SANJANAS ARANYA PHASE-1 is a residential apartment project in Gundlapochampally, Medchal (also rendered as Medchal(M)) Mandal, Medchal-Malkajgiri District. It is being developed by registered promoter SANJANAS ARANYA PRIVATE LIMITED. The project has a net land area of 12,557.27 sq m and comprises five residential blocks and one clubhouse, with 232 homes: 216 2BHK and 16 1BHK units. It is registered under TG-RERA number P02200005997, with proposed completion on 31/12/2025.

More from Sanjanas Aranya Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 31 Dec 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSANJANAS ARANYA PHASE-1 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase-1; the RERA record identifies six buildings in this registered project RERA record RERA unit table
TG-RERA registration numberP02200005997 RERA record
Registration validity1 April 2023–31 December 2025; the supplied registration certificate says it was not extended RERA record Approvals record
Registered promoterSANJANAS ARANYA PRIVATE LIMITED RERA record Corporate record
RERA statusThe project is registered under the number above. The certificate’s stated validity ended on 31 December 2025; no extension is shown in the supplied record. Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageGundlapochampally; also rendered in project documents as Gundla Pochampally RERA record Land records
MandalMedchal (also rendered as Medchal(M)) RERA record RERA filing
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500043 RERA record
Project survey number(s)Sy. No. 691/1; no subdivision is separately disclosed in the supplied project identity RERA filing Land records
Registered / stated site extentThe RERA land record lists total area 12,620.38 sq m, affected area 63.11 sq m, and net area 12,557.27 sq m. The HMDA building approval records the site extent as 12,557.27 Sq. Mt. Land records RERA filing
Boundaries in RERA filingEast: ROAD; West, North and South: NEIGHBOURS LAND RERA filing
HMDA document locationGundlapochampally Village, Medchal(M) Mandal, Medchal-Malkajgiri District

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the building-permit record refers to processing through Gundlapochampally Municipality / Municipal Corporation Approvals record
Principal building approval004369/BP/HMDA/0806/MED/2022, approved 22 December 2022 Approvals record
Approved built-up area30,670.38 sq m in the HMDA approval
Building arrangementFive residential blocks—A, B, C, D and E—and one clubhouse; six total buildings RERA unit table
Sanctioned floor configurationBlock A: 1 Ground + 5 upper floors; B: 1 Ground + 3 upper floors; C: 1 Ground + 1 upper floors; D: 1 Ground + 5 upper floors; E: 1 Cellar + 1 Ground + 1 upper floors; clubhouse: 1 Ground + 3 upper floors
Parking levelsThe approval says cellar and stilt approved for parking must be used exclusively for vehicles; Block E is recorded with one cellar. The supplied materials do not establish the full parking layout or total sanctioned space count.
Unit countThe RERA filing lists 232 homes: 216 2BHK and 16 1BHK. The approved plan summary gives six buildings, but a separate approved dwelling-unit total is not provided in the supplied extracts. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations1BHK: 16 units; 2BHK: 216 units RERA unit table RERA unit details
RERA-filed saleable area1BHK: 8.3 sq m; 2BHK: 7.4 sq m RERA unit table RERA unit details
Booked / availablePortal-derived filing summary reports 0 booked and 16 available 1BHK units, and 0 booked and 216 available 2BHK units. The portal summary carries no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction / completion recordAn architect’s Building Completion Notice dated 29-12-2025 requests an occupancy certificate. HMDA subsequently issued an Occupancy Certificate dated 18/03/2026 for the listed blocks and clubhouse.
Occupancy-certificate scopeThe supplied HMDA certificate lists Blocks A–E and the clubhouse at Sy. No. 691/1, Gundlapochampally.
Completion deadline in RERA record31/12/2025 RERA record RERA filing
Registration validity vs completion and OCRegistration validity ended 31 December 2025; the RERA filing’s proposed completion date was also 31/12/2025. The HMDA Occupancy Certificate is dated 18/03/2026. These are separate milestones and scopes. RERA filing

2. The project story

SANJANAS ARANYA PHASE-1 is recorded as a residential apartment development on Sy. No. 691/1 in Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District. The HMDA building-permit documents describe five residential blocks and a separate clubhouse. The project filing records 232 homes across two configurations: 216 2BHK units and 16 1BHK units. RERA record Land records RERA unit table

The supplied completion record includes an architect’s notice stating completion in accordance with the sanctioned plan and requesting an occupancy certificate. HMDA’s later Occupancy Certificate lists the five residential blocks and clubhouse and records zero deviated built-up area for Block 0 in the extracted field. This certificate is the available authority-issued occupancy evidence for the listed buildings. The materials do not provide independent site inspection evidence or a current construction-progress assessment.

3. Master plan, architecture & building design

The HMDA approval describes 30,670.38 sq m of approved built-up area on a site extent of 12,557.27 Sq. Mt. The RERA land record separately reports total area 12,620.38 sq m, affected area 63.11 sq m and net area 12,557.27 sq m. The HMDA document identifies five residential blocks and one clubhouse; the approval extract gives the following floor configurations. Land records

BuildingUseSanctioned floor configuration
Block AResidential1 Ground + 5 upper floors
Block BResidential1 Ground + 3 upper floors
Block CResidential1 Ground + 1 upper floors
Block DResidential1 Ground + 5 upper floors
Block EResidential1 Cellar + 1 Ground + 1 upper floors
ClubhouseAmenity1 Ground + 3 upper floors

The approval lists proposed built-up areas by building: clubhouse 855.20 sq m; Block E 11,991.54 sq m; Block D 5,937.88 sq m; Block B 3,961.92 sq m; Block C 1,985.96 sq m; and Block A 5,937.88 sq m. These are approval-extract figures, not carpet or saleable areas.

The HMDA Occupancy Certificate separately lists building heights and built-up areas for Blocks A–E and the clubhouse. It records one cellar for each listed building, no stilt, and the stated ground and upper-floor counts. The certificate’s extracted block details are: A—17.85 metres; B—12.05 metres; C—6.25 metres; D—17.85 metres; E—9.8 metres; clubhouse—12.45 metres.

The supplied record does not provide floor-by-floor apartment arrangements, building footprints, internal circulation plans, lift or stair counts, landscaping/open-space areas, or a surveyed master-plan zoning result. The HMDA master-plan map is available as an image, but the project record does not establish the exact zone at the survey. HMDA Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK160168.3 sq mNot measured in supplied drawing analysisNot supplied
2BHK21602167.4 sq mNot measured in supplied drawing analysisNot supplied

The unit counts, booking counts and saleable areas are from the TG-RERA filing summary; the booking summary has no stated as-of date. The floor-plan review reports two drawings processed but zero flat designs measured for the listed 1BHK and 2BHK configurations. Accordingly, no software-measured carpet area or room dimensions can be reported. The project record distinguishes RERA saleable area from drawing-measured carpet area: no carpet-area measurement is available here, and the supplied record does not provide a loading figure. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and must not be converted to another use. It also prohibits parking or construction in setback areas. Block E is listed with one cellar in the permit extract; the Occupancy Certificate lists one cellar for each of Blocks A–E and the clubhouse.

The supplied materials do not establish sanctioned parking-space counts, visitor or accessible parking, two-wheeler provision, ramp and driveway arrangements, EV charging, or unit-specific parking allocations. No exclusive ownership or allotment of a particular parking bay is established by the available extracts. RERA amenities

6. Amenities, recreation & open spaces

The RERA amenities summary records several site-level items as available at 100%, but it does not give a verification date or independently verified completion evidence. The HMDA approval also identifies a clubhouse building and includes conditions for specified infrastructure and safety features. RERA amenities

Clubhouse
Description / sizeSeparate clubhouse building; sanctioned as 1 Ground + 3 upper floors
Declared progress / verified statusListed in the HMDA Occupancy Certificate; specific internal facilities and sizes are not supplied
Internal roads & footpaths
Description / sizeNo dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA summary: YES, 100%; no independent progress verification supplied
Green strip / tot lot / park
Description / sizeNo area or dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA summary: YES, 100%; no independent progress verification supplied
Water conservation / rainwater harvesting
Description / sizeNo capacity supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA summary: YES, 100%; HMDA approval requires rainwater-harvesting structures; completion is not independently verified here
Other recreational facilities
Description / sizeNo specific sanctioned schedule or size supplied
Evidence sourceRERA amenities Promoter website
Declared progress / verified statusA third-party vendor listing mentions children’s play areas, indoor games, swimming pool and gym; these are not established as sanctioned or delivered by the supplied project records

The RERA summary lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, and electrical meter room/sub-station/receiving station as YES at 100%. These are site services and are described further below. It lists street lighting, community buildings, solid-waste management, energy management, fire protection and aggregate recreational open space at 0%; no explanation or project-specific completion verification accompanies those entries. RERA amenities

7. Utilities, building services & safety

The HMDA approval lists an STP, transformer, garbage house, rainwater-harvesting structures and a generator. It specifies an underground static water-storage tank capacity of 25,000 lts. and a terrace tank of 25,000 lts. The RERA amenities summary reports water supply, sewerage, storm-water drains, sewage/sullage treatment and electrical meter room/sub-station/receiving station at YES, 100%. These are filed or approval-record details; the supplied materials do not establish current operating status or utility capacities beyond the stated tank figures. RERA amenities

The HMDA approval requires CCTV cameras and rainwater-harvesting structures, and states that occupancy certification is required before occupying a building. The RERA summary lists fire-protection and fire-safety requirements at 0%; the supplied extracts do not establish installed fire systems, clearances, escape-stair details, accessibility features, waste segregation, CCTV installation or security/access-control operation. RERA amenities

8. Location, access & connectivity

The registered project location is Gundlapochampally, Medchal Mandal, Medchal-Malkajgiri District, Telangana 500043, on Sy. No. 691/1. The HMDA approval records a 4.5mts. road width and refers to a minimum approach-road width indicated in the plan; the extracted record does not provide a route description. RERA record Land records

The supplied location data gives the following measured distances from the cadastral parcel centroid; these are location-data measurements, not promoter travel-time claims. Location record

Nearby placeCategoryDistance
Financial District (Nanakramguda)Anchor1.2 km
IndusInd BankBank0.4 km
Unnamed bus stationBus station2.2 km
Manuu Polytechnic HyderabadCollege1.6 km
Sankaraya Eye HospitalHospital1.6 km
ADPIT office0.0 km
South india shopping mallMall2.6 km
Unnamed parkPark1.2 km
Nanakramguda Govt primary schoolSchool0.5 km

The supplied record does not identify named public-transport routes, travel times or a verified road-access itinerary. Location record

9. Developer & development status

The registered legal promoter is SANJANAS ARANYA PRIVATE LIMITED, a private limited company, GSTIN 36AAKCS5824K1ZW. Its RERA-listed address is SANJANAS ARANYA, Near Mallanna Temple, Gundlapochampally, Medchal, Medchal-Malkajgiri, Telangana 500043. The project’s Form B declares the company was formerly known as SAHITI SUHARIKA ESTATES PRIVATE LIMITED. RERA record Corporate record Parties record

The project’s RERA proposed completion date was 31/12/2025. The architect’s completion notice is dated 29-12-2025, and HMDA’s Occupancy Certificate is dated 18/03/2026 and lists Blocks A–E and the clubhouse. The supplied record does not include a current site-progress report or an independent physical inspection. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200005997; issued 01/04/2023; valid to 31/12/2025
What the supplied record establishesRegistration of SANJANAS ARANYA PHASE-1 under section 5; certificate states registration validity and a separate-account condition.
HMDA building approval
Identifier / date004369/BP/HMDA/0806/MED/2022; 22 December 2022
What the supplied record establishesBuilding-construction approval for the residential blocks and clubhouse on Sy. No. 691/1; includes sanctioned area and building conditions.
HMDA building permit order
Identifier / dateProceedings 002044/BP/HMDA/MED/2022; 22 December 2022
What the supplied record establishesPermit order records five residential blocks, clubhouse, site extent and built-up area.
Architect’s Building Completion Notice
Identifier / dateBuilding permit reference 112/2025; completion notice dated 29-12-2025
What the supplied record establishesNotice states completion as per sanctioned plan and requests an occupancy certificate.
HMDA Occupancy Certificate
Identifier / date013457/HMDA/03901/SWOC/MDL1/2026; approved 18/03/2026
What the supplied record establishesOccupancy Certificate for SANJANAS ARANYA, Sy. No. 691/1, listing Blocks A–E and clubhouse.
Form B promoter declaration
Identifier / dateForm B filed by SANJANAS ARANYA PRIVATE LIMITED
What the supplied record establishesPromoter declaration concerning title, encumbrance status, completion undertaking and RERA fund-management obligations.

The supplied evidence does not include an extracted approved-layout plan, detailed floor-plan measurements, or a complete parking schedule. The HMDA approval identifies the building plan and conditions; full sanction conditions and land/title issues are addressed in the relevant report sections. Document index

Other registrations of Sanjanas Aranya

Frequently asked questions

Is SANJANAS ARANYA PHASE-1 registered with Telangana RERA?

Yes. SANJANAS ARANYA PHASE-1 is registered with the Telangana Real Estate Regulatory Authority as P02200005997; the registration status is New Project.

Who is the developer of SANJANAS ARANYA PHASE-1?

The promoter named in the RERA registration is SANJANAS ARANYA PRIVATE LIMITED.

Where is SANJANAS ARANYA PHASE-1 located?

SANJANAS ARANYA PHASE-1 is in GUNDLAPOCHAMPALLY, Medchal, Medchal-Malkajgiri, Telangana (500043).

When will SANJANAS ARANYA PHASE-1 be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Gundlapochampally