Golden Oriole
FORRTUNE GREENHOMES · Rangareddy · RERA P02400000078
GOLDEN ORIOLE is a residential apartment project at Puppalguda main road, Puppalguda, Gandipet mandal, Ranga Reddy district, developed by registered promoter Forrtune Greenhomes. The site area is 14,028.87 sq. m, with five residential blocks and one clubhouse block; Block A has 1 Cellar + 1 Ground + 5 floors, Blocks B–E each have 1 Ground + 5 floors, and the clubhouse has 1 Ground + 3 floors. The TG-RERA filing records 245 homes in 2BHK and 3BHK configurations, under registration P02400000078. The proposed completion date recorded in the filing is 29/06/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | GOLDEN ORIOLE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | One registered project; the record does not identify a separate phase RERA record |
| TG-RERA registration | P02400000078 RERA record |
| Registration validity | 13/12/2018 to 29/06/2024; the certificate says five years and that validity could be extended by the Authority. The supplied certificate records no extension |
| Registered promoter | Forrtune Greenhomes (also rendered in the project filing and approval material as FORRTUNE GREEN HOMES / FORRTUNE Green Homes) RERA record |
| RERA status in project record | “On-Going Project”; proposed and revised completion date both recorded as 29/06/2024 RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Puppalguda main road RERA record RERA filing |
| Revenue village | Puppalguda (also written “Puppalaguda” in the technical approval) RERA record |
| Mandal | Gandipet RERA record |
| District | Ranga Reddy RERA record |
| PIN | 500089 RERA record |
| Project survey numbers | 218, 219, 220 and 221 RERA record |
| Subdivisions | Not specified in the project identity or approval records supplied Land records |
| Site area | Total 14,028.87 sq. m; net area 13,686.67 sq. m; area recorded as affected by road widening/FTL/Nala widening: 342.20 sq. m RERA filing |
| Boundaries as filed | North: 120 FEET ROAD; South: SURVEY NO 228 180 181; East: SURVEY NO 182 188 189; West: SURVEY NO 222 215 216 RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal technical approval | 012497/SKP/R1/U6/HMDA/08062018, dated 30/06/2018 Approvals record |
| Approved built-up area | 33,979.06 sq. m |
| Residential buildings and sanctioned floor configuration | Blocks A–E: Block A, 1 Cellar + 1 Ground + 5; Blocks B, C, D and E, each 1 Ground + 5 |
| Clubhouse | One proposed clubhouse block, 1 Ground + 3; recorded built-up area 1,196.8 sq. m |
| Building count | Five residential blocks and one clubhouse block in the technical approval |
| Parking levels | Block A includes a cellar; the supplied records do not specify a complete parking schedule or total parking-space count |
| Approved vs RERA-declared units | TG-RERA filing records 245 units in five blocks; the supplied extracted technical approval does not state a unit count RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable area | 2BHK: 92.88 sq. m; 3BHK: 122.26 sq. m RERA unit table |
| RERA portal booking snapshot | 2BHK: 65 total, 39 booked, 26 available; 3BHK: 180 total, 129 booked, 51 available. Portal counts have no supplied as-of date and are indicative RERA unit table |
| Construction stage | TG-RERA status says “On-Going Project”; an architect’s Form 1A states overall completion and identifies an HMDA occupancy certificate RERA record |
| Completion dates in filing | Proposed 29/06/2024; revised proposed 29/06/2024 RERA filing |
| Occupancy certificate record | 044996/SKP/OC/U6/HMDA /07042021, dated 3rdMay2021; Form 1A identifies scope as C+G+5 Floors. The supplied extract does not map that certificate to particular block letters |
2. The project story
Golden Oriole is a residential apartment development registered with TG-RERA as project P02400000078, at Puppalguda main road in Puppalguda village, Gandipet mandal, Ranga Reddy district. Its registered land identity covers Survey Nos. 218, 219, 220 and 221. The RERA filing describes a site of 14,028.87 sq. m in total, with a net area of 13,686.67 sq. m after the recorded 342.20 sq. m affected area. RERA record RERA filing
The HMDA technical approval identifies five residential blocks, A through E, and a separate proposed clubhouse block. Blocks B–E are recorded as Ground + 5 floors; Block A has a cellar as well as Ground + 5 floors. The TG-RERA unit record lists 245 apartments: 65 two-bedroom and 180 three-bedroom homes. RERA unit table
The project’s completion and occupancy information needs to be read by document and scope: the RERA filing retains the status “On-Going Project” and a completion date of 29/06/2024, while the architect’s Form 1A states that the registered project was completed and cites an HMDA occupancy certificate for “C+G+5 Floors,” dated 3rdMay2021. The certificate extract does not identify which block letters it covers, so the supplied material does not establish block-by-block OC scope. These are record statements, not an independent site inspection or current construction verification. RERA record RERA filing
3. Master plan, architecture & building design
The HMDA technical approval is for group housing on Survey Nos. 218, 219, 220 and 221, Puppalguda, over 14,028.87 sq. m. It records total built-up area of 33,979.06 sq. m and gives the following block areas and heights:
| Approved block | Use and floors | Built-up area | Height |
|---|---|---|---|
| A | Residential; 1 Cellar + 1 Ground + 5 | 10,149.42 sq. m | 17.9 |
| B | Residential; 1 Ground + 5 | 8,990.58 sq. m | 17 |
| C | Residential; 1 Ground + 5 | 4,932.96 sq. m | 17 |
| D | Residential; 1 Ground + 5 | 4,745.04 sq. m | 17 |
| E | Residential; 1 Ground + 5 | 3,964.26 sq. m | 17 |
| Clubhouse | Amenity; 1 Ground + 3 | 1,196.8 sq. m | 11.8 |
The approval records a mortgage in favour of the Metropolitan Commissioner, HMDA, of 3,459.37 sq. m of built-up area, described as parts of the ground and first floors in Blocks A and B and parts of the ground floor in Blocks C, D and E. The technical approval also states that parking or construction must not be placed in setback areas. RERA filing
The supplied approval extract does not provide a building-footprint schedule, floor-by-floor apartment arrangement, flats per floor, lift or stair counts, internal-road dimensions, or detailed landscaping/open-space drawings. Accordingly, those design details cannot be described from this evidence. The 33,979.06 sq. m figure is the approval’s total built-up area; it is not represented here as carpet area or saleable area.
4. Homes, configurations & floor plans
TG-RERA records two apartment configurations and their unit counts and saleable areas. Drawing-based carpet areas below are software measurements from approved floor-plan drawings, not RERA-filed carpet-area disclosures; the supplied measurement record says they require review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 65 | 39 | 26 | 92.88 sq. m | Software-measured: median 85.1 sq. m; range 79.9–89.3 sq. m | Not supplied |
| 3BHK | 180 | 129 | 51 | 122.26 sq. m | Software-measured: median 109.7 sq. m; range 82.2–120.7 sq. m | Not supplied |
The drawing sample comprises 14 measured 2BHK designs and 16 measured 3BHK designs from document 4380. One sampled 2BHK drawing labels a child’s bedroom, living room, dining area, kitchen, toilets, sit-out and wash area; one sampled 3BHK drawing labels a guest bedroom, child’s bedroom, master bedroom, living room, dining area, kitchen, toilets, sit-out and wash area. These are room labels from individual drawings, not a statement that every unit has the same arrangement. RERA unit details Floor plans
Saleable area is the RERA-filed unit-area figure; the software-measured carpet area is derived from drawing geometry and is not the same measurement. The supplied floor-plan note says saleable area also includes the home’s share of common areas. No separately verified balcony, utility, or loading-area measurements are supplied. Booking and availability counts are portal figures without an as-of date. RERA unit table Floor plans
5. Parking & vehicle circulation
The technical approval identifies a cellar level in Block A, but the supplied record does not provide the approved number of car or two-wheeler spaces, visitor or accessible bays, a parking schedule by block or level, ramp details, or EV charging provision. It therefore does not establish a spaces-per-home figure.
A vendor listing names “Car parking” as an amenity, but that is a vendor statement and does not establish a sanctioned count or an individual allottee’s exclusive parking allocation. No unit-specific parking allocation is included in the supplied material. Promoter website
6. Amenities, recreation & open spaces
The evidence includes amenities recorded in the RERA project data, a clubhouse block in HMDA’s technical approval, and a separate list from a vendor source. The available records do not establish current, independently inspected delivery of these facilities.
| Description / size | One proposed amenity block, Ground + 3; built-up area 1,196.8 sq. m |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approved as proposed in the extracted approval; completion status not independently verified |
| Description / size | Size not supplied |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied RERA amenities |
| Description / size | Size not supplied |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied RERA amenities |
| Description / size | Size and facilities not specified |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied RERA amenities |
| Description / size | Vendor lists gymnasium, badminton, basketball, jogging track, lawn tennis, swimming pool, skating, library, community hall, indoor games, aerobics and meditation areas, among others |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-marketed; sizes, approval status and delivery are not established by the supplied evidence Promoter website |
| Description / size | Vendor lists open-air theatre, children’s play area, gazebos, seating plaza and party lawn |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-marketed; sizes, approval status and delivery are not established by the supplied evidence Promoter website |
The RERA amenity record also lists water conservation/rainwater harvesting, energy management, water supply, sewerage and storm-water drainage; site utilities are addressed below. RERA amenities
7. Utilities, building services & safety
| Supplied evidence | RERA amenity record lists water supply as “YES,” 100%. Vendor specifications mention a sump and overhead tank. RERA amenities Promoter website |
|---|---|
| Status / limits of evidence | Source, storage capacities, treatment arrangements and current operating status are not supplied. |
| Supplied evidence | RERA amenity record lists sewerage and treatment/disposal of sewage and sullage water as “YES,” 100%, and storm-water drains as “YES,” 100%. HMDA approval requires an ETP. RERA amenities |
|---|---|
| Status / limits of evidence | The extracts do not give treatment capacity, reuse volumes, or independent operating verification. |
| Supplied evidence | HMDA approval lists a transformer, generator and emergency lighting. Vendor specifications state three-phase supply and individual meter boards. Promoter website |
|---|---|
| Status / limits of evidence | Capacities and current completion/operating status are not supplied. |
| Supplied evidence | Vendor listing names lifts; HMDA approval requires fire-resistant swing doors for collapsible lifts on all floors. Promoter website |
|---|---|
| Status / limits of evidence | Lift count, type, capacity and independent commissioning evidence are not supplied. |
| Supplied evidence | HMDA approval contains a fire-resistant lift-door condition. RERA amenity record lists fire protection and fire-safety requirements with no “YES” completion entry shown. RERA amenities |
|---|---|
| Status / limits of evidence | The supplied material does not establish the full fire system, escape-stair/access details, fire clearance, or completed statutory compliance. |
| Supplied evidence | HMDA approval lists a garbage house. Vendor listing names garbage disposal and CCTV cameras. Promoter website |
|---|---|
| Status / limits of evidence | Waste-management arrangements and installed/operating security systems are not independently verified. |
| Supplied evidence | No accessibility or accessible-circulation details supplied. |
|---|---|
| Status / limits of evidence | Unknown from the supplied record. |
The HMDA technical approval also lists an ETP, generator and emergency lighting as project provisions. Listing a requirement or provision does not itself establish current installation or operation.
8. Location, access & connectivity
The registered project location is Puppalguda main road, Puppalguda village, Gandipet mandal, Ranga Reddy district, Telangana 500089. A supplied software geocode identifies the cadastral parcel centroid as 17.40121, 78.35418. RERA record RERA filing Location record
Supplied location data lists these nearby places and measured distances:
| Place | Recorded distance |
|---|---|
| Sankaraya Eye Hospital | 0.4 km |
| Unnamed park | 0.4 km |
| Keystone International School | 1.3 km |
| ADP | 1.6 km |
| ICICI Bank | 1.7 km |
| Financial District (Nanakramguda) | 2.0 km |
| Holy Mary College | 2.4 km |
No approach-road description, public-transport information, or travel-time measurements are supplied. Location record
9. Developer & development status
The TG-RERA registered promoter is Forrtune Greenhomes, recorded as a partnership. The filing identifies Sambireddy Vanga as a partner and Suresh Venkata Somisetty as authorised signatory. The registration certificate gives a promoter-office address in Neknapur, Gandipet, Ranga Reddy, PIN 500089; the project address is separately recorded at Puppalguda main road, Puppalguda. No corporate registration number, company identifier beyond the masked tax identifier in the filing, official website, or official contact details are supplied here. Corporate record Parties record RERA filing
The promoter’s Form B declaration, dated 14 November 2018, records its stated undertakings concerning project completion, separate-account funding and audits, pending approvals, and non-discrimination. These are promoter declarations in the filed document.
The RERA record gives 29/06/2024 as both the proposed and revised completion date. The architect’s Form 1A states overall completion and records the HMDA OC reference for C+G+5 Floors, but the supplied extract does not identify the certificate’s block-by-block scope. No independent current site-progress inspection is supplied. RERA filing
10. Approvals, official records & documents
| Identifier / date | P02400000078, issued 13/12/2018; validity recorded to 29/06/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GOLDEN ORIOLE; certificate states five-year validity and includes the separate-account condition |
| Identifier / date | 012497/SKP/R1/U6/HMDA/08062018, dated 30/06/2018 |
|---|---|
| What the supplied record establishes | Technical approval for group housing on Survey Nos. 218, 219, 220 and 221, including five residential blocks and a proposed clubhouse; the document states that building plans were to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval |
| Identifier / date | 044996/SKP/OC/U6/HMDA /07042021, dated 3rdMay2021 |
|---|---|
| What the supplied record establishes | Architect’s Form 1A identifies the certificate and gives scope as C+G+5 Floors; block-letter scope is not specified in the supplied extract |
| Identifier / date | Dated 14 November 2018 |
|---|---|
| What the supplied record establishes | Promoter declaration signed by Sambireddy Vanga as managing partner, including project and compliance undertakings |
| Identifier / date | Documents 8132, 8133, 8134 and 4379 are identified in the supplied project record |
|---|---|
| What the supplied record establishes | Filed title reports and an encumbrance statement are available; detailed title, restriction and encumbrance analysis belongs in the corresponding report sections Document index |
| Identifier / date | Document 4380 |
|---|---|
| What the supplied record establishes | Building-plan document used for software measurement of sample floor plans; the extracted sheet-level material is incomplete for describing the full design |
The supplied material does not include an independently retrieved final sanction set, a complete approved layout drawing, or detailed block-by-block OC documentation. The approval extract identifies its delegated local authority and includes conditions, but this Overview does not determine the fulfilment of those conditions.
1. Project at a glance
Project identity
Registered project name: GOLDEN ORIOLE
Project type: Residential apartment project
Phase / registered portion: One registered project; the record does not identify a separate phase
TG-RERA registration: P02400000078
Registration validity: 13/12/2018 to 29/06/2024; the certificate says five years and that validity could be extended by the Authority. The supplied certificate records no extension
Registered promoter: Forrtune Greenhomes (also rendered in the project filing and approval material as FORRTUNE GREEN HOMES / FORRTUNE Green Homes)
RERA status in project record: “On-Going Project”; proposed and revised completion date both recorded as 29/06/2024
Land and geographic identity
Locality: Puppalguda main road
Revenue village: Puppalguda (also written “Puppalaguda” in the technical approval)
Mandal: Gandipet
District: Ranga Reddy
PIN: 500089
Project survey numbers: 218, 219, 220 and 221
Subdivisions: Not specified in the project identity or approval records supplied
Site area: Total 14,028.87 sq. m; net area 13,686.67 sq. m; area recorded as affected by road widening/FTL/Nala widening: 342.20 sq. m
Boundaries as filed: North: 120 FEET ROAD; South: SURVEY NO 228 180 181; East: SURVEY NO 182 188 189; West: SURVEY NO 222 215 216
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal technical approval: 012497/SKP/R1/U6/HMDA/08062018, dated 30/06/2018
Approved built-up area: 33,979.06 sq. m
Residential buildings and sanctioned floor configuration: Blocks A–E: Block A, 1 Cellar + 1 Ground + 5; Blocks B, C, D and E, each 1 Ground + 5
Clubhouse: One proposed clubhouse block, 1 Ground + 3; recorded built-up area 1,196.8 sq. m
Building count: Five residential blocks and one clubhouse block in the technical approval
Parking levels: Block A includes a cellar; the supplied records do not specify a complete parking schedule or total parking-space count
Approved vs RERA-declared units: TG-RERA filing records 245 units in five blocks; the supplied extracted technical approval does not state a unit count
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 92.88 sq. m; 3BHK: 122.26 sq. m
RERA portal booking snapshot: 2BHK: 65 total, 39 booked, 26 available; 3BHK: 180 total, 129 booked, 51 available. Portal counts have no supplied as-of date and are indicative
Construction stage: TG-RERA status says “On-Going Project”; an architect’s Form 1A states overall completion and identifies an HMDA occupancy certificate
Completion dates in filing: Proposed 29/06/2024; revised proposed 29/06/2024
Occupancy certificate record: 044996/SKP/OC/U6/HMDA /07042021, dated 3rdMay2021; Form 1A identifies scope as C+G+5 Floors. The supplied extract does not map that certificate to particular block letters
2. The project story
Golden Oriole is a residential apartment development registered with TG-RERA as project P02400000078, at Puppalguda main road in Puppalguda village, Gandipet mandal, Ranga Reddy district. Its registered land identity covers Survey Nos. 218, 219, 220 and 221. The RERA filing describes a site of 14,028.87 sq. m in total, with a net area of 13,686.67 sq. m after the recorded 342.20 sq. m affected area.
The HMDA technical approval identifies five residential blocks, A through E, and a separate proposed clubhouse block. Blocks B–E are recorded as Ground + 5 floors; Block A has a cellar as well as Ground + 5 floors. The TG-RERA unit record lists 245 apartments: 65 two-bedroom and 180 three-bedroom homes.
The project’s completion and occupancy information needs to be read by document and scope: the RERA filing retains the status “On-Going Project” and a completion date of 29/06/2024, while the architect’s Form 1A states that the registered project was completed and cites an HMDA occupancy certificate for “C+G+5 Floors,” dated 3rdMay2021. The certificate extract does not identify which block letters it covers, so the supplied material does not establish block-by-block OC scope. These are record statements, not an independent site inspection or current construction verification.
3. Master plan, architecture & building design
The HMDA technical approval is for group housing on Survey Nos. 218, 219, 220 and 221, Puppalguda, over 14,028.87 sq. m. It records total built-up area of 33,979.06 sq. m and gives the following block areas and heights:
| Approved block | Use and floors | Built-up area | Height |
|---|---|---|---|
| A | Residential; 1 Cellar + 1 Ground + 5 | 10,149.42 sq. m | 17.9 |
| B | Residential; 1 Ground + 5 | 8,990.58 sq. m | 17 |
| C | Residential; 1 Ground + 5 | 4,932.96 sq. m | 17 |
| D | Residential; 1 Ground + 5 | 4,745.04 sq. m | 17 |
| E | Residential; 1 Ground + 5 | 3,964.26 sq. m | 17 |
| Clubhouse | Amenity; 1 Ground + 3 | 1,196.8 sq. m | 11.8 |
The approval records a mortgage in favour of the Metropolitan Commissioner, HMDA, of 3,459.37 sq. m of built-up area, described as parts of the ground and first floors in Blocks A and B and parts of the ground floor in Blocks C, D and E. The technical approval also states that parking or construction must not be placed in setback areas.
The supplied approval extract does not provide a building-footprint schedule, floor-by-floor apartment arrangement, flats per floor, lift or stair counts, internal-road dimensions, or detailed landscaping/open-space drawings. Accordingly, those design details cannot be described from this evidence. The 33,979.06 sq. m figure is the approval’s total built-up area; it is not represented here as carpet area or saleable area.
4. Homes, configurations & floor plans
TG-RERA records two apartment configurations and their unit counts and saleable areas. Drawing-based carpet areas below are software measurements from approved floor-plan drawings, not RERA-filed carpet-area disclosures; the supplied measurement record says they require review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 65 | 39 | 26 | 92.88 sq. m | Software-measured: median 85.1 sq. m; range 79.9–89.3 sq. m | Not supplied |
| 3BHK | 180 | 129 | 51 | 122.26 sq. m | Software-measured: median 109.7 sq. m; range 82.2–120.7 sq. m | Not supplied |
The drawing sample comprises 14 measured 2BHK designs and 16 measured 3BHK designs from document 4380. One sampled 2BHK drawing labels a child’s bedroom, living room, dining area, kitchen, toilets, sit-out and wash area; one sampled 3BHK drawing labels a guest bedroom, child’s bedroom, master bedroom, living room, dining area, kitchen, toilets, sit-out and wash area. These are room labels from individual drawings, not a statement that every unit has the same arrangement.
Saleable area is the RERA-filed unit-area figure; the software-measured carpet area is derived from drawing geometry and is not the same measurement. The supplied floor-plan note says saleable area also includes the home’s share of common areas. No separately verified balcony, utility, or loading-area measurements are supplied. Booking and availability counts are portal figures without an as-of date.
5. Parking & vehicle circulation
The technical approval identifies a cellar level in Block A, but the supplied record does not provide the approved number of car or two-wheeler spaces, visitor or accessible bays, a parking schedule by block or level, ramp details, or EV charging provision. It therefore does not establish a spaces-per-home figure.
A vendor listing names “Car parking” as an amenity, but that is a vendor statement and does not establish a sanctioned count or an individual allottee’s exclusive parking allocation. No unit-specific parking allocation is included in the supplied material.
6. Amenities, recreation & open spaces
The evidence includes amenities recorded in the RERA project data, a clubhouse block in HMDA’s technical approval, and a separate list from a vendor source. The available records do not establish current, independently inspected delivery of these facilities.
| Description / size | One proposed amenity block, Ground + 3; built-up area 1,196.8 sq. m |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approved as proposed in the extracted approval; completion status not independently verified |
| Description / size | Size not supplied |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied |
| Description / size | Size not supplied |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied |
| Description / size | Size and facilities not specified |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Listed “YES,” 100%; no independent completion verification supplied |
| Description / size | Vendor lists gymnasium, badminton, basketball, jogging track, lawn tennis, swimming pool, skating, library, community hall, indoor games, aerobics and meditation areas, among others |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-marketed; sizes, approval status and delivery are not established by the supplied evidence |
| Description / size | Vendor lists open-air theatre, children’s play area, gazebos, seating plaza and party lawn |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Vendor-marketed; sizes, approval status and delivery are not established by the supplied evidence |
The RERA amenity record also lists water conservation/rainwater harvesting, energy management, water supply, sewerage and storm-water drainage; site utilities are addressed below.
7. Utilities, building services & safety
| Supplied evidence | RERA amenity record lists water supply as “YES,” 100%. Vendor specifications mention a sump and overhead tank. |
|---|---|
| Status / limits of evidence | Source, storage capacities, treatment arrangements and current operating status are not supplied. |
| Supplied evidence | RERA amenity record lists sewerage and treatment/disposal of sewage and sullage water as “YES,” 100%, and storm-water drains as “YES,” 100%. HMDA approval requires an ETP. |
|---|---|
| Status / limits of evidence | The extracts do not give treatment capacity, reuse volumes, or independent operating verification. |
| Supplied evidence | HMDA approval lists a transformer, generator and emergency lighting. Vendor specifications state three-phase supply and individual meter boards. |
|---|---|
| Status / limits of evidence | Capacities and current completion/operating status are not supplied. |
| Supplied evidence | Vendor listing names lifts; HMDA approval requires fire-resistant swing doors for collapsible lifts on all floors. |
|---|---|
| Status / limits of evidence | Lift count, type, capacity and independent commissioning evidence are not supplied. |
| Supplied evidence | HMDA approval contains a fire-resistant lift-door condition. RERA amenity record lists fire protection and fire-safety requirements with no “YES” completion entry shown. |
|---|---|
| Status / limits of evidence | The supplied material does not establish the full fire system, escape-stair/access details, fire clearance, or completed statutory compliance. |
| Supplied evidence | HMDA approval lists a garbage house. Vendor listing names garbage disposal and CCTV cameras. |
|---|---|
| Status / limits of evidence | Waste-management arrangements and installed/operating security systems are not independently verified. |
| Supplied evidence | No accessibility or accessible-circulation details supplied. |
|---|---|
| Status / limits of evidence | Unknown from the supplied record. |
The HMDA technical approval also lists an ETP, generator and emergency lighting as project provisions. Listing a requirement or provision does not itself establish current installation or operation.
8. Location, access & connectivity
The registered project location is Puppalguda main road, Puppalguda village, Gandipet mandal, Ranga Reddy district, Telangana 500089. A supplied software geocode identifies the cadastral parcel centroid as 17.40121, 78.35418.
Supplied location data lists these nearby places and measured distances:
Sankaraya Eye Hospital: 0.4 km
Unnamed park: 0.4 km
Keystone International School: 1.3 km
ADP: 1.6 km
ICICI Bank: 1.7 km
Financial District (Nanakramguda): 2.0 km
Holy Mary College: 2.4 km
No approach-road description, public-transport information, or travel-time measurements are supplied.
9. Developer & development status
The TG-RERA registered promoter is Forrtune Greenhomes, recorded as a partnership. The filing identifies Sambireddy Vanga as a partner and Suresh Venkata Somisetty as authorised signatory. The registration certificate gives a promoter-office address in Neknapur, Gandipet, Ranga Reddy, PIN 500089; the project address is separately recorded at Puppalguda main road, Puppalguda. No corporate registration number, company identifier beyond the masked tax identifier in the filing, official website, or official contact details are supplied here.
The promoter’s Form B declaration, dated 14 November 2018, records its stated undertakings concerning project completion, separate-account funding and audits, pending approvals, and non-discrimination. These are promoter declarations in the filed document.
The RERA record gives 29/06/2024 as both the proposed and revised completion date. The architect’s Form 1A states overall completion and records the HMDA OC reference for C+G+5 Floors, but the supplied extract does not identify the certificate’s block-by-block scope. No independent current site-progress inspection is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400000078, issued 13/12/2018; validity recorded to 29/06/2024 |
|---|---|
| What the supplied record establishes | Form C registration for GOLDEN ORIOLE; certificate states five-year validity and includes the separate-account condition |
| Identifier / date | 012497/SKP/R1/U6/HMDA/08062018, dated 30/06/2018 |
|---|---|
| What the supplied record establishes | Technical approval for group housing on Survey Nos. 218, 219, 220 and 221, including five residential blocks and a proposed clubhouse; the document states that building plans were to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval |
| Identifier / date | 044996/SKP/OC/U6/HMDA /07042021, dated 3rdMay2021 |
|---|---|
| What the supplied record establishes | Architect’s Form 1A identifies the certificate and gives scope as C+G+5 Floors; block-letter scope is not specified in the supplied extract |
| Identifier / date | Dated 14 November 2018 |
|---|---|
| What the supplied record establishes | Promoter declaration signed by Sambireddy Vanga as managing partner, including project and compliance undertakings |
| Identifier / date | Documents 8132, 8133, 8134 and 4379 are identified in the supplied project record |
|---|---|
| What the supplied record establishes | Filed title reports and an encumbrance statement are available; detailed title, restriction and encumbrance analysis belongs in the corresponding report sections |
| Identifier / date | Document 4380 |
|---|---|
| What the supplied record establishes | Building-plan document used for software measurement of sample floor plans; the extracted sheet-level material is incomplete for describing the full design |
The supplied material does not include an independently retrieved final sanction set, a complete approved layout drawing, or detailed block-by-block OC documentation. The approval extract identifies its delegated local authority and includes conditions, but this Overview does not determine the fulfilment of those conditions.
Frequently asked questions
Is GOLDEN ORIOLE registered with Telangana RERA?
Yes. GOLDEN ORIOLE is registered with the Telangana Real Estate Regulatory Authority as P02400000078; the registration status is On-Going Project.
Who is the developer of GOLDEN ORIOLE?
The promoter named in the RERA registration is FORRTUNE GREENHOMES.
Where is GOLDEN ORIOLE located?
GOLDEN ORIOLE is in Puppalguda main road, Puppalguda, Gandipet, Rangareddy, Telangana (500089).
When will GOLDEN ORIOLE be completed?
The promoter's proposed date of completion filed with RERA is 29/06/2024. This is the promoter's declaration, not a guarantee.