Avanis East Lake Avenue
AVANI INFRA DEVELOPERS · Medchal-Malkajgiri · RERA P02200002489
AVANIS EAST LAKE AVENUE is a plotted residential development in Edulabad Village, Ghatkesar Mandal, Medchal-Malkajgiri District, developed by the registered promoter AVANI INFRA DEVELOPERS. The site covers 85,489.84 sq m total area and 76,006.17 sq m net area; the supplied records do not state a number of towers, blocks, floors, homes or plots, or plot configurations. It is registered with TG-RERA as P02200002489, and the promoter’s completion undertaking is on or before 31.12.2022.
More from Avani Infra Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AVANIS EAST LAKE AVENUE RERA record |
| Project type | Plotted development / residential open-plot layout RERA record |
| Phase or registered portion | Not identified as a separate phase in the supplied registration record; the registration concerns the listed Edulabad survey lands. |
| TG-RERA registration number | P02200002489 RERA record |
| Registration validity | 31/01/2021 to 31/12/2022; the supplied certificate states that an extension would require Authority approval. |
| Registered promoter | AVANI INFRA DEVELOPERS; the registration certificate identifies the promoter as Avani Infra Developers. RERA record |
| RERA status in supplied record | The certificate records registration; it does not show an extension. The registration validity dates are not the same as the project completion undertaking or an occupancy/completion certificate. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Edulabad / Edulabad Village (also rendered “Edulabad-ORRGC Village” in HMDA approval material). RERA record |
| Mandal | Ghatkesar (approval records also use “Ghatkesar-ORRGC”). RERA record |
| District | Medchal-Malkajgiri. RERA record |
| PIN | 500088. RERA record |
| Project survey numbers | 1089/P, 1090/P, 1091/P, 1092/P and 1095/P. RERA record |
| Registered site extent | 85,489.84 sq m total site area; 76,006.17 sq m net site area. The filed approval material identifies 9,316.44 sq m as master-plan road-affected area. RERA filing |
| Boundaries in RERA filing | East: neighbouring land Sy. Nos. 1089 and 1086; west: neighbouring land Sy. No. 175; north: neighbouring land, survey number redacted in the supplied record; south: neighbouring land Sy. No. 176. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). |
| Principal layout approval | Final Layout Permit 000129/LO/Plg/HMDA/2020, dated 01 October 2022. |
| Earlier layout record | HMDA draft layout letter, approval number 000129/LO/Plg/HMDA/2020, dated 05 November 2020; it forwarded the proposal to Ghanpur Gram Panchayat for further action. |
| Approved built-up area | 47,361.52 sq m is recorded in the RERA land details as “Approved Built up Area”; the supplied material does not explain how this label relates to individual plot construction permissions. RERA filing |
| Building / tower count and floors | Not stated in the supplied RERA project records. The approval is for a plotted layout; individual building permissions are to be considered separately under the applicable building rules. |
| Parking | No project-wide parking count or parking-level arrangement is established in the supplied RERA records. Document index |
Offering and status
| Field | Record |
|---|---|
| RERA-filed offering | Residential plots; the supplied registration record does not provide a verified plot-count or plot-size schedule. |
| RERA-filed booked / available counts | Not available in the supplied evidence. Document index |
| Plot measurements from the layout drawing | Plot-area schedule is incomplete in the supplied drawing-derived record; no verified count or size bands are available here. Layout record |
| Completion undertaking | The promoter’s Form B declares completion on or before 31.12.2022. |
| Construction / development stage | No independently verified present-day site progress is supplied. The RERA amenity record gives low reported percentages for listed infrastructure items; it is not a site inspection. RERA amenities |
| Completion / occupancy certificate | No project completion certificate or occupancy certificate is established in the supplied documents. The available HMDA record is a final layout release, not an occupancy certificate for buildings. Document index |
The project story
AVANIS EAST LAKE AVENUE is registered with TG-RERA as a plotted residential development in Edulabad Village, Ghatkesar Mandal, Medchal-Malkajgiri District. The registered land comprises survey references 1089/P, 1090/P, 1091/P, 1092/P and 1095/P. RERA record
HMDA’s final-layout record identifies a net layout area of 76,006.17 sq m and a residential open-plot layout. It records handover of roads and open spaces to the local authority by registered gift deed and a relinquishment deed concerning mortgaged plots. The approval also states that building permissions for individual sites are to be considered separately; it does not establish that houses have been built or that any building has an occupancy certificate.
The promoter’s Form B undertaking set a completion deadline of 31.12.2022. The supplied evidence does not establish current site completion or provide a current, independently verified construction inspection. RERA amenities
Master plan, architecture & building design
This is a plotted layout rather than a supplied multi-storey building design. The HMDA filing records 85,489.84 sq m total site area, 9,316.44 sq m affected by the master-plan road, and 76,006.17 sq m net site area. Its land-use statement records 47,361.52 sq m plotted area, 20,478.98 sq m layout roads, 6,265.11 sq m park area and 1,900.55 sq m social infrastructure area. The supplied record also labels 1,900.55 sq m as “Open space”; these are reported as stated, without reclassifying the area.
The layout drawing-derived record reports that 21 plots—Nos. 37–39, 97–101, 155–162 and 229–233—were mortgaged to the approving authority as an approval condition. The later final-layout material records a relinquishment deed concerning mortgaged plots. Layout record
The RERA land details give an “Approved Built up Area” of 47,361.52 sq m. No building footprint, number of homes, floor configuration, tower arrangement, FSI-counted area or plot-by-plot building design is established in the supplied material. The drawing-derived plot count and sizes are incomplete and should not be treated as a verified schedule. RERA filing Layout record
Homes, configurations & floor plans
The RERA project is a plotted development. No RERA-filed plot inventory with unit counts, booked/available numbers or saleable-area schedule is available in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed in supplied RERA records | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout drawing-derived data does not provide a complete plot count or plot-size bands. The vendor-supplied listing describes plot sizes, but those figures are not presented here as TG-RERA-filed measurements. Layout record Promoter website
Parking & vehicle circulation
The supplied RERA material does not establish a total parking-space count, visitor or accessible parking provision, or individual plot parking allocations. The HMDA draft conditions refer to roads being open for access to neighbouring sites and to roads being taken over by the local authority; the final-layout conditions require roads to remain open for public access. These are layout access conditions, not evidence of a specified parking arrangement.
No exclusive parking ownership or allocation to a purchaser is established by the supplied documents. Document index
Amenities, recreation & open spaces
The HMDA approval records layout-level open space, roads and social infrastructure. The RERA amenity record marks several infrastructure categories as available but reports 0% for most listed categories and 10% for internal roads and footpaths. These are filed progress figures, not independent confirmation of completion. RERA amenities
| Description / size | Not disclosed |
|---|---|
| Evidence source | RERA amenities Document index |
| Declared progress / verified status | Not established |
| Description / size | No size or quantity disclosed |
|---|---|
| Declared progress / verified status | Condition in draft approval; completion not verified |
| Description / size | Areas as recorded in HMDA approval material |
|---|---|
| Declared progress / verified status | Final-layout record states roads and open spaces were handed over to the local authority; current maintenance or physical completion is not independently verified. |
| Description / size | Not disclosed |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Completion not independently verified |
Utilities, building services & safety
HMDA’s draft layout conditions list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue planting, park development, rainwater-harvesting pits, solid-waste arrangements and a bio-compost unit. The final-layout record refers to water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures. These are approval-recorded provisions; the supplied evidence does not establish their current operational status or capacities.
The draft conditions also require potable-water connectivity arrangements, garbage segregation and LED street lighting. Fire-protection requirements appear as a category in the RERA amenity record, but no specific system, clearance or completed fire-safety installation is documented in the supplied material. No electrical backup, CCTV, accessibility design, lift provision or utility capacity is established. RERA amenities Document index
Location, access & connectivity
The registered location is Edulabad Village, Ghatkesar Mandal, Medchal-Malkajgiri District, Telangana 500088. RERA record
The HMDA layout record identifies a 36 M wide master-plan road affected area and requires layout roads to remain open for access to neighbouring sites; the final-layout conditions require roads to remain open for public access.
Location data supplied for this review gives an approximate sampled Outer Ring Road interchange distance of 4.8 km and a distance of 0.8 km to Megha Institute Of Engineering And Technology For Women. These are location-dataset distances, not TG-RERA-filed travel-time claims. Location record
Developer & development status
The registered promoter is AVANI INFRA DEVELOPERS, identified in the RERA filing as a partnership. Its supplied corporate identifier is GSTIN 36AAWFA7397Q1Z4. The RERA certificate lists a promoter office at Nallakunta, Amberpet Mandal, Hyderabad District, PIN 500013; the project filing separately gives an address at Manorama Golden Towers, Shivam Road, Ghanpur Gram Panchayat, Edulabad Village, Ghatkesar, Medchal-Malkajgiri, PIN 500088. Corporate record RERA filing
The promoter’s Form B affidavit, dated 03/12/2020, declares that the project would be completed on or before 31.12.2022 and that the land was free from encumbrances. These are promoter declarations in the filed affidavit, not independent findings.
No current site inspection or independently verified completion status is supplied. The supplied TG-RERA certificate records validity through 31/12/2022 and does not show an extension. The final HMDA layout release does not establish a building completion or occupancy certificate.
Approvals, official records & documents
| What it establishes in the supplied evidence | Registration of AVANIS EAST LAKE AVENUE, P02200002489, with validity from 31/01/2021 to 31/12/2022. |
|---|
| What it establishes in the supplied evidence | Draft open-plot layout approval material for the listed survey lands, dated 05 November 2020; it forwards the proposal to Ghanpur Gram Panchayat for further action. |
|---|
| What it establishes in the supplied evidence | Final residential open-plot layout record, permit 000129/LO/Plg/HMDA/2020, dated 01 October 2022, for the listed Edulabad survey lands. |
|---|
| What it establishes in the supplied evidence | The final-layout material cites registered gift deed 2388/2022, dated 26-03-2022, and relinquishment deed 6568/2022, dated 15/09/2022. |
|---|
| What it establishes in the supplied evidence | Promoter declaration dated 03/12/2020, including the completion undertaking and stated title/encumbrance declarations. |
|---|
| What it establishes in the supplied evidence | No individual building approval or building completion/occupancy certificate is established in the supplied evidence. The HMDA material concerns layout approval and release. |
|---|---|
| Reference | Document index |
Project at a glance
Project identity
Registered project name: AVANIS EAST LAKE AVENUE
Project type: Plotted development / residential open-plot layout
Phase or registered portion: Not identified as a separate phase in the supplied registration record; the registration concerns the listed Edulabad survey lands.
TG-RERA registration number: P02200002489
Registration validity: 31/01/2021 to 31/12/2022; the supplied certificate states that an extension would require Authority approval.
Registered promoter: AVANI INFRA DEVELOPERS; the registration certificate identifies the promoter as Avani Infra Developers.
RERA status in supplied record: The certificate records registration; it does not show an extension. The registration validity dates are not the same as the project completion undertaking or an occupancy/completion certificate.
Land and geographic identity
Locality / revenue village: Edulabad / Edulabad Village (also rendered “Edulabad-ORRGC Village” in HMDA approval material).
Mandal: Ghatkesar (approval records also use “Ghatkesar-ORRGC”).
District: Medchal-Malkajgiri.
PIN: 500088.
Project survey numbers: 1089/P, 1090/P, 1091/P, 1092/P and 1095/P.
Registered site extent: 85,489.84 sq m total site area; 76,006.17 sq m net site area. The filed approval material identifies 9,316.44 sq m as master-plan road-affected area.
Boundaries in RERA filing: East: neighbouring land Sy. Nos. 1089 and 1086; west: neighbouring land Sy. No. 175; north: neighbouring land, survey number redacted in the supplied record; south: neighbouring land Sy. No. 176.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval: Final Layout Permit 000129/LO/Plg/HMDA/2020, dated 01 October 2022.
Earlier layout record: HMDA draft layout letter, approval number 000129/LO/Plg/HMDA/2020, dated 05 November 2020; it forwarded the proposal to Ghanpur Gram Panchayat for further action.
Approved built-up area: 47,361.52 sq m is recorded in the RERA land details as “Approved Built up Area”; the supplied material does not explain how this label relates to individual plot construction permissions.
Building / tower count and floors: Not stated in the supplied RERA project records. The approval is for a plotted layout; individual building permissions are to be considered separately under the applicable building rules.
Parking: No project-wide parking count or parking-level arrangement is established in the supplied RERA records.
Offering and status
RERA-filed offering: Residential plots; the supplied registration record does not provide a verified plot-count or plot-size schedule.
RERA-filed booked / available counts: Not available in the supplied evidence.
Plot measurements from the layout drawing: Plot-area schedule is incomplete in the supplied drawing-derived record; no verified count or size bands are available here.
Completion undertaking: The promoter’s Form B declares completion on or before 31.12.2022.
Construction / development stage: No independently verified present-day site progress is supplied. The RERA amenity record gives low reported percentages for listed infrastructure items; it is not a site inspection.
Completion / occupancy certificate: No project completion certificate or occupancy certificate is established in the supplied documents. The available HMDA record is a final layout release, not an occupancy certificate for buildings.
The project story
AVANIS EAST LAKE AVENUE is registered with TG-RERA as a plotted residential development in Edulabad Village, Ghatkesar Mandal, Medchal-Malkajgiri District. The registered land comprises survey references 1089/P, 1090/P, 1091/P, 1092/P and 1095/P.
HMDA’s final-layout record identifies a net layout area of 76,006.17 sq m and a residential open-plot layout. It records handover of roads and open spaces to the local authority by registered gift deed and a relinquishment deed concerning mortgaged plots. The approval also states that building permissions for individual sites are to be considered separately; it does not establish that houses have been built or that any building has an occupancy certificate.
The promoter’s Form B undertaking set a completion deadline of 31.12.2022. The supplied evidence does not establish current site completion or provide a current, independently verified construction inspection.
Master plan, architecture & building design
This is a plotted layout rather than a supplied multi-storey building design. The HMDA filing records 85,489.84 sq m total site area, 9,316.44 sq m affected by the master-plan road, and 76,006.17 sq m net site area. Its land-use statement records 47,361.52 sq m plotted area, 20,478.98 sq m layout roads, 6,265.11 sq m park area and 1,900.55 sq m social infrastructure area. The supplied record also labels 1,900.55 sq m as “Open space”; these are reported as stated, without reclassifying the area.
The layout drawing-derived record reports that 21 plots—Nos. 37–39, 97–101, 155–162 and 229–233—were mortgaged to the approving authority as an approval condition. The later final-layout material records a relinquishment deed concerning mortgaged plots.
The RERA land details give an “Approved Built up Area” of 47,361.52 sq m. No building footprint, number of homes, floor configuration, tower arrangement, FSI-counted area or plot-by-plot building design is established in the supplied material. The drawing-derived plot count and sizes are incomplete and should not be treated as a verified schedule.
Homes, configurations & floor plans
The RERA project is a plotted development. No RERA-filed plot inventory with unit counts, booked/available numbers or saleable-area schedule is available in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed in supplied RERA records | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout drawing-derived data does not provide a complete plot count or plot-size bands. The vendor-supplied listing describes plot sizes, but those figures are not presented here as TG-RERA-filed measurements.
Parking & vehicle circulation
The supplied RERA material does not establish a total parking-space count, visitor or accessible parking provision, or individual plot parking allocations. The HMDA draft conditions refer to roads being open for access to neighbouring sites and to roads being taken over by the local authority; the final-layout conditions require roads to remain open for public access. These are layout access conditions, not evidence of a specified parking arrangement.
No exclusive parking ownership or allocation to a purchaser is established by the supplied documents.
Amenities, recreation & open spaces
The HMDA approval records layout-level open space, roads and social infrastructure. The RERA amenity record marks several infrastructure categories as available but reports 0% for most listed categories and 10% for internal roads and footpaths. These are filed progress figures, not independent confirmation of completion.
| Description / size | Not disclosed |
|---|---|
| Declared progress / verified status | Not established |
| Description / size | No size or quantity disclosed |
|---|---|
| Declared progress / verified status | Condition in draft approval; completion not verified |
| Description / size | Areas as recorded in HMDA approval material |
|---|---|
| Declared progress / verified status | Final-layout record states roads and open spaces were handed over to the local authority; current maintenance or physical completion is not independently verified. |
| Description / size | Not disclosed |
|---|---|
| Declared progress / verified status | Completion not independently verified |
Utilities, building services & safety
HMDA’s draft layout conditions list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue planting, park development, rainwater-harvesting pits, solid-waste arrangements and a bio-compost unit. The final-layout record refers to water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures. These are approval-recorded provisions; the supplied evidence does not establish their current operational status or capacities.
The draft conditions also require potable-water connectivity arrangements, garbage segregation and LED street lighting. Fire-protection requirements appear as a category in the RERA amenity record, but no specific system, clearance or completed fire-safety installation is documented in the supplied material. No electrical backup, CCTV, accessibility design, lift provision or utility capacity is established.
Location, access & connectivity
The registered location is Edulabad Village, Ghatkesar Mandal, Medchal-Malkajgiri District, Telangana 500088.
The HMDA layout record identifies a 36 M wide master-plan road affected area and requires layout roads to remain open for access to neighbouring sites; the final-layout conditions require roads to remain open for public access.
Location data supplied for this review gives an approximate sampled Outer Ring Road interchange distance of 4.8 km and a distance of 0.8 km to Megha Institute Of Engineering And Technology For Women. These are location-dataset distances, not TG-RERA-filed travel-time claims.
Developer & development status
The registered promoter is AVANI INFRA DEVELOPERS, identified in the RERA filing as a partnership. Its supplied corporate identifier is GSTIN 36AAWFA7397Q1Z4. The RERA certificate lists a promoter office at Nallakunta, Amberpet Mandal, Hyderabad District, PIN 500013; the project filing separately gives an address at Manorama Golden Towers, Shivam Road, Ghanpur Gram Panchayat, Edulabad Village, Ghatkesar, Medchal-Malkajgiri, PIN 500088.
The promoter’s Form B affidavit, dated 03/12/2020, declares that the project would be completed on or before 31.12.2022 and that the land was free from encumbrances. These are promoter declarations in the filed affidavit, not independent findings.
No current site inspection or independently verified completion status is supplied. The supplied TG-RERA certificate records validity through 31/12/2022 and does not show an extension. The final HMDA layout release does not establish a building completion or occupancy certificate.
Approvals, official records & documents
| What it establishes in the supplied evidence | Registration of AVANIS EAST LAKE AVENUE, P02200002489, with validity from 31/01/2021 to 31/12/2022. |
|---|
| What it establishes in the supplied evidence | Draft open-plot layout approval material for the listed survey lands, dated 05 November 2020; it forwards the proposal to Ghanpur Gram Panchayat for further action. |
|---|
| What it establishes in the supplied evidence | Final residential open-plot layout record, permit 000129/LO/Plg/HMDA/2020, dated 01 October 2022, for the listed Edulabad survey lands. |
|---|
| What it establishes in the supplied evidence | The final-layout material cites registered gift deed 2388/2022, dated 26-03-2022, and relinquishment deed 6568/2022, dated 15/09/2022. |
|---|
| What it establishes in the supplied evidence | Promoter declaration dated 03/12/2020, including the completion undertaking and stated title/encumbrance declarations. |
|---|
| What it establishes in the supplied evidence | No individual building approval or building completion/occupancy certificate is established in the supplied evidence. The HMDA material concerns layout approval and release. |
|---|
Frequently asked questions
Is AVANIS EAST LAKE AVENUE registered with Telangana RERA?
Yes. AVANIS EAST LAKE AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02200002489; the registration status is New Project.
Who is the developer of AVANIS EAST LAKE AVENUE?
The promoter named in the RERA registration is AVANI INFRA DEVELOPERS.
Where is AVANIS EAST LAKE AVENUE located?
AVANIS EAST LAKE AVENUE is in EDULABAD VILLAGE, Edulabad, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).
When will AVANIS EAST LAKE AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2022. This is the promoter's declaration, not a guarantee.