Sign in

Maruthi Golden Towers

RAJA RAJESWARI PROPERTIES PRIVATE LIMITED · Hyderabad · RERA P02500008183

MARUTHI GOLDEN TOWERS is a residential apartment project in Central Excise Colony, Amberpet, Hyderabad. The registered promoter is RAJA RAJESWARI PROPERTIES PRIVATE LIMITED. The project is on 334.37 sq. m of land and comprises one building with 1 Stilt + 5 upper floors and 10 homes: 5 2BHK units of 89.19 sq. m and 5 3BHK units of 116.13 sq. m. Its TG-RERA registration is P02500008183, and its proposed completion date is 15/12/2026.

More from Raja Rajeswari Properties Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 15 Dec 2026
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from aurumproptech.in
Ce Colony, Amberpet, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameMARUTHI GOLDEN TOWERS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name is identified in the supplied record; the registration is for this project. RERA record
TG-RERA registrationP02500008183 RERA record
Registration validity5 May 2024–15 December 2026, as stated in the registration certificate. This is the registration-validity period, not a statement that construction is complete. RERA record
Registered promoterRAJA RAJESWARI PROPERTIES PRIVATE LIMITED RERA record
RERA statusRegistered; record labels the project “New Project.” RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / site addressCentral Excise Colony; the registration certificate identifies Plot No. 2-2-23/22/C, at CE Colony, Amberpet, Hyderabad, PIN 500013.
Revenue villageThe supplied project identity records CE COLONY. The building-permit extraction separately identifies village Amberpet; the supplied evidence does not reconcile these village labels. RERA filing
Mandal / district / PINAmberpet / Hyderabad / 500013 RERA record RERA filing
Survey number(s) and subdivisionsNot disclosed in the supplied project identity or permit extraction. The recorded plot/house identifier is 2-2-23/22/C; approval material also refers to 2-2-23/22/C/1. These are not supplied as survey numbers. Land records
Site extentRERA/approval record: 334.37 sq. m. The permit extraction records total plot area and net plot area as 334.37 sq. m, with road-affected and nala-affected areas each recorded as 0.0. RERA filing
Boundaries recorded in the project filingEast: 2-2-23-22-C-1 AND 2-2-23-C-2; West: 2-2-23-22-D-2; North: NEIGHOURBS LAND; South: 40FT WIDE ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 4778/GHMC/SEC/2023-BP, dated 15 December, 2023; file number 008624/GHMC/4269/SEC2/2023-BP. Approvals record
Approved building configuration1 Stilt + 5 upper floors; permit describes a residential building.
Building countOne building is recorded in the project filing. RERA filing
Approved area figuresPermit extraction lists TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 918.50, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1095.10, TOTAL BUA: 1110.89, DEDUCTIONS: 22.86, NET BUA: 918.50, and PARKING AREA: 176.60. The source does not define these area labels sufficiently to treat them as interchangeable.
HeightPermit extraction records BLDG HT: 15.00 MT. and Total Ht.: 20.75mt.; it also records 17.75 mt. from GL and 15.00 mt. Excluding Stilt Floor.
UnitsThe building-permit extraction states 10 units; the RERA filing records 10 total building units and 10 proposed building units. RERA filing
ParkingPermit extraction records PARKING AREA: 176.60; it does not provide a verified parking-space count. Stilt parking is specified in permit conditions.

Offering and status

ItemProject record
RERA-filed configurations2BHK: 5 units; 3BHK: 5 units. RERA unit table
RERA-filed saleable areas2BHK: 89.19 sq. m; 3BHK: 116.13 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked and 5 available for each configuration (10 available in total). The portal record has no as-of date, so these counts are indicative, not a dated current inventory confirmation. RERA unit table
Construction stageNot established by the supplied RERA filing and documents. A third-party listing describes the project as under construction, but that is not independently verified here. Promoter website
Completion dateThe RERA registration record and promoter’s Form B declaration state 15/12/2026 as the completion date. No earlier or revised completion date is supplied. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. The permit requires a completion notice and occupancy certificate before occupation; this is an approval condition, not evidence that either has been issued.

2. The project story

MARUTHI GOLDEN TOWERS is registered as a residential apartment project in Central Excise Colony, CE Colony, Amberpet, Hyderabad. The registration certificate identifies the site as Plot No. 2-2-23/22/C and records the promoter as Raja Rajeswari Properties Private Limited. The sanctioned scheme is one residential building on a recorded 334.37 sq. m site, with one stilt level and five upper floors.

The RERA filing lists ten homes: five 2BHK and five 3BHK units. The supplied record does not establish construction progress through a dated site inspection or progress certificate. The promoter’s filed completion undertaking is 15/12/2026; no occupancy or completion certificate is included in the documents supplied for this review. RERA unit table

3. Master plan, architecture & building design

GHMC’s permit extraction describes a single residential building and records 1 Stilt + 5 upper floors. The plan extraction lists N NO OF FLOORS: 6 and a building height of 15.00 MT.; it separately records total height of 20.75mt. and 17.75 mt. from GL. The supplied material does not include a complete, legible set of floor-by-floor drawings for describing the building footprint, apartment arrangement on each floor, stairs, lifts, entrances, or circulation in detail.

The permit extraction contains several distinct area labels: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 918.50, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1095.10, TOTAL BUA: 1110.89, DEDUCTIONS: 22.86, NET BUA: 918.50, and PARKING AREA: 176.60. These are reported as labelled in the source; the available extract does not provide enough detail to equate them with FSI-counted area, carpet area, or saleable area.

The site is recorded as 334.37 sq. m. Permit conditions specify a 2.50 mt. Wide Passage and state that parking or construction is not to be placed in setback areas. The permit also requires periphery greenery/tree planting and a fenced tot-lot maintained as greenery; the supplied evidence does not establish their delivery or current condition.

4. Homes, configurations & floor plans

RERA records ten homes in total, split evenly between 2BHK and 3BHK configurations. The saleable areas below are RERA-filed figures. The carpet-area measurements are software-measured from the supplied plan drawing and are not RERA disclosures; they require review against the drawing. Saleable area and carpet area are different measures, and the supplied record does not establish that the RERA-filed saleable area is carpet area. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50589.19 sq. m53.5–56.2 sq. m; median 56.2 sq. m (software-measured)37% (software-derived)
3BHK505116.13 sq. m72.2–82.4 sq. m; median 82.4 sq. m (software-measured)29% (software-derived)

The drawing-derived 2BHK example identifies two bedrooms, a living/kitchen area, two toilets and a balcony; the balcony is excluded from the measured carpet area. The 3BHK example identifies three bedrooms, living and dining areas, kitchen, two toilets and a utility; the utility is excluded from the measured carpet area. Room dimensions are available in the extracted plan data, but the measurements are software-derived from drawing geometry rather than RERA-filed specifications. RERA unit details

5. Parking & vehicle circulation

The building-permit extraction records PARKING AREA: 176.60 and states that the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state a number of car or two-wheeler spaces, identify visitor or accessible parking, or establish individual unit allocations. A parking area or drawn bay does not by itself establish an exclusive right to a particular space.

The permit also states that no parking or construction is to be placed in setback areas. No parking-space count, ramp configuration, internal driveway layout, pedestrian separation plan, or EV-charging installation status is established by the supplied project documents.

6. Amenities, recreation & open spaces

The RERA amenity record identifies several facilities or infrastructure items, but the supplied entries show 0% progress where a percentage is recorded and do not establish that any facility is complete. Permit conditions and the permit extraction separately record certain proposed or required site provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkRERA amenity entry; permit conditions also require periphery greenery and a fenced tot-lot. No area is supplied.RERA amenitiesRERA entry records 0%; completion not independently verified.
Community buildingsNo further description or size supplied.RERA amenities0%; not verified complete.
Internal roads and footpathsRERA amenity entry; no layout dimensions supplied.RERA amenities0%; not verified complete.
Water conservation / rainwater harvestingPermit extraction records 1 rainwater-harvesting pit; permit conditions require a rainwater-harvesting structure.RERA amenitiesRERA entry records 0%; installation not verified.
Water supplyRERA amenity entry; permit extraction lists a sump.RERA amenitiesRERA entry records 0%; service status not verified.
Sewerage / septic tankRERA amenity entry refers to chamber, lines, septic tank and STP; permit extraction lists a septic tank.RERA amenitiesRERA entry records 0%; installation or operation not verified.
Storm-water drainsListed in the RERA amenity record; no design or capacity supplied.RERA amenities0%; not verified complete.
Street lightingListed in the RERA amenity record.RERA amenities0%; not verified complete.
Sewage and sullage treatment/disposalListed in the RERA amenity record; no treatment details supplied.RERA amenities0%; not verified complete.
Solid-waste management and disposalListed in the RERA amenity record; permit requires a garbage house and twin bins for each tenement.RERA amenities0%; provision and operation not verified.
Energy managementListed in the RERA amenity record; no system details supplied.RERA amenities0%; not verified complete.
Electrical meter room / sub-station / receiving stationRERA amenity entry; permit requires space for a transformer.RERA amenitiesRERA entry records 0%; installation not verified.
Fire protection and fire-safety requirementsListed in the RERA amenity record; permit requires an occupancy fire NOC before issue of an occupancy certificate and a working fire extinguisher on each floor.RERA amenities0%; compliance or installation not verified.
Recreational open spaceRERA record includes an aggregate recreational open-space entry, without an area.RERA amenities0%; not verified complete.

A third-party listing advertises facilities including a swimming pool, gym and clubhouse, but these are not established as RERA-filed, sanctioned or delivered facilities in the supplied project record. Promoter website

7. Utilities, building services & safety

  • Water and drainage: The RERA amenity record lists water supply, sewerage, storm-water drains, and water conservation/rainwater harvesting. The permit extraction lists a sump, septic tank and one rainwater-harvesting pit, and includes a condition requiring a rainwater-harvesting pit with piped connection from the terrace. No water source, storage capacity, treatment plant capacity, reuse arrangement, or operating status is supplied. RERA amenities
  • Electrical and building services: The permit extraction lists space for a transformer and a lift; the RERA amenity record lists an electrical meter room/sub-station/receiving station. No lift capacity or electrical-backup specification is supplied. The permit states that parking places are to provide EV-charging infrastructure under the cited requirements; the supplied evidence does not establish installation or capacity. RERA amenities
  • Fire and life safety: GHMC’s permit conditions require an occupancy fire NOC before issue of an occupancy certificate and state that fire-safety requirements are to be provided. The permit extraction also requires a working fire extinguisher on each floor. These are approval conditions; the supplied documents do not establish that the systems are installed, inspected or cleared.
  • Waste and security: The permit requires a garbage house within the premises and twin bins for each tenement; the RERA amenity record lists solid-waste management and disposal. The permit also requires CCTV installation. No CCTV coverage, access-control arrangements, or waste-management operating details are supplied. RERA amenities

8. Location, access & connectivity

The registered project location is Plot No. 2-2-23/22/C, CE Colony, Amberpet, Hyderabad, 500013. The permit extraction describes the locality as Central Excise Colony 9B, Amberpet. The permit material records road-width references of 18 mt. road widths and, in another extracted plan record, 12.00MT WIDE MAINROAD and 40'-0" WIDE ROAD; the project boundary record identifies a 40FT WIDE ROAD to the south. RERA filing

The supplied location record lists these distances: RTC Cross Roads metro, 2.1 km; Vidyanagar Bus Stop, 0.7 km; Kacheguda railway station, 2.0 km; Union Bank of India, 0.2 km; Elen kindergarten School, 0.1 km; Shantilal Navodaya Multi Speciality Hospital, 0.2 km; Reliance Digital mall, 0.6 km; a park, 0.1 km; and Divyanjali High School, 0.3 km. The source does not identify these as surveyed or independently verified route distances. Location record

9. Developer & development status

The registered promoter is RAJA RAJESWARI PROPERTIES PRIVATE LIMITED, a private limited company. Its GSTIN is 36AAGCR3420C1ZU. The supplied promoter address record is “., BHAGHYALAXMI COLONY, CENTRAL EXCISE COLONY, CENTRAL EXCISE COLONY, Amberpet, Hyderabad, 500013.” A separate registration-certificate address identifies DD Colony-II, Amberpet, Hyderabad, PIN 500013. The supplied material does not provide an official project website or project-specific contact details. RERA record Corporate record Parties record

The promoter’s Form B declaration, signed by authorized signatory Rama Krishna Bonthalakoti, states a completion undertaking of 15/12/2026. The supplied evidence does not include a dated, independently verified construction-progress report or an issued occupancy/completion certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500008183; validity 05/05/2024–15/12/2026
What the supplied record establishesRegistration certificate for MARUTHI GOLDEN TOWERS; names Raja Rajeswari Properties Private Limited as promoter.
GHMC building permit
Identifier / date4778/GHMC/SEC/2023-BP; 15 December, 2023
What the supplied record establishesResidential building permit for a 334.37 sq. m site; extracted configuration is 1 Stilt + 5 upper floors.
GHMC file number
Identifier / date008624/GHMC/4269/SEC2/2023-BP
What the supplied record establishesFile identifier stated in the building-permit extraction.
Plan-related identifier
Identifier / date167/9046/OPEN/2/82
What the supplied record establishesListed as “Approved Layout No. / LRS Proceeding No. / Sub division No” in the permit extraction. It is not a disclosed project survey number.
GHMC permit conditions
Identifier / datePermit extraction
What the supplied record establishesIncludes commencement/completion notice requirements, occupancy-certificate requirement, fire-NOC condition, parking-use condition and other site/building conditions.
Promoter Form B declaration
Identifier / dateDated 21/03/2024
What the supplied record establishesPromoter declaration includes a stated title basis, a declaration that the land is free from encumbrances, and completion undertaking to 15/12/2026. These are promoter assertions in a filed declaration.
Form 1A architect completion certificate
Identifier / dateSupplied OCR reads “NOT APPLICABLE.”
What the supplied record establishesEstablishes no completion approval or certificate details.

The supplied project identity does not disclose a survey number or subdivision. No occupancy or completion certificate is included in the documents provided for this Overview.

Frequently asked questions

Is MARUTHI GOLDEN TOWERS registered with Telangana RERA?

Yes. MARUTHI GOLDEN TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02500008183; the registration status is New Project.

Who is the developer of MARUTHI GOLDEN TOWERS?

The promoter named in the RERA registration is RAJA RAJESWARI PROPERTIES PRIVATE LIMITED.

Where is MARUTHI GOLDEN TOWERS located?

MARUTHI GOLDEN TOWERS is in CENTRAL EXCISE COLONY, CE COLONY, Amberpet, Hyderabad, Telangana (500013).

When will MARUTHI GOLDEN TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 15/12/2026. This is the promoter's declaration, not a guarantee.

More projects in Ce Colony