Sign in

The Rhythm

POOJA CRAFTED HOMES PRIVATE LIMITED · Rangareddy · RERA P02400001885

The Rhythm is a commercial project in Puppalaguda, Gandipet, Ranga Reddy. The registered promoter is POOJA CRAFTED HOMES PRIVATE LIMITED. The project covers 3,579.45 sq. m. and comprises one office building with 3 Cellar + 1 Ground + 12 Upper floors; its RERA unit data contains floor-labelled commercial entries, with no standard commercial configuration filed. It is registered under TG-RERA **P02400001885**, with a proposed completion date of 28/11/2025.

More from Pooja Crafted Homes Pvt Ltd · 7 projects →

01What we found

Period endedTG-RERA registration ran to 28 Nov 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameThe Rhythm RERA record
Project typeCommercial; the RERA filing classifies it as a new project. RERA record RERA filing
Phase / registered portionNo separate phase name or phase number is disclosed. The registration is for the project identified as Survey No. 319/Part. RERA record
TG-RERA registrationP02400001885; registration certificate issued 21/03/2020, stated valid from 21/03/2020 to 28/11/2025. RERA record
Registered promoterPOOJA CRAFTED HOMES PRIVATE LIMITED, a private limited company. RERA record Corporate record
RERA statusThe supplied certificate records an end date of 28/11/2025 and says extension is subject to Authority approval. The evidence supplied here does not establish an extension or a current registration status.

Land and geographic identity

FieldProject record
Locality / revenue villagePuppalaguda; the registration and title material also use Puppalguda, Puppalguda-ORRGC Village, and Poppalguda Village. RERA record RERA filing Land records
Mandal / district / PINGandipet; Ranga Reddy; 500089. RERA record
Project survey identity319/Part, also recorded as 319/PART and 319/P in project documents. The project filing does not identify a more specific subdivision. RERA record Land records
Registered site extent3,579.45 sq. m. in the project land details; the HMDA technical approval also states 3,579.45 Sq. Mt. RERA filing
Total / net areaTotal area 3,579.45 sq. m.; net area 3,579.45 sq. m.; area reported affected by road widening/FTL/Nala widening: 0 sq. m. RERA filing
BoundariesEast: Road; South: Road; West: agricultural land in Sy. No. 320; North: agricultural land in Sy. No. 319 Part. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalHMDA technical approval 022371/SKP/C1/U6/HMDA/03042019, dated 28 November 2019; building permission proceedings Roc. No. MC MNK TP 38 2019-2020, Manikonda Municipality, dated 20-01-2020. Approvals record
Approved built-up area14425.18 (approved built-up area, as recorded in the RERA project fields and sanction extraction). The sanction extraction separately lists proposed built-up area 14607.85. RERA filing
Building count and useOne building / office building, commercial use. RERA filing
Sanctioned floor configuration3 Cellar + 1 Ground + 12 Upper floors.
Parking / mortgage recordCellars and stilts identified for parking in the plan are to be used exclusively for parking; a separate parking-space count is not supplied. The approval records a mortgage in favour of HMDA covering built-up area.
Approved vs RERA-declared unitsRERA land details state 1 total building unit as per approved plan and 1 proposed building unit as per agreement. The RERA unit table contains 13 floor-labelled rows, not 13 separately described unit configurations. RERA filing RERA unit table RERA unit details

Offering and status

FieldProject record
Unit offeringCommercial floor-labelled entries; no standard commercial configuration is filed in the supplied unit data. RERA unit details RERA unit table
RERA saleable areaFiled entries range from 855.99 sq. m. to 1196.23 sq. m.; see the unit table below for each floor-labelled entry. RERA unit table RERA unit table
Booked / availablePortal-derived unit data shows 0 booked and 13 available, but carries no as-of date; treat as indicative, not a current inventory confirmation. These are floor-labelled filing rows, not an independently verified count of saleable units. RERA unit table RERA unit details
Construction stageNo independent site inspection or verified construction-progress measurement is supplied. The RERA amenities record lists sewerage at 85%; other listed percentages are 0%, which does not establish whether facilities are absent or incomplete. RERA amenities
Completion timelinePromoter’s Form B undertaking and the registration record give 28th Nov 2025 / 28/11/2025 as the completion date. No revised completion date is supplied.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The building permissions require an occupancy certificate before occupation.

2. The project story

The Rhythm is registered as a commercial development on 3,579.45 sq. m. in Survey No. 319/Part, Puppalaguda, Gandipet Mandal, Ranga Reddy District. The sanctioned scheme is one office building with three cellar levels, a ground floor and twelve upper floors. The land is identified in the RERA filing as having one building unit; the detailed unit table instead records floor-labelled entries. RERA record RERA filing RERA unit table

The project’s RERA certificate and promoter’s Form B state a completion date of 28/11/2025. The supplied evidence does not establish actual construction completion, an occupancy certificate, or a current site progress level. The 85% sewerage figure is a RERA amenities-table progress entry; it is not an overall construction-completion measure. RERA amenities

3. Master plan, architecture & building design

The RERA filing identifies a site of 3,579.45 sq. m. and approved built-up area of 14425.18. The HMDA technical approval describes a commercial office building of 3 Cellar + 1 Ground + 12 Upper floors and states a building height of 44.3. The approval extraction also lists proposed built-up area 14607.85; the figures are presented as recorded, without treating them as interchangeable area measures. RERA filing RERA filing

The plan approval records transformer, garbage house, rain-water-harvesting structure, tot-lot and sewage treatment plant as amenities/utilities. The municipality’s proceedings additionally list a generator room, electrical installations, laundry, car wash, solar water heating and lighting, storm-water drains and refuse chute. The supplied evidence does not provide building footprint, floor-by-floor floorplate dimensions, number of lifts or stairs, detailed circulation drawings, or a measured carpet-area schedule.

The plan records a 461.19 sq. m. gift deed for master-plan-road-affected area and a mortgage of built-up area in favour of HMDA; these are approval-record details, not a description of saleable area.

4. Homes, configurations & floor plans

The RERA unit data is organized by floor labels rather than by a filed commercial configuration. The portal-derived booking and availability counts have no recorded as-of date. The floor-plan dataset contains two drawings, neither measured as a flat/unit plan; therefore no software-measured carpet areas or room dimensions are available. RERA unit details Floor plans

Configuration / filing labelUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
GROUND FLOOR 01101855.99 sq. m.Not measuredNot supplied
FIRST FLOOR 01101863.92 sq. m.Not measuredNot supplied
SECOND FLOOR 011011196.23 sq. m.Not measuredNot supplied
THIRD FLOOR 011011196.23 sq. m.Not measuredNot supplied
FOURTH FLOOR 011011196.23 sq. m.Not measuredNot supplied
FIFTH FLOOR 011011196.23 sq. m.Not measuredNot supplied
SIXTH FLOOR 011011196.23 sq. m.Not measuredNot supplied
SEVENTH FLOOR1011196.23 sq. m.Not measuredNot supplied
EIGHT FLOOR1011196.23 sq. m.Not measuredNot supplied
NINTH FLOOR1011196.23 sq. m.Not measuredNot supplied
TENTH FLOOR1011196.23 sq. m.Not measuredNot supplied
ELEVENTH FLOOR1011196.23 sq. m.Not measuredNot supplied
TWELFTH FLOOR101925.64 sq. m.Not measuredNot supplied

The supplied RERA data labels these figures as saleable area. It does not supply carpet area or loading. Carpet area, balcony/utility area and common-area loading should therefore not be inferred from these saleable-area figures. RERA unit table Floor plans

5. Parking & vehicle circulation

The approvals identify three cellar levels and state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The RERA filing does not provide a parking-space count, resident or visitor allocation, accessible spaces, mechanical-parking provision, EV charging provision, or unit-specific parking allotments. A drawn or approved parking area does not by itself establish exclusive ownership or an allotment to a particular purchaser.

The Manikonda Municipality proceedings specify a minimum entry and exit width of 4.5 mtrs and height clearance of 5 mtrs. The HMDA technical approval also records a road width of 18 mt.; the supplied evidence does not describe internal driveway geometry or pedestrian separation.

6. Amenities, recreation & open spaces

Landscape / open space
FacilityTot-lot / green strip
Description / sizeTot-lot and open space are identified in the approval; no area or capacity is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusApproval requires it to be maintained as greenery; completion is not independently verified.
Landscape / open space
FacilityAggregate recreational open space
Description / sizeListed in the RERA amenities table; no size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusListed as “YES”; progress is recorded as 0%.
Convenience / community
FacilityInternal roads and footpaths
Description / sizeListed in the RERA amenities table; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified statusListed as “YES”; progress is recorded as 0%.
Convenience / community
FacilityStreet lighting
Description / sizeListed in the RERA amenities table.
Evidence sourceRERA amenities
Declared progress / verified statusListed as “YES”; progress is recorded as 0%.
Utilities-related amenity
FacilitySewerage (chamber, lines, septic tank, STP)
Description / sizeSTP and sewerage infrastructure are listed; no capacity supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities table reports 85%; independent verification not supplied.
Utilities-related amenity
FacilityRain-water harvesting
Description / sizeRain-water-harvesting structure is listed in the HMDA approval; municipality proceedings also require rain-water-harvesting structures.
Evidence sourceRERA amenities
Declared progress / verified statusListed as “YES” in the RERA amenities table; progress is recorded as 0%; completion not independently verified.
Convenience / community
FacilityGarbage house
Description / sizeListed in the approval documents.
Declared progress / verified statusNo completion status supplied.
Convenience / community
FacilityLaundry and car wash
Description / sizeListed in the municipal permission proceedings.
Declared progress / verified statusNo completion status supplied.

No clubhouse, indoor recreation facility, or sports facility is identified in the supplied project evidence. The RERA amenities-table percentages are declarations in that record and do not independently verify delivery. RERA amenities

7. Utilities, building services & safety

  • Water and rainwater: Water supply, rain-water-harvesting structures, a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres are specified in the municipal proceedings. The project evidence does not state the water source or establish that the tanks or harvesting system are completed. RERA amenities
  • Sewerage and drainage: The approvals list an STP, storm-water drains and sewerage facilities. The municipal proceedings require that effluent or drainage not overflow onto roads or public places. No STP capacity or verified commissioning record is supplied; the RERA amenities table records sewerage at 85%. RERA amenities
  • Electrical and backup systems: Transformer, electrical installations and generator room are listed. The approvals also require solar water heating and solar lighting provisions. Capacity and installed/operating status are not supplied.
  • Fire and life safety: The municipal permission requires compliance with fire-safety requirements, Fire Services Department clearance, and fire-service clearance before applying for an occupancy certificate. It also specifies an automatic sprinkler system if the basement area exceeds 200 Sq.mtrs. No fire clearance or installed-system verification is included in the supplied evidence.
  • Waste and building services: Garbage house and refuse chute are listed in approval records. No detailed waste-management process, security/CCTV provision, lift details, accessibility provisions, or service-lift capacity is supplied.

8. Location, access & connectivity

The registered location is Puppalguda/Puppalaguda, Gandipet Mandal, Ranga Reddy District, PIN 500089, with the project land identified as Survey No. 319/Part. The project boundary description records roads on the east and south sides. The supplied evidence includes a cadastral parcel-centroid geocode and the following nearby-point distances; it does not provide public-transport routes or travel times. RERA record RERA filing Location record

Nearby pointRecorded distance
Financial District (Nanakramguda)2.0 km
ICICI Bank1.7 km
Holy Mary College2.4 km
Sankaraya Eye Hospital0.4 km
ADP1.6 km
(unnamed park)0.4 km
Keystone International School1.3 km

9. Developer & development status

The registered promoter is POOJA CRAFTED HOMES PRIVATE LIMITED, identified as a company/private limited entity. The RERA filing lists its office address as CRUX Building, Sai Aishwarya Layout, Puppalaguda, Gandipet, Ranga Reddy, 500089; the supplied RERA certificate separately records the promoter office as Village: Mandal: Himayatha Nagar, District: Hyderabad, Pin: 500029. Corporate record Parties record

The project is being developed under a Development Agreement-cum-General Power of Attorney with landowner Vankina Chamundeswara Nath; the RERA land-owner record identifies an AreaShare agreement. The RERA certificate and Form B record a completion date of 28/11/2025. The supplied evidence does not establish current construction progress, a revised completion date, an extension of registration, or an occupancy/completion certificate. Parties record Land records

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001885; issued 21/03/2020; stated validity to 28/11/2025
What the supplied record establishesRegistration of The Rhythm and stated registration conditions. No extension is evidenced in the supplied certificate.
HMDA technical approval
Identifier / date022371/SKP/C1/U6/HMDA/03042019; 28 November 2019
What the supplied record establishesTechnical approval for the commercial office building, with the stated floor configuration and conditions.
Manikonda Municipality building permission
Identifier / dateRoc. No. MC MNK TP 38 2019-2020; 20-01-2020
What the supplied record establishesProceedings releasing plans technically approved by HMDA, subject to stated construction, safety, utility and occupancy requirements.
Form B promoter declaration
Identifier / dateDocument 103380
What the supplied record establishesPromoter’s declarations concerning title basis, encumbrances, project-account obligations, pending approvals and completion undertaking.
Encumbrance statement filed with RERA
Identifier / dateStatement No. 41656054; searched 01-10-2007 to 29-08-2019
What the supplied record establishesFiled statement records a Development Agreement-cum-GPA, gift settlement and mortgage entry. It is not a current encumbrance search.
Layout-plan document slot
Identifier / dateDocument 103378
What the supplied record establishesThe RERA document list requests a stamped layout approval/layout plan or a declaration if not applicable; the supplied record is not extracted as an available approved layout plan.
Occupancy / completion certificate
Identifier / dateNot present in supplied documents
What the supplied record establishesThe permissions require an occupancy certificate before occupation; no project occupancy or completion certificate is evidenced here.

Frequently asked questions

Is The Rhythm registered with Telangana RERA?

Yes. The Rhythm is registered with the Telangana Real Estate Regulatory Authority as P02400001885; the registration status is New Project.

Who is the developer of The Rhythm?

The promoter named in the RERA registration is POOJA CRAFTED HOMES PRIVATE LIMITED.

Where is The Rhythm located?

The Rhythm is in Puppalaguda, Puppalguda, Gandipet, Rangareddy, Telangana (500089).

When will The Rhythm be completed?

The promoter's proposed date of completion filed with RERA is 28/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Puppalguda