GITHA VIHAR is a residential apartment project in CENTRAL EXCISE COLONY 9B, Amberpet mandal, Hyderabad district, developed by the registered promoter Suchir Engineers & Constructions. The registered site extent is 600 Square Yards or 501.7 Square Meters, and the project comprises one building (Building A) with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a filed saleable area of 67.81 sq. m. Its TG-RERA registration number is P02500004721, and the promoter’s proposed completion date is 06/08/2024.

01What we found

Period endedTG-RERA registration ran to 6 Aug 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ce Colony, Amberpet, Hyderabad · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered nameGITHA VIHAR
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the available registration record; the certificate identifies the registered project as GITHA VIHAR
TG-RERA registrationP02500004721
Registration validity19/07/2022–06/08/2024; the supplied certificate says two years and records no extension
Registered promoterSuchir Engineers & Constructions
RERA status in supplied recordRegistration period ended 06/08/2024; current registration status is not established by the supplied record

Land and geographic identity

ItemProject record
LocalityCENTRAL EXCISE COLONY 9B; the registration certificate also records CE COLONY, Amberpet RERA record
Revenue villageCE COLONY / CENTRAL EXCISE COLONY, as recorded in project filings RERA record
Mandal / district / PINAmberpet / Hyderabad / 500013 RERA record
Survey number2-2-647/182 Land records
Registered site extent600 Square Yards or 501.7 Square Meters, stated in the title-document record Land records
Permit land areasPlot area 501.7 Sq. Mtrs; road-affected area 82.31 Sq. Mtrs; nala-affected area 0.0 Sq. Mtrs; net plot area 414.69 Sq. Mtrs in the building permit
BoundariesNorth and east: ROAD 30 FEET WIDE; south: building belonging to V Appala Raju; west: building belonging to V Satyanarayana Reddy Land records

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approval0078/GHMC/SEC/2021-BP, building permit order dated 06 August, 2021; file no. TS/001661/2021
Approved built-up area1,406.12 sq. m. as recorded in the project fields RERA filing
Building count / configurationOne building (Building A); sanctioned as 1 Stilt + 5 upper floors
Sanctioned area figures in permitResidential: 1,158.25; stilt: 218.37; total parking area: 218.35 (units are not specified in the extracted figures)
Approved versus RERA-declared homesGHMC permit: 10 units; TG-RERA filing: 10 units RERA unit table
Parking levelsStilt parking is identified in the permit; the extracted permit conditions also refer to cellar and stilt parking, but no cellar level is specified in the recorded floor configuration

Offering and status

ItemProject record
Unit type and filed saleable area3BHK; 67.81 sq. m. saleable area (730 sq. ft. in the normalized unit record) RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table
Construction stageNo independently verified or project-specific construction-progress figure is supplied Document index RERA amenities
Completion datePromoter’s Form B undertaking: 06/08/2024
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents; permit conditions require an occupancy certificate before occupation

The project story

GITHA VIHAR is a registered residential apartment project on survey 2-2-647/182 in CE COLONY / CENTRAL EXCISE COLONY, Amberpet, Hyderabad. The GHMC permit describes one residential building, Building A, with a stilt and five upper floors. The project record lists ten 3BHK apartments. RERA record Land records RERA unit table

The building permit is dated 06 August 2021 and sets 06 August 2024 as the date before which construction was to be completed. The promoter’s Form B also states 06/08/2024 as its completion undertaking. These are permit and promoter-filed timeline statements, not evidence of actual completion. The supplied record does not establish construction progress or provide an occupancy certificate. The permit requires an occupancy certificate before occupation.

Master plan, architecture & building design

The GHMC permit records one residential building, Building A, on a net plot area of 414.69 Sq. Mtrs, with the sanctioned configuration 1 Stilt + 5 upper floors and a stated building height of 14.99 m. The project fields record approved built-up area of 1,406.12 sq. m. The permit’s extracted area figures separately identify residential area 1,158.25, stilt area 218.37, and total parking area 218.35; the extracted figures do not specify units for those three entries. RERA filing

The record identifies a road-affected portion of 82.31 Sq. Mtrs and states that it is to be surrendered to GHMC without compensation. The permit also requires a tot-lot to be fenced and maintained as greenery, a peripheral greenery strip, rainwater-harvesting pits, transformer space and a garbage house. These are permit conditions or listed provisions; the supplied evidence does not establish that they have been completed.

Floor-plan drawings are not available for measurement in the supplied material: two drawings are recorded, with one scan pending and no measured floor plans. Consequently, flat-per-floor arrangement, room layout, circulation, lifts, stairs, entries, exits and detailed common-area distribution cannot be described from the available drawing evidence. Floor plans

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001067.81 sq. m. (730 sq. ft.)Not measured from the supplied drawingsNot supplied

Unit counts, booking figures and saleable area are from the TG-RERA filing; booking figures have no supplied as-of date and are indicative. No carpet-area measurement is available: the drawing record shows no measured plans and one scan pending. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet area. RERA unit table RERA unit details Floor plans

Parking & vehicle circulation

The permit records 218.35 as total parking area and 218.37 as stilt area; the extracted figures do not specify units. The permit conditions state that cellar and stilt spaces approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted sanctioned floor configuration specifies a stilt but does not identify a cellar floor. No parking-space count, visitor or accessible allocation, ramp or driveway details, EV provision, or unit-specific parking allocation is established by the supplied evidence.

Amenities, recreation & open spaces

Rainwater harvesting
Description / sizePermit lists 6 rainwater-harvesting pits; the permit condition also calls for a rainwater-harvesting structure (percolation pit)
Evidence sourceGHMC permit
Declared progress / verified statusRequired/listed; completion not verified
Tot-lot / greenery
Description / sizeTot-lot to be fenced and maintained as greenery; peripheral greenery strip to be maintained
Evidence sourceGHMC permit
Declared progress / verified statusPermit conditions; completion not verified
Transformer space
Description / sizeSpace for transformer is listed
Evidence sourceGHMC permit
Declared progress / verified statusRequired/listed; installation not verified
Garbage house
Description / sizeGarbage house within the premises is listed
Evidence sourceGHMC permit
Declared progress / verified statusRequired/listed; completion not verified
Internal roads and footpaths
Description / sizeListed in the TG-RERA amenities record; progress shown as 0% RERA amenities
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal-reported progress: 0%; independent verification not supplied
Water supply; sewerage; storm-water drains
Description / sizeListed in the TG-RERA amenities record; each shows 0% progress RERA amenities
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal-reported progress: 0%; independent verification not supplied
Street lighting; community buildings; sewage treatment and disposal; solid-waste management; energy management; fire protection; recreational open space
Description / sizeListed in the TG-RERA amenities record; each shows 0% progress RERA amenities
Evidence sourceTG-RERA amenities record
Declared progress / verified statusPortal-reported progress: 0%; independent verification not supplied
Water conservation / rainwater harvesting
Description / sizeListed in the TG-RERA amenities record and marked “YES”; progress shown as 0% RERA amenities
Evidence sourceTG-RERA amenities record
Declared progress / verified statusDeclared available; portal-reported progress: 0%; completion not verified
Electrical meter room / sub-station / receiving station
Description / sizeListed and marked “YES”; progress shown as 0% RERA amenities
Evidence sourceTG-RERA amenities record
Declared progress / verified statusDeclared available; portal-reported progress: 0%; completion not verified

No clubhouse, gym, pool or other recreational facility is established in the TG-RERA amenity evidence supplied for this overview.

Utilities, building services & safety

The TG-RERA amenities record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; each is recorded at 0% progress. This is portal-reported information, not independent confirmation of installation or operation. RERA amenities

The GHMC permit lists rainwater-harvesting pits, transformer space and a garbage house. It also requires an occupancy fire NOC from the Director (EV&DM) before issue of an occupancy certificate and makes the occupancy certificate compulsory before occupation. The supplied material does not establish that the fire NOC or occupancy certificate has been obtained. No capacities or detailed specifications for water storage, treatment, sewerage treatment, backup power, lifts, fire systems, waste handling, security or accessibility are supplied.

Location, access & connectivity

The registered project location is CENTRAL EXCISE COLONY 9B, CE COLONY / CENTRAL EXCISE COLONY, Amberpet, Hyderabad, Telangana, PIN 500013. The permit identifies roads on the north and east boundaries, each described in the project land record as ROAD 30 FEET WIDE. The permit also refers to an 18 mt. road width in a condition concerning the front compound wall. RERA record Land records

A sampled Outer Ring Road interchange is recorded approximately 14.2 km away. The supplied location record provides no public-transport details or measured distances to local landmarks. Location record

Developer & development status

  • The registered promoter is Suchir Engineers & Constructions, recorded as a partnership. Its supplied corporate identifier is GSTIN 36AEOFS1490J1ZI. The project record identifies Padira Mithileshwar Reddy as authorized signatory and lists Guduru Sucharitha Reddy, Padira Madhusudan Reddy and Padira Lavanya Reddy as partners. Parties record Corporate record
  • The RERA-filed promoter address is B, JUBILEE HILLS, 72, CENTRAL EXCISE COLONY, BAGH AMBERPET, Amberpet, Hyderabad, 500013. The registration certificate’s promoter-office field separately records Hyderabad, PIN 500110; the supplied materials do not establish the current registered office or official promoter contact details. Parties record
  • The project filing identifies one building and ten 3BHK units. See The project story above for the completion-date undertaking and supplied construction-progress and occupancy/completion evidence. RERA unit table Document index

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for GITHA VIHAR, P02500004721, issued 19/07/2022; validity recorded through 06/08/2024
GHMC building permissionBuilding Permit Order 0078/GHMC/SEC/2021-BP, file no. TS/001661/2021, dated 06 August, 2021; identifies survey 2-2-647/182 and Building A
Title-related filingAdvocate’s land-title search report dated 26-04-2022, filed with the project
Development agreement / GPARegistered Development Agreement cum GPA, recorded as dated 25 November 2021 and concerning 501.7 sq. m.; cited in the title-document record
Promoter declarationForm B affidavit-cum-declaration by Mithileshwar Reddy as authorized signatory, dated 09 APR ZA22 in the extraction; includes the promoter’s completion undertaking
Occupancy / completion recordNo occupancy or completion certificate is included in the supplied documents Document index

The supplied evidence establishes the existence and contents of the listed filed records; it does not establish current project completion or occupancy certification.

Frequently asked questions

Is GITHA VIHAR registered with Telangana RERA?

Yes. GITHA VIHAR is registered with the Telangana Real Estate Regulatory Authority as P02500004721; the registration status is New Project.

Who is the developer of GITHA VIHAR?

The promoter named in the RERA registration is SUCHIR ENGINEERS & CONSTRUCTIONS.

Where is GITHA VIHAR located?

GITHA VIHAR is in CENTRAL EXCISE COLONY 9B, CE COLONY, Amberpet, Hyderabad, Telangana (500013).

When will GITHA VIHAR be completed?

The promoter's proposed date of completion filed with RERA is 06/08/2024. This is the promoter's declaration, not a guarantee.