Ananya Township
SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS · Yadadri Bhuvanagiri · RERA P02000010228
ANANYA TOWNSHIP is a plotted development in Bhongir Town, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS. The project covers 34,950.26 sq.m of total site area and 27,734.47 sq.m of net layout area, with 77 plots shown in the layout drawing; plot configurations and RERA-filed plot areas are not disclosed. It is registered with TG-RERA as P02000010228, with a proposed completion date of 28 January 2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | ANANYA TOWNSHIP RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase or registered portion | New project; the registration record covers the stated project land. A separate phase description is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02000010228; registered 28 September 2025 and valid through 28 September 2028, unless extended by the Authority RERA record Approvals record |
| Registered promoter | SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS RERA record |
| RERA status | Registration certificate recorded; the registration’s stated validity is separate from the promoter’s completion undertaking. Approvals record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / town | Bhongir Town; the filed layout documents describe Bhongir locality. RERA record RERA filing |
| Revenue village | Bhongir Village RERA filing |
| Mandal | Bhongir RERA record RERA filing |
| District | Yadadri Bhuvanagiri RERA record RERA filing |
| PIN | 508116 RERA record RERA filing |
| Project surveys / subdivisions | 575/PART, 576/PART and 658/PART RERA record RERA filing |
| Registered site extent | 34,950.26 sq.m total site area; 27,734.47 sq.m net layout area RERA filing Layout record |
| Road widening / affected area | 7,215.79 sq.m in the RERA land details; the layout approval extract records road-affected area of 6,853.1 sq.m. RERA filing |
| Boundaries | North: existing 30 feet road; east, west and south: other land RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter delegates release of proceedings and plans to Bhongir Municipality. Approvals record |
| Principal approval identifiers | Application/file no. 001861/HMDA/00535/SWDL/GTK/2025; layout permit no. 0139/HMDA/SWDL/2025 Approvals record |
| Approval date recorded | Draft layout letter dated/approved 28/09/2025; a related approval-plan extract also records 14/07/2025. Approvals record |
| Approved built-up area | Not disclosed as a building-area figure; this is a plotted layout. The RERA filing separately records 17,320.77 sq.m as approved built-up area, while the drawing identifies that amount as plotted area. RERA filing Layout record |
| Buildings / floor configuration | No buildings, floors, towers or building commencement certificates are evidenced in the supplied project record. |
| Unit count | 77 plots, as read from the layout plot schedule; the schedule count is software-read from the drawing and should be checked against the approved plan. Layout record |
| Roads and open space | Layout extract records proposed roads, organized open space, utility and social-infrastructure areas; see the master-plan section. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; plot sizes and booking/availability counts are not disclosed in the supplied RERA unit data. RERA record RERA filing |
| Completion date | The Form-B declaration gives 28 September 2028; the RERA project header records proposed completion 28 January 2029. These are reported as distinct supplied records, not reconciled here. RERA record |
| Registration validity | Through 28 September 2028, unless extended by TG-RERA. |
| Construction / development stage | No independently verified site-progress evidence is supplied. The HMDA letter is a draft layout letter and says development works are to be completed within three years. |
| Occupancy / completion certificate | Not evidenced. The record concerns a plotted layout; an OC status for any building is not supplied. |
2. The project story
ANANYA TOWNSHIP is registered with TG-RERA as a plotted-development project on land identified in the filing as 575/PART, 576/PART and 658/PART, in Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The project is laid out for open plots rather than apartments or villas. RERA record
The HMDA-filed layout material describes a net layout area of 27,734.47 sq.m and a proposed schedule of 77 plots. It also shows roads, open space, utility and social-infrastructure land. The approval material is identified as a draft layout letter; the supplied record does not establish that final layout proceedings have been released or that development works have been completed. The RERA-filed proposed completion date is 28 January 2029; the promoter’s Form-B completion undertaking states 28 September 2028. Layout record RERA record
The project is registered as P02000010228, valid through 28 September 2028 unless extended. Registration validity is not itself a completion date or evidence of completed development.
3. Master plan, architecture & building design
This is a plotted layout, so the drawing evidence concerns plot arrangement and land use rather than building design. The approved-plan extract states a total site area of 34,950.26 sq.m and a net layout area of 27,734.47 sq.m. Its land-use schedule is:
| Layout component | Area | Share shown in the filed drawing |
|---|---|---|
| Plotted area | 17,320.77 sq.m | 62.45% |
| Road area | 6,928.40 sq.m | 24.98% |
| Open space / park area | 2,089.46 sq.m | 7.53% |
| Buffer-zone area | 834.43 sq.m | 3.01% |
| Social-infrastructure area | 709.67 sq.m | 2.56% |
| Utility area | 214.44 sq.m | 0.77% |
| Common parking area | 0.00 sq.m | 0% |
The layout drawing indicates road widths including 9.14 m, 30 m and 9.11 m; the draft layout letter also refers to roads of 18 mts and above. The layout material identifies open space/park, social infrastructure, utility land and a cycle track. The records do not describe a building arrangement, building footprints, floors, lifts or residential/commercial building areas.
The drawing-derived plot schedule contains 77 plots. Software-read plot sizes range from 150.43 sq.m to 622.2 sq.m, with a median of 162.91 sq.m; these measurements are extracted from the drawing and are not RERA-filed unit areas. Layout record
4. Homes, configurations & floor plans
The offering is plots, not apartment configurations. The supplied RERA data does not provide plot-wise saleable areas, booked or available counts, or plot allocations by allottee. The layout drawing’s plot count and size measurements are software-read from the drawing and require verification against the approved plan. RERA record Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 77 plots shown in the drawing schedule | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The drawing-derived size bands are: 40 plots at 150–200 sq.yd, 17 at 200–250 sq.yd, 2 at 250–300 sq.yd, 4 at 300–400 sq.yd, 6 at 400–500 sq.yd, and 8 at 500–1000 sq.yd. These are software-read bands from the drawing, not RERA-filed saleable-area figures. Layout record
The floor-plan dataset contains two layout sheets and no measured floor plans or flats. Carpet-area measurements and room configurations therefore are not applicable or established by the supplied evidence. Floor plans
5. Parking & vehicle circulation
The layout land-use schedule shows 0.00 sq.m as common parking area. A RERA-filed layout condition says that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, but the supplied project materials do not establish building parking levels or a sanctioned number of parking spaces.
The vendor record lists “Open Parking,” but no plot-wise parking allocation, visitor parking count, accessible parking provision, vehicle-entry arrangement, or EV-charging provision for the layout is established in the supplied project evidence. Promoter website No exclusive ownership of a parking space can be inferred from the available record.
6. Amenities, recreation & open spaces
The layout materials identify open space/park, social infrastructure, utility land and a cycle track. The TG-RERA amenity fields mark several proposed infrastructure categories as available, but record 0% progress; that does not establish completed delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 2,089.46 sq.m; drawing schedule states 7.53% | Identified in layout; no completion verification supplied | |
| Social infrastructure | 709.67 sq.m | Identified in layout; no facility specification or completion verification supplied | |
| Utility land | 214.44 sq.m | Identified in layout; no completion verification supplied | |
| Cycle track | Shown among layout amenities/utilities; size not supplied | No progress or completion evidence supplied | |
| Green strip / tot-lot / park | RERA amenity field identifies this category; HMDA layout conditions refer to maintaining greenery and fencing the tot-lot | RERA amenities | No completion verification supplied |
| Community buildings | RERA amenity category is listed; no size or specification supplied | RERA amenities | No progress or completion evidence supplied |
7. Utilities, building services & safety
The RERA amenity fields list internal roads and footpaths, water supply, sewerage including septic tank/STP, storm-water drains, rainwater harvesting, an electrical meter room/substation/receiving station, and recreational open space. The layout documents also identify a sump, septic tank, garbage facility and transformer; the draft layout letter lists an STP and overhead tank. These are filed or drawing-identified provisions, not evidence that the services are installed or operational. RERA amenities
The layout approval conditions call for a rainwater-harvesting structure, transformer space and a garbage house. They also state that public utility connections are tied to production of an occupancy certificate, and that the tot-lot and greenery are to be maintained. No capacities, water source, treatment process, reuse arrangement, electrical backup, security system, accessibility design, or completed service-connection evidence is supplied.
8. Location, access & connectivity
The registered location is Bhongir Town, Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The project boundary description identifies an existing 30 feet road to the north; the layout materials also show proposed internal roads. RERA record RERA filing RERA filing
A location record provides a sampled Outer Ring Road interchange distance of 23.1 km. No other measured distances, public-transport details, landmarks or travel times are supplied. Location record
9. Developer & development status
The registered promoter is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS. The RERA certificate identifies SUSHAR CONSTRUCTIONS PRIVATE LIMITED as promoter and gives an address in Amberpet, Hyderabad; a project-site address in Bhongir is also filed. RERA record Parties record
The project documents identify Vuduta Susmitha as an authorized signatory. The supplied corporate record does not provide a company registration number, registered-office address, official website or contact details sufficient to further identify the entity.
The RERA filing records a proposed completion date of 28 January 2029; the promoter’s Form-B declaration gives 28 September 2028. No independently verified construction-progress report is supplied. The HMDA draft layout letter states that developmental works are to be completed within three years. Registration validity through 28 September 2028 is a separate matter and is not proof of physical completion. RERA record
10. Approvals, official records & documents
| Identifier / date | P02000010228; valid 28 September 2025–28 September 2028 unless extended |
|---|---|
| What the supplied record establishes | Form C registration for ANANYA TOWNSHIP and the stated survey numbers and location. |
| Identifier / date | 001861/HMDA/00535/SWDL/GTK/2025; application date 30 May 2025 |
|---|---|
| What the supplied record establishes | Layout application and associated plan material for the project land. |
| Identifier / date | 0139/HMDA/SWDL/2025; letter records 28 September 2025 |
|---|---|
| What the supplied record establishes | Draft layout letter for the plotted layout, with development conditions and delegation to Bhongir Municipality for release of proceedings and plans. |
| Identifier / date | File no. 001861/HMDA/00535/SWDL/GTK/2025; plan extract records 14 July 2025 |
|---|---|
| What the supplied record establishes | Drawing-derived layout, road and land-use information. |
| Identifier / date | 4891/2025, dated 4 July 2025 |
|---|---|
| What the supplied record establishes | Listed in the draft layout letter in connection with road-affected and buffer areas handed over to the local body. |
| Identifier / date | 4892/2025 and 4893/2025, dated 4 July 2025 |
|---|---|
| What the supplied record establishes | Draft layout letter lists mortgaged plots 12–17 and 10–11 respectively in favour of HMDA. |
| Identifier / date | Dated 28 September 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration on title basis, encumbrances, project funds, approvals and completion undertaking. |
The supplied approval record is a draft layout letter; the file does not establish release of final layout proceedings, completion of development works, or an occupancy/completion certificate. No building-specific commencement or occupancy certificate is evidenced for this plotted development.
1. Project at a glance
Project identity
Registered project name: ANANYA TOWNSHIP
Project type: Plotted development / open-plot layout
Phase or registered portion: New project; the registration record covers the stated project land. A separate phase description is not disclosed.
TG-RERA registration: P02000010228; registered 28 September 2025 and valid through 28 September 2028, unless extended by the Authority
Registered promoter: SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS
RERA status: Registration certificate recorded; the registration’s stated validity is separate from the promoter’s completion undertaking.
Land and geographic identity
Locality / town: Bhongir Town; the filed layout documents describe Bhongir locality.
Revenue village: Bhongir Village
Mandal: Bhongir
District: Yadadri Bhuvanagiri
PIN: 508116
Project surveys / subdivisions: 575/PART, 576/PART and 658/PART
Registered site extent: 34,950.26 sq.m total site area; 27,734.47 sq.m net layout area
Road widening / affected area: 7,215.79 sq.m in the RERA land details; the layout approval extract records road-affected area of 6,853.1 sq.m.
Boundaries: North: existing 30 feet road; east, west and south: other land
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter delegates release of proceedings and plans to Bhongir Municipality.
Principal approval identifiers: Application/file no. 001861/HMDA/00535/SWDL/GTK/2025; layout permit no. 0139/HMDA/SWDL/2025
Approval date recorded: Draft layout letter dated/approved 28/09/2025; a related approval-plan extract also records 14/07/2025.
Approved built-up area: Not disclosed as a building-area figure; this is a plotted layout. The RERA filing separately records 17,320.77 sq.m as approved built-up area, while the drawing identifies that amount as plotted area.
Buildings / floor configuration: No buildings, floors, towers or building commencement certificates are evidenced in the supplied project record.
Unit count: 77 plots, as read from the layout plot schedule; the schedule count is software-read from the drawing and should be checked against the approved plan.
Roads and open space: Layout extract records proposed roads, organized open space, utility and social-infrastructure areas; see the master-plan section.
Offering and status
Offering: Plots; plot sizes and booking/availability counts are not disclosed in the supplied RERA unit data.
Completion date: The Form-B declaration gives 28 September 2028; the RERA project header records proposed completion 28 January 2029. These are reported as distinct supplied records, not reconciled here.
Registration validity: Through 28 September 2028, unless extended by TG-RERA.
Construction / development stage: No independently verified site-progress evidence is supplied. The HMDA letter is a draft layout letter and says development works are to be completed within three years.
Occupancy / completion certificate: Not evidenced. The record concerns a plotted layout; an OC status for any building is not supplied.
2. The project story
ANANYA TOWNSHIP is registered with TG-RERA as a plotted-development project on land identified in the filing as 575/PART, 576/PART and 658/PART, in Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The project is laid out for open plots rather than apartments or villas.
The HMDA-filed layout material describes a net layout area of 27,734.47 sq.m and a proposed schedule of 77 plots. It also shows roads, open space, utility and social-infrastructure land. The approval material is identified as a draft layout letter; the supplied record does not establish that final layout proceedings have been released or that development works have been completed. The RERA-filed proposed completion date is 28 January 2029; the promoter’s Form-B completion undertaking states 28 September 2028.
The project is registered as P02000010228, valid through 28 September 2028 unless extended. Registration validity is not itself a completion date or evidence of completed development.
3. Master plan, architecture & building design
This is a plotted layout, so the drawing evidence concerns plot arrangement and land use rather than building design. The approved-plan extract states a total site area of 34,950.26 sq.m and a net layout area of 27,734.47 sq.m. Its land-use schedule is:
| Layout component | Area | Share shown in the filed drawing |
|---|---|---|
| Plotted area | 17,320.77 sq.m | 62.45% |
| Road area | 6,928.40 sq.m | 24.98% |
| Open space / park area | 2,089.46 sq.m | 7.53% |
| Buffer-zone area | 834.43 sq.m | 3.01% |
| Social-infrastructure area | 709.67 sq.m | 2.56% |
| Utility area | 214.44 sq.m | 0.77% |
| Common parking area | 0.00 sq.m | 0% |
The layout drawing indicates road widths including 9.14 m, 30 m and 9.11 m; the draft layout letter also refers to roads of 18 mts and above. The layout material identifies open space/park, social infrastructure, utility land and a cycle track. The records do not describe a building arrangement, building footprints, floors, lifts or residential/commercial building areas.
The drawing-derived plot schedule contains 77 plots. Software-read plot sizes range from 150.43 sq.m to 622.2 sq.m, with a median of 162.91 sq.m; these measurements are extracted from the drawing and are not RERA-filed unit areas.
4. Homes, configurations & floor plans
The offering is plots, not apartment configurations. The supplied RERA data does not provide plot-wise saleable areas, booked or available counts, or plot allocations by allottee. The layout drawing’s plot count and size measurements are software-read from the drawing and require verification against the approved plan.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 77 plots shown in the drawing schedule | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The drawing-derived size bands are: 40 plots at 150–200 sq.yd, 17 at 200–250 sq.yd, 2 at 250–300 sq.yd, 4 at 300–400 sq.yd, 6 at 400–500 sq.yd, and 8 at 500–1000 sq.yd. These are software-read bands from the drawing, not RERA-filed saleable-area figures.
The floor-plan dataset contains two layout sheets and no measured floor plans or flats. Carpet-area measurements and room configurations therefore are not applicable or established by the supplied evidence.
5. Parking & vehicle circulation
The layout land-use schedule shows 0.00 sq.m as common parking area. A RERA-filed layout condition says that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, but the supplied project materials do not establish building parking levels or a sanctioned number of parking spaces.
The vendor record lists “Open Parking,” but no plot-wise parking allocation, visitor parking count, accessible parking provision, vehicle-entry arrangement, or EV-charging provision for the layout is established in the supplied project evidence. No exclusive ownership of a parking space can be inferred from the available record.
6. Amenities, recreation & open spaces
The layout materials identify open space/park, social infrastructure, utility land and a cycle track. The TG-RERA amenity fields mark several proposed infrastructure categories as available, but record 0% progress; that does not establish completed delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 2,089.46 sq.m; drawing schedule states 7.53% | Identified in layout; no completion verification supplied | |
| Social infrastructure | 709.67 sq.m | Identified in layout; no facility specification or completion verification supplied | |
| Utility land | 214.44 sq.m | Identified in layout; no completion verification supplied | |
| Cycle track | Shown among layout amenities/utilities; size not supplied | No progress or completion evidence supplied | |
| Green strip / tot-lot / park | RERA amenity field identifies this category; HMDA layout conditions refer to maintaining greenery and fencing the tot-lot | No completion verification supplied | |
| Community buildings | RERA amenity category is listed; no size or specification supplied | No progress or completion evidence supplied |
7. Utilities, building services & safety
The RERA amenity fields list internal roads and footpaths, water supply, sewerage including septic tank/STP, storm-water drains, rainwater harvesting, an electrical meter room/substation/receiving station, and recreational open space. The layout documents also identify a sump, septic tank, garbage facility and transformer; the draft layout letter lists an STP and overhead tank. These are filed or drawing-identified provisions, not evidence that the services are installed or operational.
The layout approval conditions call for a rainwater-harvesting structure, transformer space and a garbage house. They also state that public utility connections are tied to production of an occupancy certificate, and that the tot-lot and greenery are to be maintained. No capacities, water source, treatment process, reuse arrangement, electrical backup, security system, accessibility design, or completed service-connection evidence is supplied.
8. Location, access & connectivity
The registered location is Bhongir Town, Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The project boundary description identifies an existing 30 feet road to the north; the layout materials also show proposed internal roads.
A location record provides a sampled Outer Ring Road interchange distance of 23.1 km. No other measured distances, public-transport details, landmarks or travel times are supplied.
9. Developer & development status
The registered promoter is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS. The RERA certificate identifies SUSHAR CONSTRUCTIONS PRIVATE LIMITED as promoter and gives an address in Amberpet, Hyderabad; a project-site address in Bhongir is also filed.
The project documents identify Vuduta Susmitha as an authorized signatory. The supplied corporate record does not provide a company registration number, registered-office address, official website or contact details sufficient to further identify the entity.
The RERA filing records a proposed completion date of 28 January 2029; the promoter’s Form-B declaration gives 28 September 2028. No independently verified construction-progress report is supplied. The HMDA draft layout letter states that developmental works are to be completed within three years. Registration validity through 28 September 2028 is a separate matter and is not proof of physical completion.
10. Approvals, official records & documents
| Identifier / date | P02000010228; valid 28 September 2025–28 September 2028 unless extended |
|---|---|
| What the supplied record establishes | Form C registration for ANANYA TOWNSHIP and the stated survey numbers and location. |
| Identifier / date | 001861/HMDA/00535/SWDL/GTK/2025; application date 30 May 2025 |
|---|---|
| What the supplied record establishes | Layout application and associated plan material for the project land. |
| Identifier / date | 0139/HMDA/SWDL/2025; letter records 28 September 2025 |
|---|---|
| What the supplied record establishes | Draft layout letter for the plotted layout, with development conditions and delegation to Bhongir Municipality for release of proceedings and plans. |
| Identifier / date | File no. 001861/HMDA/00535/SWDL/GTK/2025; plan extract records 14 July 2025 |
|---|---|
| What the supplied record establishes | Drawing-derived layout, road and land-use information. |
| Identifier / date | 4891/2025, dated 4 July 2025 |
|---|---|
| What the supplied record establishes | Listed in the draft layout letter in connection with road-affected and buffer areas handed over to the local body. |
| Identifier / date | 4892/2025 and 4893/2025, dated 4 July 2025 |
|---|---|
| What the supplied record establishes | Draft layout letter lists mortgaged plots 12–17 and 10–11 respectively in favour of HMDA. |
| Identifier / date | Dated 28 September 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration on title basis, encumbrances, project funds, approvals and completion undertaking. |
The supplied approval record is a draft layout letter; the file does not establish release of final layout proceedings, completion of development works, or an occupancy/completion certificate. No building-specific commencement or occupancy certificate is evidenced for this plotted development.
Frequently asked questions
Is ANANYA TOWNSHIP registered with Telangana RERA?
Yes. ANANYA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02000010228; the registration status is New Project.
Who is the developer of ANANYA TOWNSHIP?
The promoter named in the RERA registration is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS.
Where is ANANYA TOWNSHIP located?
ANANYA TOWNSHIP is in Bhongir Town, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).
When will ANANYA TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 28/01/2029. This is the promoter's declaration, not a guarantee.