67/PART AND 68/PART; the supplied approval documents specify Sy. Nos 67/PART and Sy. Nos 68/PART. RERA record
Registered site extentRERA land details state 14,551.12 sq.m total and 14,551.12 sq.m net. RERA filing
Layout drawing area figuresThe layout-plan extraction records 14550.64 sq.mt. as area of plot and 14550.44 sq.mt. as total net layout.
BoundariesEast: ROAD; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authority and principal approvalKOLLAPUR Municipality/Municipal Corporation approval for a tentative layout plan, No. 0004/LO/3062/2025, dated 23 April 2025. The filed drawing separately carries TS-DTCP file No. G/282/02/KLKY/2021-22. Approvals record
Approved built-up areaThe RERA filing states 8304.83 sq.m under “Approved Built up Area”; the layout drawing identifies this figure as plotted area. No residential building built-up area is supplied. RERA filing Layout record
Plots and layoutThe tentative layout approval records 57 plots.
Buildings / floors / parking levelsNot disclosed as a multi-building or apartment scheme; no floor configuration or parking-level information is supplied. Layout record
Mortgage areaRERA land details state 1292.41 sq.m; the filing identifies a mortgage deed, and the tentative layout approval identifies plots 23, 22, 21, 31, 36, 35, 34, 33, 32 and 45. RERA filing Approvals record

Offering and status

ItemRecord
Offering57 individual plots are shown in the layout record. Plot-by-plot RERA saleable areas and inventory counts are not supplied here. Layout record
Construction / development stageNo verified on-site progress or completed work is reported in the supplied overview data. The layout approval requires infrastructure and amenities to be completed within two years of approval.
Completion datesThe tentative layout approval sets infrastructure and amenities completion at 23 April 2027; the promoter’s Form B declaration states completion by 23-Apr-2027. These are completion commitments, distinct from RERA registration validity.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied records. The evidence concerns a plotted layout and tentative layout approval. Document index

The project story

MK TOWNSHIP is a proposed residential plotted layout at Choutabetla/Choutabetla Sivar, in the registered project area identified as SY NOS 67/PART AND 68/PART. The RERA registration covers a plotted development, and the filed layout approval describes 57 individual plots rather than apartment units. RERA record

The tentative layout plan allocates land to plots, roads, open space, social infrastructure and utilities. The approval also describes infrastructure and amenities to be provided, including water, drainage, street lighting and rainwater-harvesting works. These are approved or required provisions, not evidence that the works have been completed. The supplied records contain no independent site-progress verification. RERA amenities

Master plan, architecture & building design

This is a plotted layout, not a documented apartment-building scheme. The tentative layout approval records 57 plots on the project land. The layout drawing lists road widths of 9.14 mt., 30.48 MT and 45.72 MT.

The layout drawing’s land-use table records 14,550.44 sq.mt. as total net layout: 8,304.83 sq.mt. plotted area (57.08%), 4,346.00 sq.mt. roads (29.87%), 1,346.35 sq.mt. organized open space/park (9.25%), 388.44 sq.mt. social infrastructure (2.67%), 163.56 sq.mt. utility area (1.12%) and 1.26 sq.mt. buffer zone (0.01%). It records 0.00 sq.mt. for amenity area. These are layout-drawing figures, not measurements of built structures.

The tentative approval separately expresses the reserved land in local area units: open space 0 Acer 13.31 Gts / 1610 Sq. Yds; social infrastructure 0 Acer 3.84 Gts / 465 Sq. Yds; utilities 0 Acer 1.62 Gts / 196 Sq. Yds; roads 1 Acer 2.96 Gts / 5198 Sq. Yds; plotted area 2 Acer 2.09 Gts / 9933 Sq. Yds.

The approval lists plots 23, 22, 21, 31, 36, 35, 34, 33, 32 and 45 as the mortgage plots, with 1292.41 sq.mt. proposed and 1251.18 sq.mt. required (15%) in the layout-plan extraction. No building arrangement, floors, building footprint, apartment circulation or phase-wise building plan is supplied.

Homes, configurations & floor plans

The offering evidenced here is plotted development, not apartments. The layout drawing’s software-read plot schedule reports 57 plots, with sizes ranging from 82.04 sq.m (98.1 sq.yd) to 353.14 sq.m (422.4 sq.yd) and a median of 127.16 sq.m (152.1 sq.yd). These are drawing-derived measurements and should be checked against the layout drawing; they are not RERA-filed unit saleable areas. Layout record

Plot-size bandPlot count
0–100 sq.yd (0–84 sq.m)1
100–150 sq.yd (84–125 sq.m)13
150–200 sq.yd (125–167 sq.m)32
200–250 sq.yd (167–209 sq.m)7
250–300 sq.yd (209–251 sq.m)1
300–400 sq.yd (251–334 sq.m)2
400–500 sq.yd (334–418 sq.m)1

No RERA-filed plot-by-plot saleable-area schedule, booked/available inventory count, or measured carpet area is supplied. Carpet-area and loading concepts for apartments do not apply to this plotted-layout evidence. RERA unit table Layout record

Parking & vehicle circulation

The layout drawing records 0.00 sq.mt. as common parking area. The supplied records do not establish a count of parking spaces, plot-specific parking allocations, visitor or accessible parking, or vehicle-entry arrangements. Roads are shown in the layout, with widths of 9.14 mt., 30.48 MT and 45.72 MT.

Amenities, recreation & open spaces

Landscape / open space

Organized open space / park
Description / size1,346.35 sq.m (9.25%) in the layout drawing; the tentative approval records 0 Acer 13.31 Gts / 1610 Sq. Yds.
Declared progress / verified statusLayout provision / approval requirement; completion is not verified.
Green strip / tot-lot / park
Description / sizeRERA amenity schedule marks this item “YES”; the layout-plan extraction lists “Tot-lot.”
Evidence sourceRERA amenities
Declared progress / verified statusRERA-filed amenity entry; no completed status established.

Convenience / community and site-development facilities

Social infrastructure area
Description / size388.44 sq.m (2.67%) in the layout drawing; approval records 0 Acer 3.84 Gts / 465 Sq. Yds.
Declared progress / verified statusReserved/provided for in layout; no completed facility identified.
Utility area
Description / size163.56 sq.m (1.12%) in the layout drawing; approval records 0 Acer 1.62 Gts / 196 Sq. Yds.
Declared progress / verified statusReserved/provided for in layout; no completed utility installation verified.
Community buildings
Description / sizeListed in the RERA amenity schedule without a supplied size or facility description.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0% in the supplied schedule; no completion verification.

The RERA amenity schedule also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station. The schedule shows 0% progress for its listed entries; it does not establish that these works are complete. RERA amenities

Utilities, building services & safety

The tentative layout approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, street lights, avenue plantation and rainwater-harvesting pits. It requires the owner/developer to provide infrastructure and amenities by 23 April 2027 and to hand over specified open space, utility and road areas to the municipality by registered gift deed before release of the final layout. These are approval provisions and conditions; completed installation or handover is not established by the supplied evidence.

The RERA amenity schedule lists water supply, sewerage, storm-water drainage, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire protection and an electrical meter room/sub-station/receiving station. No system capacities, source details, treatment specifications, backup-power provision, security systems, accessibility arrangements or fire-clearance evidence are supplied. RERA amenities

Location, access & connectivity

The registered location is CHOWTABETLA, Choutabetla revenue village, Pentlavelli mandal, Nagarkurnool district, Telangana, PIN 509102; the layout drawing describes the site as Choutabetla Sivar. RERA record

The layout drawing identifies roads along the east and west boundaries and internal road widths of 9.14 mt., 30.48 MT and 45.72 MT. The supplied location data lists Balaji Hospital, Pentlavelli at 0.2 km and the nearest sampled Outer Ring Road interchange at approximately 130.0 km. No travel times or public-transport details are supplied. RERA filing Location record

Developer & development status

The TG-RERA registration certificate identifies MARATI MALLIKARJUN as the promoter; the project header uses MARATI. The legal entity type, registered office details, official contact details and website are not established in the supplied evidence. RERA record Corporate record

In the Form B affidavit-cum-declaration dated 27-February-2026, MARATI MALLIKARJUN declared legal title and that the land is free from encumbrances, and undertook completion by 23-Apr-2027. This is a promoter declaration. The tentative layout approval also sets 23 April 2027 as the deadline for infrastructure and amenities. No independent construction-progress evidence or completed works are provided.

Approvals, official records & documents

TG-RERA Registration Certificate, Form C
Identifier / dateP01600011146; valid 23/04/2025–23/04/2027
What it establishes in this OverviewProject registration for MK TOWNSHIP; certificate includes conditions covering the separate account, agreements for sale, conveyance and quarterly updates.
Tentative layout-plan approval
Identifier / date0004/LO/3062/2025, 23 April 2025; Kollapur Municipality/Municipal Corporation
What it establishes in this OverviewTentative residential layout approval for the project land in Sy. Nos 67/PART and 68/PART, recording 57 plots and land-use reservations.
Filed layout plan
Identifier / dateTS-DTCP file No. G/282/02/KLKY/2021-22; LTP Licence No. TS/069572/2024
What it establishes in this OverviewLayout drawing and plot schedule for Sy. Nos 67/PART and 68/PART. The supplied extraction says the drawing itself has no approval number or approval date.
Form B affidavit-cum-declaration
Identifier / dateDated 27-February-2026
What it establishes in this OverviewPromoter declaration on title, encumbrances, separate-account obligations and completion by 23-Apr-2027.

The supplied records do not identify an occupancy or completion certificate. The layout approval is expressly described as tentative; its conditions include completion and handover steps before release of the final layout.

Frequently asked questions

Is MK TOWNSHIP registered with Telangana RERA?

Yes. MK TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01600011146; the registration status is New Project.

Who is the developer of MK TOWNSHIP?

The promoter named in the RERA registration is MARATI.

Where is MK TOWNSHIP located?

MK TOWNSHIP is in CHOWTABETLA, Choutabetla, Pentlavelli, Nagarkurnool, Telangana (509102).

When will MK TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2027. This is the promoter's declaration, not a guarantee.

More projects in Nagarkurnool