Subiksha Towers

SUBIKSHA INFRA · Medchal-Malkajgiri · RERA P02200002109

SUBIKSHA TOWERS is a residential apartment project in Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri. It is being developed by the registered promoter SUBIKSHA INFRA on a site of 4175.89 sq. m., with 1 building comprising 1 Cellar + 1 Stilt + 7 Upper floors and 88 3BHK apartments. The project is registered under TG-RERA number P02200002109, with a proposed completion date of 15/5/2025.

01What we found

Period endedTG-RERA registration ran to 15 May 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 120, Kompally -Shivalayam)
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameSUBIKSHA TOWERS
Project typeResidential apartment project RERA record
Phase / registered portionNot separately identified in the supplied record; the registration and approval describe one building. RERA record
TG-RERA registrationP02200002109
Registration validity24/08/2020 to 15/05/2025; the supplied certificate does not record an extension. Registration validity is distinct from the promised completion date.
Registered promoterSUBIKSHA INFRA
RERA statusThe supplied certificate records registration under section 5. It does not establish current registration status after 15/05/2025.

Land and geographic identity

ItemProject record
Locality / revenue villageRERA identity: Kompally -Shivalayam; approval documents describe Kompally Village or Kompalle Village. RERA record
Mandal / districtDundigal Gandimaisamma / Medchal-Malkajgiri RERA record
PIN500043 RERA record
Project survey number(s)Survey No. 120; title and development records also refer to 120/Part and Sy.No.120/P. Land records
Site extent4175.89 sq. m. site area and net area in the building permit record. HMDA technical approval also states 4,175.89 Sq. Mt.
Boundaries (RERA filing)East: CTS NO; West: EXISTING BUILDING; North: SURVEY NO 120; South: ROAD WIDTH. RERA filing
Road widening / FTL / nala affected area (RERA filing)0 sq. m. RERA filing

Development identity

ItemProject record
Sanctioning authoritiesHMDA technical approval, with building permission issued by Kompally Municipality.
Principal approval numbers / datesHMDA Technical Approval 026055/MED/R1/U6/HMDA/19072019, dated 15/05/2020; municipal Building Permit Order 0006/2020, dated 09 06 2020 (File No. 1287/2020).
Approved built-up areaHMDA technical-approval extract lists Built up Area 13084.96 and Total Built up Area 16488.57; the municipal permit extract lists built-up area entries of 6264.78 and 5579.97 Sqm. These are the figures as stated in the respective approval records; their scope is not further specified in the supplied extracts.
Building count1 building / tower in the RERA filing. RERA filing
Sanctioned floor configuration1 Cellar + 1 Stilt + 7 Upper floors in the HMDA and municipal approval extracts.
HeightHMDA technical-approval extract: 19.95; municipal permit extract: 21. Units are not stated in the supplied extracted fields.
Parking levels / countCellar and stilt are approved for parking; the supplied approval extract does not give a parking-space count.
Units88 RERA-filed 3BHK units; the land-details filing records 1 total building unit, so the supplied extracts do not reconcile that field with the unit inventory. RERA unit table RERA filing

Offering and status

ItemProject record
Configuration3BHK apartments RERA unit table
RERA-filed saleable area147.07 sq. m. per filed configuration RERA unit table
Booked / available0 booked / 88 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageNot disclosed in the supplied project evidence. No independently verified site-progress record is provided. Document index RERA amenities
Promoter-declared completion deadline15/5/2025, stated in the Form-B declaration.
Occupancy certificate (OC)The supplied documents state that an OC must be obtained before occupation and that the applicant should approach the authority for an OC after construction. No OC is included in the supplied documents.

The project story

SUBIKSHA TOWERS is registered as a residential apartment project on Survey No. 120, in the RERA-identified locality Kompally -Shivalayam, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. Its municipal permit describes the site as Kompally Village and authorizes a residential building of Cellar + Stilt + 7 Upper Floors. RERA record

The RERA unit record identifies 88 3BHK apartments. The approved-plan extract identifies a single residential building, while the supplied evidence does not include a construction-progress update or an independently verified site inspection. Accordingly, construction stage and completion on site cannot be established from this record. The promoter’s Form-B declaration undertook completion by 15/5/2025; that undertaking is not evidence that the building was completed or received an OC. RERA unit table

Master plan, architecture & building design

The project record describes one residential building on a site of 4175.89 sq. m. The HMDA technical approval and municipal building permit both describe Cellar + Stilt + 7 Upper Floors. The municipal permit states setbacks of Front 7.00 M, Rear 3.00 M, Side -1 3.00 M and Side - II 3.00 M.

Design itemEvidence in the supplied record
Site area4175.89 sq. m. site and net area in the municipal permit
Building arrangementOne residential building, named PROP (SUBIKSHA) in the HMDA technical approval
Floors1 Cellar + 1 Stilt + 7 Upper floors
Built-up areaHMDA extract: 13084.96 built-up area and 16488.57 total built-up area; municipal extract: 6264.78 and 5579.97 Sqm. built-up area entries. The supplied extracts do not define the scope of each figure.
Open space / landscapingThe HMDA conditions say the open space earmarked in the site layout plan is not to be altered and that no construction is permitted there; the municipal permit calls for a strip of greenery on the site periphery. The site layout drawing itself is not available in the supplied extracts.
Other drawing detailsFloor-plan document 115214 is listed as a layout plan/building-floor-plan document. The supplied record includes a software measurement from its typical floor plan, but not a complete drawing-based account of lifts, stairs, entrances, circulation or floor-by-floor unit arrangement. Document index

The approval records are not a substitute for a complete review of the stamped plans. No FSI-counted area is supplied. The approved built-up figures above are kept distinct from the RERA-filed saleable area and the software-measured carpet area below. RERA unit table

Homes, configurations & floor plans

The TG-RERA filing records 88 3BHK units, with 0 booked and 88 available in the portal snapshot (no as-of date supplied). Its filed saleable area is 147.07 sq. m. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK88088147.07 sq. m.85.1 sq. m. (software-measured)42% (software-derived)

The carpet-area estimate of 85.1 sq. m. (916 sq. ft.) is software-measured from the typical floor-plan drawing, not a RERA-filed measurement, and should be checked against the drawing. The measured plan shows three bedrooms, a living/dining area, kitchen, three toilets, balconies and a utility area. The supplied drawing data gives dimensions for several rooms, including living/dining 5.98 × 7.35 m, kitchen 2.55 × 2.97 m, and utility 1.22 × 2.97 m. Balcony and utility areas are excluded from the software-measured carpet area. Floor plans

The RERA saleable figure is a separate filed measure; the supplied drawing note says saleable area includes a share of common areas and is not the same as the drawing-measured carpet area. The file does not provide a RERA-filed balcony-area breakdown or an independently verified measurement. RERA unit table Floor plans

Parking & vehicle circulation

The sanctioned configuration includes a cellar and stilt, and the HMDA approval requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The supplied approval extracts do not state the number of parking spaces, identify visitor or accessible bays, or describe ramps, vehicle entry/exit arrangements, internal driveways or EV charging.

The RERA inventory marks the 3BHK units as mortgaged, but the supplied record does not establish any individual buyer’s parking allocation or exclusive parking rights. A vendor listing mentions covered car parking, but this is not a sanctioned space count or a documented unit allocation. RERA unit table Promoter website

Amenities, recreation & open spaces

The RERA amenity record lists facilities, but its progress fields are 0% where shown and do not establish completion. Approval documents also identify certain site provisions. The supplied material does not provide independent verification that any facility has been delivered. RERA amenities

Clubhouse / indoor
FacilityCommunity Buildings
Description / sizeSize not supplied
Evidence sourceRERA amenity record; municipal permit also lists Tot-lot RERA amenities
Declared progress / verified statusRERA availability marked YES; progress shown as 0%. No independent completion verification.
Sports / recreation
FacilityGreen Strip / Tot Lot / Park
Description / sizeSize not supplied
Evidence sourceRERA amenity record; municipal permit lists Tot-lot RERA amenities
Declared progress / verified statusProgress shown as 0%; no independent completion verification.
Landscape / open space
FacilityAggregate area of recreational Open Space
Description / sizeArea not supplied
Evidence sourceRERA amenity record; HMDA approval condition protects the earmarked open space RERA amenities
Declared progress / verified statusProgress shown as 0%; no independent completion verification.
Convenience / community
FacilityInternal Roads & Footpaths; Street Lighting
Description / sizeSizes / quantities not supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusAvailability marked YES for both; progress shown as 0%. No independent completion verification.

The RERA amenity record also lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station. These site services are addressed in the next section. RERA amenities

Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available. It lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, and fire protection and safety requirements, but the supplied record does not establish their completion or provide capacities. RERA amenities

The HMDA technical approval lists a Transformer, Garbage House, Rain Water Harvesting Structure and Sewage Treatment Plant (STP). The municipal permit requires a rainwater-harvesting structure and records 10 RWHPs. These are approval-recorded provisions, not verified operating facilities.

The available material does not establish water sources or storage capacity, STP capacity or reuse arrangements, storm-water design, backup-power capacity, lift count or capacity, fire-system specifications, security systems, or accessible routes. A third-party vendor listing mentions power backup, lifts, CCTV and fire safety, but these are vendor claims, not evidence of sanctioned or completed provision. Promoter website

Location, access & connectivity

The registered project location is Kompally -Shivalayam, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043. Approval documents refer to Kompally Village / Kompalle Village. The supplied project evidence does not set out a named approach road or public-transport service for the site. RERA record

The supplied location record gives these sampled distances: Location record

DestinationDistance
Outer Ring Road (nearest sampled interchange, approx)7.2 km
Bank of India0.1 km
St Martins Engineering College1.8 km
Sanjeevani Thyroid Sugar and Hormones Clinic0.6 km
Jayabheri Park0.9 km
Gundla Pochampally railway station2.7 km
Krishnaveni Talent School0.3 km

These are supplied location-record distances; the evidence does not specify measurement method or date. No travel-time figure is supplied.

Developer & development status

The registered promoter is SUBIKSHA INFRA, identified in the RERA filing as a partnership. Its listed address is FLAT NO 301, AIKYA ARCADE, PET BASHEERBAD, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500043. The promoter’s corporate identifier is masked in the supplied record as xxxxxx300C; no official website or contact details are supplied. Corporate record RERA filing RERA filing

The RERA filing identifies NALLA NARENDER REDDY as authorized signatory and lists partners JAKANAMPALLY PRASHANTH, MENNENI BALAKRISHAN RAO, MAMIDI RAVINDER REDDY, NALLA LAHARI, KATIPELLY INDRAKARAN REDDY, RANGINENI BALAJI RAO, MAMIDI PEDDA REDDY and SINGI REDDY SRINIVAS. The Form-B declaration by the authorized signatory undertakes completion by 15/5/2025. Parties record

The supplied evidence does not state construction progress or provide a later completion extension. The registration certificate states validity through 15/05/2025, while the municipal and HMDA records require an occupancy certificate before occupation; no occupancy certificate is included in the supplied material.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002109; issued 24/08/2020; valid through 15/05/2025
What it recordsForm C registration for SUBIKSHA TOWERS, with a separate-account condition.
HMDA technical approval
Identifier / date026055/MED/R1/U6/HMDA/19072019; 15/05/2020
What it recordsTechnical approval for a residential apartment building at Survey No. 120, with conditions including subsequent municipal sanction and OC requirements.
Kompally Municipality Building Permit Order
Identifier / date0006/2020; 09 06 2020; File No. 1287/2020
What it recordsBuilding permission for Survey No. 120, Cellar + Stilt + 7 Upper Floors.
Form-B promoter declaration
Identifier / dateDated 18/06/2020
What it recordsPromoter declaration concerning title, encumbrances, separate-account obligations and proposed completion by 15/5/2025.
Filed title and development records
Identifier / dateDeed and title material cited in Land & Title, including development agreement cum GPA 2790/2020
What it recordsRERA-filed material concerning the land and development arrangement.
Floor-plan document
Identifier / date115214
What it recordsListed as layout/building-floor-plan material; used for the software-measured unit details above.

The supplied documents include no occupancy/completion certificate. The public HMDA layout lookup is reported as unavailable in the supplied evidence, so no separate public layout-record result is presented here. Document index HMDA

Frequently asked questions

Is SUBIKSHA TOWERS registered with Telangana RERA?

Yes. SUBIKSHA TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02200002109; the registration status is New Project.

Who is the developer of SUBIKSHA TOWERS?

The promoter named in the RERA registration is SUBIKSHA INFRA.

Where is SUBIKSHA TOWERS located?

SUBIKSHA TOWERS is in KOMPALLY, Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).

When will SUBIKSHA TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 15/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Kompally Shivalayam