Sign in

Sunyuga Vista Block A

SUNYUGA INFRA PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200003023

SUNYUGA VISTA BLOCK A is a residential apartment project in Gundlapochampally Muncipality, Medchal-Malkajgiri, Medchal-Malkajgiri district. The registered promoter is SUNYUGA INFRA PRIVATE LIMITED. The project has a site extent of 3986.89 sq. m and one building, Block A, with 1 Cellar + 1 Ground + 5 upper floors and 82 apartments: 46 2BHK and 36 3BHK units. It is registered under TG-RERA registration P02200003023, and the promoter’s RERA-filed completion undertaking is 31/12/2024.

📘 Project brochure from the promoter’s website ↗

More from Sunyuga Infra Pvt Ltd · 12 projects →

01What we found

Period endedTG-RERA registration ran to 31 Dec 2024 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSUNYUGA VISTA BLOCK A RERA record
Project type and registered portionResidential apartment project; the registered portion is Block A. The registration certificate and filed plans identify one building. RERA record
TG-RERA registrationP02200003023
Registration validity17/06/2021–31/12/2024; the supplied certificate says it may be extended by the Authority under the Act and Rules. This is the registration-validity period, not an occupancy certificate or a building-completion date.
Registered promoterSUNYUGA INFRA PRIVATE LIMITED, a company. RERA record Corporate record
RERA status in supplied recordThe project is registered. The supplied record does not show an extension of its registration.

Land and geographic identity

ItemProject record
Locality / revenue-village wordingProject records use Gundlapochampally Muncipality as locality and village wording; the plan identifies Gundla Pochampalle and the occupancy records use Gundlapochampally. Exact revenue-village identity should be confirmed from the land records. RERA record Land records
MandalNot consistently established in the supplied project identity fields; the approval records refer to Gundlapochampally Muncipality/Mandal and the occupancy record to Medchal (M). Land records
District / PINMedchal-Malkajgiri; PIN 500043 in the project identity and registration record. RERA record
Project survey numbers and subdivisions388/1/A/U, 388/1/A/EE, 388/1/A/AA and 388/R/A/1. RERA record Land records
Site extentProject filing and plans state 3986.89 sq. m. The commencement approval records 3,979.66 Sq. Mt. as net extent. The occupancy record states site area 3,986.89 and net area 3,979.66. RERA filing
Boundaries filedEast: ROAD WIDTH 12; west: LAND OF C VEERESH YADAV; north and south: LAND IN SY NO 388 OBLICK PART. RERA filing

Development identity

ItemProject record
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA); the commencement approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans. Approvals record
Principal building-permit reference and date036078/MED/R1/U6/HMDA/30052020, dated 23/03/2021. Approvals record
Building and floorsOne residential building, Block A: 1 Cellar + 1 Ground + 5 upper floors.
Height17.99 MT. in the plan; the occupancy record also states 17.99 m for both sanctioned and completed building.
Approved-area figures as recordedPlan: Proposed Net BUA Area 10269.59; commencement approval: Proposed Built-up Area 10248.22 and Built up Area 10150.2; occupancy record: floor area 10150.2 as sanctioned and 10155.6 as completed. These are document-specific area labels, not interchangeable measurements.
Parking and related plan figurePlan records Parking proposed area 2834.80. The occupancy record states Parking Area (m2): 399.89; no parking-space count is supplied.
Unit count82 dwelling units in the filed plan and RERA unit records; configurations are 46 2BHK and 36 3BHK. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 46 units; 3BHK: 36 units. RERA unit table
Booked / available2BHK: 10 booked / 36 available; 3BHK: 24 booked / 12 available. Counts are from the TG-RERA portal record; it gives no as-of date, so they are indicative. RERA unit table
RERA-filed saleable area2BHK: 14.54 sq. m; 3BHK: 155.92 sq. m. RERA unit table
Building completion / occupancy recordHMDA occupancy certificate 005704/OC/HMDA/MED/2024, dated 02 September, 2024, covers Block A. It records the completion notice as 10 March, 2024 and declares the inspected building fit for occupation.
Promoter’s RERA completion undertakingForm B states completion by 31/12/2024. This is the promoter’s RERA-filed undertaking, separate from the occupancy record.
Construction stageThe supplied occupancy documents certify the building as completed and occupancy-approved; no current independent site-progress assessment is supplied.

2. The project story

SUNYUGA VISTA BLOCK A is recorded with TG-RERA as a residential apartment project on the four stated survey subdivisions in Gundlapochampally. The filed development comprises one building—Block A—with a cellar, ground floor and five upper floors, and a total of 82 apartments. RERA record Land records RERA unit table

The RERA unit schedule lists 2BHK and 3BHK apartments. The filed unit record shows 34 booked and 48 available in total, but its booking data has no stated “as of” date. These figures should therefore be treated as a portal snapshot, not a current availability confirmation. RERA unit table

The project’s documents include an HMDA occupancy certificate for Block A. That certificate records a completion notice dated 10 March 2024 and declares the inspected building fit for occupation. It concerns the identified Block A building; it should not be read as evidence about any other project or phase.

3. Master plan, architecture & building design

The filed plan depicts a single residential Block A on a stated site extent of 3986.89 SQ.MT., with 1 Cellar + 1 Ground + 5 upper floors and a building height of 17.99 MT. It records proposed coverage of 43.47 % and 1729.84, and Proposed Net BUA Area 10269.59.

The commencement approval records a proposed built-up area of 10248.22, a built-up area of 10150.2, and a mortgage area of 1021.27. The occupancy document separately reports floor area of 10150.2 as per sanctioned plan and 10155.6 as per completed building plan. The occupancy record gives the same cellar/ground/five-upper-floor configuration for the sanctioned and completed building.

Plan annotations show a 12.00 road, a 4.88M WIDE DRIVE WAY and 5.5M road-width figures. The approval also refers to a proposed 30.0m road and requires a 7.23 sqmts road-affected area to be handed to the local body by registered gift deed.

The supplied plan identifies a tot lot, distribution transformer and a sump. It does not provide a complete drawing-based account here of apartment counts per floor, lift and stair locations, entries and exits, or landscaped/open-space distribution beyond the tot-lot references.

4. Homes, configurations & floor plans

TG-RERA unit records list 46 2BHK and 36 3BHK homes. Their filed saleable areas are reproduced below; booking figures are the portal snapshot and have no recorded as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK46103614.54 sq. mNot suppliedNot supplied
3BHK362412155.92 sq. m109.2–120.6 sq. m; median 114.9 sq. m (software-measured)26% (software-measured)

The 3BHK carpet figures are software measurements from two flat designs in the filed plan drawing, not RERA-filed carpet-area disclosures. The drawing measurement requires review. The plan extraction also contains a room schedule for flat G11, including living, bedrooms, toilets, dining/kitchen, balcony and utility; the balcony and utility are excluded from the software carpet measurement. RERA unit details Floor plans

Saleable area and carpet area describe different things: the drawing-based carpet measurement is the software-measured usable apartment area, while saleable area is the RERA-filed unit figure and may include a proportionate share of common areas. The supplied data does not provide measured carpet area for the 2BHK type. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The building plan describes a cellar and stilt-related parking condition in the HMDA approval: the approved cellar and stilts for parking are to be used exclusively for vehicle parking and not converted or misused. The plan extraction records Parking proposed area 2834.80; the occupancy record separately gives Parking Area (m2): 399.89. No count of car or two-wheeler spaces, visitor or accessible bays, or unit-specific parking allocations is supplied.

The plan includes a 4.88M WIDE DRIVE WAY and road-width annotations. The supplied documents do not establish ramp configuration, separate pedestrian circulation, EV charging, or an exclusive parking right attached to any particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity schedule records the following items. Its progress percentages are 0 where shown; the schedule does not provide independently verified delivery status. The filed plans and approval also identify certain site provisions. RERA amenities

Tot lot / green strip
Description / sizeOccupancy record states tot-lot area 399.89 m2; commencement approval requires the tot lot to be fenced and maintained as greenery before occupancy certificate.
Declared progress / verified statusRERA schedule marks green strip/tot lot/park available “YES” and progress 0; occupancy record lists tot-lot area. No independent present-day verification supplied.
Water-conservation / rainwater harvesting
Description / sizeRainwater-harvesting structures are required by the commencement approval; occupancy record lists RWH.
Declared progress / verified statusRERA schedule marks available “YES” and progress 0; no independent operational verification supplied.
Internal roads and footpaths
Description / sizeListed in RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0; completion not independently verified.
Street lighting
Description / sizeListed in RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0; completion not independently verified.
Community buildings
Description / sizeListed in RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0; no facility details or independent completion evidence supplied.
Water supply
Description / sizeListed in RERA amenity schedule; plan also identifies a sump.
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule marks available “YES” and progress 0; no independent operational verification supplied.
Sewerage and treatment/disposal
Description / sizeRERA schedule lists sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. The commencement approval requires a septic tank and ETP.
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule marks sewerage available “YES” and progress 0; the record does not independently establish current operation or completion.
Storm-water drains
Description / sizeListed in RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0; completion not independently verified.
Solid-waste management and disposal
Description / sizeListed in RERA amenity schedule; commencement approval requires a garbage house within the premises.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0; completion not independently verified.
Electrical meter room / sub-station / receiving station
Description / sizeListed in RERA amenity schedule; plan identifies a distribution transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule marks available “YES” and progress 0; no independent verification supplied.
Fire protection and fire-safety requirements
Description / sizeListed in RERA amenity schedule; commencement approval directs the applicant to follow Fire Service department norms.
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0 in RERA schedule; no separate detailed fire-system inventory is supplied here.

7. Utilities, building services & safety

Water and drainage: The filed plan identifies a sump measuring 11.70X6.5X1.0M with 76,000LITERS CAPACITY. The promoter-marketed specification also describes overhead-tank water supply supplemented by a borewell, but the supplied record does not establish current supply sources, operational status or capacity beyond the plan’s sump figure. The RERA amenity schedule marks water supply available “YES.” RERA amenities Promoter website

The commencement approval requires rainwater-harvesting structures, an ETP and a septic tank. The occupancy records list rainwater harvesting. The RERA schedule lists sewerage, treatment and disposal of sewage and sullage water, and storm-water drains; their recorded progress percentages are 0, so the schedule alone does not establish completion or operation. RERA amenities

Electrical and lifts: The plan identifies a distribution transformer, and the RERA schedule marks the electrical meter room/sub-station/receiving-station item available “YES.” The brochure specification states generator backup for the lift, common areas and 2 light and 2 fan points in each flat, and a 6 passenger standard lift; these are promoter-marketed specifications, not independent verification of installed services. RERA amenities Promoter website

Fire, safety and accessibility: The RERA schedule includes fire protection and fire-safety requirements. The commencement approval instructs compliance with Fire Service department norms and makes an occupancy certificate compulsory before occupation. The occupancy record contains a fire-NOC field, but it does not identify an issuance reference in the supplied extraction. Detailed fire-system capacities, accessible routes, ramps, CCTV or access-control provisions are not established in the supplied material. RERA amenities

8. Location, access & connectivity

The project records identify the site in Gundlapochampally Muncipality, Medchal-Malkajgiri district, PIN 500043, on survey numbers 388/1/A/U, 388/1/A/EE, 388/1/A/AA and 388/R/A/1. The plan names Gundla Pochampalle; the occupancy record uses Gundlapochampally. RERA record Land records

The plan records a 12.00 road-width figure and a 4.88M WIDE DRIVE WAY; HMDA’s commencement approval refers to a proposed 30.0m road and 18 mt. road widths. A supplied location record gives Financial District (Nanakramguda) — 1.2 km. No public-transport or additional approach-route details are established in the supplied project records. Location record

9. Developer & development status

The registered promoter is SUNYUGA INFRA PRIVATE LIMITED, a company, with GSTIN 36AAZCS9049M1Z4. The project record gives its address as LN 3 LANCOHILLS, MANIKONDA, Gundla Pochampalle, Gundlapochampally Muncipality, Medchal-Malkajgiri, 500043. Corporate record Parties record RERA filing

TG-RERA records one registered building, Block A, with 82 apartments. Form B, signed by director Viswanath Reddy Dadimi and dated 25th March, 2021, gives the promoter’s completion undertaking as 31/12/2024. Separately, the HMDA occupancy record for Block A states a building completion notice dated 10 March, 2024 and an occupancy certificate dated 02 September, 2024. The supplied materials do not provide independent current site observations. RERA unit table

The project’s TG-RERA certificate records registration through 31/12/2024. That validity period is distinct from both the promoter’s completion undertaking and the building’s occupancy certificate.

10. Approvals, official records & documents

TG-RERA Form C registration certificate
Reference / dateP02200003023; issued 17/06/2021; valid through 31/12/2024
Scope and record descriptionRegisters SUNYUGA VISTA BLOCK A and identifies the survey numbers and promoter.
HMDA technical building approval / commencement record
Reference / date036078/MED/R1/U6/HMDA/30052020; dated 23/03/2021
Scope and record descriptionTechnical approval for residential Block A on the four project survey subdivisions; includes conditions on local-body sanction, parking, road-affected land, rainwater harvesting and other requirements.
Filed building plan
Reference / dateFile reference 036078/MED/R1/U6/HMDA/30052020; plan date 23-03-2021
Scope and record descriptionPlan for one residential building with cellar, ground floor and five upper floors, and 82 dwelling units.
HMDA occupancy certificate
Reference / date005704/OC/HMDA/MED/2024; application 002810/OC/HMDA/0574/MED/2024; dated 02 September, 2024
Scope and record descriptionOccupancy certificate for Block A; records completion notice dated 10 March, 2024 and declares the inspected building fit for occupation.
Promoter’s Form B declaration
Reference / dateDated 25th March, 2021
Scope and record descriptionRERA-filed promoter declaration, including the 31/12/2024 completion undertaking and project-fund undertakings.

The approved-layout lookup is not publicly reachable in the supplied HMDA portal check, so no separate public-layout-portal verification is available here. HMDA

Frequently asked questions

Is SUNYUGA VISTA BLOCK A registered with Telangana RERA?

Yes. SUNYUGA VISTA BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200003023; the registration status is New Project.

Who is the developer of SUNYUGA VISTA BLOCK A?

The promoter named in the RERA registration is SUNYUGA INFRA PRIVATE LIMITED.

Where is SUNYUGA VISTA BLOCK A located?

SUNYUGA VISTA BLOCK A is in Gundlapochampally Muncipality, Medchal-Malkajgiri, Telangana (500043).

When will SUNYUGA VISTA BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri