APR PRANAV TOWNSQUARE is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district. It is being developed by VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED on a site of 24,281.59 sq. m., with four residential blocks and a clubhouse; the residential blocks are 1 Cellar + 1 Ground + 5 for Block 1 and 1 Ground + 5 for Blocks 2, 3 and 4. The RERA unit filing records 432 homes in 2BHK, 2.5BHK and 3BHK configurations. Its TG-RERA registration is P02200001090, and the TG-RERA project header records proposed completion as 04/05/2024.
More from Venkata Praneeth Developers Pvt Ltd · 10 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | APR PRANAV TOWNSQUARE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The Form-B declaration describes a single-phase project. The RERA certificate names the registered project; no separate phase registration is identified in the supplied record. |
| TG-RERA registration | P02200001090; registered 05/08/2019, valid through 04/05/2024. The certificate records no extension. Registration validity is distinct from the completion date and from occupancy certification. |
| Registered promoter | VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED RERA record |
| RERA status | The supplied certificate establishes the registration and its stated validity period. Current registration status after 04/05/2024 is not established by the supplied evidence. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Bachupally / Bachupally Village RERA record RERA filing |
| Revenue village | Bachupally in the RERA identity and title records; the HMDA approval spells it Bachpalle. RERA record |
| Mandal / district / PIN | Bachupally / Medchal-Malkajgiri / 500090 RERA record RERA filing |
| Project survey numbers | Sy. Nos. 54 and 55; no project subdivision is specified in the RERA identity. RERA record |
| Site extent | 24,281.59 sq. m. in the RERA land filing and HMDA technical approval. The RERA filing records both total and net area as 24,281.59 sq. m., with area affected by road widening/FTL/nala widening recorded as 0. RERA filing |
| Boundaries filed | East: other property; west: road width 18; north: other property; south: other property. The HMDA approval refers to an 18 mt. road width. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal approval | Hyderabad Metropolitan Development Authority (HMDA), technical approval 011807/ZOC/R1/U6/HMDA/18052018, dated 04/05/2019. The approval states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans. Approvals record |
| Approved built-up area | HMDA approval records total built-up area 66,255.7 and total proposed built-up area 66,623.04; the RERA filing records approved built-up area 66,255.71 sq. m. RERA filing |
| Buildings and configuration in the HMDA technical approval | Four residential blocks: Block 1, 1 Cellar + 1 Ground + 5; Blocks 2, 3 and 4, each 1 Ground + 5. Club House: 1 Ground + 2. |
| RERA-declared building/unit counts | RERA land details state 5 total building units and 5 proposed building units. The RERA unit table contains 432 residential units and a separate amenities-floor row; the Form-B declaration separately states 527 Flats in 4 Blocks. RERA filing RERA unit table |
| Parking | The HMDA technical approval identifies a cellar in Block 1 and requires cellar/silt areas to be used exclusively for vehicle parking. Supplied evidence does not establish a total sanctioned parking-space count or a unit-wise allocation. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK, 2.5BHK and 3BHK apartments. RERA unit records total 432 homes; a separate “AMENITIES FLOOR 1” entry is not a home for sale. RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 107.77–108.65 sq. m.; 2.5BHK: 126.24 sq. m.; 3BHK: 143.6–144.37 sq. m. RERA unit table RERA unit details |
| Booked / available | 218 booked and 214 available across the 432 filed homes, based on the TG-RERA portal data supplied. The portal record has no as-of date, so counts are indicative, not a current inventory confirmation. RERA unit table |
| Construction stage | Current construction stage is not established by the supplied evidence. The RERA amenity/infrastructure progress fields show 0% entries; these are filed progress fields, not independent site verification. RERA amenities |
| Completion dates | TG-RERA project header records proposed completion as 04/05/2024; the Form-B declaration states 11/09/2024. These are promoter/RERA-recorded dates, not proof of completion. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate for the project is identified in the supplied documents. The HMDA approval requires an occupancy certificate before occupation. |
The project story
APR PRANAV TOWNSQUARE is registered as a residential apartment project on Sy. Nos. 54 and 55 at Bachupally, Medchal-Malkajgiri. The RERA land filing gives a site extent of 24,281.59 sq. m. and records four residential blocks and an amenities building in the approval material. HMDA’s technical approval describes the residential blocks as five upper floors above ground, with a cellar additionally shown for Block 1, and a Ground + 2 clubhouse. RERA record RERA filing
The project is registered under P02200001090. Its certificate states validity through 04/05/2024, while the RERA project record and Form-B declaration give completion dates of 04/05/2024 and 11/09/2024 respectively. The available documents do not establish the present construction stage, completion, or an issued occupancy certificate. The 0% entries in the supplied RERA progress fields should therefore be read as recorded fields, not as an independently verified assessment of work on site. RERA record RERA amenities
Master plan, architecture & building design
The HMDA technical approval is for a residential apartment development with a clubhouse on a stated site extent of 24,281.59 sq. m. The approval lists these building-level built-up areas and heights:
| Approved building | Approval’s floor description | Built-up area | Height |
|---|---|---|---|
| Block 1 | 1 Cellar + 1 Ground + 5 | 16,223.7 | 17.95 |
| Block 2 | 1 Ground + 5 | 26,309.04 | 17.05 |
| Block 3 | 1 Ground + 5 | 19,074.6 | 17.05 |
| Block 4 | 1 Ground + 5 | 2,410.03 | 17.05 |
| Club House | 1 Ground + 2 | 2,238.33 | 10.8 |
| Total built-up area stated in approval | — | 66,255.7 | — |
| Total proposed built-up area stated in approval | — | 66,623.04 | — |
The RERA filing records approved built-up area as 66,255.71 sq. m. The supplied documents do not provide a verified floor-by-floor flat distribution, building footprints, flats per floor, lift/stair counts, or a measured area breakdown separating FSI-counted, gross built-up, saleable and carpet area. The approved-plan document describes the cellar/silt as exclusively for vehicle parking and prohibits parking or construction in setback areas. RERA filing
Homes, configurations & floor plans
The TG-RERA unit filing records three apartment configurations. Saleable areas below are the RERA-filed values; the booking counts are portal snapshots without a supplied as-of date. The separate amenities-floor record is excluded from homes available for sale. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 124 | 76 | 48 | 107.77–108.65 sq. m. | Not measured from supplied drawings | Not supplied |
| 2.5BHK | 98 | 67 | 31 | 126.24 sq. m. | Not measured from supplied drawings | Not supplied |
| 3BHK | 210 | 75 | 135 | 143.6–144.37 sq. m. | Not measured from supplied drawings | Not supplied |
| Total homes | 432 | 218 | 214 | — | — | — |
The supplied floor-plan review reports 12 drawings, with no flats measured. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA saleable area is the filed unit-area measure; a carpet-area figure cannot be inferred from it. Floor plans
Parking & vehicle circulation
The HMDA technical approval identifies a cellar in Block 1 and directs that the cellar/silt be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies one entry and one exit to the premises, each subject to a minimum width of 4.5mts. and height clearance of 5mts. No total parking-space count, visitor or accessible-space provision, EV charging provision, parking levels beyond the stated cellar, or unit-wise parking allocation is established by the supplied record. A drawn or reserved parking area does not by itself establish exclusive ownership or allocation to a particular apartment.
Amenities, recreation & open spaces
The RERA filing lists community and site facilities, but the supplied progress fields show 0% for the listed items; they do not establish independent completion or present availability. HMDA’s technical approval also specifies a clubhouse, tot-lot, rainwater harvesting structures, ETP, transformer and garbage house as part of the approval material. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | |||
| Community buildings | Size and internal facilities not established in the supplied RERA record | RERA filing; HMDA technical approval describes a Club House, 1 Ground + 2 | RERA-listed; progress field 0%; completion not independently verified RERA amenities |
| Sports / recreation | |||
| Tot-lot / green strip / park | Size and equipment not supplied | RERA filing; HMDA approval requires tot-lot greenery | RERA-listed; progress field 0%; completion not independently verified RERA amenities |
| Aggregate recreational open space | Area not supplied | RERA filing | Progress field 0%; completion not independently verified RERA amenities |
| Landscape / open space | |||
| Green strip / tot-lot / park | Area and planting plan not supplied | RERA filing; HMDA approval | Progress field 0%; completion not independently verified RERA amenities |
| Convenience / community | |||
| Internal roads and footpaths | Dimensions and completion status not supplied | RERA filing | Progress field 0%; completion not independently verified RERA amenities |
| Street lighting | Quantity and completion status not supplied | RERA filing | Progress field 0%; completion not independently verified RERA amenities |
| Water supply; sewerage and sewage/sullage treatment | System capacities not supplied | RERA filing | Listed “YES” for water supply and sewerage; progress fields 0%; completion not independently verified RERA amenities |
| Storm-water drains; solid-waste management | System details and capacities not supplied | RERA filing | Progress fields 0%; completion not independently verified RERA amenities |
| Water conservation / rainwater harvesting | Capacity and arrangement not supplied | RERA filing; HMDA approval calls for rainwater-harvesting structures | Listed “YES”; progress field 0%; completion not independently verified RERA amenities |
| Energy management; electrical meter room/sub-station/receiving station | Equipment details and capacities not supplied | RERA filing | Listed “YES”; progress fields 0%; completion not independently verified RERA amenities |
| Fire protection and fire-safety requirements | Systems and installed status not supplied | RERA filing; HMDA approval conditions | Progress field 0%; completion not independently verified RERA amenities |
Promotional material lists additional facilities, including a swimming pool, gym, indoor games, library, guest rooms, security and CCTV, but these are promoter-marketed claims rather than demonstrated RERA completion or delivery evidence. Promoter website
Utilities, building services & safety
The RERA filing lists water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage, solid-waste management, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. It marks water supply, sewerage, rainwater harvesting, energy management and electrical infrastructure “YES,” but provides no capacities or independent completion verification. RERA amenities
HMDA’s approval conditions require rainwater-harvesting structures, an ETP, a transformer space, and a garbage house. They also set out conditions concerning sewerage treatment/disposal, prevention of effluent or drainage overflow onto public places, water-source and sewerage-source separation, fire equipment and alarm systems, emergency lighting, water storage tanks, lift fire-resistant swing doors, and a generator as an alternate power source. These are approval conditions; the supplied evidence does not establish their installation or commissioning. No lift count/capacity, STP/ETP capacity, water-storage capacity beyond the approval’s stated tank conditions, generator capacity, accessibility details, CCTV status, or completed safety certifications is established here.
Location, access & connectivity
The registered location is Bachupally Village, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. A supplied geocode is identified as “bachupally village road, Bachupally mandal, Medchal–Malkajgiri, Telangana, 500090, India.” RERA record Location record
The location record gives these distances; they are record-derived nearby-place measurements, not travel-time claims: Location record
| Nearby place / access point | Supplied distance |
|---|---|
| Nearest Metro: Miyapur | 5.0 km |
| New Mallampet Bus Stop | 2.2 km |
| Sri Swastik Multispeciality Hospital | 0.2 km |
| Sri Chaitanya Jr. College | 0.6 km |
| Silver Oaks | 0.3 km |
| PPZ Park | 0.4 km |
| Dr. Reddy's Laboratories Limited | 1.9 km |
| natonal bank | 0.1 km |
No approach-road alignment, public-transport service frequency, or verified travel time is supplied.
Developer & development status
The registered legal promoter is VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED, a private company. The RERA record provides GSTIN 36AACCV4975A1ZC. The Form-B affidavit is made by Mr. Narendra Kumar Kamaraju, representing the company, and declares the project’s completion date as 11/09/2024. These are promoter-filed declarations; the supplied evidence does not establish current construction progress or completion. RERA record Corporate record
The RERA registration certificate gives the project’s validity through 04/05/2024; it does not record an extension. The supplied project documents do not identify an issued occupancy or completion certificate. No registered office, project-specific phone number or email is established in the evidence presented here.
Approvals, official records & documents
| Supplied evidence | FORM “C”, registration P02200001090, issued 05/08/2019; stated validity through 04/05/2024 |
|---|---|
| Scope / note | APR PRANAV TOWNSQUARE; certificate states no extension |
| Supplied evidence | Approval 011807/ZOC/R1/U6/HMDA/18052018, dated 04/05/2019 |
|---|---|
| Scope / note | Residential blocks and clubhouse on Sy. Nos. 54 and 55; approval conditions include subsequent Executive Authority sanction and occupancy requirements |
| Supplied evidence | Procgs.No.L/551/2018, Revenue Divisional Officer, Malkajgiri; document records agricultural-to-non-agricultural conversion permission and lists Sy. Nos. 54 & 55, 51/P, 54/P and 55/P |
|---|---|
| Scope / note | Supplied extraction gives the proceedings date only as 00-05-2018; the document states conversion permission does not confer title |
| Supplied evidence | Form-B affidavit for APR PRANAV TOWNSQUARE |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, separate-account arrangements, approvals and completion |
| Supplied evidence | No project certificate identified in the supplied documents |
|---|---|
| Scope / note | Current certificate status is not established |
The available evidence index is limited to the supplied RERA filings and extracted approval documents; it does not include the full set of detailed sanctioned drawings, a current construction-progress inspection, or a project occupancy/completion certificate.
Project at a glance
Project identity
Registered project name: APR PRANAV TOWNSQUARE
Project type: Residential apartment project
Phase / registered portion: The Form-B declaration describes a single-phase project. The RERA certificate names the registered project; no separate phase registration is identified in the supplied record.
TG-RERA registration: P02200001090; registered 05/08/2019, valid through 04/05/2024. The certificate records no extension. Registration validity is distinct from the completion date and from occupancy certification.
Registered promoter: VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED
RERA status: The supplied certificate establishes the registration and its stated validity period. Current registration status after 04/05/2024 is not established by the supplied evidence.
Land and geographic identity
Locality: Bachupally / Bachupally Village
Revenue village: Bachupally in the RERA identity and title records; the HMDA approval spells it Bachpalle.
Mandal / district / PIN: Bachupally / Medchal-Malkajgiri / 500090
Project survey numbers: Sy. Nos. 54 and 55; no project subdivision is specified in the RERA identity.
Site extent: 24,281.59 sq. m. in the RERA land filing and HMDA technical approval. The RERA filing records both total and net area as 24,281.59 sq. m., with area affected by road widening/FTL/nala widening recorded as 0.
Boundaries filed: East: other property; west: road width 18; north: other property; south: other property. The HMDA approval refers to an 18 mt. road width.
Development identity
Sanctioning authority / principal approval: Hyderabad Metropolitan Development Authority (HMDA), technical approval 011807/ZOC/R1/U6/HMDA/18052018, dated 04/05/2019. The approval states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans.
Approved built-up area: HMDA approval records total built-up area 66,255.7 and total proposed built-up area 66,623.04; the RERA filing records approved built-up area 66,255.71 sq. m.
Buildings and configuration in the HMDA technical approval: Four residential blocks: Block 1, 1 Cellar + 1 Ground + 5; Blocks 2, 3 and 4, each 1 Ground + 5. Club House: 1 Ground + 2.
RERA-declared building/unit counts: RERA land details state 5 total building units and 5 proposed building units. The RERA unit table contains 432 residential units and a separate amenities-floor row; the Form-B declaration separately states 527 Flats in 4 Blocks.
Parking: The HMDA technical approval identifies a cellar in Block 1 and requires cellar/silt areas to be used exclusively for vehicle parking. Supplied evidence does not establish a total sanctioned parking-space count or a unit-wise allocation.
Offering and status
RERA-filed configurations: 2BHK, 2.5BHK and 3BHK apartments. RERA unit records total 432 homes; a separate “AMENITIES FLOOR 1” entry is not a home for sale.
RERA-filed saleable area: 2BHK: 107.77–108.65 sq. m.; 2.5BHK: 126.24 sq. m.; 3BHK: 143.6–144.37 sq. m.
Booked / available: 218 booked and 214 available across the 432 filed homes, based on the TG-RERA portal data supplied. The portal record has no as-of date, so counts are indicative, not a current inventory confirmation.
Construction stage: Current construction stage is not established by the supplied evidence. The RERA amenity/infrastructure progress fields show 0% entries; these are filed progress fields, not independent site verification.
Completion dates: TG-RERA project header records proposed completion as 04/05/2024; the Form-B declaration states 11/09/2024. These are promoter/RERA-recorded dates, not proof of completion.
Occupancy / completion certificate: No occupancy or completion certificate for the project is identified in the supplied documents. The HMDA approval requires an occupancy certificate before occupation.
The project story
APR PRANAV TOWNSQUARE is registered as a residential apartment project on Sy. Nos. 54 and 55 at Bachupally, Medchal-Malkajgiri. The RERA land filing gives a site extent of 24,281.59 sq. m. and records four residential blocks and an amenities building in the approval material. HMDA’s technical approval describes the residential blocks as five upper floors above ground, with a cellar additionally shown for Block 1, and a Ground + 2 clubhouse.
The project is registered under P02200001090. Its certificate states validity through 04/05/2024, while the RERA project record and Form-B declaration give completion dates of 04/05/2024 and 11/09/2024 respectively. The available documents do not establish the present construction stage, completion, or an issued occupancy certificate. The 0% entries in the supplied RERA progress fields should therefore be read as recorded fields, not as an independently verified assessment of work on site.
Master plan, architecture & building design
The HMDA technical approval is for a residential apartment development with a clubhouse on a stated site extent of 24,281.59 sq. m. The approval lists these building-level built-up areas and heights:
| Approved building | Approval’s floor description | Built-up area | Height |
|---|---|---|---|
| Block 1 | 1 Cellar + 1 Ground + 5 | 16,223.7 | 17.95 |
| Block 2 | 1 Ground + 5 | 26,309.04 | 17.05 |
| Block 3 | 1 Ground + 5 | 19,074.6 | 17.05 |
| Block 4 | 1 Ground + 5 | 2,410.03 | 17.05 |
| Club House | 1 Ground + 2 | 2,238.33 | 10.8 |
| Total built-up area stated in approval | — | 66,255.7 | — |
| Total proposed built-up area stated in approval | — | 66,623.04 | — |
The RERA filing records approved built-up area as 66,255.71 sq. m. The supplied documents do not provide a verified floor-by-floor flat distribution, building footprints, flats per floor, lift/stair counts, or a measured area breakdown separating FSI-counted, gross built-up, saleable and carpet area. The approved-plan document describes the cellar/silt as exclusively for vehicle parking and prohibits parking or construction in setback areas.
Homes, configurations & floor plans
The TG-RERA unit filing records three apartment configurations. Saleable areas below are the RERA-filed values; the booking counts are portal snapshots without a supplied as-of date. The separate amenities-floor record is excluded from homes available for sale.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 124 | 76 | 48 | 107.77–108.65 sq. m. | Not measured from supplied drawings | Not supplied |
| 2.5BHK | 98 | 67 | 31 | 126.24 sq. m. | Not measured from supplied drawings | Not supplied |
| 3BHK | 210 | 75 | 135 | 143.6–144.37 sq. m. | Not measured from supplied drawings | Not supplied |
| Total homes | 432 | 218 | 214 | — | — | — |
The supplied floor-plan review reports 12 drawings, with no flats measured. Accordingly, no software-measured carpet area or room dimensions can be reported. RERA saleable area is the filed unit-area measure; a carpet-area figure cannot be inferred from it.
Parking & vehicle circulation
The HMDA technical approval identifies a cellar in Block 1 and directs that the cellar/silt be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies one entry and one exit to the premises, each subject to a minimum width of 4.5mts. and height clearance of 5mts. No total parking-space count, visitor or accessible-space provision, EV charging provision, parking levels beyond the stated cellar, or unit-wise parking allocation is established by the supplied record. A drawn or reserved parking area does not by itself establish exclusive ownership or allocation to a particular apartment.
Amenities, recreation & open spaces
The RERA filing lists community and site facilities, but the supplied progress fields show 0% for the listed items; they do not establish independent completion or present availability. HMDA’s technical approval also specifies a clubhouse, tot-lot, rainwater harvesting structures, ETP, transformer and garbage house as part of the approval material.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | |||
| Community buildings | Size and internal facilities not established in the supplied RERA record | RERA filing; HMDA technical approval describes a Club House, 1 Ground + 2 | RERA-listed; progress field 0%; completion not independently verified |
| Sports / recreation | |||
| Tot-lot / green strip / park | Size and equipment not supplied | RERA filing; HMDA approval requires tot-lot greenery | RERA-listed; progress field 0%; completion not independently verified |
| Aggregate recreational open space | Area not supplied | RERA filing | Progress field 0%; completion not independently verified |
| Landscape / open space | |||
| Green strip / tot-lot / park | Area and planting plan not supplied | RERA filing; HMDA approval | Progress field 0%; completion not independently verified |
| Convenience / community | |||
| Internal roads and footpaths | Dimensions and completion status not supplied | RERA filing | Progress field 0%; completion not independently verified |
| Street lighting | Quantity and completion status not supplied | RERA filing | Progress field 0%; completion not independently verified |
| Water supply; sewerage and sewage/sullage treatment | System capacities not supplied | RERA filing | Listed “YES” for water supply and sewerage; progress fields 0%; completion not independently verified |
| Storm-water drains; solid-waste management | System details and capacities not supplied | RERA filing | Progress fields 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Capacity and arrangement not supplied | RERA filing; HMDA approval calls for rainwater-harvesting structures | Listed “YES”; progress field 0%; completion not independently verified |
| Energy management; electrical meter room/sub-station/receiving station | Equipment details and capacities not supplied | RERA filing | Listed “YES”; progress fields 0%; completion not independently verified |
| Fire protection and fire-safety requirements | Systems and installed status not supplied | RERA filing; HMDA approval conditions | Progress field 0%; completion not independently verified |
Promotional material lists additional facilities, including a swimming pool, gym, indoor games, library, guest rooms, security and CCTV, but these are promoter-marketed claims rather than demonstrated RERA completion or delivery evidence.
Utilities, building services & safety
The RERA filing lists water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage, solid-waste management, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. It marks water supply, sewerage, rainwater harvesting, energy management and electrical infrastructure “YES,” but provides no capacities or independent completion verification.
HMDA’s approval conditions require rainwater-harvesting structures, an ETP, a transformer space, and a garbage house. They also set out conditions concerning sewerage treatment/disposal, prevention of effluent or drainage overflow onto public places, water-source and sewerage-source separation, fire equipment and alarm systems, emergency lighting, water storage tanks, lift fire-resistant swing doors, and a generator as an alternate power source. These are approval conditions; the supplied evidence does not establish their installation or commissioning. No lift count/capacity, STP/ETP capacity, water-storage capacity beyond the approval’s stated tank conditions, generator capacity, accessibility details, CCTV status, or completed safety certifications is established here.
Location, access & connectivity
The registered location is Bachupally Village, Bachupally mandal, Medchal-Malkajgiri district, Telangana, PIN 500090. A supplied geocode is identified as “bachupally village road, Bachupally mandal, Medchal–Malkajgiri, Telangana, 500090, India.”
The location record gives these distances; they are record-derived nearby-place measurements, not travel-time claims:
Nearest Metro: Miyapur: 5.0 km
New Mallampet Bus Stop: 2.2 km
Sri Swastik Multispeciality Hospital: 0.2 km
Sri Chaitanya Jr. College: 0.6 km
Silver Oaks: 0.3 km
PPZ Park: 0.4 km
Dr. Reddy's Laboratories Limited: 1.9 km
natonal bank: 0.1 km
No approach-road alignment, public-transport service frequency, or verified travel time is supplied.
Developer & development status
The registered legal promoter is VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED, a private company. The RERA record provides GSTIN 36AACCV4975A1ZC. The Form-B affidavit is made by Mr. Narendra Kumar Kamaraju, representing the company, and declares the project’s completion date as 11/09/2024. These are promoter-filed declarations; the supplied evidence does not establish current construction progress or completion.
The RERA registration certificate gives the project’s validity through 04/05/2024; it does not record an extension. The supplied project documents do not identify an issued occupancy or completion certificate. No registered office, project-specific phone number or email is established in the evidence presented here.
Approvals, official records & documents
| Supplied evidence | FORM “C”, registration P02200001090, issued 05/08/2019; stated validity through 04/05/2024 |
|---|---|
| Scope / note | APR PRANAV TOWNSQUARE; certificate states no extension |
| Supplied evidence | Approval 011807/ZOC/R1/U6/HMDA/18052018, dated 04/05/2019 |
|---|---|
| Scope / note | Residential blocks and clubhouse on Sy. Nos. 54 and 55; approval conditions include subsequent Executive Authority sanction and occupancy requirements |
| Supplied evidence | Procgs.No.L/551/2018, Revenue Divisional Officer, Malkajgiri; document records agricultural-to-non-agricultural conversion permission and lists Sy. Nos. 54 & 55, 51/P, 54/P and 55/P |
|---|---|
| Scope / note | Supplied extraction gives the proceedings date only as 00-05-2018; the document states conversion permission does not confer title |
| Supplied evidence | Form-B affidavit for APR PRANAV TOWNSQUARE |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, separate-account arrangements, approvals and completion |
| Supplied evidence | No project certificate identified in the supplied documents |
|---|---|
| Scope / note | Current certificate status is not established |
The available evidence index is limited to the supplied RERA filings and extracted approval documents; it does not include the full set of detailed sanctioned drawings, a current construction-progress inspection, or a project occupancy/completion certificate.
Frequently asked questions
Is APR PRANAV TOWNSQUARE registered with Telangana RERA?
Yes. APR PRANAV TOWNSQUARE is registered with the Telangana Real Estate Regulatory Authority as P02200001090; the registration status is New Project.
Who is the developer of APR PRANAV TOWNSQUARE?
The promoter named in the RERA registration is VENKATA PRANEETH DEVELOPERS PRIVATE LIMITED.
Where is APR PRANAV TOWNSQUARE located?
APR PRANAV TOWNSQUARE is in BACHUPALLY VILLAGE, Bachupally, Medchal-Malkajgiri, Telangana (500090).
When will APR PRANAV TOWNSQUARE be completed?
The promoter's proposed date of completion filed with RERA is 04/05/2024. This is the promoter's declaration, not a guarantee.