NAKSHATRA HOMES-ASHWINI is a residential apartment project in NAKSHATRA PARK, RANJOLE, ZAHEERABAD Mandal, Sangareddy District. The registered promoter is SMVSCONSTRUCTIONS. The project is on a 670.44 m² site and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a filed saleable area of 102.19 m². Its TG-RERA registration is P01100005555, and its proposed completion date is 22/09/2025.

01What we found

Period endedTG-RERA registration ran to 22 Sep 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameNAKSHATRA HOMES-ASHWINI RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNew Project; the registration record identifies one building. A separately named phase is not disclosed. RERA record RERA filing RERA unit table
TG-RERA registrationP01100005555 RERA record
Registration validity20 December 2022 to 22 September 2025; the supplied certificate records no extension. Registration validity is separate from the completion deadline and does not establish completion or an occupancy certificate. RERA record
Registered promoterSMVSCONSTRUCTIONS; the RERA record describes the organization as a partnership. RERA record RERA filing
RERA status in supplied recordThe project is registered. The supplied record shows the registration validity end date above; it does not establish a later extension or current registration status. RERA record

Land and geographic identity

ItemProject record
LocalityNAKSHATRA PARK RERA record
Revenue villageRANJOLE (also rendered “Ranjole” in the approval and title material) RERA record
MandalZAHEERABAD RERA record
DistrictSangareddy RERA record
PIN503218 RERA record
Project survey number / subdivision282/A RERA record Land records
Registered site extent670.44 m² Land records
Total / net area and road-affected areaTotal and net area are each 670.44 m²; road-affected area is 0 m², as recorded in the building approval.
Plot reference776 AND 777/PART NOTHERN SIDE in the RERA project record. RERA filing
BoundariesNot stated in the supplied parcel record. Land records

Development identity

ItemProject record
Sanctioning authorityZaheerabad Municipality/Municipal Corporation
Principal building approval0013/BP/3057/2022, dated 22 September, 2022 Approvals record
File number008797/BP/DTCP/3057/0029/2022
Approved built-up areaRERA fields record approved built-up area of 1771.81 m². The approval extraction separately lists residential upper-floors area of 1,761.95 m² and stilt area of 353.11 m²; these are distinct figures and labels in the supplied record. RERA filing
Building countOne building / one tower in the RERA record RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors
Sanctioned building height14.95 m
Parking levels / approved useThe approval says the stilt and cellar approved in the plan are to be used exclusively for vehicle parking; the extracted floor description identifies 1 Stilt + 5 upper floors. A separate parking-space count is not stated.
Unit countThe RERA land fields record one proposed building unit; the unit schedule records 20 apartments. RERA filing RERA unit table

Offering and status

ItemProject record
Filed configuration2BHK RERA unit table RERA unit details
RERA-filed saleable area102.19 m² per listed 2BHK configuration RERA unit table
Booked / available0 booked / 20 available as last read from the TG-RERA portal; the supplied record has no as-of date for these counts, so they are indicative. RERA unit table
Construction stageNo construction-progress percentage or independently verified site status is supplied. The RERA record labels the project “New Project.” RERA filing RERA amenities
Completion dateThe RERA record lists proposed completion as 22/09/2025; the Form B affidavit also records a completion undertaking, rendered as “22, sCP. 2025.” RERA record
OC / completion-certificate statusNo project-issued occupancy or completion certificate is evidenced in the supplied project documents. The building approval states that an occupancy certificate is compulsory before occupation. Document index

The project story

NAKSHATRA HOMES-ASHWINI is registered as a residential apartment project on a 670.44 m² site at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. The RERA record identifies survey number 282/A and a single building; the building approval describes a residential structure of 1 Stilt + 5 upper floors. RERA record Land records

The filed offering is 20 two-bedroom apartments, with the portal’s recorded inventory showing 0 booked and 20 available at the time it was read; no as-of date accompanies those counts. The completion date recorded in the registration is 22 September 2025. The supplied evidence does not provide a construction-progress update, independent site inspection, or project-specific issued occupancy certificate, so it does not establish whether construction is complete or whether any portion is ready for occupation. RERA unit table RERA record Document index

Master plan, architecture & building design

The building approval identifies one residential building on survey number 282/A, with a sanctioned site area of 670.44 m², 1 Stilt + 5 upper floors, and a stated height of 14.95 m. It records 1,761.95 m² as residential upper-floors area and 353.11 m² as stilt area. Separately, the RERA fields list approved built-up area as 1771.81 m²; these source labels are retained as recorded and are not treated as interchangeable measurements. RERA filing

The approval extraction lists no tot-lot area (“NA”) and does not provide a detailed building layout in the available evidence. Number of flats per floor, lift and stair arrangements, building footprint, internal circulation, and residential/common-area distribution are not established by the supplied extracts. The sanctioned floor description is not evidence of completed construction. Document index

Homes, configurations & floor plans

The RERA unit schedule lists 20 2BHK homes, each with filed saleable area of 102.19 m²; 0 are recorded as booked and 20 as available, with no as-of date supplied for the inventory snapshot. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020102.19 m²Software-measured range: 57.3–69.6 m²; median 63.4 m²38%

The carpet-area measurements are software-measured from the approved floor-plan drawings, not RERA-filed carpet-area disclosures; the source notes they require review against the drawing. The supplied measurements cover eight flat designs. Saleable area and carpet area are different measures: the drawing analysis notes that saleable area also counts the home’s share of common areas. Floor plans RERA unit details

One measured 2BHK drawing lists a kitchen, two bedrooms, dining area and living area; it also shows a utility area of 2.18 m² and a balcony of 3.0 m², both excluded from that drawing’s carpet-area measurement. These room details relate to the measured drawing and should be checked against the relevant unit’s final approved and sale documents. RERA unit details

Parking & vehicle circulation

The building approval states that the stilt and cellar approved in the plan should be used exclusively for parking of vehicles. The available extraction does not establish a sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or the detailed arrangement of ramps and vehicle circulation. A parking bay shown in a plan, by itself, does not establish an exclusive right to that space. Document index

The unit schedule marks the 2BHK configuration as mortgaged, and the approval states that the mortgaged built-up area is to be allowed for registration only after an occupancy certificate is produced. No unit-specific parking allotment or lender release document is supplied here. RERA unit table

Amenities, recreation & open spaces

The approval lists a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. The project’s RERA amenity schedule records several facilities as available (“YES”), but the supplied progress entries are 0%; that schedule does not establish that the facilities have been completed or independently verified. RERA amenities

Rainwater harvesting
Description / sizePercolation pit; approval records 3 RWHPs.
Evidence sourceSanctioned building approval
Declared progress / verified statusRequired in approval; progress not evidenced.
Water supply
Description / sizeNo source, storage capacity or treatment detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusMarked “YES”; 0% progress recorded; completion not independently verified.
Sewerage
Description / sizeSchedule label: “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system-specific detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusMarked “YES”; 0% progress recorded; completion not independently verified.
Storm-water drains
Description / sizeNo size or network detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.
Green strip / tot lot / park
Description / sizeApproval lists tot-lot area as “NA”; it also requires a strip of greenery on the site periphery.
Evidence sourceSanctioned building approval; RERA amenity schedule RERA amenities
Declared progress / verified statusGreen strip is an approval condition; no completion evidence supplied.
Street lighting
Description / sizeNo specifications supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.
Community buildings
Description / sizeNo building description or size supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.
Sewage and sullage treatment/disposal
Description / sizeNo treatment or reuse details supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.
Solid-waste management and disposal
Description / sizeApproval requires a garbage house within the premises; no capacity or operating arrangements supplied.
Evidence sourceSanctioned building approval; RERA amenity schedule RERA amenities
Declared progress / verified statusGarbage house required by approval; completion not evidenced.
Energy management
Description / sizeNo systems or capacity details supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusMarked “YES”; 0% progress recorded; completion not independently verified.
Fire protection and safety
Description / sizeNo system specifications or clearance document supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusMarked “YES”; 0% progress recorded; completion not independently verified.
Electrical meter room / sub-station / receiving station
Description / sizeApproval requires space for a transformer; no capacity supplied.
Evidence sourceSanctioned building approval; RERA amenity schedule RERA amenities
Declared progress / verified statusSchedule marked “YES”; 0% progress recorded; completion not independently verified.
Aggregate recreational open space
Description / sizeNo area supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.
Internal roads and footpaths
Description / sizeNo dimensions or layout details supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; 0% progress recorded; completion not independently verified.

Utilities, building services & safety

The approval requires a rainwater-harvesting percolation pit and space for a transformer, and requires a garbage house within the premises. It also states that the sanctioned plan must be followed, a commencement notice submitted before construction, a completion notice submitted after construction, and an occupancy certificate obtained before occupation. These are approval conditions, not evidence that the services or works have been completed.

The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection and electrical meter-room/sub-station facilities as “YES,” but records 0% progress against the listed items. The supplied evidence does not give water sources or storage, sewerage treatment capacity, power-backup arrangements, lift details, fire-system specifications, security or CCTV arrangements, waste-segregation procedures, or accessibility provisions. RERA amenities

Location, access & connectivity

The official project location in the supplied RERA record is Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District, Telangana 503218. The cadastral parcel centroid is recorded at 17.68235, 77.64915. RERA record Location record Cadastral map

The nearest sampled Outer Ring Road interchange is listed at 66.9 km (approx.). No project approach-road description, public-transport details, or independently substantiated nearby landmark distances are supplied in the project evidence. Location record

Developer & development status

The registered promoter is SMVSCONSTRUCTIONS, recorded as a partnership. The project documents identify KOLLI SRINIVASA RAO as managing partner / authorized signatory and MALLESWARI KOLLI as partner. The supplied promoter identifiers include GSTIN 36ADRFS4218E1ZW. RERA filing Parties record Corporate record

The registration certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project-site address is recorded separately at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. No official promoter website or project contact details are supplied. RERA record

The promoter’s Form B affidavit records a completion undertaking for 22 September 2025 and declarations concerning title, encumbrances and project funds; these are promoter declarations, not independent verification of land status, project progress or completion. The supplied project record does not include a construction-progress percentage or issued occupancy certificate. Document index

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C records registration P01100005555 for NAKSHATRA HOMES-ASHWINI under section 5, issued 20/12/2022, with validity through 22/09/2025. The supplied record states no extension.
Building approvalApproval 0013/BP/3057/2022, issued by Zaheerabad Municipality/Municipal Corporation on 22 September, 2022, for a residential apartment building on survey number 282/A.
Approval file number008797/BP/DTCP/3057/0029/2022
Layout permit referenceT.L.P. NO. 92/2018/H, dated 20/09/2018, recorded in the building-approval document.
Title reportAdvocate’s land-title search report for a 670.44 m² layout in survey number 282/A, Ranjole; the supplied extraction records the report’s conclusion and stated precautions.
Filed title and sale documentsTitle-report documents include sale-deed material 9010/2021, 9011/2021, 9012/2021, 9013/2021, 2208/2022, and earlier instruments identified in the title records, including 7546/2020, 5856/2017 and 11429/2018. Their full scope and chain are addressed in the Land & Title section.
Form B declarationPromoter affidavit-cum-declaration for SMVS CONSTRUCTIONS, signed by KOLLI SRINIVASA RAO as promoter or authorized person.
Floor-plan documentLayout-plan document 274524 is listed, but no drawing-derived measurements are included in the supplied document extraction itself; the software-measured unit information is separately identified as drawing-based and subject to review. Floor plans
Occupancy certificateNo project-specific issued occupancy certificate is evidenced in the supplied documents. An unrelated occupancy-certificate-type document in the wider record does not establish an OC for this project. Document index

The project’s building-approval document also records contractor’s all-risk policy number 61170044220300000047, dated 16 August, 2022. The supplied extract does not establish the policy’s current status.

Frequently asked questions

Is NAKSHATRA HOMES-ASHWINI registered with Telangana RERA?

Yes. NAKSHATRA HOMES-ASHWINI is registered with the Telangana Real Estate Regulatory Authority as P01100005555; the registration status is New Project.

Who is the developer of NAKSHATRA HOMES-ASHWINI?

The promoter named in the RERA registration is SMVSCONSTRUCTIONS.

Where is NAKSHATRA HOMES-ASHWINI located?

NAKSHATRA HOMES-ASHWINI is in NAKSHATRA PARK, RANJOLE, ZAHEERABAD, Sangareddy, Telangana (503218).

When will NAKSHATRA HOMES-ASHWINI be completed?

The promoter's proposed date of completion filed with RERA is 22/09/2025. This is the promoter's declaration, not a guarantee.