Sign in

Heaven City

MOHAMMED · Sangareddy · RERA P01100006960

HEAVEN CITY is a plotted development in Ranjole Revenue Village, Zaheerabad Mandal, Sangareddy District. The TG-RERA certificate names Mohammed Abdul Hafeez Quadri as the registered promoter developing the project. It covers 18109.12 sq. m and has 68 residential plots; building or floor configurations are not disclosed. The TG-RERA registration is P01100006960, and the promoter-declared completion undertaking is 08 June 2025.

01What we found

Period endedTG-RERA registration ran to 8 Jun 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameHEAVEN CITY RERA record
Project typePlotted development / residential layout RERA record
Registered phase or portionNew Project; the registration record identifies the project, but does not separately identify a phase RERA record
TG-RERA registrationP01100006960 RERA record
Registration validity16/09/2023 to 08/06/2025; the certificate says the registration may be extended by the Authority under the Act and Rules. No extension is shown in the supplied record
Registered promoterThe registration certificate names Mohammed Abdul Hafeez Quadri. The project header records the promoter as MOHAMMED; legal entity type is not disclosed RERA record
RERA status in supplied recordNew Project; registration validity ended 08/06/2025. The supplied evidence does not establish a later extension or current registration status RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageRanjole (also shown as RANJOLE) Revenue Village RERA record
Mandal / districtZaheerabad Mandal, Sangareddy District RERA record
PIN502318 RERA record
Project survey numbers / subdivisions48/P, 52/P and 55/P RERA record
Registered site extent18109.12 sq. m in the project record RERA filing
Total / net land area18109.12 sq. m total and net area in the project record RERA filing
BoundariesEast: Agriculture Land; West: Agriculture Land; North: Agriculture Land; South: Road RERA filing

Development identity

ItemRecord
Sanctioning authorityZaheerabad Municipality/Municipal Corporation Approvals record
Principal layout approvalTentative layout approval 0004/LO/3057/2023, dated 08 June 2023; application 004677/LO/DTCP/3057/0010/2023 Approvals record
Final layout recordFinal Layout Certificate 0013/FLT/3057/2025, proceedings 013800/FLT/ZAHE/3057/0027/2024, dated 17 February 2025 Approvals record
Approved built-up area11795.61 sq. m is recorded as “Approved Built up Area” in the project filing; this is a plotted layout, and the supplied material does not describe building-level built-up area RERA filing
Buildings / floor configurationNot disclosed; no building or floor configuration is supplied for this plotted layout Document index
Layout plots68 plots in the layout approval and final layout record
Mortgage area1837.71 sq. m in the project filing; the tentative approval identifies plots 19, 18 and 20–27 as mortgaged to the municipality pending the stated layout conditions RERA filing
Parking provisionThe final layout record lists “Common Parking Area”; a count, dimensions, allocation and location are not supplied

Offering and status

ItemRecord
Unit typeResidential plots; the final layout conditions specify detached dwelling use for a single family on each site
Plot count and sizes68 plots; plot sizes are software-read from the approved layout drawing and are not a RERA unit-area disclosure. Measured sizes range from 134.04 sq. m to 567.97 sq. m; median 164.8 sq. m Layout record
Booked / available countsNot disclosed in the supplied project record RERA filing
Construction / development stageThe final layout approval record is marked as completion-certified; this does not establish independent on-site verification of each infrastructure item or individual plot construction
Completion datesPromoter-declared completion undertaking: 08 June 2025. The final layout approval record gives 17/02/2025 as its completion date
Occupancy / completion certificateNo occupancy certificate for individual buildings is supplied. The final layout document is a final layout approval/release record, not evidence of building-level occupancy certification

2. The project story

HEAVEN CITY is a proposed residential plotted layout in Ranjole Revenue Village, Zaheerabad Mandal, Sangareddy District. The registered project covers survey numbers 48/P, 52/P and 55/P and is recorded as a plotted development rather than an apartment or multi-building project. RERA record

The layout approval records 68 residential plots. Its final-layout conditions say each building site is intended for a detached dwelling for one family; the supplied record does not provide house designs, construction progress for individual homes, or evidence that homes have been built. The promoter’s Form B declaration gives 08 June 2025 as the project completion undertaking. The final layout approval is recorded as completion-certified, but that is not independent site verification of all works.

3. Master plan, architecture & building design

The approved layout allocates 18109.12 sq. m of net layout area as follows: 11795.61 sq. m for plots, 4047.05 sq. m for roads, 1630.92 sq. m for parks/open space, 182.44 sq. m for utilities and 453.11 sq. m for social infrastructure. The area statement is drawing-derived; the plot count and plot sizes were read by software from the layout drawing and should be checked against the drawing itself. Layout record

The approval document’s area schedule expresses the same land-use allocation in its printed units and percentages: plotted area 2 Acer 36.59 Gts 14108 Sq. Yds (65.14%); road area 1 Acer 0 Gts 4840 Sq. Yds (22.35%); open space 0 Acer 16.12 Gts 1951 Sq. Yds (9.01%); social infrastructure 0 Acer 4.48 Gts 542 Sq. Yds (2.5%); and utilities 0 Acer 1.8 Gts 218 Sq. Yds (1.01%).

The final-layout conditions restrict sites to detached dwelling use for a single family and require prior approval for plot boundary or dimension changes, amalgamation, or subdivision. No building elevations, house floor plans, building footprints, tower or block arrangements, or building-level floor schedules are supplied. Floor plans

4. Homes, configurations & floor plans

This is a plotted layout, so the offered units are residential plots, not apartment configurations. The layout drawing’s schedule gives 68 plots; the software-read plot sizes are not RERA-filed saleable areas. The drawing-derived measurements are: Layout record

Plot-size band (sq. yd)Equivalent band shown (sq. m)Plots
150–200125–16738
200–250167–20924
250–300209–2514
300–400251–3341
500–1000418–8361

The measured smallest plot is 134.04 sq. m (160.3 sq. yd), the median is 164.8 sq. m (197.1 sq. yd), and the largest is 567.97 sq. m (679.3 sq. yd). These are software-measured from the approved layout drawing, not RERA-filed carpet or saleable areas. No house floor plans or room measurements are supplied; the two available drawing sheets are layout sheets and contain no flats. Layout record Floor plans

5. Parking & vehicle circulation

The final-layout record lists a Common Parking Area, but does not state a number of spaces, dimensions, location, accessibility provision, or any plot-specific parking allocation. No evidence of exclusive parking ownership or allotment is supplied.

The tentative layout approval records internal road area of 4047.05 sq. m in the project area schedule and requires roads to remain open for access to neighbouring lands. The supplied record does not give road widths, driveway dimensions, vehicle entries or exits, pedestrian separation, or EV charging provision. Layout record

6. Amenities, recreation & open spaces

The following facilities are identified in the layout and project records. The final layout document is marked completion-certified, but the supplied evidence does not independently verify on-site completion of each facility.

Park / open space
Description / size1630.92 sq. m in the drawing-derived area schedule; approval record states 0 Acer 16.12 Gts 1951 Sq. Yds (9.01%)
Evidence sourceLayout record
Declared progress / verified statusReserved in the layout; final-layout document marked completion-certified; site completion not independently verified
Community buildings / social infrastructure
Description / size453.11 sq. m in the drawing-derived area schedule; approval record states 0 Acer 4.48 Gts 542 Sq. Yds (2.5%)
Evidence sourceLayout record
Declared progress / verified statusLand reserved; a specific building or facility is not identified
Internal roads
Description / size4047.05 sq. m in the drawing-derived area schedule; approval record states 1 Acer 0 Gts 4840 Sq. Yds (22.35%)
Evidence sourceLayout record
Declared progress / verified statusShown in layout; completion not independently verified
Common parking area
Description / sizeNo count or size supplied
Declared progress / verified statusListed in final layout record; completion not independently verified
Avenue plantation / park development
Description / sizeNo quantities or sizes supplied
Declared progress / verified statusListed among proposed layout works; completion not independently verified

7. Utilities, building services & safety

The tentative layout approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, street lights, avenue plantation, park development and rainwater-harvesting pits as layout works. The supplied document does not state capacities, connection sources, treatment specifications, or independent completion results.

The final layout record lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, garbage bin and common parking area. It also requires rainwater-harvesting structures. No lift, building fire-system, backup-power, CCTV/security, or accessibility details are supplied for this plotted development.

8. Location, access & connectivity

The registered location is Ranjole Revenue Village, Ranjole, Zaheerabad Mandal, Sangareddy District, Telangana, PIN 502318. The project record describes the south boundary as a road and the other three boundaries as agricultural land. The supplied geocode is the cadastral parcel centroid at 17.682937720759853, 77.66517063574868. RERA record RERA filing RERA filing Cadastral map

The nearest sampled Outer Ring Road interchange is listed at approximately 65.3 km. No other measured distances, public-transport details, approach-road names, or verified landmark information are supplied. Location record

9. Developer & development status

The TG-RERA certificate identifies Mohammed Abdul Hafeez Quadri as promoter. The project header uses “MOHAMMED” as the promoter label, and the Form B declaration identifies Mohammed Abdul Hafeez Quadri as an authorised signatory for the promoters. The legal entity type, corporate identifiers and registered office for the project promoter are not established in the supplied material. RERA record Corporate record

Form B identifies Sri Patlolla Bharath Reddy as land owner and refers to a registered development agreement. The promoter’s declared project completion date is 08 June 2025. No project-specific construction-progress figures or independent site inspection results are supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100006960; issued 16/09/2023; validity to 08/06/2025
Scope and sourceHEAVEN CITY, survey numbers 48/P, 52/P and 55/P
Tentative layout approval
Identifier / date0004/LO/3057/2023, dated 08 June 2023; application 004677/LO/DTCP/3057/0010/2023
Scope and source68-plot layout; Zaheerabad Municipality/Municipal Corporation
Final layout certificate / proceedings
Identifier / date0013/FLT/3057/2025; 013800/FLT/ZAHE/3057/0027/2024; dated 17 February 2025
Scope and sourceFinal layout approval record; 68 plots in survey numbers 48/P, 52/P and 55/P
Form B promoter declaration
Identifier / dateDated 16 August (year is not clearly legible in the supplied extraction)
Scope and sourcePromoter declaration, landowner identification, completion undertaking and project fund undertakings
Layout plan
Identifier / dateDocument 349013
Scope and sourceTwo layout sheets; software-read plot schedule and land-use figures Layout record
Encumbrance statements filed with TG-RERA
Identifier / dateDocuments 349012 and 353323
Scope and sourceStatements covering searches from 01-01-2000 to 09-07-2023 and 01-01-1983 to 04-09-2023, respectively; entries are not reproduced here Document index

No building-level commencement certificate or occupancy certificate is supplied. The final layout approval is not a building-level occupancy certificate. Document index

Frequently asked questions

Is HEAVEN CITY registered with Telangana RERA?

Yes. HEAVEN CITY is registered with the Telangana Real Estate Regulatory Authority as P01100006960; the registration status is New Project.

Who is the developer of HEAVEN CITY?

The promoter named in the RERA registration is MOHAMMED.

Where is HEAVEN CITY located?

HEAVEN CITY is in RANJOLE, ZAHEERABAD, Sangareddy, Telangana (502318).

When will HEAVEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 08/06/2025. This is the promoter's declaration, not a guarantee.

More projects in Ranjole