SILPA BRINDAVANAM IV is a plotted development of residential plots in RANJOLE, Zaheerabad Mandal, Sangareddy District. The registered promoter is SILPA INFRATECH LIMITED. The registered site extent is 52,862.30 sq. m, and the approved layout has 164 plots; the drawing-derived plot sizes range from 118.13 sq. m (141.3 sq. yd) to 291.23 sq. m (348.3 sq. yd). The project is registered under TG-RERA **P01100011318**, with a proposed completion date of 26 June 2026.

More from Silpa Infratech Ltd · 7 projects →

01What we found

RegisteredTG-RERA
54documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSILPA BRINDAVANAM IV RERA record
Project typePlotted development / residential layout RERA record
Phase / registered portion“IV” is the registered project name; the supplied record does not separately define the phase boundaries beyond the registered land and layout RERA record
TG-RERA registrationP01100011318
Registration validityCertificate states 26/06/2024–26/06/2026; no extension is recorded in the supplied evidence. This is the registration period, not a statement about completion or occupancy
Registered promoterSILPA INFRATECH LIMITED RERA record Corporate record
RERA status in supplied recordThe certificate records registration under section 5. Current portal status beyond the certificate’s stated validity is not established by the supplied records

Land and geographic identity

ItemRecord
Locality / revenue villageRANJOLE / Ranjole Revenue Village RERA record
Mandal / district / PINZAHEERABAD / Sangareddy / 502318 RERA record
Project survey numbers and subdivisions248/P and 250/P RERA record Land records
Registered site extentRERA project land details state 52,862.30 sq. m total and 52,659.86 sq. m net; 202.44 sq. m is identified as affected by road widening/FTL of tanks/nala widening RERA filing
BoundariesEast: OTHERS LAND; West: CANAL; North: EXISTING LAYOUT; South: OTHERS LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityZAHEERABAD Municipality/Municipal Corporation
Principal layout approvalTentative Layout Plan 0002/LO/3057/2024, approved 26 June 2024; application 003914/LO/DTCP/3057/0012/2024
Approved layout scale164 plots
Approved built-up areaNot stated in the supplied records; this is a plotted layout, not a multi-storey building project RERA filing
Buildings / floors / parking levelsNot applicable or not disclosed for this plotted-layout approval; no building-level floor configuration or parking schedule is supplied
RERA-declared unit countNot supplied in the available RERA unit records. The approved layout drawing extraction records 164 plots Layout record

Offering and status

ItemRecord
Unit typeResidential plots RERA record
Plot count and sizesDrawing-derived schedule: 164 plots, all 164 with a parsed size; smallest 118.13 sq. m (141.3 sq. yd), median 156.34 sq. m (187.0 sq. yd), largest 291.23 sq. m (348.3 sq. yd). These are software-read drawing figures, not RERA unit disclosures Layout record
Booked / availableNot disclosed in the supplied project data Document index
Construction / development stageNo independently verified site-progress record supplied. Approval conditions require infrastructure and amenities to be completed by 26 June 2026; this is a deadline, not evidence that works are complete
Completion datePromoter’s Form B and tentative-layout conditions state 26 June 2026
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For this plotted development, the record identifies tentative layout approval; final layout release is not evidenced here

2. The project story

  • SILPA BRINDAVANAM IV is a residential plotted layout at Ranjole Revenue Village, Zaheerabad Mandal, Sangareddy District, on land identified in the RERA filing as Survey Nos. 248/P and 250/P. The project is organized as individual plots with internal roads, reserved open space, social-infrastructure land and utility land, rather than as apartment towers or villas. RERA record Land records
  • The competent authority’s document is an approval for a tentative layout plan for 164 plots, dated 26 June 2024. The same document makes development works the layout applicant’s responsibility and sets a two-year infrastructure-and-amenities completion period ending 26 June 2026. The supplied documents do not establish actual on-site completion or final layout release.
  • The promoter’s Form B states the project completion undertaking as 26 June 2026. That declared date should be read separately from the TG-RERA certificate’s stated registration validity ending on the same date; neither record establishes that all works have been completed or that an occupancy/completion certificate has issued.

3. Master plan, architecture & building design

The submitted development is a plotted layout. The authority’s tentative-layout document identifies a layout extent of 13 Acer 2.51 Gts / 63,225 Sq. Yds and a schedule of 164 plots. The RERA land-details record separately gives a total area of 52,862.30 sq. m, net area of 52,659.86 sq. m, and affected area of 202.44 sq. m. The drawing-based layout area statement uses net layout area of 52,659.86 sq. m. RERA filing Layout record

The layout drawing’s software-read area statement allocates the net layout area as follows:

Layout useAreaShare
Plots26,803.50 sq. m50.90%
Roads18,436.13 sq. m35.01%
Parks / open space4,758.48 sq. m9.04%
Utilities529.70 sq. m1.01%
Social infrastructure1,322.16 sq. m2.51%
Amenities0.00 sq. m0.00%

Layout record

The authority’s approval document specifies road widths of 18 mts and above and records the same principal land-use categories. It also identifies 0 Acer 40.05 Gts / 4,846 Sq. Yds as mortgage area. No tower arrangement, building footprints, floors, apartment layouts or architectural elevations are evidenced for this plotted development.

4. Homes, configurations & floor plans

The offering is residential plots, not apartments. No RERA-filed plot-by-plot unit schedule with booking or availability status is present in the supplied unit records. The approved layout drawing extraction identifies 164 plots; plot-size figures below were read by software from the drawing and should be checked against the original schedule. Layout record

Plot-size bandNumber of plots
100–150 sq. yd (84–125 sq. m)5
150–200 sq. yd (125–167 sq. m)104
200–250 sq. yd (167–209 sq. m)38
250–300 sq. yd (209–251 sq. m)14
300–400 sq. yd (251–334 sq. m)3

Layout record

The drawing extraction reports a smallest plot of 118.13 sq. m (141.3 sq. yd), median 156.34 sq. m (187.0 sq. yd) and largest 291.23 sq. m (348.3 sq. yd). These are plot areas, not apartment carpet or saleable areas. Apartment floor-plan measurements and apartment configuration counts are not applicable or not supplied. Layout record Floor plans

5. Parking & vehicle circulation

  • No project-wide parking count, visitor or accessible parking schedule, parking allocation to individual plots, or vehicle-parking design is supplied. The project is a plotted layout; parking provision within any future dwelling or plot is not established by the layout information provided. Layout record
  • The tentative approval records roads of 18 mts and above and requires roads to remain open for access to neighbouring sites. This establishes a road-access condition, not a specific driveway, turning, pedestrian-separation or parking arrangement.

6. Amenities, recreation & open spaces

The RERA-filed amenity data marks several layout facilities as available, but the supplied record does not provide independent site verification of completion. The tentative-layout approval also describes infrastructure and facilities required as part of development; these are approval requirements, not proof of delivery. RERA amenities

Landscape / open space — Park / green strip / tot lot
Description / sizeReserved open space: 4,758.48 sq. m in the drawing-derived area statement; authority document states 1 Acer 7.03 Gts / 5,691 Sq. Yds (9.04%)
Evidence sourceLayout record
Declared progress / verified statusRERA amenity record marks Green Strip/TOT LOT/Park and aggregate recreational open space at 100%; no independent completion verification supplied RERA amenities
Sports / recreation — Recreational open space
Description / sizeAggregate recreational open space is listed; no facilities, equipment or capacity specified
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded as available at 100%; not independently verified RERA amenities
Convenience / community — Social infrastructure land
Description / sizeDrawing-derived area 1,322.16 sq. m; authority document states 0 Acer 13.07 Gts / 1,581 Sq. Yds (2.51%)
Evidence sourceLayout record
Declared progress / verified statusReserved land is identified; no specific community-building facility or completed status is established. Community Buildings are recorded at 0% in the amenity data RERA amenities
Utilities — Utility land
Description / sizeDrawing-derived area 529.70 sq. m; authority document states 0 Acer 5.24 Gts / 634 Sq. Yds (1.01%)
Evidence sourceLayout record
Declared progress / verified statusUtility area is reserved; installation/completion of each service is not independently verified here RERA amenities

No clubhouse or indoor recreational facility is evidenced. The authority’s approval conditions require handing over open-space, utility and road areas by registered gift deed before release of the final layout; the supplied evidence does not establish that this handover or final release has occurred.

7. Utilities, building services & safety

The tentative-layout approval describes the planned layout works, while the RERA amenity record indicates which listed items are declared available. Neither source, by itself, verifies completed installation or operational capacity. RERA amenities

Water supply
Evidence in the recordApproval conditions describe internal water-supply pipelines, an assured water-supply source, and an overhead tank/sump; the RERA amenity data marks Water Supply at 100% RERA amenities
Status / limitationPromoter/RERA-recorded availability; source, storage capacity and independent operating verification are not supplied
Sewerage and drainage
Evidence in the recordApproval conditions specify underground drainage lines, common septic tank/STP, and storm-water drains; the RERA amenity record lists sewerage and storm-water drains at 100% RERA amenities
Status / limitationNo system capacity, treatment standard, reuse arrangement or independent commissioning evidence supplied
Rainwater harvesting
Evidence in the recordApproval conditions require harvesting pits; RERA amenity data marks water conservation/rainwater harvesting at 100% RERA amenities
Status / limitationNo pit count, capacity or independent completion verification supplied
Electrical services and lighting
Evidence in the recordApproval conditions identify electrical supply lines, transformer and street lighting; RERA amenity data marks street lighting and electrical meter room/sub-station/receiving station at 100% RERA amenities
Status / limitationNo electrical capacity, backup provision or independent commissioning evidence supplied
Solid-waste management
Evidence in the recordApproval conditions identify solid-waste management; the RERA amenity data records Solid Waste Management and Disposal at 0% RERA amenities
Status / limitationCompletion is not established
Fire/life safety
Evidence in the recordRERA amenity data records Fire Protection and Fire Safety Requirements at 0% RERA amenities
Status / limitationNo project-specific fire-system design, clearance or completion evidence supplied
Accessibility / lifts
Evidence in the recordNo project-specific accessibility, lift or building-service details are supplied Document index
Status / limitationNot established in this plotted-layout record

8. Location, access & connectivity

The registered location is RANJOLE, Zaheerabad Mandal, Sangareddy District, PIN 502318, with project land identified in Survey Nos. 248/P and 250/P. The boundary schedule records a canal to the west, an existing layout to the north, and other land to the east and south. RERA record Land records

  • The available location data identifies the cadastral parcel centroid as 17.67488, 77.64059. The nearest sampled Outer Ring Road interchange is listed at approximately 67.6 km; no other measured road, public-transport or landmark distances are supplied. Location record
  • The tentative-layout approval requires roads to remain open for access to neighbouring sites and identifies road widths of 18 mts and above. It does not provide a named approach-road route or public-transport details.

9. Developer & development status

  • The registered legal promoter is SILPA INFRATECH LIMITED, recorded as a company. The project filing lists GSTIN 36AALCS4085R2ZD; the supplied corporate record does not provide a verified official website or contact details for the promoter. Corporate record RERA filing
  • The RERA registration certificate lists the promoter office as Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500081. The project filing separately gives an address in Ranjole, Zaheerabad, Sangareddy; this is the project-side address, not the promoter office. Parties record
  • The promoter’s Form B declares a project completion date of 26 June 2026. The tentative layout approval also sets 26 June 2026 for completing infrastructure and amenities. No verified progress percentage, site inspection report, final layout release, or occupancy/completion certificate is included in the supplied project evidence.

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate, P01100011318Form C identifies SILPA BRINDAVANAM IV, promoter SILPA INFRATECH LIMITED, Survey Nos. 248/P and 250/P, and stated validity from 26/06/2024 to 26/06/2026
Tentative layout approval, 0002/LO/3057/2024ZAHEERABAD Municipality/Municipal Corporation approval dated 26 June 2024, for a plotted layout with 164 plots; application 003914/LO/DTCP/3057/0012/2024
Mortgage deed, 4173The approval document records a municipal mortgage over Plots 50, 46, 47, 59, 60, 58, 61, 62, 56, 57, 63, 64, 65, 66, 53, 54, 55, 67, 45, 48, 49, 44, 43, 42, 41, 52 and 51, with mortgage area stated as 0 Acer 40.05 Gts / 4,846 Sq. Yds
Form B promoter declarationAuthorized signatory Singareddy Chandra Mohan Reddy makes the promoter’s declarations and states a completion undertaking of 26 June 2026
Approved layout drawingOne layout sheet is recorded; its plot schedule and land-use figures are software-read drawing measurements, not RERA unit disclosures Layout record
Final layout release / occupancy or completion certificateNot supplied in the evidence reviewed Document index

Frequently asked questions

Is SILPA BRINDAVANAM IV registered with Telangana RERA?

Yes. SILPA BRINDAVANAM IV is registered with the Telangana Real Estate Regulatory Authority as P01100011318; the registration status is New Project.

Who is the developer of SILPA BRINDAVANAM IV?

The promoter named in the RERA registration is SILPA INFRATECH LIMITED.

Where is SILPA BRINDAVANAM IV located?

SILPA BRINDAVANAM IV is in RANJOLE, ZAHEERABAD, Sangareddy, Telangana (502318).

When will SILPA BRINDAVANAM IV be completed?

The promoter's proposed date of completion filed with RERA is 26/06/2026. This is the promoter's declaration, not a guarantee.