ORGANO IBRAHIMPALLE is a residential project in Ibrahimpally, Chevella Mandal, Ranga Reddy district, developed by ORGANO ECO HABITATS PRIVATE LIMITED. The site measures 23,863.08 sq.m and the plan describes two residential blocks, each 1 Ground + 1 upper floors, and a ground-floor clubhouse; the RERA filing records 17 total building units, including 16 “SPLIT BLOCK” rows whose configuration is not specified. The project is registered under TG-RERA number P02400009354, with proposed completion on 28/05/2028.

More from Organo Eco Habitats Pvt Ltd · 11 projects →

01What we found

RegisteredTG-RERA
36documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameORGANO IBRAHIMPALLE RERA record
Project typeResidential; the RERA filing categorises it as a villa project, while the filed building-permit material describes a group-housing/apartment development. RERA record RERA filing
Phase / registered portionA single registration is identified; no separate phase name is disclosed. The registration covers the stated site and 17 approved building units. RERA record RERA filing
TG-RERA registrationP02400009354; registration certificate issued 29 January 2025. RERA record Approvals record
Registration validityThe certificate records a validity period, but its expiry date is not present in the supplied extract. This is distinct from the completion dates stated in the filing and promoter declaration.
Registered promoterORGANO ECO HABITATS PRIVATE LIMITED; TG-RERA status: New Project. RERA record RERA filing

Land and geographic identity

ItemRecord
Locality / revenue villageIbrahimpally (also rendered Ibrahimpalle in filed records); one revenue village is identified. RERA record
Mandal / district / PINChevella / Ranga Reddy / 574296. RERA record RERA filing
Project survey numbersSY NO 7, 8, 9, 10, 13, 14, 160. No project subdivision identifiers are specified in the project identity record. RERA record RERA filing
Site extentRERA filing: 23,863.08 sq.m total and net area; affected road-widening/FTL/nala-widening area is recorded as 0 sq.m. RERA filing
BoundariesNorth: EXISTING ROAD TOWARD RAMANAGUDA VILLAGE; south, east and west: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authority / principal approvalHMDA technical approval and Ibrahimpally Gram Panchayat building-permit order; approval/proceedings number 011440/BP/HMDA/3027/SKP/2024, dated 29 January 2025. Approvals record
Approved built-up area8,870.35 sq.m total sanctioned built-up area in the permit extract. The plan record separately states 6,932.60 sq.m excluding parking and 8,500.22 sq.m including parking; these are distinct figures as presented in the filed records.
Buildings and floorsThree buildings: two residential blocks, each 1 Ground + 1 upper floors (G+1; 7.79 m height recorded in the plan extract), and one ground-floor clubhouse (3.00 m height recorded there).
Parking provision in plan recordRequired parking area 1,544.89; proposed parking area 1,567.62. Proposed car count is recorded as 0. No parking-level or unit-allocation schedule is supplied.
Approved versus RERA-declared unitsApproval-plan extract records 16.00 dwelling units; the RERA land-details filing records 17 total building units, comprising 17 proposed building units as per agreement. The RERA unit table includes one multipurpose hall and 16 rows filed as “SPLIT BLOCK” units. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed unit rows16 rows labelled “SPLIT BLOCK 1 01” to “SPLIT BLOCK 1 08” and “SPLIT BLOCK 2 01” to “SPLIT BLOCK 2 08”; the filed labels do not specify a configuration. A separate “MULTIPURPOSE HALL” row is recorded as a common area, not a home for sale. RERA unit table RERA unit table
Filed saleable-area range428.03–439.7 sq.m for the 16 “SPLIT BLOCK” rows. The multipurpose hall is separately recorded at 179.38 sq.m. RERA unit table RERA unit table
Booked / availablePortal-read figures show 0 booked and 16 available for the “SPLIT BLOCK” rows, and 0 booked and 1 available for the multipurpose hall. The record has no as-of date; treat these counts as indicative. RERA unit table RERA unit table
Construction stageNo construction-progress percentage or independently verified site-stage evidence is supplied. The records describe the development as proposed/new. RERA record
Completion datesRERA filing header gives proposed completion 28/05/2028; Form B declaration dated 30.01.2025 undertakes completion by 28/01/2028. These are separately recorded dates; no revised completion date is supplied. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building-permit order makes occupancy subject to completion and obtaining an occupancy certificate.

2. The project story

ORGANO IBRAHIMPALLE is a residential development registered in Ibrahimpally village, Chevella Mandal, on a site recorded as 23,863.08 sq.m across survey numbers 7, 8, 9, 10, 13, 14 and 160. The filed permit material describes two G+1 residential blocks—B1 E1 to B1 E8 and B2 W1 to B2 W8—and a ground-floor clubhouse. RERA record RERA filing

The RERA unit schedule records 16 “SPLIT BLOCK” rows and one multipurpose hall. The residential rows are not classified into a RERA configuration in the supplied filing extract. The registration and approval records describe a proposed development; the supplied evidence does not establish construction progress or completed, occupied or occupancy-certified buildings. RERA unit table RERA unit table

3. Master plan, architecture & building design

The plan extract describes three buildings on the project site: a clubhouse and two residential blocks, each arranged as ground plus one upper floor. The plan records a total built-up area of 8,870.35 sq.m; separately, it identifies 6,932.60 sq.m excluding parking and 8,500.22 sq.m including parking. These categories are reported as filed and are not interchangeable. The residential blocks’ total built-up areas are recorded as 4,395.59 sq.m for B1 and 4,295.38 sq.m for B2; the clubhouse is recorded as 179.38 sq.m.

The proposed plan extract labels internal features including a tot-lot, green strip, landscape and service buffers, a shallow waterbody, a clubhouse and an entrance gate. It also shows road and passage labels including 6M WIDE DRIVE WAY, 18.00 MT WIDE EXISTING ROAD, 30.00 MT WIDE PROPOSED ROAD and 9.00 M. WIDE PASSAGE. These are drawing labels; no site-completion verification is supplied.

No verified dwelling-unit floor-plan configuration, flats-per-floor schedule, lift or stair details, or measured building footprint is supplied. The RERA unit labels remain “SPLIT BLOCK” entries rather than a filed home configuration. RERA unit table

4. Homes, configurations & floor plans

The RERA unit rows identify 16 entries but do not state their home configuration. Their filed labels and saleable-area figures are listed below. The multipurpose hall is a common-area entry and is not included as a home. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Homes; configuration not filed (“SPLIT BLOCK” rows)16016428.03–439.7 sq.mNot established for these RERA rowsNot supplied

Separately, software measurement of the approved floor-plan drawing identified a 1BHK plan with a median measured carpet area of 218.1 sq.m (2,347 sq.ft; measured range 2,347–2,348 sq.ft). This is a drawing-based software measurement, not a RERA-filed configuration or area disclosure; the drawing review advises checking the measurement against the plan. The measured rooms include living/dining, living, bedroom, toilet and dress room; utility areas are excluded from the measured carpet figure. Floor plans RERA unit details

The drawing-based measurement and the RERA saleable areas describe different area concepts and do not establish a RERA unit match. No loading figure is supplied. Floor plans RERA unit details RERA unit table

5. Parking & vehicle circulation

The plan extract records 1,567.62 as proposed parking area against 1,544.89 required parking area, while also recording 0 proposed cars. No unit-wise parking allocation, visitor or accessible-space count, two-wheeler count, parking-level layout, or mechanical-parking provision is supplied. The approval document states that stilt/cellar space, where provided, is for vehicle parking and that the mortgaged built-up area is subject to its stated approval conditions; the supplied extracts do not establish an exclusive parking entitlement for any buyer.

The proposed plan labels driveways and passages, but does not provide a verified circulation or pedestrian-separation description. The plan conditions refer to electric-vehicle charging infrastructure; no project-specific charging count or installation status is supplied.

6. Amenities, recreation & open spaces

The RERA amenity schedule lists 14 infrastructure and amenity categories. All progress percentages shown are 0; these are filing-status entries, not independent site observations. RERA amenities

Clubhouse / community building
Description / sizeGround-floor clubhouse; built-up area 179.38 sq.m. The multipurpose hall is separately listed at 179.38 sq.m in the RERA unit table. RERA unit table
Evidence sourceSanction-plan and RERA records
Declared progress / verified statusNo completion verification supplied.
Tot-lot / green strip / park
Description / sizeProposed-plan labels include Tot-lot, Green Strip and LANDSCAPE BUFFER; no area or progress measurement supplied.
Evidence sourceProposed plan
Declared progress / verified statusRERA amenity progress 0; no independent completion verification. RERA amenities
Shallow waterbody
Description / sizeLabelled in the proposed plan; no size or status supplied.
Evidence sourceProposed plan
Declared progress / verified statusNo completion verification supplied.
Internal roads and footpaths
Description / sizeListed in the RERA amenity schedule; progress 0. RERA amenities
Evidence sourceTG-RERA filing
Declared progress / verified statusNo independent completion verification.
Street lighting
Description / sizeListed in the RERA amenity schedule; progress 0. RERA amenities
Evidence sourceTG-RERA filing
Declared progress / verified statusNo independent completion verification.
Community buildings
Description / sizeListed in the RERA amenity schedule; progress 0. RERA amenities
Evidence sourceTG-RERA filing
Declared progress / verified statusNo independent completion verification.

Other facilities advertised on vendor sites are not treated here as RERA-filed or delivered amenities. Promoter website

7. Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available “YES”; each corresponding progress entry is 0. These are filed status fields, not proof of completed or operating services. RERA amenities

The approval records require rainwater-harvesting structures and provide for an STP, transformer and garbage house. The proposed plan also labels a sump, sewage treatment plant, distribution transformer and rainwater harvesting. No water source, storage capacity, STP capacity, electrical load, backup-power provision, lift capacity, or installed fire-system specification is supplied.

The plan conditions address fire safety and structural stability and include an EV-charging-infrastructure provision. These are approval conditions or plan requirements; the supplied records do not establish completion, commissioning or statutory compliance.

8. Location, access & connectivity

The registered revenue location is Ibrahimpally village, Chevella Mandal, Ranga Reddy district, PIN 574296. The RERA site boundary description identifies an existing road toward Ramanaguda Village to the north. RERA record RERA filing RERA filing

A location record identifies the Chevella–Shankarpalli Road area and gives the nearest sampled Outer Ring Road interchange at approximately 20.4 km. This is a mapped-distance record; no travel time, public-transport service, or other verified landmark distance is supplied. Location record

9. Developer & development status

The registered legal promoter is ORGANO ECO HABITATS PRIVATE LIMITED, a private limited company, GSTIN 36AAACF6221F1Z1. The RERA record gives the promoter address as B, LIC EMPLOYEES COLONY, IBRAHIMPALLE VILLAGE, CHEVELLA MANDAL, Chevella, Ranga Reddy, 574296. Corporate record Parties record

B. Nagesh Kumar’s Form B declaration, dated 30.01.2025, states a completion undertaking of 28/01/2028 and declares that the land is free from encumbrances. The RERA filing header records proposed completion as 28/05/2028. No construction progress or independently confirmed completion status is supplied. RERA record

The supplied records identify no distinct development phases or separate phase registrations for this project. The promoter website is listed as https://www.organo.co.in/ibrahimpalle; website material is not used here to establish RERA-filed project specifications. Parties record RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400009354; 29 January 2025
What the supplied record establishesRegistration of ORGANO IBRAHIMPALLE under registered promoter ORGANO ECO HABITATS PRIVATE LIMITED; certificate includes project obligations and registration conditions.
HMDA technical approval
Identifier / date011440/BP/HMDA/3027/SKP/2024; 29 January 2025
What the supplied record establishesTechnical approval for the proposed residential development on the stated survey numbers and site extent; includes building areas and approval conditions.
Ibrahimpally Gram Panchayat building-permit order
Identifier / date011440/BP/HMDA/3027/SKP/2024; 29 January 2025
What the supplied record establishesPermit order for two residential block groups and a clubhouse; states conditions including obtaining an occupancy certificate before occupation.
Plan / approval filing
Identifier / dateHMDA file no. CA/07/40895; LTP licence TS/054915/2024
What the supplied record establishesProposed G+1 group-housing plan material with site and building schedule, parking-area entries and plan conditions.
Mortgage deed recorded in approval material
Identifier / dateDocument No. 421/2025; 28 January 2025
What the supplied record establishesRecords a mortgage of 706.92 sq.m built-up area in favour of the Metropolitan Commissioner, HMDA.
Form B promoter declaration
Identifier / date30 January 2025
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds, approvals and completion undertaking.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo occupancy or completion certificate is included in the reviewed project records. Document index

The supplied layout-plan extract is the proposed plan material identified under file no. CA/07/40895; a separate stamped layout-approval letter is not identified in the supplied evidence.

Frequently asked questions

Is ORGANO IBRAHIMPALLE registered with Telangana RERA?

Yes. ORGANO IBRAHIMPALLE is registered with the Telangana Real Estate Regulatory Authority as P02400009354; the registration status is New Project.

Who is the developer of ORGANO IBRAHIMPALLE?

The promoter named in the RERA registration is ORGANO ECO HABITATS PRIVATE LIMITED.

Where is ORGANO IBRAHIMPALLE located?

ORGANO IBRAHIMPALLE is in CHEVELLA MANDAL, Ibrahimpally, Chevella, Rangareddy, Telangana (574296).

When will ORGANO IBRAHIMPALLE be completed?

The promoter's proposed date of completion filed with RERA is 28/05/2028. This is the promoter's declaration, not a guarantee.