MEDELLINS NEST is a residential apartment project in Kaziguda, Medchal mandal, Medchal-Malkajgiri district, developed by the registered promoter MEDELLIN INFRA PRIVATE LIMITED. The project covers 502.44 m² and comprises one proposed residential building with 1 stilt and 5 upper floors. The TG-RERA filing records 10 2BHK apartments, each with a saleable area of 156.5 m². Its TG-RERA registration number is P02200011073, and its proposed completion date is 08/12/2026.

More from Medellin Infra Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 8 Aug 2026 - check its extension on TG-RERA
25documents on file - each fact links to its page
2court cases on this project's land (survey 15, 16, 17, 18, Gundlapochampally)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMEDELLINS NEST RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; the registration is for the project at Plot Nos. 14 & 15
TG-RERA registrationP02200011073; registration certificate Form C
Registration validity08/08/2023 to 08/08/2026; the certificate records a three-year term and no extension
Registered promoterMEDELLIN INFRA PRIVATE LIMITED, a private limited company RERA record Corporate record
RERA status shown in supplied recordNew Project; the certificate records registration under section 5 RERA record

Land and geographic identity

FieldProject record
Locality / site descriptionKaziguda; Plot Nos. 14 & 15 RERA record
Revenue villageGundlapochampally is the project’s recorded village; title material refers to Kaziguda Village. The supplied record does not establish these as separate project parcels RERA record Land records
MandalMedchal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500100 in the project header and registration certificate RERA record
All project survey numbers12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 34 & 35 Land records
Registered site extent502.44 m² in the building approval
Total / net area; road-affected areaTotal area 502.44 m²; net area 502.44 m²; road-affected area 0 m², as recorded in the filed land details and approval Land records
BoundariesEast: neighbours’ land; west: 40ft wide road; north: Plot No. 14; south: Plot No. 16 Land records

Development identity

FieldProject record
Sanctioning authorityGundlapochampally Municipality/Municipal Corporation; the approval file number includes DTCP
Principal building approval0012/BP/3140/2023, approved 08 August 2023; file no. 004802/BP/DTCP/3140/0008/2023 Approvals record
Approved built-up areaResidential upper floors: 1,183.25 m²; stilt: 222.27 m². These are the approval’s separate area figures
Building count and configurationOne proposed residential building, identified as BUILDING1: 1 Stilt + 5 upper floors; stated height 14.5 m
Parking provisionApproval conditions say the approved cellar and stilt areas are to be used exclusively for vehicle parking; the supplied extract does not state a parking-space count
Unit countApproved building-plan extract: one “building unit”; TG-RERA filing: 10 apartments Land records RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK; 10 units RERA unit table
RERA-filed saleable area156.5 m² per unit RERA unit table
Booked / available0 booked / 10 available in the portal data; no as-of date is supplied, so these counts are indicative RERA unit table
Construction stageNo construction-progress percentage or independently verified site-progress evidence is supplied. The RERA amenity-progress fields shown are 0% RERA amenities
Completion dateProposed completion recorded in the project header: 08/12/2026 RERA record
Registration expiry08/08/2026; this is the registration-validity date, not the proposed completion date
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; OC status is therefore not established Document index

2. The project story

MEDELLINS NEST is registered as a residential apartment project at Plot Nos. 14 and 15 in the Kaziguda/Gundlapochampally location recorded in the project documents. The building permission describes a single proposed residential building with one stilt and five upper floors. The TG-RERA filing records 10 two-bedroom apartments, with 10 shown as available in the portal data; that booking snapshot has no stated retrieval date. RERA record RERA unit table

The supplied evidence establishes the proposed and sanctioned configuration, but does not establish construction progress, completion, or possession readiness. The approval requires a completion notice and occupancy certificate before occupation; no OC is supplied here. The project header gives a proposed completion date of 08/12/2026, while the registration certificate records validity only through 08/08/2026; these are distinct dates and statuses. RERA record

3. Master plan, architecture & building design

The building approval covers a 502.44 m² site and one proposed residential building. It records one stilt and five upper floors, a stated building height of 14.5 m, residential upper-floor area of 1,183.25 m², and stilt area of 222.27 m². The approval extract does not provide a floor-by-floor apartment schedule, number of flats per floor, lift or stair details, or a building-footprint figure.

The RERA filing identifies 10 apartments, but the supplied plan extract does not establish their distribution across floors. No approved basement or podium configuration is stated in the available building details; the approval conditions refer to cellar and stilt parking. The approval also records 14% open space, one rainwater-harvesting structure, and a tot-lot listed as “NA”; it does not give a tot-lot area. Land records

The floor-plan file listed for layout material is not extracted as a layout plan in the supplied document index. The building approval is the available sanctioned-design record; no separate promotional-plan or phase-layout description is included here. Document index

4. Homes, configurations & floor plans

The RERA filing records 10 two-bedroom apartments, each with a filed saleable area of 156.5 m². Software measurement of the approved floor-plan drawing gives a median carpet area of 80.9 m², with a measured range of 74.2–89.8 m² across four flat designs. These drawing-based measurements are not RERA-filed carpet-area disclosures and are identified as requiring review. Saleable area and carpet area are different measures; saleable area includes a share of common areas, while the supplied floor-plan record excludes balcony and utility areas from its carpet measurement. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010156.5 m²Software-measured range: 74.2–89.8 m²; median 80.9 m²48% (drawing-measurement record)

The drawing record includes a second-floor flat plan with a drawing room, living/dining area, kitchen, two bedrooms, two toilets, utility and balcony. For that depicted flat, the recorded room dimensions include drawing room 5.26 × 3.0 m; living/dining 4.84 × 5.57 m; kitchen 3.07 × 3.0 m; bedroom 3.66 × 3.66 m; and master bedroom 4.27 × 3.66 m. The utility is 1.32 × 3.0 m and balcony 3.23 × 1.32 m; both are excluded from the software-measured carpet area. The drawing record reports four measured flat designs, not a per-floor unit schedule. RERA unit details

5. Parking & vehicle circulation

The building approval states that approved cellar and stilt areas are to be used exclusively for vehicle parking and not converted to other uses. Its extracted sanctioned parameters show a stilt area of 222.27 m². No number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp or driveway arrangement, or EV-charging installation is established by the supplied extract. A parking bay shown or described in an approval does not by itself establish exclusive ownership or an allotment to a particular buyer.

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists 14 facilities or infrastructure categories. All shown progress values are 0%; this is a portal-recorded progress field, not independent site verification. The building approval separately requires specified site provisions, as noted below. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsCategory listed; no description or size suppliedTG-RERA amenities RERA amenities0%; completion not independently verified
Green strip / tot-lot / parkApproval records 14% open space; tot-lot area shown as “NA” and requires fencing and maintenance as greenery before OCTG-RERA amenities RERA amenities; building approvalAmenity progress 0%; no completion verification
Aggregate recreational open spaceListed; no area supplied in amenity recordTG-RERA amenities RERA amenities0%; completion not independently verified
Internal roads and footpathsListed; no dimensions suppliedTG-RERA amenities RERA amenities0%; completion not independently verified
Street lightingListed; no specification suppliedTG-RERA amenities RERA amenities0%; completion not independently verified

The supplied amenity record does not identify a clubhouse, indoor recreation facilities, or named sports facilities. Vendor-listed amenities are not treated here as RERA-filed or sanctioned project facilities.

7. Utilities, building services & safety

The TG-RERA amenity record marks water supply, sewerage and an electrical meter room/sub-station/receiving station as “YES,” while recording 0% progress for those categories. It does not specify capacities, water sources, storage, STP design or reuse, drainage design, electrical backup, or transformer capacity. The building approval requires a transformer space, a garbage house within the premises, and a rainwater-harvesting structure (one shown in the sanctioned parameters). These are requirements or filed declarations, not evidence that the installations are complete. RERA amenities

Fire protection and fire-safety requirements, storm-water drains, solid-waste management, sewage/sullage treatment and disposal, energy management, and water conservation/rainwater harvesting appear in the TG-RERA amenity list, each with 0% progress recorded. The approval assigns responsibility for fire-safety provision and requires relevant services to be executed under qualified technical supervision; it does not establish completed systems, clearances or capacities in the supplied extract. No lift specifications, emergency-egress details, CCTV/security system, accessibility features or EV chargers are established in the available project evidence. RERA amenities

8. Location, access & connectivity

The project’s registered location is recorded as Kaziguda/Gundlapochampally, Medchal mandal, Medchal-Malkajgiri district, PIN 500100. The building approval identifies Plot Nos. 14 and 15 and records a 40ft road on the west boundary; its extracted road-width parameter lists 12M. RERA record Land records

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 6.8 km. The geocode is a mapping record, not a surveyed boundary location. No verified public-transport distance or travel time is supplied. Location record

9. Developer & development status

The registered legal promoter is MEDELLIN INFRA PRIVATE LIMITED, identified as a company, with GSTIN 36AATCM3624N1ZT. The project record gives its address as Tirumalgiri, Bahadurpalle, Gundlapochampally, Kaziguda, Medchal, Medchal-Malkajgiri, 500100. The supplied evidence identifies Manda Narender Reddy as managing director and Rajyam Mandha as an authorized signatory; a Form B declaration is attributed to Manda Narendes Reddy as director. Corporate record Parties record RERA record

The building approval names Gahan Developers as the applicant. The available record does not provide a verified construction-progress percentage or independent site inspection. The project header states proposed completion on 08/12/2026; the registration certificate is valid through 08/08/2026, with no extension recorded in that certificate. No OC or completion certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200011073; Form C; issued 21/07/2026
What the supplied record establishesRegisters MEDELLINS NEST for three years from 08/08/2023 to 08/08/2026; certificate records project location, Plot Nos. 14 & 15, survey numbers and promoter conditions
Building approval / permission
Identifier / date0012/BP/3140/2023; 08 August 2023; file no. 004802/BP/DTCP/3140/0008/2023
What the supplied record establishesBuilding approval for one proposed residential building on the recorded site; includes one stilt and five upper floors
Layout approval reference
Identifier / date20/LO/PLG/HMDA/2015; 04/09/2015
What the supplied record establishesReferenced in the building-approval document; a separate layout plan is not extracted in the supplied document record
Form B declaration
Identifier / dateDated 30 April 2026
What the supplied record establishesPromoter declaration on title basis, encumbrances, project funds, approvals and other undertakings; it is a promoter declaration, not an independent title verification
Floor-plan / layout document
Identifier / dateDocument ID 693640
What the supplied record establishesListed as layout-plan material but not extracted as an approved layout plan; floor-plan drawing measurements are available for the unit analysis
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesOC/completion status is not established in the supplied documents Document index

The building approval requires an occupancy certificate before occupation and states that the permission does not confer ownership rights. The project registration certificate separately records the registration period; neither record is itself an occupancy certificate.

Frequently asked questions

Is MEDELLINS NEST registered with Telangana RERA?

Yes. MEDELLINS NEST is registered with the Telangana Real Estate Regulatory Authority as P02200011073; the registration status is New Project.

Who is the developer of MEDELLINS NEST?

The promoter named in the RERA registration is MEDELLIN INFRA PRIVATE LIMITED.

Where is MEDELLINS NEST located?

MEDELLINS NEST is in Kaziguda, Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana (500100).

When will MEDELLINS NEST be completed?

The promoter's proposed date of completion filed with RERA is 08/12/2026. This is the promoter's declaration, not a guarantee.