N-City
NIVEE DEVELOPERS · Sangareddy · RERA P01100009797
N-CITY is a plotted development in RAMESHWAR BANDA, PATANCHERU, Sangareddy. The registered promoter is NIVEE DEVELOPERS. The layout covers 74352.63 sq.mt and lists 97 plots; no towers, floors or building configurations are disclosed. TG-RERA registration number P01100009797 is valid 03/12/2024–03/12/2026, and the project header gives proposed completion as 03/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | N-CITY RERA record |
| Project type | Plotted development / open plotted layout RERA record RERA filing |
| Phase / registered portion | Not separately identified in the supplied RERA record. The registration covers the project; the filed layout is for land in 70/PART and 71/PART. |
| TG-RERA registration | P01100009797; valid 03/12/2024–03/12/2026. Registration validity is distinct from the project completion date. RERA record Approvals record |
| Registered promoter | NIVEE DEVELOPERS; entity type stated as partnership. RERA filing Parties record |
| RERA status | Registered; the certificate says registration is valid for two years unless extended by the Authority. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | RERA identifies RAMESHWAR BANDA in the layout documents and PATANCHERU A in the registration record. |
| Mandal | PATANCHERU (also rendered PATANCHERU (M) in the layout record). |
| District | Sangareddy. |
| PIN | 502319. RERA record |
| Project survey numbers / subdivisions | RERA registration: 70/P, 71/P; layout documents: 70/PART, 71/PART. |
| Registered site extent | 74352.63 sq.mt total layout area; 74117.27 sq.mt net layout area; 235.36 sq.mt road-affected area. RERA filing |
| Layout area statement | 74116.67 sq.mt total net layout in the layout drawing’s land-use table. Layout record |
| Boundaries | East: OPEN LAND; west: EXISTING ROAD; north: EXISTING LAYOUT; south: OWNERS LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal layout approval | 005565/LO/HMDA/1263/SKP/2024, approved 03 December, 2024; recorded as a draft layout approval. Approvals record |
| Other layout identifiers | File no. CA/2018/97607; existing HMDA approved layout LP.No. 01817/SKP/LT/US/HMDA/18052018; LTP licence TS/048270/2024. Approvals record |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the filed plotted-layout parameters. |
| Plots | 97 individual subplots in the layout record. Layout record |
| Buildings / floors | Not applicable to the approved plotted-layout proposal; no building or floor configuration is disclosed in the supplied project record. |
| Parking | The layout drawing states 0.00 common parking area; no project-wide parking-space count is supplied. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plots; the layout schedule is software-read from the drawing and lists 97 plots. Layout record |
| Plot size range | Software-measured from the approved layout drawing: 222.97–1534.68 sq.m ( 266.7–1835.5 sq.yd); drawing-based figures require verification against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied RERA evidence. |
| Construction / development stage | RERA progress disclosure lists internal roads and footpaths at 20%, and sewerage at 50%; these are filed progress figures, not independently verified site progress. Other listed infrastructure items show 0% in the supplied amenity-progress data. RERA amenities |
| Completion dates | Project header: proposed completion 03/04/2027. The promoter’s Form B declaration dated 02-06-2025 undertakes completion by 03-12-2026. These are completion disclosures, not registration-validity dates. RERA record |
| Occupancy / completion certificate | Not applicable to a plotted layout as a building OC; no final layout release or project completion certificate is evidenced in the supplied documents. The filed HMDA letter is for draft layout approval. |
2. The project story
N-CITY is a proposed open plotted layout registered with Telangana RERA under P01100009797. Its filed layout concerns a site identified as 70/PART and 71/PART at Rameshwar Banda, Patancheru, and shows 97 plots within a total layout area of 74352.63 sq.mt.
The drawing allocates land to plots, internal roads, parks/open space, social infrastructure and utilities. It does not propose buildings: the filed layout parameters show 0.00 proposed built-up area. The HMDA record describes the approval as a draft layout and requires specified infrastructure and land handovers before final layout release.
The RERA progress data reports 20% for internal roads and footpaths and 50% for sewerage. These are reported project-progress figures; the supplied evidence does not establish independent verification of completed works. RERA amenities
3. Master plan, architecture & building design
This is a plotted layout, not a building project in the supplied sanctioned plan. The drawing-derived layout schedule identifies 97 plots and allocates land as follows; plot counts and areas are software-read from the drawing and should be checked against the original approved drawing. Layout record
| Layout use | Area | Share shown in layout drawing |
|---|---|---|
| Plotted area | 42672.31 sq.mt | 57.57% |
| Road area | 23606.65 sq.mt | 31.85% |
| Organized open space / park | 5572.65 sq.mt | 7.52% |
| Social infrastructure | 1857.36 sq.mt | 2.51% |
| Utility area | 407.70 sq.mt | 0.55% |
| Amenity area | 0.00 sq.mt | 0.00% |
| Total net layout in the land-use table | 74116.67 sq.mt | 100.00% |
The layout drawing records 30.48 mt. Wide InternalRoad, 9.14 mt. Wide InternalRoad, 12.19 MT WIDE EXISTING and 30.48 MT WIDE PROPOSED ROAD. The HMDA draft-layout letter also refers to road widths of 18 mts and 60 feet.
No tower, floor, building-footprint, dwelling configuration or residential/commercial built-up-area information is applicable or disclosed for this plotted-layout proposal. The layout plan names STP, SPT, DUSTBIN, OHT, CYCLE TRACK and Tot-lot among amenities/utilities; these labels do not establish that the facilities are complete.
4. Homes, configurations & floor plans
The project offering is plots rather than apartments or villas. The approved-layout drawing schedule lists 97 plots; no apartment configuration, RERA saleable area, apartment carpet area, or booked/available inventory is supplied. Layout record
| Plot information | Record |
|---|---|
| Plot count | 97; read from the plot schedule table on the layout drawing. Layout record |
| Software-measured plot sizes | Smallest 222.97 sq.m (266.7 sq.yd); median 250.84 sq.m (300.0 sq.yd); largest 1534.68 sq.m (1835.5 sq.yd). Layout record |
| Common sizes shown by software reading | 250.84 sq.m: 48 plots; 229.94 sq.m: 12 plots; 543.48 sq.m: 8 plots; 1022.04 sq.m: 4 plots; 222.97 sq.m: 4 plots. Layout record |
| Measurement limitation | These plot areas are software-read from the drawing, not separately confirmed against individual sale documents. Apartment floor plans and carpet-area measurements are not applicable; the supplied drawing review records no flats. Layout record Floor plans |
5. Parking & vehicle circulation
The filed layout parameters show 0.00 common parking area. No sanctioned vehicle-space count, visitor or accessible parking provision, EV charging, parking allocation to individual plots, or parking-management arrangement is established in the supplied evidence.
The layout drawing identifies internal roads, and the HMDA draft-layout conditions refer to opening roads for access to neighbouring sites. The evidence does not specify driveway entry/exit arrangements or pedestrian–vehicle separation.
6. Amenities, recreation & open spaces
The layout drawing identifies land uses and labels facilities; the RERA progress record separately reports progress percentages. Neither a drawing label nor a progress entry alone establishes delivery or independent verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 5572.65 sq.mt; layout table shows 7.52%. | Layout record | RERA progress list shows Green Strip/TOT LOT/Park at 0%; no independent completion evidence. RERA amenities |
| Tot-lot | Named in the layout drawing’s amenities/utilities list; no size supplied. | No completion evidence supplied. | |
| Cycle track | Named in the layout drawing’s amenities/utilities list; no length or area supplied. | No completion evidence supplied. | |
| Social infrastructure | 1857.36 sq.mt; layout table shows 2.51%. | Layout record | RERA progress list shows Community Buildings at 0%; no independent completion evidence. RERA amenities |
| Internal roads and footpaths | Road area 23606.65 sq.mt in the layout drawing. | Layout record | RERA progress reported at 20%; not independently verified. RERA amenities |
| Internal road-width provisions | Drawing lists 30.48 mt., 9.14 mt., 12.19 MT existing and 30.48 MT proposed road widths. | Completion status not independently verified. | |
| Utility area | 407.70 sq.mt. | Layout record | No separate completion percentage supplied. |
No clubhouse or other indoor recreation facility is established by the supplied records.
7. Utilities, building services & safety
The layout approval records proposed infrastructure including internal water-supply lines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, storm-water drains, underground drainage, a common septic tank/STP and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that they are operational.
| Evidence in the project record | Draft-layout conditions specify internal water-supply lines, an overhead tank and an assured water-supply source. |
|---|---|
| Status / limitation | Proposed/required; source, storage capacity and completion are not supplied. |
| Evidence in the project record | Common septic tank/STP, underground drainage and storm-water drains are specified. |
|---|---|
| Status / limitation | RERA progress lists sewerage at 50%; treatment capacity, reuse arrangements and independent completion verification are not supplied. RERA amenities |
| Evidence in the project record | Rainwater-harvesting pits are specified in the draft-layout conditions. |
|---|---|
| Status / limitation | Proposed/required; capacity and completion are not supplied. |
| Evidence in the project record | Electrical supply lines, street lights and a transformer are specified. |
|---|---|
| Status / limitation | Proposed/required; capacity, backup arrangements and completion are not supplied. |
| Evidence in the project record | A dustbin is named in the layout drawing’s amenities/utilities list; the RERA progress list includes solid-waste management and disposal. |
|---|---|
| Status / limitation | No capacity, operating arrangement or completion evidence supplied. RERA amenities |
| Evidence in the project record | The progress list includes fire-protection and fire-safety requirements. |
|---|---|
| Status / limitation | No project-specific fire-system details, clearance, accessible circulation or completion evidence supplied. RERA amenities |
8. Location, access & connectivity
The RERA record places the project in PATANCHERU A, Patancheru Mandal, Sangareddy District, PIN 502319; the layout documents identify the site as Rameshwar Banda. RERA record
The supplied location data gives a nearest sampled Outer Ring Road interchange distance of 1.6 km (approx.). This is a location-data measurement, not a promoter travel-time claim. Location record
The registered project evidence does not provide measured distances to public transport or local services. The promoter/vendor listing names nearby institutions and a railway station, but those are vendor-supplied connectivity statements rather than RERA-filed project particulars. Promoter website
9. Developer & development status
The registered promoter is NIVEE DEVELOPERS, stated in the RERA record as a partnership. The GSTIN recorded for the promoter is 36AAPFN4647K1ZN. The supplied record identifies BANALA RAM REDDY as an authorized signatory and VADDI REDDI RAYAPA REDDY as a partner. RERA filing Corporate record Parties record
The promoter’s Form B affidavit, dated 02-06-2025, declares that the project land is free from encumbrance and undertakes completion by 03-12-2026. This is a promoter declaration. The project header separately records proposed completion as 03/04/2027; no revised completion order is supplied. RERA record
The registered office address and official promoter website/contact details are not disclosed in the supplied evidence. The RERA registration certificate runs to 03/12/2026, unless extended; that validity period is separate from the completion disclosures.
10. Approvals, official records & documents
| Identifier / date | P01100009797; 03/12/2024–03/12/2026 |
|---|---|
| What the supplied document establishes | Form C certificate names NIVEE DEVELOPERS as promoter and records the registration validity and stated conditions. |
| Identifier / date | 005565/LO/HMDA/1263/SKP/2024; 03 December, 2024 |
|---|---|
| What the supplied document establishes | Draft open plotted-layout permission for the site, showing 97 plots and layout land uses; the document says permission is not proof of title and requires specified works and handovers before final layout release. |
| Identifier / date | File no. CA/2018/97607; LTP licence TS/048270/2024 |
|---|---|
| What the supplied document establishes | Drawing-derived plot schedule and land-use allocation; plot readings are software-measured. |
| Identifier / date | Mortgage documents 30858/2024 and 30859, dated 20 November, 2024 |
|---|---|
| What the supplied document establishes | The filed approval records plots reserved/mortgaged in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | 02-06-2025 |
|---|---|
| What the supplied document establishes | Promoter declaration of title/encumbrance and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | The supplied HMDA record is for draft layout approval; no final layout release or completion certificate is evidenced. |
1. Project at a glance
Project identity
Registered project name: N-CITY
Project type: Plotted development / open plotted layout
Phase / registered portion: Not separately identified in the supplied RERA record. The registration covers the project; the filed layout is for land in 70/PART and 71/PART.
TG-RERA registration: P01100009797; valid 03/12/2024–03/12/2026. Registration validity is distinct from the project completion date.
Registered promoter: NIVEE DEVELOPERS; entity type stated as partnership.
RERA status: Registered; the certificate says registration is valid for two years unless extended by the Authority.
Land and geographic identity
Locality / revenue village: RERA identifies RAMESHWAR BANDA in the layout documents and PATANCHERU A in the registration record.
Mandal: PATANCHERU (also rendered PATANCHERU (M) in the layout record).
District: Sangareddy.
PIN: 502319.
Project survey numbers / subdivisions: RERA registration: 70/P, 71/P; layout documents: 70/PART, 71/PART.
Registered site extent: 74352.63 sq.mt total layout area; 74117.27 sq.mt net layout area; 235.36 sq.mt road-affected area.
Layout area statement: 74116.67 sq.mt total net layout in the layout drawing’s land-use table.
Boundaries: East: OPEN LAND; west: EXISTING ROAD; north: EXISTING LAYOUT; south: OWNERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval: 005565/LO/HMDA/1263/SKP/2024, approved 03 December, 2024; recorded as a draft layout approval.
Other layout identifiers: File no. CA/2018/97607; existing HMDA approved layout LP.No. 01817/SKP/LT/US/HMDA/18052018; LTP licence TS/048270/2024.
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the filed plotted-layout parameters.
Plots: 97 individual subplots in the layout record.
Buildings / floors: Not applicable to the approved plotted-layout proposal; no building or floor configuration is disclosed in the supplied project record.
Parking: The layout drawing states 0.00 common parking area; no project-wide parking-space count is supplied.
Offering and status
Unit type: Plots; the layout schedule is software-read from the drawing and lists 97 plots.
Plot size range: Software-measured from the approved layout drawing: 222.97–1534.68 sq.m ( 266.7–1835.5 sq.yd); drawing-based figures require verification against the drawing.
Booked / available counts: Not disclosed in the supplied RERA evidence.
Construction / development stage: RERA progress disclosure lists internal roads and footpaths at 20%, and sewerage at 50%; these are filed progress figures, not independently verified site progress. Other listed infrastructure items show 0% in the supplied amenity-progress data.
Completion dates: Project header: proposed completion 03/04/2027. The promoter’s Form B declaration dated 02-06-2025 undertakes completion by 03-12-2026. These are completion disclosures, not registration-validity dates.
Occupancy / completion certificate: Not applicable to a plotted layout as a building OC; no final layout release or project completion certificate is evidenced in the supplied documents. The filed HMDA letter is for draft layout approval.
2. The project story
N-CITY is a proposed open plotted layout registered with Telangana RERA under P01100009797. Its filed layout concerns a site identified as 70/PART and 71/PART at Rameshwar Banda, Patancheru, and shows 97 plots within a total layout area of 74352.63 sq.mt.
The drawing allocates land to plots, internal roads, parks/open space, social infrastructure and utilities. It does not propose buildings: the filed layout parameters show 0.00 proposed built-up area. The HMDA record describes the approval as a draft layout and requires specified infrastructure and land handovers before final layout release.
The RERA progress data reports 20% for internal roads and footpaths and 50% for sewerage. These are reported project-progress figures; the supplied evidence does not establish independent verification of completed works.
3. Master plan, architecture & building design
This is a plotted layout, not a building project in the supplied sanctioned plan. The drawing-derived layout schedule identifies 97 plots and allocates land as follows; plot counts and areas are software-read from the drawing and should be checked against the original approved drawing.
| Layout use | Area | Share shown in layout drawing |
|---|---|---|
| Plotted area | 42672.31 sq.mt | 57.57% |
| Road area | 23606.65 sq.mt | 31.85% |
| Organized open space / park | 5572.65 sq.mt | 7.52% |
| Social infrastructure | 1857.36 sq.mt | 2.51% |
| Utility area | 407.70 sq.mt | 0.55% |
| Amenity area | 0.00 sq.mt | 0.00% |
| Total net layout in the land-use table | 74116.67 sq.mt | 100.00% |
The layout drawing records 30.48 mt. Wide InternalRoad, 9.14 mt. Wide InternalRoad, 12.19 MT WIDE EXISTING and 30.48 MT WIDE PROPOSED ROAD. The HMDA draft-layout letter also refers to road widths of 18 mts and 60 feet.
No tower, floor, building-footprint, dwelling configuration or residential/commercial built-up-area information is applicable or disclosed for this plotted-layout proposal. The layout plan names STP, SPT, DUSTBIN, OHT, CYCLE TRACK and Tot-lot among amenities/utilities; these labels do not establish that the facilities are complete.
4. Homes, configurations & floor plans
The project offering is plots rather than apartments or villas. The approved-layout drawing schedule lists 97 plots; no apartment configuration, RERA saleable area, apartment carpet area, or booked/available inventory is supplied.
Plot count: 97; read from the plot schedule table on the layout drawing.
Software-measured plot sizes: Smallest 222.97 sq.m (266.7 sq.yd); median 250.84 sq.m (300.0 sq.yd); largest 1534.68 sq.m (1835.5 sq.yd).
Common sizes shown by software reading: 250.84 sq.m: 48 plots; 229.94 sq.m: 12 plots; 543.48 sq.m: 8 plots; 1022.04 sq.m: 4 plots; 222.97 sq.m: 4 plots.
Measurement limitation: These plot areas are software-read from the drawing, not separately confirmed against individual sale documents. Apartment floor plans and carpet-area measurements are not applicable; the supplied drawing review records no flats.
5. Parking & vehicle circulation
The filed layout parameters show 0.00 common parking area. No sanctioned vehicle-space count, visitor or accessible parking provision, EV charging, parking allocation to individual plots, or parking-management arrangement is established in the supplied evidence.
The layout drawing identifies internal roads, and the HMDA draft-layout conditions refer to opening roads for access to neighbouring sites. The evidence does not specify driveway entry/exit arrangements or pedestrian–vehicle separation.
6. Amenities, recreation & open spaces
The layout drawing identifies land uses and labels facilities; the RERA progress record separately reports progress percentages. Neither a drawing label nor a progress entry alone establishes delivery or independent verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 5572.65 sq.mt; layout table shows 7.52%. | RERA progress list shows Green Strip/TOT LOT/Park at 0%; no independent completion evidence. | |
| Tot-lot | Named in the layout drawing’s amenities/utilities list; no size supplied. | No completion evidence supplied. | |
| Cycle track | Named in the layout drawing’s amenities/utilities list; no length or area supplied. | No completion evidence supplied. | |
| Social infrastructure | 1857.36 sq.mt; layout table shows 2.51%. | RERA progress list shows Community Buildings at 0%; no independent completion evidence. | |
| Internal roads and footpaths | Road area 23606.65 sq.mt in the layout drawing. | RERA progress reported at 20%; not independently verified. | |
| Internal road-width provisions | Drawing lists 30.48 mt., 9.14 mt., 12.19 MT existing and 30.48 MT proposed road widths. | Completion status not independently verified. | |
| Utility area | 407.70 sq.mt. | No separate completion percentage supplied. |
No clubhouse or other indoor recreation facility is established by the supplied records.
7. Utilities, building services & safety
The layout approval records proposed infrastructure including internal water-supply lines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, storm-water drains, underground drainage, a common septic tank/STP and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that they are operational.
| Evidence in the project record | Draft-layout conditions specify internal water-supply lines, an overhead tank and an assured water-supply source. |
|---|---|
| Status / limitation | Proposed/required; source, storage capacity and completion are not supplied. |
| Evidence in the project record | Common septic tank/STP, underground drainage and storm-water drains are specified. |
|---|---|
| Status / limitation | RERA progress lists sewerage at 50%; treatment capacity, reuse arrangements and independent completion verification are not supplied. |
| Evidence in the project record | Rainwater-harvesting pits are specified in the draft-layout conditions. |
|---|---|
| Status / limitation | Proposed/required; capacity and completion are not supplied. |
| Evidence in the project record | Electrical supply lines, street lights and a transformer are specified. |
|---|---|
| Status / limitation | Proposed/required; capacity, backup arrangements and completion are not supplied. |
| Evidence in the project record | A dustbin is named in the layout drawing’s amenities/utilities list; the RERA progress list includes solid-waste management and disposal. |
|---|---|
| Status / limitation | No capacity, operating arrangement or completion evidence supplied. |
| Evidence in the project record | The progress list includes fire-protection and fire-safety requirements. |
|---|---|
| Status / limitation | No project-specific fire-system details, clearance, accessible circulation or completion evidence supplied. |
8. Location, access & connectivity
The RERA record places the project in PATANCHERU A, Patancheru Mandal, Sangareddy District, PIN 502319; the layout documents identify the site as Rameshwar Banda.
The supplied location data gives a nearest sampled Outer Ring Road interchange distance of 1.6 km (approx.). This is a location-data measurement, not a promoter travel-time claim.
The registered project evidence does not provide measured distances to public transport or local services. The promoter/vendor listing names nearby institutions and a railway station, but those are vendor-supplied connectivity statements rather than RERA-filed project particulars.
9. Developer & development status
The registered promoter is NIVEE DEVELOPERS, stated in the RERA record as a partnership. The GSTIN recorded for the promoter is 36AAPFN4647K1ZN. The supplied record identifies BANALA RAM REDDY as an authorized signatory and VADDI REDDI RAYAPA REDDY as a partner.
The promoter’s Form B affidavit, dated 02-06-2025, declares that the project land is free from encumbrance and undertakes completion by 03-12-2026. This is a promoter declaration. The project header separately records proposed completion as 03/04/2027; no revised completion order is supplied.
The registered office address and official promoter website/contact details are not disclosed in the supplied evidence. The RERA registration certificate runs to 03/12/2026, unless extended; that validity period is separate from the completion disclosures.
10. Approvals, official records & documents
| Identifier / date | P01100009797; 03/12/2024–03/12/2026 |
|---|---|
| What the supplied document establishes | Form C certificate names NIVEE DEVELOPERS as promoter and records the registration validity and stated conditions. |
| Identifier / date | 005565/LO/HMDA/1263/SKP/2024; 03 December, 2024 |
|---|---|
| What the supplied document establishes | Draft open plotted-layout permission for the site, showing 97 plots and layout land uses; the document says permission is not proof of title and requires specified works and handovers before final layout release. |
| Identifier / date | File no. CA/2018/97607; LTP licence TS/048270/2024 |
|---|---|
| What the supplied document establishes | Drawing-derived plot schedule and land-use allocation; plot readings are software-measured. |
| Identifier / date | Mortgage documents 30858/2024 and 30859, dated 20 November, 2024 |
|---|---|
| What the supplied document establishes | The filed approval records plots reserved/mortgaged in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | 02-06-2025 |
|---|---|
| What the supplied document establishes | Promoter declaration of title/encumbrance and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | The supplied HMDA record is for draft layout approval; no final layout release or completion certificate is evidenced. |
Frequently asked questions
Is N-CITY registered with Telangana RERA?
Yes. N-CITY is registered with the Telangana Real Estate Regulatory Authority as P01100009797; the registration status is New Project.
Who is the developer of N-CITY?
The promoter named in the RERA registration is NIVEE DEVELOPERS.
Where is N-CITY located?
N-CITY is in RAMESHWAR BANDA, PATANCHERU A, PATANCHERU, Sangareddy, Telangana (502319).
When will N-CITY be completed?
The promoter's proposed date of completion filed with RERA is 03/04/2027. This is the promoter's declaration, not a guarantee.