Vasudhaika Homes
VV DEVELOPERS · Nirmal · RERA P02300010160
VASUDHAIKA HOMES is a residential apartment building in Gollapet, Nirmal mandal, Nirmal district, developed by registered promoter VV DEVELOPERS, a partnership. The project covers 526.71 sq.m and comprises one residential building, Building A, with 1 Stilt + 5 upper floors and 10 homes: nine 3BHK units and one 5BHK unit. The TG-RERA registration is P02300010160, and the project header gives a proposed completion date of 28/04/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | VASUDHAIKA HOMES RERA record |
| Project type / use | Residential apartment building RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; registration and building details concern this project and Building A. RERA record |
| TG-RERA registration | P02300010160 RERA record |
| Registration validity | 28/12/2024–28/12/2027 RERA record |
| Registered promoter | VV DEVELOPERS, a partnership RERA record Corporate record |
| RERA status | Registration certificate supplied; captured from TG-RERA on 10 September 2026. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / site description | Gollapet; Gollapet Shivar is also used in the filed building-approval material. RERA record |
| Revenue village | Gollapet RERA record |
| Mandal / district / PIN | Nirmal / Nirmal / 504106 RERA record |
| Project survey numbers | 1065 New and 1056 Old RERA record Land records |
| Plot numbers | 56 and 57 RERA filing |
| Site area | 526.71 sq.m / 526.71 m² in the building-approval record; RERA land details give total area and net area as 526.71 sq.m. RERA filing |
| Boundaries | East: 30 FEET WIDE ROAD; West: EXISTING HOUSES; North: OPEN PLOTS; South: OPEN PLOTS. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Nirmal Municipality/Municipal Corporation; the RERA filing also identifies DTCP for the plan-approval record. Approvals record |
| Principal building approval | 0023/BP/3028/2024, dated 28 December 2024 Approvals record |
| Building / floors | One residential building, Building A; 1 Stilt + 5 upper floors (six floors stated in the filed plan details). |
| Height | 14.95 m building height; the filed plan details also state 19.95mt. total height. |
| Approved built-up area | 1,234.80 m² residential upper floors / net BUA; the filed building-plan details separately state 1,494.20 m² proposed built-up area including parking and 1,515.06 as total BUA. |
| Parking area / stilt | Parking area 259.40 m² in the filed plan details; stilt area 245.79 m² in the building-approval record. |
| Unit count | 10 units in the filed project information and plan details. RERA filing |
| Commencement / occupancy documents | Building-construction approval supplied; no occupancy certificate is recorded in the supplied evidence. |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 3BHK and 5BHK RERA unit table |
| RERA-filed saleable areas | 3BHK: 145.34 sq.m; 5BHK: 150.97 sq.m RERA unit table |
| Booked / available | 3BHK: 0 booked / 9 available; 5BHK: 0 booked / 1 available. Counts are from the TG-RERA portal record and have no stated as-of date, so are indicative. RERA unit table |
| Construction stage | No measured or independently verified construction progress is supplied. RERA status is “New Project.” RERA record RERA amenities |
| Completion dates | Promoter’s Form B declaration states completion by 28t* December, 2027; the project header gives proposed completion 28/04/2028. RERA record |
| Registration validity versus completion | Registration is valid through 28/12/2027; this is separate from the completion dates stated above. |
| Occupancy-certificate status | No OC is included in the supplied documents; the building approval requires an OC before occupation. |
2. The project story
VASUDHAIKA HOMES is registered as a residential apartment project on plots 56 and 57 in Gollapet, Nirmal, on survey numbers 1065 New and 1056 Old. The filed site area is 526.71 sq.m. The filed boundaries identify a 30-foot-wide road to the east, existing houses to the west, and open plots to the north and south. RERA filing
The approved development is a single apartment building, Building A, with a stilt and five upper floors. The project record lists ten homes: nine 3BHK units and one 5BHK unit. The portal-derived booking snapshot shows all ten as available, but provides no snapshot date. RERA unit table
The evidence includes a building-construction approval, not an occupancy certificate. No site-inspection evidence or verified construction-progress percentage is supplied, so the project’s present physical stage cannot be established from this record. The promoter’s Form B declaration gives a completion undertaking ending 28t* December, 2027; the project header separately records a proposed completion date of 28/04/2028. RERA record
3. Master plan, architecture & building design
The filed building-plan details describe a residential apartment building on a 526.71 m² site, with 1,234.80 m² of residential upper-floor built-up area. The same plan data separately records 259.40 m² of parking area, 1,494.20 m² proposed built-up area including parking, and 1,515.06 as total BUA. These are separately reported plan figures; the supplied record does not define their measurement bases beyond the labels shown.
The building approval identifies Building A as 1 Stilt + 5 upper floors, with a stated building height of 14.95 m. Filed plan details also show a 19.95mt. total height and floor levels from +0.00 mt. to +14.46 mt., plus -0.60 mt. and a lift machine room at +17.45 mt.
The supplied material does not establish a detailed floor-by-floor apartment arrangement, lift count, stair arrangement, building footprint, open-space area, or internal circulation plan. The building approval requires a rainwater-harvesting structure, transformer space, a garbage house, a fenced tot-lot and peripheral greenery; these are approval conditions, not evidence of completed works.
4. Homes, configurations & floor plans
RERA records nine 3BHK homes and one 5BHK home. The filed saleable areas are shown below. The 3BHK carpet-area figures are software measurements from the approved floor-plan drawing, not RERA disclosures; the filing itself reports saleable area. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 145.34 sq.m | 86.3–90.6 sq.m; median 88.5 sq.m (software-measured) | 39% (software-derived) |
| 5BHK | 1 | 0 | 1 | 150.97 sq.m | Not supplied | Not supplied |
The measured 3BHK drawing sample covers four flat designs. One measured plan shows a living room, dining area, kitchen, three bedrooms, three toilets and a balcony; the listed balcony area is excluded from the software-measured carpet area. The room measurements are drawing-based and require review against the drawing. RERA unit details Floor plans
Carpet area is not the same as saleable area: the supplied measurement note says saleable area also counts the home’s share of common areas. No measured 5BHK carpet area, RERA-filed balcony or utility dimensions, or unit-specific loading figure for the 5BHK is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The building approval states that the stilt is approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters. The filed plan details identify 259.40 m² of parking area; the building approval separately records a 245.79 m² stilt area. The approval requires EV-charging infrastructure in building parking areas. No sanctioned parking-space count, resident or visitor allocation, accessible-space provision, mechanical parking, ramp or driveway arrangement, or unit-specific parking allocation is established in the supplied evidence. A third-party/vendor record states “10 Covered Parking spaces,” but this is not a TG-RERA-filed or sanctioned allocation. Promoter website
6. Amenities, recreation & open spaces
The following are facilities recorded in project filings, approvals or the TG-RERA amenities record. The listed progress percentages are all 0; no independent completion verification is supplied. RERA amenities
| Description / size | Fenced tot-lot and peripheral greenery required by the building approval; no area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Amenities record: 0%; completion not independently verified. |
| Description / size | Rainwater-harvesting structure / percolation pit; the building approval records one RWHP. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Amenities record: 0%; completion not independently verified. |
| Description / size | Listed in TG-RERA amenities data; no system or capacity specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed in TG-RERA amenities data; no facility or size specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
No clubhouse, indoor recreation facility or specific sports facility is identified in the supplied project evidence. The building approval’s requirements for a tot-lot and greenery describe obligations, not confirmation that these facilities have been delivered.
7. Utilities, building services & safety
TG-RERA’s amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management and an electrical meter room/sub-station/receiving station as “YES”; the listed progress is 0% for these entries. The record does not specify water source or storage capacity, sewage-treatment capacity or reuse arrangements, electrical supply or backup capacity, or storm-water-system details. RERA amenities
The building approval requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. Its conditions also require sanitation, plumbing, fire-safety systems, lifts and electrical installations to be executed under qualified technical supervision, and place responsibility for structural and fire-safety requirements on the specified project professionals. These are approval requirements; the supplied record does not establish installation, commissioning or statutory clearance.
The filed layout-plan conditions refer to dual piping and EV-charging infrastructure. No lift count or capacity, fire-system specification, escape-stair details, accessibility arrangements, waste-segregation arrangements, CCTV or access-control systems are established in the supplied evidence. RERA amenities
8. Location, access & connectivity
The registered project location is Gollapet, Nirmal, Nirmal, 504106, on survey numbers 1065 New and 1056 Old, plots 56 and 57. RERA filing
The location record identifies Gollapet on Old NH7 and gives one sampled connectivity reference: Outer Ring Road (nearest sampled interchange, approximate) at 163.5 km. No local public-transport details or other measured landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is VV DEVELOPERS, identified as a partnership, with GSTIN 36AATFV8567G1Z9. The RERA certificate names the promoter and VINAYAK KOMMULA as its representative. The promoter address recorded in the project information is Gundampally, Gollapet Shivar, Gollapet, Nirmal, Nirmal, 504106. Corporate record Parties record
The registration certificate records validity through 28/12/2027. The promoter’s Form B declaration undertakes completion by 28t* December, 2027; the project header separately records a proposed completion date of 28/04/2028. No verified construction-progress evidence or occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for VASUDHAIKA HOMES, registration P02300010160, valid 28/12/2024–28/12/2027. |
| Principal building approval | Building-construction approval 0023/BP/3028/2024, dated 28 December 2024, for Building A, 1 Stilt + 5 upper floors, on plots 56 and 57, Gollapet. |
| Layout/building-plan material | Filed plan details identify survey numbers 1065 (NEW) and 1056 (OLD), residential use, ten units and plan parameters. |
| Layout references in approval | T.P No. 44/73, dated 23/09/1973, and layout file 10753/73-DS are recorded in the building-approval material. |
| Occupancy/completion certificate | No OC or completion certificate is included in the supplied evidence. The building approval requires an OC before occupation. |
| Other project documents | Form B promoter declaration, dated 20 August, 2025** in the extracted record, and TG-RERA registration certificate are supplied. |
The supplied overview evidence does not include a site-progress certificate or a completed OC record. Approval conditions and filed declarations should not be read as confirmation that the corresponding construction, services or facilities are complete.
1. Project at a glance
Project identity
Registered project name: VASUDHAIKA HOMES
Project type / use: Residential apartment building
Phase / registered portion: Phase not separately identified in the supplied record; registration and building details concern this project and Building A.
TG-RERA registration: P02300010160
Registration validity: 28/12/2024–28/12/2027
Registered promoter: VV DEVELOPERS, a partnership
RERA status: Registration certificate supplied; captured from TG-RERA on 10 September 2026.
Land and geographic identity
Locality / site description: Gollapet; Gollapet Shivar is also used in the filed building-approval material.
Revenue village: Gollapet
Mandal / district / PIN: Nirmal / Nirmal / 504106
Project survey numbers: 1065 New and 1056 Old
Plot numbers: 56 and 57
Site area: 526.71 sq.m / 526.71 m² in the building-approval record; RERA land details give total area and net area as 526.71 sq.m.
Boundaries: East: 30 FEET WIDE ROAD; West: EXISTING HOUSES; North: OPEN PLOTS; South: OPEN PLOTS.
Development identity
Sanctioning authority: Nirmal Municipality/Municipal Corporation; the RERA filing also identifies DTCP for the plan-approval record.
Principal building approval: 0023/BP/3028/2024, dated 28 December 2024
Building / floors: One residential building, Building A; 1 Stilt + 5 upper floors (six floors stated in the filed plan details).
Height: 14.95 m building height; the filed plan details also state 19.95mt. total height.
Approved built-up area: 1,234.80 m² residential upper floors / net BUA; the filed building-plan details separately state 1,494.20 m² proposed built-up area including parking and 1,515.06 as total BUA.
Parking area / stilt: Parking area 259.40 m² in the filed plan details; stilt area 245.79 m² in the building-approval record.
Unit count: 10 units in the filed project information and plan details.
Commencement / occupancy documents: Building-construction approval supplied; no occupancy certificate is recorded in the supplied evidence.
Offering and status
Configurations: 3BHK and 5BHK
RERA-filed saleable areas: 3BHK: 145.34 sq.m; 5BHK: 150.97 sq.m
Booked / available: 3BHK: 0 booked / 9 available; 5BHK: 0 booked / 1 available. Counts are from the TG-RERA portal record and have no stated as-of date, so are indicative.
Construction stage: No measured or independently verified construction progress is supplied. RERA status is “New Project.”
Completion dates: Promoter’s Form B declaration states completion by 28t* December, 2027; the project header gives proposed completion 28/04/2028.
Registration validity versus completion: Registration is valid through 28/12/2027; this is separate from the completion dates stated above.
Occupancy-certificate status: No OC is included in the supplied documents; the building approval requires an OC before occupation.
2. The project story
VASUDHAIKA HOMES is registered as a residential apartment project on plots 56 and 57 in Gollapet, Nirmal, on survey numbers 1065 New and 1056 Old. The filed site area is 526.71 sq.m. The filed boundaries identify a 30-foot-wide road to the east, existing houses to the west, and open plots to the north and south.
The approved development is a single apartment building, Building A, with a stilt and five upper floors. The project record lists ten homes: nine 3BHK units and one 5BHK unit. The portal-derived booking snapshot shows all ten as available, but provides no snapshot date.
The evidence includes a building-construction approval, not an occupancy certificate. No site-inspection evidence or verified construction-progress percentage is supplied, so the project’s present physical stage cannot be established from this record. The promoter’s Form B declaration gives a completion undertaking ending 28t* December, 2027; the project header separately records a proposed completion date of 28/04/2028.
3. Master plan, architecture & building design
The filed building-plan details describe a residential apartment building on a 526.71 m² site, with 1,234.80 m² of residential upper-floor built-up area. The same plan data separately records 259.40 m² of parking area, 1,494.20 m² proposed built-up area including parking, and 1,515.06 as total BUA. These are separately reported plan figures; the supplied record does not define their measurement bases beyond the labels shown.
The building approval identifies Building A as 1 Stilt + 5 upper floors, with a stated building height of 14.95 m. Filed plan details also show a 19.95mt. total height and floor levels from +0.00 mt. to +14.46 mt., plus -0.60 mt. and a lift machine room at +17.45 mt.
The supplied material does not establish a detailed floor-by-floor apartment arrangement, lift count, stair arrangement, building footprint, open-space area, or internal circulation plan. The building approval requires a rainwater-harvesting structure, transformer space, a garbage house, a fenced tot-lot and peripheral greenery; these are approval conditions, not evidence of completed works.
4. Homes, configurations & floor plans
RERA records nine 3BHK homes and one 5BHK home. The filed saleable areas are shown below. The 3BHK carpet-area figures are software measurements from the approved floor-plan drawing, not RERA disclosures; the filing itself reports saleable area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 145.34 sq.m | 86.3–90.6 sq.m; median 88.5 sq.m (software-measured) | 39% (software-derived) |
| 5BHK | 1 | 0 | 1 | 150.97 sq.m | Not supplied | Not supplied |
The measured 3BHK drawing sample covers four flat designs. One measured plan shows a living room, dining area, kitchen, three bedrooms, three toilets and a balcony; the listed balcony area is excluded from the software-measured carpet area. The room measurements are drawing-based and require review against the drawing.
Carpet area is not the same as saleable area: the supplied measurement note says saleable area also counts the home’s share of common areas. No measured 5BHK carpet area, RERA-filed balcony or utility dimensions, or unit-specific loading figure for the 5BHK is supplied.
5. Parking & vehicle circulation
The building approval states that the stilt is approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters. The filed plan details identify 259.40 m² of parking area; the building approval separately records a 245.79 m² stilt area. The approval requires EV-charging infrastructure in building parking areas. No sanctioned parking-space count, resident or visitor allocation, accessible-space provision, mechanical parking, ramp or driveway arrangement, or unit-specific parking allocation is established in the supplied evidence. A third-party/vendor record states “10 Covered Parking spaces,” but this is not a TG-RERA-filed or sanctioned allocation.
6. Amenities, recreation & open spaces
The following are facilities recorded in project filings, approvals or the TG-RERA amenities record. The listed progress percentages are all 0; no independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Fenced tot-lot and peripheral greenery required by the building approval; no area supplied. | Amenities record: 0%; completion not independently verified. | |
| Water conservation / rainwater harvesting | Rainwater-harvesting structure / percolation pit; the building approval records one RWHP. | Amenities record: 0%; completion not independently verified. | |
| Energy management | Listed in TG-RERA amenities data; no system or capacity specified. | 0%; not independently verified. | |
| Community buildings | Listed in TG-RERA amenities data; no facility or size specified. | 0%; not independently verified. |
No clubhouse, indoor recreation facility or specific sports facility is identified in the supplied project evidence. The building approval’s requirements for a tot-lot and greenery describe obligations, not confirmation that these facilities have been delivered.
7. Utilities, building services & safety
TG-RERA’s amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management and an electrical meter room/sub-station/receiving station as “YES”; the listed progress is 0% for these entries. The record does not specify water source or storage capacity, sewage-treatment capacity or reuse arrangements, electrical supply or backup capacity, or storm-water-system details.
The building approval requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. Its conditions also require sanitation, plumbing, fire-safety systems, lifts and electrical installations to be executed under qualified technical supervision, and place responsibility for structural and fire-safety requirements on the specified project professionals. These are approval requirements; the supplied record does not establish installation, commissioning or statutory clearance.
The filed layout-plan conditions refer to dual piping and EV-charging infrastructure. No lift count or capacity, fire-system specification, escape-stair details, accessibility arrangements, waste-segregation arrangements, CCTV or access-control systems are established in the supplied evidence.
8. Location, access & connectivity
The registered project location is Gollapet, Nirmal, Nirmal, 504106, on survey numbers 1065 New and 1056 Old, plots 56 and 57.
The location record identifies Gollapet on Old NH7 and gives one sampled connectivity reference: Outer Ring Road (nearest sampled interchange, approximate) at 163.5 km. No local public-transport details or other measured landmark distances are supplied.
9. Developer & development status
The registered promoter is VV DEVELOPERS, identified as a partnership, with GSTIN 36AATFV8567G1Z9. The RERA certificate names the promoter and VINAYAK KOMMULA as its representative. The promoter address recorded in the project information is Gundampally, Gollapet Shivar, Gollapet, Nirmal, Nirmal, 504106.
The registration certificate records validity through 28/12/2027. The promoter’s Form B declaration undertakes completion by 28t* December, 2027; the project header separately records a proposed completion date of 28/04/2028. No verified construction-progress evidence or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for VASUDHAIKA HOMES, registration P02300010160, valid 28/12/2024–28/12/2027.
Principal building approval: Building-construction approval 0023/BP/3028/2024, dated 28 December 2024, for Building A, 1 Stilt + 5 upper floors, on plots 56 and 57, Gollapet.
Layout/building-plan material: Filed plan details identify survey numbers 1065 (NEW) and 1056 (OLD), residential use, ten units and plan parameters.
Layout references in approval: T.P No. 44/73, dated 23/09/1973, and layout file 10753/73-DS are recorded in the building-approval material.
Occupancy/completion certificate: No OC or completion certificate is included in the supplied evidence. The building approval requires an OC before occupation.
Other project documents: Form B promoter declaration, dated 20 August, 2025** in the extracted record, and TG-RERA registration certificate are supplied.
The supplied overview evidence does not include a site-progress certificate or a completed OC record. Approval conditions and filed declarations should not be read as confirmation that the corresponding construction, services or facilities are complete.
Frequently asked questions
Is VASUDHAIKA HOMES registered with Telangana RERA?
Yes. VASUDHAIKA HOMES is registered with the Telangana Real Estate Regulatory Authority as P02300010160; the registration status is New Project.
Who is the developer of VASUDHAIKA HOMES?
The promoter named in the RERA registration is VV DEVELOPERS.
Where is VASUDHAIKA HOMES located?
VASUDHAIKA HOMES is in Gollapet, Nirmal, Telangana (504106).
When will VASUDHAIKA HOMES be completed?
The promoter's proposed date of completion filed with RERA is 28/04/2028. This is the promoter's declaration, not a guarantee.