Sign in

Milestone Enclave

MILESTONE ESTATES · Medchal-Malkajgiri · RERA P02200009974

MILESTONE ENCLAVE is a plotted development / residential open layout at Shamirpet, Shamirpet Mandal, Medchal-Malkajgiri district. The registered promoter is MILESTONE ESTATES. The project has a registered site extent of 21,112.47 sq.m and comprises 74 plots, with software-measured plot sizes of 87.76–351.68 sq.m (105.0–420.6 sq. yd.); towers and building floors are not disclosed. Its TG-RERA registration number is P02200009974, and the project header records proposed completion as 28/09/2028.

01What we found

RegisteredTG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameMILESTONE ENCLAVE RERA record
Project typePlotted development / residential open layout RERA record
Phase or registered portionNew project; the registration record does not identify a separate phase RERA record
TG-RERA registrationP02200009974
Registration validity29/05/2025 to 28/05/2028, unless extended by the Authority
Registered promoterMILESTONE ESTATES
RERA statusRegistered; the record describes the project as a new project RERA record Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageTG-RERA identifies Shamirpet; the HMDA layout documents identify Bomraspet village. Both names are retained as stated in the records.
MandalShamirpet / Shamirpet 1 RERA record
DistrictMedchal-Malkajgiri RERA record
PIN501401 RERA record
Project survey numbersSy. Nos. 477 Part, 478 Part, 479, 480 Part & 483
Registered site extent21,112.47 sq.m total site area
Layout-area figures20,228.64 sq.m net site/layout area in the HMDA draft layout record; the drawing’s area statement also gives net layout area as 20,228.64 sq.m.
Road-affected area574.72 sq.m
BoundariesEast: neighbours’ land; West: 12 19 MT WIDE EXISTING ROAD; North: neighbours’ land; South: neighbours’ land RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the draft layout letter records delegation to Bommarasipet Gram Panchayat
Principal approval012090/LO/HMDA/3216/MED/2024, dated 29 May, 2025; the record is identified as a TG-bPASS draft layout letter
Approved built-up area12,326.8 sq.m in the RERA filing; the layout drawing labels this as plotted area, not building floor area. RERA filing
Plots74 in the layout drawing and draft layout record
Towers / building floors / parking levelsNot disclosed for this plotted-layout project in the supplied RERA and approval records.
Layout roads and open spaceLayout roads: 5,197.96 sq.m; open space/park: 1,535.85 sq.m
Mortgage area1,861.68 sq.m, comprising 10 identified plots in favour of HMDA

Offering and status

ItemProject record
OfferingPlots in a residential open layout; the drawing records 74 individual sub-plots
Plot count / size range74 plots; software-measured from the layout drawing: 87.76–351.68 sq.m (105.0–420.6 sq. yd.) Layout record
Booked / available countsNot established in the supplied project record.
Construction or development stageThe approval document is a draft layout and makes final layout release conditional on development and handover requirements. No independently verified on-site completion status is supplied.
Completion dateThe RERA Form B declaration states 28/05/2028 as the promoter’s completion undertaking; the project header records proposed completion as 28/09/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the supplied records instead describe draft layout permission and conditions for final layout release.

Registration validity is the TG-RERA registration period, not a statement that the layout works are complete. The completion date is a promoter undertaking; no completion certificate is evidenced in this pack.

2. The project story

MILESTONE ENCLAVE is registered as a plotted residential development at Shamirpet, in Medchal-Malkajgiri district. The TG-RERA certificate identifies the project land as Sy. Nos. 477 PART, 478 PART, 479, 480 PART and 483; HMDA’s draft layout documents describe the site as being at Bomraspet village, Shamirpet Mandal.

The approved layout drawing depicts 74 plots, with internal roads, park/open space, social-infrastructure land and utility land. The HMDA record is expressly a draft layout permission and requires infrastructure works and the handover of specified roads and open areas before final layout plans are released. The evidence pack contains no independently verified construction-progress report or occupancy/completion certificate, so physical completion cannot be confirmed from these records.

3. Master plan, architecture & building design

This is a plotted layout rather than a tower or apartment scheme. The drawing identifies 74 plots and divides the recorded net layout area into plotted land, roads, park/open space, social infrastructure, utilities and buffer land. Its stated figures are:

Layout componentAreaDrawing-stated share
Plotted area12,326.80 sq.m60.94%
Road area5,197.96 sq.m25.70%
Organized open space / park1,535.85 sq.m7.59%
Social infrastructure area506.08 sq.m2.50%
Utility area173.26 sq.m0.86%
Buffer zone area488.65 sq.m2.42%
Total net layout20,228.60 sq.m100.00%

The draft-layout record separately states a net site area of 20,228.64 sq.m, and identifies a 574.72 sq.m master-plan road-affected area. The layout drawing lists 12.19 MT and 9.14 MT internal roads, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road.

No tower arrangement, building footprint, floor configuration, apartment distribution or building-height information is applicable or disclosed in the supplied records. The 12,326.8 sq.m figure is identified in the layout records as plotted area; it is not presented here as apartment built-up area.

4. Homes, configurations & floor plans

The RERA-filed offering is plots, not apartments. The layout drawing states 74 plots; the software-measured plot sizes span 87.76–351.68 sq.m (105.0–420.6 sq. yd.). These measurements are drawing-derived and are not RERA-filed individual saleable-area disclosures. Layout record

Plot-size bandPlots
100–150 sq. yd.3
150–200 sq. yd.51
200–250 sq. yd.13
250–300 sq. yd.3
300–400 sq. yd.3
400–500 sq. yd.1

The layout schedule contains measurements for all 74 plots; the most common printed plot size is 153.29 sq.m, appearing for 32 plots. Drawing-measured plot area is not the same as an apartment’s carpet or saleable area. Booked and available plot counts are not disclosed in the supplied evidence. Layout record

5. Parking & vehicle circulation

The layout area statement records 0.00 sq.m of common parking area; the supplied project records do not establish a sanctioned count of parking bays, individual plot parking allocations or visitor parking.

Internal roads are shown at 12.19 MT and 9.14 MT widths, alongside the listed existing, proposed master-plan and village roads. The approval conditions also require roads to be opened for access to neighbouring sites. No evidence is supplied on separate pedestrian routes, ramps, EV charging or a parking-allotment arrangement.

6. Amenities, recreation & open spaces

Landscape / open space

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space1,535.85 sq.mHMDA draft layout record and layout drawingShown in the layout record; no independent completion verification supplied
Tot-lot / green stripListed as a layout feature; no separate size suppliedLayout drawingNo completion status supplied
Cycling tracksListed in the draft-layout document’s amenities/utilities extraction; no size suppliedNo completion status supplied

Convenience / community

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Social infrastructure area506.08 sq.mHMDA draft layout recordLand allocation shown; no facility-specific completion evidence supplied
Utility area173.26 sq.mHMDA draft layout recordLand allocation shown; no completion evidence supplied

The layout records show 0 sq.m for an amenity area. No clubhouse or indoor recreation facility is established in the supplied project records.

7. Utilities, building services & safety

The HMDA draft-layout conditions specify layout infrastructure including black-top roads, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions, not evidence that the works have been completed.

Water
Evidence in the project recordInternal water-supply pipelines, overhead tank and an assured supply source are specified in the draft-layout conditions. The layout drawing also lists an OHT with below-ground sump.
Status evidencedRequired / listed; completion not independently verified
Sewerage and drainage
Evidence in the project recordUnderground drainage lines, common septic tank/STP and storm-water drains are specified.
Status evidencedRequired / listed; completion not independently verified
Electrical and lighting
Evidence in the project recordElectrical supply lines, transformer and street lights are specified; a transformer is also listed on the layout drawing.
Status evidencedRequired / listed; completion not independently verified
Waste
Evidence in the project recordA garbage bin is listed on the layout drawing.
Status evidencedListed; no operational status supplied
Safety and emergency systems
Evidence in the project recordNo project-specific fire-system, fire-access, CCTV or security installation details are established by the supplied RERA and layout records.
Status evidencedNot disclosed / not verified
Accessibility
Evidence in the project recordNo accessible-route or accessibility specifications are supplied.
Status evidencedNot disclosed

8. Location, access & connectivity

The TG-RERA project record gives the location as Shamirpet, Shamirpet, Medchal-Malkajgiri, 501401. The HMDA layout documents place it at Bomraspet village, Shamirpet Mandal. The registered survey identifiers are 477 Part, 478 Part, 479, 480 Part and 483.

The layout drawing identifies internal roads of 12.19 MT and 9.14 MT, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road. The nearest sampled Outer Ring Road interchange is recorded as approximately 9.0 km from the cadastral parcel centroid. Location record

9. Developer & development status

The registered promoter is MILESTONE ESTATES, identified in the project filing as a partnership. Its GSTIN is 36ABSFM6033G1Z0. The RERA certificate lists the promoter address as Village: Mandal: Gandipet, District: Ranga Reddy, PIN 500032; the project filing separately provides an address at Jayabheri Pine Valley, Telecom Nagar, Bomraspet Village, Shamirpet 1 Mandal, Shamirpet, Medchal-Malkajgiri, PIN 501401. Corporate record RERA filing

The RERA filing names GADDAM RAMAKRISHNA REDDY as authorized signatory and identifies ALLADI VENKAT NARSAIAH as a partner. The promoter’s Form B declaration, dated 10 JUN 2025, undertakes completion by 28/05/2028. Parties record

The supplied approval is a draft layout permission with infrastructure and handover conditions. No project-specific, independently verified construction-progress assessment or completion/occupancy certificate is included.

10. Approvals, official records & documents

RecordWhat the supplied record establishes
TG-RERA certificate, P02200009974Form C certificate for MILESTONE ENCLAVE; registration period 29/05/2025–28/05/2028, unless extended.
HMDA draft layout letter, approval/proceedings no. 012090/LO/HMDA/3216/MED/2024Dated 29 May, 2025; records draft layout permission for 74 plots in the stated survey numbers and sets development and handover conditions.
Layout plan and area statementDrawing records plot count, plot sizes, roads, park/open space, social infrastructure, utilities and buffer-zone area.
HMDA mortgage recordThe draft-layout record identifies 10 plots—Nos. 68, 67, 66, 65, 64, 63, 73, 72, 71 and 69—with 1,861.68 sq.m stated as mortgaged to the Metropolitan Commissioner, HMDA.
RERA Form B declarationPromoter declaration dated 10 JUN 2025, including completion undertaking, project-account and approvals disclosures.
Occupancy / completion certificateNone supplied. The available layout document is described as draft permission, with final layout release conditional on development and handover requirements.

Frequently asked questions

Is MILESTONE ENCLAVE registered with Telangana RERA?

Yes. MILESTONE ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200009974; the registration status is New Project.

Who is the developer of MILESTONE ENCLAVE?

The promoter named in the RERA registration is MILESTONE ESTATES.

Where is MILESTONE ENCLAVE located?

MILESTONE ENCLAVE is in SHAMIRPET 1 MANDAL, Shamirpet, Medchal-Malkajgiri, Telangana (501401).

When will MILESTONE ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 28/09/2028. This is the promoter's declaration, not a guarantee.

More projects in Shamirpet