Nakshatra Homes-Ashwini
SMVSCONSTRUCTIONS · Sangareddy · RERA P01100005555
NAKSHATRA HOMES-ASHWINI is a residential apartment project in NAKSHATRA PARK, RANJOLE, ZAHEERABAD Mandal, Sangareddy District. The registered promoter is SMVSCONSTRUCTIONS. The project is on a 670.44 m² site and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a filed saleable area of 102.19 m². Its TG-RERA registration is P01100005555, and its proposed completion date is 22/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | NAKSHATRA HOMES-ASHWINI RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | New Project; the registration record identifies one building. A separately named phase is not disclosed. RERA record RERA filing RERA unit table |
| TG-RERA registration | P01100005555 RERA record |
| Registration validity | 20 December 2022 to 22 September 2025; the supplied certificate records no extension. Registration validity is separate from the completion deadline and does not establish completion or an occupancy certificate. RERA record |
| Registered promoter | SMVSCONSTRUCTIONS; the RERA record describes the organization as a partnership. RERA record RERA filing |
| RERA status in supplied record | The project is registered. The supplied record shows the registration validity end date above; it does not establish a later extension or current registration status. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | NAKSHATRA PARK RERA record |
| Revenue village | RANJOLE (also rendered “Ranjole” in the approval and title material) RERA record |
| Mandal | ZAHEERABAD RERA record |
| District | Sangareddy RERA record |
| PIN | 503218 RERA record |
| Project survey number / subdivision | 282/A RERA record Land records |
| Registered site extent | 670.44 m² Land records |
| Total / net area and road-affected area | Total and net area are each 670.44 m²; road-affected area is 0 m², as recorded in the building approval. |
| Plot reference | 776 AND 777/PART NOTHERN SIDE in the RERA project record. RERA filing |
| Boundaries | Not stated in the supplied parcel record. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Zaheerabad Municipality/Municipal Corporation |
| Principal building approval | 0013/BP/3057/2022, dated 22 September, 2022 Approvals record |
| File number | 008797/BP/DTCP/3057/0029/2022 |
| Approved built-up area | RERA fields record approved built-up area of 1771.81 m². The approval extraction separately lists residential upper-floors area of 1,761.95 m² and stilt area of 353.11 m²; these are distinct figures and labels in the supplied record. RERA filing |
| Building count | One building / one tower in the RERA record RERA filing RERA unit table |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors |
| Sanctioned building height | 14.95 m |
| Parking levels / approved use | The approval says the stilt and cellar approved in the plan are to be used exclusively for vehicle parking; the extracted floor description identifies 1 Stilt + 5 upper floors. A separate parking-space count is not stated. |
| Unit count | The RERA land fields record one proposed building unit; the unit schedule records 20 apartments. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Filed configuration | 2BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 102.19 m² per listed 2BHK configuration RERA unit table |
| Booked / available | 0 booked / 20 available as last read from the TG-RERA portal; the supplied record has no as-of date for these counts, so they are indicative. RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site status is supplied. The RERA record labels the project “New Project.” RERA filing RERA amenities |
| Completion date | The RERA record lists proposed completion as 22/09/2025; the Form B affidavit also records a completion undertaking, rendered as “22, sCP. 2025.” RERA record |
| OC / completion-certificate status | No project-issued occupancy or completion certificate is evidenced in the supplied project documents. The building approval states that an occupancy certificate is compulsory before occupation. Document index |
The project story
NAKSHATRA HOMES-ASHWINI is registered as a residential apartment project on a 670.44 m² site at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. The RERA record identifies survey number 282/A and a single building; the building approval describes a residential structure of 1 Stilt + 5 upper floors. RERA record Land records
The filed offering is 20 two-bedroom apartments, with the portal’s recorded inventory showing 0 booked and 20 available at the time it was read; no as-of date accompanies those counts. The completion date recorded in the registration is 22 September 2025. The supplied evidence does not provide a construction-progress update, independent site inspection, or project-specific issued occupancy certificate, so it does not establish whether construction is complete or whether any portion is ready for occupation. RERA unit table RERA record Document index
Master plan, architecture & building design
The building approval identifies one residential building on survey number 282/A, with a sanctioned site area of 670.44 m², 1 Stilt + 5 upper floors, and a stated height of 14.95 m. It records 1,761.95 m² as residential upper-floors area and 353.11 m² as stilt area. Separately, the RERA fields list approved built-up area as 1771.81 m²; these source labels are retained as recorded and are not treated as interchangeable measurements. RERA filing
The approval extraction lists no tot-lot area (“NA”) and does not provide a detailed building layout in the available evidence. Number of flats per floor, lift and stair arrangements, building footprint, internal circulation, and residential/common-area distribution are not established by the supplied extracts. The sanctioned floor description is not evidence of completed construction. Document index
Homes, configurations & floor plans
The RERA unit schedule lists 20 2BHK homes, each with filed saleable area of 102.19 m²; 0 are recorded as booked and 20 as available, with no as-of date supplied for the inventory snapshot. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 102.19 m² | Software-measured range: 57.3–69.6 m²; median 63.4 m² | 38% |
The carpet-area measurements are software-measured from the approved floor-plan drawings, not RERA-filed carpet-area disclosures; the source notes they require review against the drawing. The supplied measurements cover eight flat designs. Saleable area and carpet area are different measures: the drawing analysis notes that saleable area also counts the home’s share of common areas. Floor plans RERA unit details
One measured 2BHK drawing lists a kitchen, two bedrooms, dining area and living area; it also shows a utility area of 2.18 m² and a balcony of 3.0 m², both excluded from that drawing’s carpet-area measurement. These room details relate to the measured drawing and should be checked against the relevant unit’s final approved and sale documents. RERA unit details
Parking & vehicle circulation
The building approval states that the stilt and cellar approved in the plan should be used exclusively for parking of vehicles. The available extraction does not establish a sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or the detailed arrangement of ramps and vehicle circulation. A parking bay shown in a plan, by itself, does not establish an exclusive right to that space. Document index
The unit schedule marks the 2BHK configuration as mortgaged, and the approval states that the mortgaged built-up area is to be allowed for registration only after an occupancy certificate is produced. No unit-specific parking allotment or lender release document is supplied here. RERA unit table
Amenities, recreation & open spaces
The approval lists a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. The project’s RERA amenity schedule records several facilities as available (“YES”), but the supplied progress entries are 0%; that schedule does not establish that the facilities have been completed or independently verified. RERA amenities
| Description / size | Percolation pit; approval records 3 RWHPs. |
|---|---|
| Evidence source | Sanctioned building approval |
| Declared progress / verified status | Required in approval; progress not evidenced. |
| Description / size | No source, storage capacity or treatment detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | Schedule label: “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system-specific detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No size or network detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | Approval lists tot-lot area as “NA”; it also requires a strip of greenery on the site periphery. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule RERA amenities |
| Declared progress / verified status | Green strip is an approval condition; no completion evidence supplied. |
| Description / size | No specifications supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No building description or size supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No treatment or reuse details supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | Approval requires a garbage house within the premises; no capacity or operating arrangements supplied. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule RERA amenities |
| Declared progress / verified status | Garbage house required by approval; completion not evidenced. |
| Description / size | No systems or capacity details supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No system specifications or clearance document supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | Approval requires space for a transformer; no capacity supplied. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule RERA amenities |
| Declared progress / verified status | Schedule marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No area supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No dimensions or layout details supplied. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
Utilities, building services & safety
The approval requires a rainwater-harvesting percolation pit and space for a transformer, and requires a garbage house within the premises. It also states that the sanctioned plan must be followed, a commencement notice submitted before construction, a completion notice submitted after construction, and an occupancy certificate obtained before occupation. These are approval conditions, not evidence that the services or works have been completed.
The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection and electrical meter-room/sub-station facilities as “YES,” but records 0% progress against the listed items. The supplied evidence does not give water sources or storage, sewerage treatment capacity, power-backup arrangements, lift details, fire-system specifications, security or CCTV arrangements, waste-segregation procedures, or accessibility provisions. RERA amenities
Location, access & connectivity
The official project location in the supplied RERA record is Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District, Telangana 503218. The cadastral parcel centroid is recorded at 17.68235, 77.64915. RERA record Location record Cadastral map
The nearest sampled Outer Ring Road interchange is listed at 66.9 km (approx.). No project approach-road description, public-transport details, or independently substantiated nearby landmark distances are supplied in the project evidence. Location record
Developer & development status
The registered promoter is SMVSCONSTRUCTIONS, recorded as a partnership. The project documents identify KOLLI SRINIVASA RAO as managing partner / authorized signatory and MALLESWARI KOLLI as partner. The supplied promoter identifiers include GSTIN 36ADRFS4218E1ZW. RERA filing Parties record Corporate record
The registration certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project-site address is recorded separately at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. No official promoter website or project contact details are supplied. RERA record
The promoter’s Form B affidavit records a completion undertaking for 22 September 2025 and declarations concerning title, encumbrances and project funds; these are promoter declarations, not independent verification of land status, project progress or completion. The supplied project record does not include a construction-progress percentage or issued occupancy certificate. Document index
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records registration P01100005555 for NAKSHATRA HOMES-ASHWINI under section 5, issued 20/12/2022, with validity through 22/09/2025. The supplied record states no extension. |
| Building approval | Approval 0013/BP/3057/2022, issued by Zaheerabad Municipality/Municipal Corporation on 22 September, 2022, for a residential apartment building on survey number 282/A. |
| Approval file number | 008797/BP/DTCP/3057/0029/2022 |
| Layout permit reference | T.L.P. NO. 92/2018/H, dated 20/09/2018, recorded in the building-approval document. |
| Title report | Advocate’s land-title search report for a 670.44 m² layout in survey number 282/A, Ranjole; the supplied extraction records the report’s conclusion and stated precautions. |
| Filed title and sale documents | Title-report documents include sale-deed material 9010/2021, 9011/2021, 9012/2021, 9013/2021, 2208/2022, and earlier instruments identified in the title records, including 7546/2020, 5856/2017 and 11429/2018. Their full scope and chain are addressed in the Land & Title section. |
| Form B declaration | Promoter affidavit-cum-declaration for SMVS CONSTRUCTIONS, signed by KOLLI SRINIVASA RAO as promoter or authorized person. |
| Floor-plan document | Layout-plan document 274524 is listed, but no drawing-derived measurements are included in the supplied document extraction itself; the software-measured unit information is separately identified as drawing-based and subject to review. Floor plans |
| Occupancy certificate | No project-specific issued occupancy certificate is evidenced in the supplied documents. An unrelated occupancy-certificate-type document in the wider record does not establish an OC for this project. Document index |
The project’s building-approval document also records contractor’s all-risk policy number 61170044220300000047, dated 16 August, 2022. The supplied extract does not establish the policy’s current status.
Project at a glance
Project identity
Registered project name: NAKSHATRA HOMES-ASHWINI
Project type: Residential apartment project
Phase / registered portion: New Project; the registration record identifies one building. A separately named phase is not disclosed.
TG-RERA registration: P01100005555
Registration validity: 20 December 2022 to 22 September 2025; the supplied certificate records no extension. Registration validity is separate from the completion deadline and does not establish completion or an occupancy certificate.
Registered promoter: SMVSCONSTRUCTIONS; the RERA record describes the organization as a partnership.
RERA status in supplied record: The project is registered. The supplied record shows the registration validity end date above; it does not establish a later extension or current registration status.
Land and geographic identity
Locality: NAKSHATRA PARK
Revenue village: RANJOLE (also rendered “Ranjole” in the approval and title material)
Mandal: ZAHEERABAD
District: Sangareddy
PIN: 503218
Project survey number / subdivision: 282/A
Registered site extent: 670.44 m²
Total / net area and road-affected area: Total and net area are each 670.44 m²; road-affected area is 0 m², as recorded in the building approval.
Plot reference: 776 AND 777/PART NOTHERN SIDE in the RERA project record.
Boundaries: Not stated in the supplied parcel record.
Development identity
Sanctioning authority: Zaheerabad Municipality/Municipal Corporation
Principal building approval: 0013/BP/3057/2022, dated 22 September, 2022
File number: 008797/BP/DTCP/3057/0029/2022
Approved built-up area: RERA fields record approved built-up area of 1771.81 m². The approval extraction separately lists residential upper-floors area of 1,761.95 m² and stilt area of 353.11 m²; these are distinct figures and labels in the supplied record.
Building count: One building / one tower in the RERA record
Sanctioned floor configuration: 1 Stilt + 5 upper floors
Sanctioned building height: 14.95 m
Parking levels / approved use: The approval says the stilt and cellar approved in the plan are to be used exclusively for vehicle parking; the extracted floor description identifies 1 Stilt + 5 upper floors. A separate parking-space count is not stated.
Unit count: The RERA land fields record one proposed building unit; the unit schedule records 20 apartments.
Offering and status
Filed configuration: 2BHK
RERA-filed saleable area: 102.19 m² per listed 2BHK configuration
Booked / available: 0 booked / 20 available as last read from the TG-RERA portal; the supplied record has no as-of date for these counts, so they are indicative.
Construction stage: No construction-progress percentage or independently verified site status is supplied. The RERA record labels the project “New Project.”
Completion date: The RERA record lists proposed completion as 22/09/2025; the Form B affidavit also records a completion undertaking, rendered as “22, sCP. 2025.”
OC / completion-certificate status: No project-issued occupancy or completion certificate is evidenced in the supplied project documents. The building approval states that an occupancy certificate is compulsory before occupation.
The project story
NAKSHATRA HOMES-ASHWINI is registered as a residential apartment project on a 670.44 m² site at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. The RERA record identifies survey number 282/A and a single building; the building approval describes a residential structure of 1 Stilt + 5 upper floors.
The filed offering is 20 two-bedroom apartments, with the portal’s recorded inventory showing 0 booked and 20 available at the time it was read; no as-of date accompanies those counts. The completion date recorded in the registration is 22 September 2025. The supplied evidence does not provide a construction-progress update, independent site inspection, or project-specific issued occupancy certificate, so it does not establish whether construction is complete or whether any portion is ready for occupation.
Master plan, architecture & building design
The building approval identifies one residential building on survey number 282/A, with a sanctioned site area of 670.44 m², 1 Stilt + 5 upper floors, and a stated height of 14.95 m. It records 1,761.95 m² as residential upper-floors area and 353.11 m² as stilt area. Separately, the RERA fields list approved built-up area as 1771.81 m²; these source labels are retained as recorded and are not treated as interchangeable measurements.
The approval extraction lists no tot-lot area (“NA”) and does not provide a detailed building layout in the available evidence. Number of flats per floor, lift and stair arrangements, building footprint, internal circulation, and residential/common-area distribution are not established by the supplied extracts. The sanctioned floor description is not evidence of completed construction.
Homes, configurations & floor plans
The RERA unit schedule lists 20 2BHK homes, each with filed saleable area of 102.19 m²; 0 are recorded as booked and 20 as available, with no as-of date supplied for the inventory snapshot.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 102.19 m² | Software-measured range: 57.3–69.6 m²; median 63.4 m² | 38% |
The carpet-area measurements are software-measured from the approved floor-plan drawings, not RERA-filed carpet-area disclosures; the source notes they require review against the drawing. The supplied measurements cover eight flat designs. Saleable area and carpet area are different measures: the drawing analysis notes that saleable area also counts the home’s share of common areas.
One measured 2BHK drawing lists a kitchen, two bedrooms, dining area and living area; it also shows a utility area of 2.18 m² and a balcony of 3.0 m², both excluded from that drawing’s carpet-area measurement. These room details relate to the measured drawing and should be checked against the relevant unit’s final approved and sale documents.
Parking & vehicle circulation
The building approval states that the stilt and cellar approved in the plan should be used exclusively for parking of vehicles. The available extraction does not establish a sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or the detailed arrangement of ramps and vehicle circulation. A parking bay shown in a plan, by itself, does not establish an exclusive right to that space.
The unit schedule marks the 2BHK configuration as mortgaged, and the approval states that the mortgaged built-up area is to be allowed for registration only after an occupancy certificate is produced. No unit-specific parking allotment or lender release document is supplied here.
Amenities, recreation & open spaces
The approval lists a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. The project’s RERA amenity schedule records several facilities as available (“YES”), but the supplied progress entries are 0%; that schedule does not establish that the facilities have been completed or independently verified.
| Description / size | Percolation pit; approval records 3 RWHPs. |
|---|---|
| Evidence source | Sanctioned building approval |
| Declared progress / verified status | Required in approval; progress not evidenced. |
| Description / size | No source, storage capacity or treatment detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | Schedule label: “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system-specific detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No size or network detail supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | Approval lists tot-lot area as “NA”; it also requires a strip of greenery on the site periphery. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule |
| Declared progress / verified status | Green strip is an approval condition; no completion evidence supplied. |
| Description / size | No specifications supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No building description or size supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No treatment or reuse details supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | Approval requires a garbage house within the premises; no capacity or operating arrangements supplied. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule |
| Declared progress / verified status | Garbage house required by approval; completion not evidenced. |
| Description / size | No systems or capacity details supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No system specifications or clearance document supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | Approval requires space for a transformer; no capacity supplied. |
|---|---|
| Evidence source | Sanctioned building approval; RERA amenity schedule |
| Declared progress / verified status | Schedule marked “YES”; 0% progress recorded; completion not independently verified. |
| Description / size | No area supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
| Description / size | No dimensions or layout details supplied. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Listed; 0% progress recorded; completion not independently verified. |
Utilities, building services & safety
The approval requires a rainwater-harvesting percolation pit and space for a transformer, and requires a garbage house within the premises. It also states that the sanctioned plan must be followed, a commencement notice submitted before construction, a completion notice submitted after construction, and an occupancy certificate obtained before occupation. These are approval conditions, not evidence that the services or works have been completed.
The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection and electrical meter-room/sub-station facilities as “YES,” but records 0% progress against the listed items. The supplied evidence does not give water sources or storage, sewerage treatment capacity, power-backup arrangements, lift details, fire-system specifications, security or CCTV arrangements, waste-segregation procedures, or accessibility provisions.
Location, access & connectivity
The official project location in the supplied RERA record is Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District, Telangana 503218. The cadastral parcel centroid is recorded at 17.68235, 77.64915.
The nearest sampled Outer Ring Road interchange is listed at 66.9 km (approx.). No project approach-road description, public-transport details, or independently substantiated nearby landmark distances are supplied in the project evidence.
Developer & development status
The registered promoter is SMVSCONSTRUCTIONS, recorded as a partnership. The project documents identify KOLLI SRINIVASA RAO as managing partner / authorized signatory and MALLESWARI KOLLI as partner. The supplied promoter identifiers include GSTIN 36ADRFS4218E1ZW.
The registration certificate lists the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project-site address is recorded separately at Nakshatra Park, Ranjole, Zaheerabad Mandal, Sangareddy District. No official promoter website or project contact details are supplied.
The promoter’s Form B affidavit records a completion undertaking for 22 September 2025 and declarations concerning title, encumbrances and project funds; these are promoter declarations, not independent verification of land status, project progress or completion. The supplied project record does not include a construction-progress percentage or issued occupancy certificate.
Approvals, official records & documents
TG-RERA registration: Form C records registration P01100005555 for NAKSHATRA HOMES-ASHWINI under section 5, issued 20/12/2022, with validity through 22/09/2025. The supplied record states no extension.
Building approval: Approval 0013/BP/3057/2022, issued by Zaheerabad Municipality/Municipal Corporation on 22 September, 2022, for a residential apartment building on survey number 282/A.
Approval file number: 008797/BP/DTCP/3057/0029/2022
Layout permit reference: T.L.P. NO. 92/2018/H, dated 20/09/2018, recorded in the building-approval document.
Title report: Advocate’s land-title search report for a 670.44 m² layout in survey number 282/A, Ranjole; the supplied extraction records the report’s conclusion and stated precautions.
Filed title and sale documents: Title-report documents include sale-deed material 9010/2021, 9011/2021, 9012/2021, 9013/2021, 2208/2022, and earlier instruments identified in the title records, including 7546/2020, 5856/2017 and 11429/2018. Their full scope and chain are addressed in the Land & Title section.
Form B declaration: Promoter affidavit-cum-declaration for SMVS CONSTRUCTIONS, signed by KOLLI SRINIVASA RAO as promoter or authorized person.
Floor-plan document: Layout-plan document 274524 is listed, but no drawing-derived measurements are included in the supplied document extraction itself; the software-measured unit information is separately identified as drawing-based and subject to review.
Occupancy certificate: No project-specific issued occupancy certificate is evidenced in the supplied documents. An unrelated occupancy-certificate-type document in the wider record does not establish an OC for this project.
The project’s building-approval document also records contractor’s all-risk policy number 61170044220300000047, dated 16 August, 2022. The supplied extract does not establish the policy’s current status.
Frequently asked questions
Is NAKSHATRA HOMES-ASHWINI registered with Telangana RERA?
Yes. NAKSHATRA HOMES-ASHWINI is registered with the Telangana Real Estate Regulatory Authority as P01100005555; the registration status is New Project.
Who is the developer of NAKSHATRA HOMES-ASHWINI?
The promoter named in the RERA registration is SMVSCONSTRUCTIONS.
Where is NAKSHATRA HOMES-ASHWINI located?
NAKSHATRA HOMES-ASHWINI is in NAKSHATRA PARK, RANJOLE, ZAHEERABAD, Sangareddy, Telangana (503218).
When will NAKSHATRA HOMES-ASHWINI be completed?
The promoter's proposed date of completion filed with RERA is 22/09/2025. This is the promoter's declaration, not a guarantee.