Jlm Fourth City County
RAGANAMONI · Rangareddy · RERA P02400009500
JLM FOURTH CITY COUNTY is a plotted development in Ferozguda, Ibrahimpatnam Mandal, Ranga Reddy District. The registered promoter is Raganamoni Mahender. The project has a total site area of 66,530.5 sq m and an open plotted layout of 178 plots, with drawing-derived plot sizes ranging from 153.29 sq m to 510.09 sq m; buildings and floors are not disclosed. It is registered under TG-RERA number P02400009500, and the project identity record gives proposed completion as 20/06/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
13 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | JLM FOURTH CITY COUNTY |
| Project type | Plotted development RERA record |
| Phase / registered portion | Not separately identified; the registration is for the project. RERA record |
| TG-RERA registration number | P02400009500 |
| Registration validity | 20 February 2025 to 20 February 2027, unless extended by the Authority. This is the registration period, not the project completion deadline. Approvals record |
| Registered promoter | Raganamoni Mahender; the project identity fields give the promoter name as RAGANAMONI. RERA record RERA filing |
| RERA status | Registered; certificate records a two-year validity period and requires quarterly updates. Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / street | Ferozguda / FEROZGUDA RERA record RERA filing |
| Revenue village | Adibatla is the village recorded in the RERA certificate and project identity fields; HMDA layout documents describe the site as Ferozguda Village. |
| Mandal | Ibrahimpatnam RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 501510 RERA record RERA filing |
| Project survey numbers | 48P and 49P as recorded in the RERA certificate and project identity fields. RERA filing |
| Survey numbers printed on the draft layout plan | 49p and 93p. |
| Registered site extent and land areas | Total site area 66,530.5 sq m; RERA land details state 6,373.68 sq m affected by road widening/FTL/Nala widening and 60,156.82 sq m net area. The HMDA draft layout letter separately records 4,524.5 sq m as master-plan road-affected area and 60,016.4 sq m as net site area. RERA filing |
| Boundaries in RERA land details | East: neighbours’ land; West: neighbours’ land; North: neighbours’ land; South: 30 metres road and others layout. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 012091/LO/HMDA/3217/SMD/2024, dated 20 February 2025; the filed document is identified as a DRAFT LAYOUT LETTER. Approvals record |
| Layout scale and use | Open plotted layout; 178 plots. Layout record |
| Approved built-up area | The draft layout plan records proposed built-up area, excluding and including parking, as 0.00. |
| Buildings / floors | Not disclosed for this plotted layout. |
| Parking | A common parking area is shown as 0.00 in the layout area statement; no parking-space count or plot-specific parking allocation is supplied. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; the RERA certificate describes the project as plotted. |
| Plot count and sizes | The layout drawing’s plot schedule is software-read as 178 plots; sizes range from 153.29 sq m to 510.09 sq m, with a median of 169.18 sq m. These are drawing-derived measurements, not RERA-filed unit-size figures. Layout record |
| Booked / available plots | Not supplied in the available project records. |
| Construction stage | RERA records the project as “New Project”; no independently verified site-progress measurement is provided. RERA record |
| Completion dates | Promoter’s Form B declaration states completion by 20-02-2027. The project identity record gives proposed completion as 20/06/2027. RERA record |
| OC / completion certificate | No occupancy or completion certificate is supplied; the project is a plotted layout. The HMDA document is a draft layout letter, not an OC. Document index |
The project story
JLM FOURTH CITY COUNTY is a proposed open plotted development registered with TG-RERA under P02400009500. The RERA record locates it in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, and identifies survey numbers 48P and 49P. The HMDA layout drawing describes the site as Ferozguda Village and depicts 178 plots. RERA record Layout record
The HMDA document on file is expressly a draft layout letter. It describes a layout whose internal development works are to include road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply pipes and an overhead tank, an assured water source, electrical lines and streetlights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are specified works and conditions, not evidence that the works are complete. The available records do not provide independently verified construction progress.
The HMDA letter also says that the development works are to be completed within five years under the cited G.O.Ms.No.62 condition and that the roads, open space, social-infrastructure and utility areas are to be handed over to the local body before release of final layout plans.
Master plan, architecture & building design
This is a plotted layout, not a building or apartment scheme. The HMDA draft layout letter records a total site area of 66,530.5 sq m, master-plan road-affected area of 4,524.5 sq m, and net site area of 60,016.4 sq m. Its area statement lists 36,618.32 sq m of plotted area, 13,553.53 sq m of layout roads, 4,515.65 sq m of open space/park, 1,505.61 sq m of social infrastructure and 245.13 sq m of utilities.
The layout-plan extraction gives a related area statement on a stated net layout area of 60,156.82 sq m: plots 36,618.32 sq m (60.87%); roads 13,553.53 sq m (22.53%); organized open space/park 4,515.65 sq m (7.51%); social infrastructure 1,505.61 sq m (2.50%); utilities 245.13 sq m (0.41%); and buffer-zone area 3,718.57 sq m (6.18%). The same plan records amenity area, LIG plotted area, EWS plotted area, green-belt area and common-parking area as 0.00.
The plot schedule is software-read from the drawing as 178 plots, with all 178 having a readable size. The size range is 153.29–510.09 sq m; the median is 169.18 sq m. The supplied size bands are:
| Plot size band (sq yd; sq m) | Number of plots |
|---|---|
| 150–200; 125–167 | 30 |
| 200–250; 167–209 | 100 |
| 250–300; 209–251 | 24 |
| 300–400; 251–334 | 11 |
| 400–500; 334–418 | 5 |
| 500–1000; 418–836 | 8 |
The layout drawing identifies a 30.00 m wide existing road, a 30.00 m wide proposed road, 10.00 m and 9.14 m internal roads, and a 9.14 m existing internal road. These are drawing labels, not a statement of as-built road condition.
No tower, floor, apartment, building-footprint, building-height or building-circulation design is disclosed for this plotted development. The layout plan names facilities and utility areas, but the supplied materials do not include a measured site-progress assessment.
Homes, configurations & floor plans
The offering shown in the project records is plots, not apartments. The layout drawing’s plot schedule is software-read as 178 plots; the measurements below are derived from that drawing and are not RERA-filed saleable-area figures. No booked or available plot count is supplied. Layout record RERA record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 178 | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
Drawing-derived plot sizes range from 153.29 sq m (183.3 sq yd) to 510.09 sq m (610.1 sq yd); the median is 169.18 sq m (202.3 sq yd). The most common printed sizes are 167.23 sq m (55 plots), 153.29 sq m (30), 181.16 sq m (26), 241.55 sq m (20) and 183.95 sq m (6). These are software-read values from the plot schedule, not unit measurements filed as RERA saleable areas. Layout record
The drawing set contains two layout sheets and no apartment floor plans. The available floor-plan review records zero measured plans and says the two drawings contain no flats. Floor plans
Parking & vehicle circulation
The layout area statement records 0.00 for common parking area. No number of parking spaces, visitor or accessible parking provision, plot-wise parking allocation, parking structures, vehicle ramps, EV charging or dedicated parking arrangement is supplied. A plot should not be assumed to include an exclusive parking space based on these records.
The layout plan shows internal roads of 10.00 m and 9.14 m, and labels a 30.00 m wide existing road and a 30.00 m wide proposed road. The HMDA letter requires roads to be opened for access to neighbouring sites; the supplied records do not independently verify their present condition.
Amenities, recreation & open spaces
The HMDA draft layout letter specifies development works and facilities; the available materials do not establish that they have been completed. The layout’s recorded park/open-space and social-infrastructure areas are shown below. RERA progress entries for the listed amenity categories show 0% in the supplied data. RERA amenities
| Description / size | 4,515.65 sq m; layout plan records 7.51% of its stated net layout area. |
|---|---|
| Evidence source | HMDA draft layout letter and layout plan |
| Declared progress / verified status | Development is required by the layout conditions; supplied RERA amenity progress is 0%. Completion not independently verified. |
| Description / size | 1,505.61 sq m; 2.50% in the layout plan’s area statement. |
|---|---|
| Evidence source | HMDA draft layout letter and layout plan |
| Declared progress / verified status | Handover to the local body is a condition before final layout release; completion not independently verified. |
| Description / size | Quantity/size not supplied. |
|---|---|
| Evidence source | HMDA draft layout-plan amenity/utility list |
| Declared progress / verified status | Progress and completion not verified. |
| Description / size | Quantity/size not supplied. |
|---|---|
| Evidence source | HMDA draft layout-letter amenity/utility list |
| Declared progress / verified status | Progress and completion not verified. |
| Description / size | No specific building or size supplied. |
|---|---|
| Evidence source | RERA amenities list RERA amenities |
| Declared progress / verified status | Supplied progress: 0%. |
| Description / size | A third-party vendor listing mentions these features; no corresponding project-specific size or completion evidence is supplied. |
|---|---|
| Evidence source | Vendor listing Promoter website |
| Declared progress / verified status | Vendor claim only; not independently verified. |
Utilities, building services & safety
The HMDA draft layout letter specifies the following proposed development works: internal water-supply pipes, an assured water-supply source and overhead tank; underground drainage and a common septic tank/STP; storm-water drains and rainwater-harvesting pits; electrical supply lines, streetlights and a transformer; and a bio-compost unit. No capacity, source yield, treatment performance or commissioning evidence is supplied.
The draft layout plan also lists a septic tank, dust bin, TR, OHT, STP, tot-lot, utility area and social-infrastructure area. The RERA amenities list includes water supply, sewerage, storm-water drains, street lighting, solid-waste management, rainwater harvesting, energy management, fire-protection and electrical-meter/substation facilities; all listed amenity progress values in the supplied data are 0%. These records identify proposed or listed facilities, not completed works or statutory compliance. RERA amenities
No capacities or project-specific details are supplied for electrical backup, fire systems, access for emergency vehicles, security/CCTV, accessibility, or building lifts. Document index RERA amenities
Location, access & connectivity
The RERA certificate identifies the project location as Adibatla, Ibrahimpatnam, Ranga Reddy, 501510; project address fields give the locality/street as FEROZGUDA. The HMDA draft documents describe the site as Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District. RERA filing
The layout drawing labels a 30.00 m wide existing road, a 30.00 m wide proposed road, internal roads of 10.00 m and 9.14 m, and a 9.14 m existing internal road. The HMDA letter says roads should be opened for access to neighbouring sites.
The supplied location record places the cadastral parcel centroid at 17.235879453887023, 78.543108500036 and gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. A third-party listing names NSKK High School and BBR Super Speciality Hospital as 0.4 km away; that is a vendor-provided connectivity claim, not an independently verified distance. Location record Promoter website
Developer & development status
The registered promoter is Raganamoni Mahender. The TG-RERA certificate gives his address as House No. 7-69, Ravirala Village, Maheshwaram Mandal, Ranga Reddy District, PIN 501510, Telangana. The available records do not identify the legal entity type, corporate registration number, official project website or project contact details. Corporate record
The Form B affidavit, dated 17-03-2025, is a promoter declaration that the project land is free from encumbrance and that the project will be completed by 20-02-2027. The registration certificate is valid to 20/02/2027, unless extended. These are separate statements about the promoter’s completion undertaking and registration validity. The project identity data also records a proposed completion date of 20/06/2027; no independent construction-progress measurement or completion certificate is supplied. RERA record
A third-party listing describes the development as under construction and states “Plot Possession Jun’27”; that is vendor information, not a verified site-status record. Promoter website
Approvals, official records & documents
| Supplied document / reference | P02400009500; Form C certificate |
|---|---|
| What it establishes in this Overview | Registered project; certificate states validity from 20 February 2025 to 20 February 2027, unless extended. |
| Supplied document / reference | 012091/LO/HMDA/3217/SMD/2024, dated 20 February 2025; DRAFT LAYOUT LETTER |
|---|---|
| What it establishes in this Overview | Draft permission for an open plotted layout, with layout conditions and development/handover requirements. |
| Supplied document / reference | Application TS/058096/2024; drawing titled “PLAN SHOWING THE DRAFT LAYOUT…” |
|---|---|
| What it establishes in this Overview | Shows the plotted layout, area statement, roads, utilities, and 178-plot schedule. |
| Supplied document / reference | Form B, dated 17-03-2025 |
|---|---|
| What it establishes in this Overview | Promoter’s declarations and completion undertaking; not independent verification of title, progress or completion. |
| Supplied document / reference | Approved-layout lookup reported unavailable through the public HMDA DPMS portal in the supplied record. HMDA |
|---|---|
| What it establishes in this Overview | Public portal status does not itself establish approval or refusal. |
| Supplied document / reference | Not supplied. Document index |
|---|---|
| What it establishes in this Overview | No OC or completion-certificate status is documented in the available materials. |
Project at a glance
Project identity
Registered project name: JLM FOURTH CITY COUNTY
Project type: Plotted development
Phase / registered portion: Not separately identified; the registration is for the project.
TG-RERA registration number: P02400009500
Registration validity: 20 February 2025 to 20 February 2027, unless extended by the Authority. This is the registration period, not the project completion deadline.
Registered promoter: Raganamoni Mahender; the project identity fields give the promoter name as RAGANAMONI.
RERA status: Registered; certificate records a two-year validity period and requires quarterly updates.
Land and geographic identity
Locality / street: Ferozguda / FEROZGUDA
Revenue village: Adibatla is the village recorded in the RERA certificate and project identity fields; HMDA layout documents describe the site as Ferozguda Village.
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501510
Project survey numbers: 48P and 49P as recorded in the RERA certificate and project identity fields.
Survey numbers printed on the draft layout plan: 49p and 93p.
Registered site extent and land areas: Total site area 66,530.5 sq m; RERA land details state 6,373.68 sq m affected by road widening/FTL/Nala widening and 60,156.82 sq m net area. The HMDA draft layout letter separately records 4,524.5 sq m as master-plan road-affected area and 60,016.4 sq m as net site area.
Boundaries in RERA land details: East: neighbours’ land; West: neighbours’ land; North: neighbours’ land; South: 30 metres road and others layout.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 012091/LO/HMDA/3217/SMD/2024, dated 20 February 2025; the filed document is identified as a DRAFT LAYOUT LETTER.
Layout scale and use: Open plotted layout; 178 plots.
Approved built-up area: The draft layout plan records proposed built-up area, excluding and including parking, as 0.00.
Buildings / floors: Not disclosed for this plotted layout.
Parking: A common parking area is shown as 0.00 in the layout area statement; no parking-space count or plot-specific parking allocation is supplied.
Offering and status
Unit type: Plots; the RERA certificate describes the project as plotted.
Plot count and sizes: The layout drawing’s plot schedule is software-read as 178 plots; sizes range from 153.29 sq m to 510.09 sq m, with a median of 169.18 sq m. These are drawing-derived measurements, not RERA-filed unit-size figures.
Booked / available plots: Not supplied in the available project records.
Construction stage: RERA records the project as “New Project”; no independently verified site-progress measurement is provided.
Completion dates: Promoter’s Form B declaration states completion by 20-02-2027. The project identity record gives proposed completion as 20/06/2027.
OC / completion certificate: No occupancy or completion certificate is supplied; the project is a plotted layout. The HMDA document is a draft layout letter, not an OC.
The project story
JLM FOURTH CITY COUNTY is a proposed open plotted development registered with TG-RERA under P02400009500. The RERA record locates it in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, and identifies survey numbers 48P and 49P. The HMDA layout drawing describes the site as Ferozguda Village and depicts 178 plots.
The HMDA document on file is expressly a draft layout letter. It describes a layout whose internal development works are to include road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply pipes and an overhead tank, an assured water source, electrical lines and streetlights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are specified works and conditions, not evidence that the works are complete. The available records do not provide independently verified construction progress.
The HMDA letter also says that the development works are to be completed within five years under the cited G.O.Ms.No.62 condition and that the roads, open space, social-infrastructure and utility areas are to be handed over to the local body before release of final layout plans.
Master plan, architecture & building design
This is a plotted layout, not a building or apartment scheme. The HMDA draft layout letter records a total site area of 66,530.5 sq m, master-plan road-affected area of 4,524.5 sq m, and net site area of 60,016.4 sq m. Its area statement lists 36,618.32 sq m of plotted area, 13,553.53 sq m of layout roads, 4,515.65 sq m of open space/park, 1,505.61 sq m of social infrastructure and 245.13 sq m of utilities.
The layout-plan extraction gives a related area statement on a stated net layout area of 60,156.82 sq m: plots 36,618.32 sq m (60.87%); roads 13,553.53 sq m (22.53%); organized open space/park 4,515.65 sq m (7.51%); social infrastructure 1,505.61 sq m (2.50%); utilities 245.13 sq m (0.41%); and buffer-zone area 3,718.57 sq m (6.18%). The same plan records amenity area, LIG plotted area, EWS plotted area, green-belt area and common-parking area as 0.00.
The plot schedule is software-read from the drawing as 178 plots, with all 178 having a readable size. The size range is 153.29–510.09 sq m; the median is 169.18 sq m. The supplied size bands are:
150–200; 125–167: 30
200–250; 167–209: 100
250–300; 209–251: 24
300–400; 251–334: 11
400–500; 334–418: 5
500–1000; 418–836: 8
The layout drawing identifies a 30.00 m wide existing road, a 30.00 m wide proposed road, 10.00 m and 9.14 m internal roads, and a 9.14 m existing internal road. These are drawing labels, not a statement of as-built road condition.
No tower, floor, apartment, building-footprint, building-height or building-circulation design is disclosed for this plotted development. The layout plan names facilities and utility areas, but the supplied materials do not include a measured site-progress assessment.
Homes, configurations & floor plans
The offering shown in the project records is plots, not apartments. The layout drawing’s plot schedule is software-read as 178 plots; the measurements below are derived from that drawing and are not RERA-filed saleable-area figures. No booked or available plot count is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 178 | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
Drawing-derived plot sizes range from 153.29 sq m (183.3 sq yd) to 510.09 sq m (610.1 sq yd); the median is 169.18 sq m (202.3 sq yd). The most common printed sizes are 167.23 sq m (55 plots), 153.29 sq m (30), 181.16 sq m (26), 241.55 sq m (20) and 183.95 sq m (6). These are software-read values from the plot schedule, not unit measurements filed as RERA saleable areas.
The drawing set contains two layout sheets and no apartment floor plans. The available floor-plan review records zero measured plans and says the two drawings contain no flats.
Parking & vehicle circulation
The layout area statement records 0.00 for common parking area. No number of parking spaces, visitor or accessible parking provision, plot-wise parking allocation, parking structures, vehicle ramps, EV charging or dedicated parking arrangement is supplied. A plot should not be assumed to include an exclusive parking space based on these records.
The layout plan shows internal roads of 10.00 m and 9.14 m, and labels a 30.00 m wide existing road and a 30.00 m wide proposed road. The HMDA letter requires roads to be opened for access to neighbouring sites; the supplied records do not independently verify their present condition.
Amenities, recreation & open spaces
The HMDA draft layout letter specifies development works and facilities; the available materials do not establish that they have been completed. The layout’s recorded park/open-space and social-infrastructure areas are shown below. RERA progress entries for the listed amenity categories show 0% in the supplied data.
| Description / size | 4,515.65 sq m; layout plan records 7.51% of its stated net layout area. |
|---|---|
| Evidence source | HMDA draft layout letter and layout plan |
| Declared progress / verified status | Development is required by the layout conditions; supplied RERA amenity progress is 0%. Completion not independently verified. |
| Description / size | 1,505.61 sq m; 2.50% in the layout plan’s area statement. |
|---|---|
| Evidence source | HMDA draft layout letter and layout plan |
| Declared progress / verified status | Handover to the local body is a condition before final layout release; completion not independently verified. |
| Description / size | Quantity/size not supplied. |
|---|---|
| Evidence source | HMDA draft layout-plan amenity/utility list |
| Declared progress / verified status | Progress and completion not verified. |
| Description / size | Quantity/size not supplied. |
|---|---|
| Evidence source | HMDA draft layout-letter amenity/utility list |
| Declared progress / verified status | Progress and completion not verified. |
| Description / size | No specific building or size supplied. |
|---|---|
| Evidence source | RERA amenities list |
| Declared progress / verified status | Supplied progress: 0%. |
| Description / size | A third-party vendor listing mentions these features; no corresponding project-specific size or completion evidence is supplied. |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor claim only; not independently verified. |
Utilities, building services & safety
The HMDA draft layout letter specifies the following proposed development works: internal water-supply pipes, an assured water-supply source and overhead tank; underground drainage and a common septic tank/STP; storm-water drains and rainwater-harvesting pits; electrical supply lines, streetlights and a transformer; and a bio-compost unit. No capacity, source yield, treatment performance or commissioning evidence is supplied.
The draft layout plan also lists a septic tank, dust bin, TR, OHT, STP, tot-lot, utility area and social-infrastructure area. The RERA amenities list includes water supply, sewerage, storm-water drains, street lighting, solid-waste management, rainwater harvesting, energy management, fire-protection and electrical-meter/substation facilities; all listed amenity progress values in the supplied data are 0%. These records identify proposed or listed facilities, not completed works or statutory compliance.
No capacities or project-specific details are supplied for electrical backup, fire systems, access for emergency vehicles, security/CCTV, accessibility, or building lifts.
Location, access & connectivity
The RERA certificate identifies the project location as Adibatla, Ibrahimpatnam, Ranga Reddy, 501510; project address fields give the locality/street as FEROZGUDA. The HMDA draft documents describe the site as Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District.
The layout drawing labels a 30.00 m wide existing road, a 30.00 m wide proposed road, internal roads of 10.00 m and 9.14 m, and a 9.14 m existing internal road. The HMDA letter says roads should be opened for access to neighbouring sites.
The supplied location record places the cadastral parcel centroid at 17.235879453887023, 78.543108500036 and gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. A third-party listing names NSKK High School and BBR Super Speciality Hospital as 0.4 km away; that is a vendor-provided connectivity claim, not an independently verified distance.
Developer & development status
The registered promoter is Raganamoni Mahender. The TG-RERA certificate gives his address as House No. 7-69, Ravirala Village, Maheshwaram Mandal, Ranga Reddy District, PIN 501510, Telangana. The available records do not identify the legal entity type, corporate registration number, official project website or project contact details.
The Form B affidavit, dated 17-03-2025, is a promoter declaration that the project land is free from encumbrance and that the project will be completed by 20-02-2027. The registration certificate is valid to 20/02/2027, unless extended. These are separate statements about the promoter’s completion undertaking and registration validity. The project identity data also records a proposed completion date of 20/06/2027; no independent construction-progress measurement or completion certificate is supplied.
A third-party listing describes the development as under construction and states “Plot Possession Jun’27”; that is vendor information, not a verified site-status record.
Approvals, official records & documents
| Supplied document / reference | P02400009500; Form C certificate |
|---|---|
| What it establishes in this Overview | Registered project; certificate states validity from 20 February 2025 to 20 February 2027, unless extended. |
| Supplied document / reference | 012091/LO/HMDA/3217/SMD/2024, dated 20 February 2025; DRAFT LAYOUT LETTER |
|---|---|
| What it establishes in this Overview | Draft permission for an open plotted layout, with layout conditions and development/handover requirements. |
| Supplied document / reference | Application TS/058096/2024; drawing titled “PLAN SHOWING THE DRAFT LAYOUT…” |
|---|---|
| What it establishes in this Overview | Shows the plotted layout, area statement, roads, utilities, and 178-plot schedule. |
| Supplied document / reference | Form B, dated 17-03-2025 |
|---|---|
| What it establishes in this Overview | Promoter’s declarations and completion undertaking; not independent verification of title, progress or completion. |
| Supplied document / reference | Approved-layout lookup reported unavailable through the public HMDA DPMS portal in the supplied record. |
|---|---|
| What it establishes in this Overview | Public portal status does not itself establish approval or refusal. |
| Supplied document / reference | Not supplied. |
|---|---|
| What it establishes in this Overview | No OC or completion-certificate status is documented in the available materials. |
Frequently asked questions
Is JLM FOURTH CITY COUNTY registered with Telangana RERA?
Yes. JLM FOURTH CITY COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400009500; the registration status is New Project.
Who is the developer of JLM FOURTH CITY COUNTY?
The promoter named in the RERA registration is RAGANAMONI.
Where is JLM FOURTH CITY COUNTY located?
JLM FOURTH CITY COUNTY is in FEROZGUDA, Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will JLM FOURTH CITY COUNTY be completed?
The promoter's proposed date of completion filed with RERA is 20/06/2027. This is the promoter's declaration, not a guarantee.
More projects in Adibatla