Sign in

Subishi Sapphire Residential Flats

Subishi Infra · Rangareddy · RERA P02400001760

Subishi Sapphire Residential Flats is a residential apartment project in Mokila, Shankarpalle Mandal, Ranga Reddy District, developed by the registered promoter, Subishi Infra. The project has a registered site extent of 6,151 sq m and one residential building with 1 Stilt + 5 upper floors. It comprises 95 homes: 60 2BHK and 35 3BHK apartments, with RERA-filed saleable areas of 117.74–125.51 sq m and 170.85–171.51 sq m, respectively. Its TG-RERA registration number is P02400001760, and its proposed completion date was 15/03/2022.

More from Subishi Infra · 7 projects →

01What we found

Period endedTG-RERA registration ran to 15 Mar 2022 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSubishi Sapphire Residential Flats RERA record
Project type / registered portionResidential apartment project; the registration record describes the registered project, with no separate phase name disclosed. RERA record RERA filing
TG-RERA registrationP02400001760 RERA record
Registration validity20/03/2020 to 15/03/2022; the supplied certificate record says it was not extended. Registration validity is separate from the completion date and the occupancy certificate.
Registered promoterSubishi Infra; the project record identifies the organisation as a partnership. RERA record Parties record Corporate record
RERA project statusOn-Going Project in the supplied project record. RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageMokila / Mokila Village RERA record RERA filing
Mandal / district / PINShankarpalle / Ranga Reddy / 501203 RERA record RERA filing
Survey numbers and subdivisions131/P, 132/P, 132/A2, and 132/A/1/1 RERA record Land records
Registered site extent6,151 sq m total and 6,151.00 sq m net area in the RERA land details. The commencement/technical approval extract separately states an extent of 5,173.40 Sq. Mt. Land records
Road-widening / FTL / nala affected area0 sq m in the RERA land details. Land records
Site boundaries in RERA recordNorth: Survey Nos 116 Parts; South: Road; East: Neighbours land; West: 9 Mtr Road Land records

Development identity

ItemProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA); technical approval 017291/SKP/R1/U6/HMDA/15112018, dated 15/03/2019. Approvals record
Local construction proceedingConstruction Proceeding Letter dated 22d March, 2019, referring to the HMDA approval.
Approved built-up areaThe approval extract states 12,671.25 as “Built up Area” and 16,987.41 as “Proposed Built-up Area”; the construction proceeding extract labels 12,671.25 Sq.Meters “Net Built Up Area” and 16,987.41 Sq.Mtrs “Total Built Up Area.” These are reported as labelled in the supplied extracts, not as carpet or saleable area.
Building count / floor configurationOne residential building, described as 1 Stilt + 5 upper floors.
RERA-declared units95 total units: 60 2BHK and 35 3BHK. Land records RERA unit table
Parking levels / sanctioned parking countThe approval requires the stilt/cellar area to be used exclusively for vehicle parking, but the supplied records do not establish a parking-space count or a cellar in the approved configuration.

Offering and status

ItemProject record
RERA-filed configurations and saleable area2BHK: 117.74–125.51 sq m; 3BHK: 170.85–171.51 sq m. RERA unit table RERA unit details
Booked / availableThe TG-RERA portal-derived figures show 60/60 2BHK and 35/35 3BHK booked, with 0 available in each configuration; the portal record has no stated as-of date, so these are indicative. RERA unit table RERA unit details
Declared completion datesOriginal and revised proposed completion: 15/03/2022. RERA record RERA filing
Occupancy certificateThe architect’s completion certificate records HMDA OC 045270/SKP/OC/U6/HMDA/17042, dated 22nd June 2021, for the project; the supplied certificate states the project is completed in all aspects. The record does not specify a tower-by-tower or phase-wise OC scope. Approvals record
Construction stageThe RERA filing includes amenity-progress percentages, but the supplied evidence does not independently verify current site progress. RERA amenities

2. The project story

Subishi Sapphire Residential Flats is a residential apartment project in Mokila Village, Shankarpalle Mandal, Ranga Reddy District. Its registered site identity covers survey numbers 131/P, 132/P, 132/A2, and 132/A/1/1. The project record describes a single residential building, with the technical approval specifying a stilt and five upper floors. RERA record Land records

The RERA filing declares 95 homes: 60 two-bedroom and 35 three-bedroom apartments. The recorded booking figures show all 95 as booked, though the portal extract has no as-of date. RERA unit table RERA unit details The project’s proposed completion date was 15/03/2022. A later architect’s certificate, dated 02/06/2026, certifies overall completion and records an HMDA occupancy certificate dated 22nd June 2021; this is a documentary certification, not an independent site inspection. RERA record

3. Master plan, architecture & building design

The HMDA technical approval describes one residential building as 1 Stilt + 5 upper floors on the four registered survey entries. The approval extract gives 12,671.25 as “Built up Area” and 16,987.41 as “Proposed Built-up Area”; the construction proceeding extract uses the labels “Net Built Up Area” and “Total Built Up Area” respectively. These figures are reproduced as stated in the documents and should not be treated as carpet or saleable area.

The approval refers to a stilt/cellar area for vehicle parking, a tot-lot, rainwater-harvesting structures, a transformer and a garbage house. Its conditions also call for greenery at the tot-lot and require construction to follow the sanctioned plan. The supplied records do not give a detailed floor-by-floor arrangement, flats per floor, building footprint, lift or stair count, internal circulation plan, or a separate approved commercial/common-area breakdown.

The RERA land record states a total and net area of 6,151 sq m; the commencement and technical-approval extracts state 5,173.40 Sq. Mt. as the extent. Both figures are given here as documented, without deriving a new area measure. Land records

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. The 2BHK carpet figures come from software measurement of the supplied approved floor-plan drawing, not from a RERA disclosure; the measurement is noted as requiring review against the drawing. No drawing-based carpet measurement is supplied for 3BHK units. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK60600117.74–125.51 sq m79.9–82.5 sq m; median 81.4 sq m (software-measured from drawing)33% (drawing-measurement record)
3BHK35350170.85–171.51 sq mNot suppliedNot supplied

The measured 2BHK drawing identifies living, dining, kitchen, two bedrooms, two toilets and a puja space for one typical flat. The stated carpet measurement is software-derived from drawing geometry and is not the RERA-filed saleable area. Saleable area and carpet area are distinct measures; the supplied drawing record cautions that saleable area includes the home’s share of common areas. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval says the stilt/cellar area is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. It does not state the number of parking spaces, identify resident or visitor allocations, or provide a unit-specific parking allocation in the supplied evidence.

The approval also refers to a service road where required and sets out a condition concerning sites abutting 18 mt. road widths. The supplied records do not establish a parking-space count, ramp arrangement, accessible spaces, EV charging, or pedestrian/vehicle separation.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 facilities or infrastructure items. Its progress percentages are reported as filed; they do not independently verify delivery or present condition. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size statedRERA amenity record RERA amenities0%; not independently verified
Water SupplyNo capacity statedRERA amenity record RERA amenitiesMarked “YES”; 50%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)No capacity statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Storm Water DrainsNo size statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Green Strip/TOT LOT/ParkNo size statedRERA amenity record RERA amenities; HMDA approvalMarked “YES”; 0%; not independently verified
Street LightingNo quantity statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Community BuildingsNo size statedRERA amenity record RERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo capacity statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Solid Waste Management and DisposalNo detail statedRERA amenity record RERA amenities0%; not independently verified
Water Conservation, Rain Water HarvestingNo capacity statedRERA amenity record RERA amenities; HMDA approvalMarked “YES”; 0%; not independently verified
Energy ManagementNo detail statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Fire Protection and Fire Safety RequirementsNo system details statedRERA amenity record RERA amenitiesMarked “YES”; 0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationNo capacity stated; approval separately refers to a transformerRERA amenity record RERA amenities; HMDA approvalMarked “YES”; 0%; not independently verified
Aggregate area of recreational Open SpaceNo area statedRERA amenity record RERA amenities0%; not independently verified

The promoter’s website-derived vendor information lists a clubhouse, gym, swimming pool, party/multipurpose hall, guest rooms, gardens, children’s play area and shuttle court, among other features. These are promoter-marketed claims, not evidence in the supplied RERA approval or amenity-progress record that the facilities were sanctioned or completed. Promoter website

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drainage, sewage/sullage treatment, rainwater harvesting, energy management and fire-safety requirements as “YES”, while recording 0% progress for those items except water supply at 50%. These are filing disclosures, not independent verification of installed or operational services. RERA amenities

The HMDA approval requires rainwater-harvesting structures, provision for a transformer and a garbage house, and compliance with fire-safety and structural conditions. It also states that an occupancy certificate is compulsory before occupation. The supplied material does not specify water source or storage capacity, STP capacity or reuse quantities, electrical load or backup capacity in the RERA filing, lift capacity or count, fire-system specifications, CCTV/access-control provision, or accessibility arrangements.

8. Location, access & connectivity

The registered location is Mokila Village, Shankarpalle Mandal, Ranga Reddy District, PIN 501203. The RERA-recorded site boundaries include a 9 Mtr Road on the west and a road on the south. RERA record Land records

A supplied location record places the nearest sampled Outer Ring Road interchange approximately 12.9 km away. This is a measured distance from the supplied location dataset; no travel time or public-transport detail is provided. Location record

9. Developer & development status

The registered promoter is Subishi Infra, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36ABVFS2593Q1ZX. The RERA certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500084. The supplied evidence does not provide a verified official contact number or email address. Parties record Corporate record

The project filing lists a landowner/promoter relationship with Piska Vijay Kumar under an AreaShare arrangement. The RERA record’s proposed completion date was 15/03/2022. The architect’s certificate dated 02/06/2026 certifies the registered project as completed in all aspects and records the HMDA occupancy certificate dated 22nd June 2021; the certificate’s stated scope is the project overall, with no separate phase or tower allocation stated. Parties record RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001760, issued 20/03/2020; valid to 15/03/2022
What the supplied record establishesRegistration certificate for Subishi Sapphire Residential Flats.
HMDA technical approval
Identifier / date017291/SKP/R1/U6/HMDA/15112018, 15/03/2019
What the supplied record establishesTechnical approval for a residential apartment building on survey numbers 131/P, 132/P, 132/A2 and 132/A/1/1; includes conditions and service provisions.
Construction Proceeding Letter
Identifier / dateApplication 017291/SKP/R1/U6/HMDA/15112018, dated 22d March, 2019
What the supplied record establishesPermission to proceed with construction, subject to conditions in the HMDA approval.
HMDA occupancy certificate, recorded in architect’s certificate
Identifier / date045270/SKP/OC/U6/HMDA/17042, dated 22nd June 2021
What the supplied record establishesThe architect’s certificate records this OC and certifies project completion in all aspects; certificate dated 02/06/2026.
Form B promoter declaration
Identifier / date28 day of March, 2011 as extracted
What the supplied record establishesPromoter declaration including land-title basis, encumbrance declaration, project-account commitments and completion undertaking.

The supplied material does not include a separate, fully legible approved floor-plan drawing extract beyond the referenced plan document, nor a public HMDA DPMS layout-lookup result. The approval and completion records above are the project documents available in this evidence set. Document index HMDA

Frequently asked questions

Is Subishi Sapphire Residential Flats registered with Telangana RERA?

Yes. Subishi Sapphire Residential Flats is registered with the Telangana Real Estate Regulatory Authority as P02400001760; the registration status is On-Going Project.

Who is the developer of Subishi Sapphire Residential Flats?

The promoter named in the RERA registration is Subishi Infra.

Where is Subishi Sapphire Residential Flats located?

Subishi Sapphire Residential Flats is in Mokila, Shankarpalle, Rangareddy, Telangana (501203).

When will Subishi Sapphire Residential Flats be completed?

The promoter's proposed date of completion filed with RERA is 15/03/2022. This is the promoter's declaration, not a guarantee.

More projects in Mokila