Sprint S Elite
SPRINT CONSTRUCTIONS · Rangareddy · RERA P02400003797
SPRINT S ELITE is a residential apartment project in LB Nagar, Saroornagar Mandal, Ranga Reddy District, developed by registered promoter SPRINT CONSTRUCTIONS. It occupies 508.30 sq. m. and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a filed saleable area of 145.8 sq. m. Its TG-RERA registration number is P02400003797, and its proposed completion date is 31/07/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SPRINT S ELITE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase designation is disclosed. The registration and sanction records describe one building, identified in the building-permit extraction as Building - A. |
| TG-RERA registration | P02400003797 |
| Registration validity | 20/12/2021 to 30/10/2022; the certificate records “0 years” and no extension. This is the registration period, not the completion deadline. |
| Registered promoter | SPRINT CONSTRUCTIONS; partnership RERA record Corporate record |
| RERA status | Recorded as “On-Going Project” in the supplied project record. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | LB Nagar; the building-permit order describes the site as New Maruthi Nagar (Kothapet-3C). RERA record |
| Revenue village | Kothapet is named in the building-permit and title-report material; Saroornagar is the village recorded in the project identity fields and TG-RERA certificate. The evidence does not resolve the revenue-village naming. RERA record |
| Mandal / district / PIN | Saroornagar Mandal; Ranga Reddy District (also rendered “Rangareddy District” in the permit extraction); 500060 in the registration certificate. |
| Project survey number(s) | Survey No. 20; no subdivision is specified in the project filing. RERA record |
| Site extent | 508.30 sq. m. in the RERA land details; building-permit extraction gives 508.3 Sq. Mtrs. Land records |
| Permit land-area breakdown | Plot Area: 508.3 sq. m.; road affected area: 0.0; nala affected area: 0.0; Net Plot Area: 508.3 sq. m. |
| Boundaries recorded in project details | East: SY 229; West: 30 FEET WIDTH ROAD; North: PLOT NO 5; South: PLOT NO 9. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order 0423/GHMC/LBN/2021-BP, approved 29 September, 2021; File No. 000974/GHMC/0570/LBN2/2021-BP. Approvals record |
| Approved built-up area | 1,230.40 sq. m. shown for residential use in the permit extraction. This is the approved residential area, not a carpet-area or saleable-area figure. |
| Buildings / blocks | One building; permit identifies Building - A. |
| Sanctioned configuration | 1 Stilt + 5 upper floors; stated height 15.00 m. No basement or podium is identified in the supplied permit extraction. |
| Parking provision shown in permit | Total Parking Area: 233.4 sq. m.; Stilt area: 233.43. No space count or unit-by-unit allocation is supplied. |
| Units | 10 units in the RERA filing; the permit extraction does not provide a separate sanctioned dwelling-unit count. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units; filed saleable area 145.8 sq. m. per unit. RERA unit table |
| Booked / available | 0 booked and 10 available in the portal data, which has no stated as-of date and should be treated as indicative. RERA unit table |
| Completion dates | Project record gives proposed and revised proposed completion as 31/07/2023. Form B separately records a promoter completion undertaking of 30-08-2022. These are completion declarations, not registration-validity dates. RERA record |
| Construction stage | No independently verified site-progress percentage or current construction stage is supplied. The RERA amenity record reports the electrical meter room / sub-station / receiving station at 50%; other listed progress percentages are 0. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the reviewed records. The permit requires an occupancy certificate before occupation; certificate status is therefore not established by this evidence. |
2. The project story
SPRINT S ELITE is recorded with TG-RERA as a residential apartment project on Survey No. 20, with a site extent of 508.30 sq. m. and one building. The GHMC building-permit order describes Building - A as a residential building of 1 Stilt + 5 upper floors in New Maruthi Nagar (Kothapet-3C), Kothapet. RERA record Land records
The RERA filing lists ten 3BHK apartments, each with a filed saleable area of 145.8 sq. m.; the portal’s recorded inventory is 0 booked and 10 available, without an as-of date. RERA unit table The available evidence does not establish the building’s present physical completion or independently verify the portal inventory. The RERA record gives 31/07/2023 as both proposed and revised completion date, while the registration certificate runs only to 30/10/2022 and no extension is recorded in the supplied certificate. No occupancy or completion certificate is included. RERA record
3. Master plan, architecture & building design
The GHMC permit extraction records a 508.3 sq. m. plot and net plot area, with 1,230.40 sq. m. of residential area and no commercial or “Others” area recorded. It identifies one residential building, Building - A, configured as 1 Stilt + 5 upper floors, with a stated height of 15.00 m. These are permit-extracted figures; the supplied record does not identify a separate FSI-counted area or gross built-up-area figure.
The permit records a 233.43 sq. m. stilt area and 233.4 sq. m. total parking area. It also specifies front, rear and Side I setbacks of 3.5 m, and lists six rain-water-harvesting pits. The approved layout drawing is listed in the RERA document register but is not extracted in the supplied evidence; therefore, building footprint, flats per floor, internal circulation, entrances, stairs, lifts, landscaped/open-space dimensions and any detailed floor-by-floor arrangement cannot be established here. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 145.8 sq. m. | Software-measured median 95.1 sq. m.; range 88.0–102.7 sq. m. | 35% |
The 3BHK unit count, booking figures and 145.8 sq. m. saleable area are from the TG-RERA filing; the booking record has no as-of date. RERA unit table The carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed measurements, and the measured designs require review. Four flat designs were measured. Floor plans
The drawing extraction for one second-floor plan shows a hall, kitchen, bedrooms, toilets, puja area, utility and a balcony. The drawing lists the utility and balcony separately from the carpet-area calculation. Room measurements are drawing-derived and should be checked against the plan. Saleable area and measured carpet area are different area measures; the supplied evidence does not provide a separate RERA-filed carpet-area figure. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction records a 233.43 sq. m. stilt area and 233.4 sq. m. total parking area. Its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters. No basement parking level is identified in the supplied extracted configuration, and the record does not state a number of parking bays, two-wheeler spaces, visitor or accessible spaces, ramp arrangements, EV charging provision, or internal vehicle-circulation details.
Although the RERA inventory marks the listed homes as mortgaged, the supplied records do not document an exclusive parking allocation to any particular unit. A parking-area figure alone does not establish an individual buyer’s parking entitlement. RERA unit table
6. Amenities, recreation & open spaces
The following table separates RERA-filed amenity entries from the permit’s specified site provisions. The amenity record shows reported progress percentages, not independent verification of completion. RERA amenities
| Description / size | Listed as available; no size supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 0%; completion not independently verified |
| Description / size | Listed as available; no size or facility details supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 0%; completion not independently verified |
| Description / size | Listed as available; permit also specifies 6 rain water harvesting pits |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Availability marked “YES”; amenity progress 0%; installation not independently verified |
| Description / size | Facility listed; no capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 50%; completion not independently verified |
The supplied records do not provide a verified clubhouse, indoor-recreation, sports-facility or convenience-facility schedule for this project. The permit also requires a garbage house within the premises and greenery on the site periphery; these are permit conditions, not evidence that the works have been completed.
7. Utilities, building services & safety
The TG-RERA amenity record lists water supply and sewerage (including chamber, lines, septic tank, STP) as available, but gives 0% progress for both. It also lists treatment and disposal of sewage and sullage water, storm-water drains, solid-waste management and disposal, and energy management; the supplied record does not provide system capacities or verified completion status. RERA amenities
The GHMC permit requires rain-water-harvesting structures and lists six rain-water-harvesting pits, space for a transformer, and a garbage house. It also requires the contractor’s all-risk insurance until issue of an occupancy certificate and states that an Occupancy FIRE NOC is to be obtained before the occupancy certificate. These are permit requirements; the supplied material does not establish completion, fire clearance, water-storage capacity, backup power, lift provision, CCTV, access control, accessibility features or any operating utility service.
8. Location, access & connectivity
The project is registered in the LB Nagar / Saroornagar area, Ranga Reddy District, and the GHMC building-permit order locates it at New Maruthi Nagar (Kothapet-3C), Kothapet. The project identity fields record Saroornagar as the revenue village, while the permit and title-report material use Kothapet; the evidence supplied does not resolve that location-name distinction. RERA record
The supplied location record gives these mapped distances: SHINE CHILDREN'S HOSPITAL, 0.2 km; L. B. Nagar Metro Station, 0.3 km; State Bank of India, 0.3 km; Dmart, 0.4 km; an unnamed park, 0.5 km; T.S.R.T.C District Bus, 0.7 km; iON Digital Zone, iDZ L.B.Nagar, 0.7 km; little flower school, 0.7 km; and Narayana AIEEE boys hostel campus, 2.1 km. Location record These are supplied location-record distances; no travel times or verified route conditions are provided.
9. Developer & development status
The registered promoter is SPRINT CONSTRUCTIONS, identified as a partnership in the project data. Its supplied corporate identifier is GSTIN 36AEJFS0577F1ZU. The project record names JAINI NARASIMHA RAJU as an authorized signatory. The promoter address in the project fields is SPRINT, ROCK TOWN COLONY, Kothapet Phanagiri Colony, LB Nagar, Saroornagar, Ranga Reddy, 500060; no official website or contact details are supplied. Corporate record Parties record RERA filing
The RERA record lists one building and ten 3BHK units. It gives a proposed and revised completion date of 31/07/2023, while Form B contains a promoter-declared completion undertaking of 30-08-2022. The supplied evidence does not establish present construction progress, a completion certificate, or an occupancy certificate. RERA record RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02400003797; issued 20/12/2021; valid to 30/10/2022 |
|---|---|
| Scope and evidence | Form C registers SPRINT S ELITE under section 5 and records a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | 0423/GHMC/LBN/2021-BP; approved 29 September, 2021; File No. 000974/GHMC/0570/LBN2/2021-BP |
|---|---|
| Scope and evidence | Permit extraction for Building - A on Survey No. 20, covering a 508.3 sq. m. site and 1 Stilt + 5 upper floors. |
| Identifier / date | 0423/GHMC/LBN/2021-BP and 000974/GHMC/0570/LBN2/2021-BP |
|---|---|
| Scope and evidence | The first is the approval number filed in the project identity; the permit extraction identifies the file number separately. Approvals record |
| Identifier / date | Dated 20 October 2021 |
|---|---|
| Scope and evidence | Promoter-declared title basis, encumbrance statement, project-fund undertakings and completion undertaking of 30-08-2022. |
| Identifier / date | Documents 191614 and 191615 |
|---|---|
| Scope and evidence | Filed title-report material includes a sale deed dated 30 June 2021 and a sale deed dated 4 January 1967, among other title-chain instruments described in the report. |
| Identifier / date | Document 191611 |
|---|---|
| Scope and evidence | Listed as a layout-plan document in the RERA filing; the supplied record does not include an extracted layout plan. Document index |
| Identifier / date | Not supplied in reviewed evidence |
|---|---|
| Scope and evidence | The permit requires completion notice and an occupancy certificate before occupation; this review does not establish whether either has since been issued. |
1. Project at a glance
Project identity
Registered project name: SPRINT S ELITE
Project type: Residential apartment project
Phase / registered portion: No phase designation is disclosed. The registration and sanction records describe one building, identified in the building-permit extraction as Building - A.
TG-RERA registration: P02400003797
Registration validity: 20/12/2021 to 30/10/2022; the certificate records “0 years” and no extension. This is the registration period, not the completion deadline.
Registered promoter: SPRINT CONSTRUCTIONS; partnership
RERA status: Recorded as “On-Going Project” in the supplied project record.
Land and geographic identity
Locality: LB Nagar; the building-permit order describes the site as New Maruthi Nagar (Kothapet-3C).
Revenue village: Kothapet is named in the building-permit and title-report material; Saroornagar is the village recorded in the project identity fields and TG-RERA certificate. The evidence does not resolve the revenue-village naming.
Mandal / district / PIN: Saroornagar Mandal; Ranga Reddy District (also rendered “Rangareddy District” in the permit extraction); 500060 in the registration certificate.
Project survey number(s): Survey No. 20; no subdivision is specified in the project filing.
Site extent: 508.30 sq. m. in the RERA land details; building-permit extraction gives 508.3 Sq. Mtrs.
Permit land-area breakdown: Plot Area: 508.3 sq. m.; road affected area: 0.0; nala affected area: 0.0; Net Plot Area: 508.3 sq. m.
Boundaries recorded in project details: East: SY 229; West: 30 FEET WIDTH ROAD; North: PLOT NO 5; South: PLOT NO 9.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 0423/GHMC/LBN/2021-BP, approved 29 September, 2021; File No. 000974/GHMC/0570/LBN2/2021-BP.
Approved built-up area: 1,230.40 sq. m. shown for residential use in the permit extraction. This is the approved residential area, not a carpet-area or saleable-area figure.
Buildings / blocks: One building; permit identifies Building - A.
Sanctioned configuration: 1 Stilt + 5 upper floors; stated height 15.00 m. No basement or podium is identified in the supplied permit extraction.
Parking provision shown in permit: Total Parking Area: 233.4 sq. m.; Stilt area: 233.43. No space count or unit-by-unit allocation is supplied.
Units: 10 units in the RERA filing; the permit extraction does not provide a separate sanctioned dwelling-unit count.
Offering and status
RERA-filed configuration: 3BHK; 10 units; filed saleable area 145.8 sq. m. per unit.
Booked / available: 0 booked and 10 available in the portal data, which has no stated as-of date and should be treated as indicative.
Completion dates: Project record gives proposed and revised proposed completion as 31/07/2023. Form B separately records a promoter completion undertaking of 30-08-2022. These are completion declarations, not registration-validity dates.
Construction stage: No independently verified site-progress percentage or current construction stage is supplied. The RERA amenity record reports the electrical meter room / sub-station / receiving station at 50%; other listed progress percentages are 0.
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the reviewed records. The permit requires an occupancy certificate before occupation; certificate status is therefore not established by this evidence.
2. The project story
SPRINT S ELITE is recorded with TG-RERA as a residential apartment project on Survey No. 20, with a site extent of 508.30 sq. m. and one building. The GHMC building-permit order describes Building - A as a residential building of 1 Stilt + 5 upper floors in New Maruthi Nagar (Kothapet-3C), Kothapet.
The RERA filing lists ten 3BHK apartments, each with a filed saleable area of 145.8 sq. m.; the portal’s recorded inventory is 0 booked and 10 available, without an as-of date. The available evidence does not establish the building’s present physical completion or independently verify the portal inventory. The RERA record gives 31/07/2023 as both proposed and revised completion date, while the registration certificate runs only to 30/10/2022 and no extension is recorded in the supplied certificate. No occupancy or completion certificate is included.
3. Master plan, architecture & building design
The GHMC permit extraction records a 508.3 sq. m. plot and net plot area, with 1,230.40 sq. m. of residential area and no commercial or “Others” area recorded. It identifies one residential building, Building - A, configured as 1 Stilt + 5 upper floors, with a stated height of 15.00 m. These are permit-extracted figures; the supplied record does not identify a separate FSI-counted area or gross built-up-area figure.
The permit records a 233.43 sq. m. stilt area and 233.4 sq. m. total parking area. It also specifies front, rear and Side I setbacks of 3.5 m, and lists six rain-water-harvesting pits. The approved layout drawing is listed in the RERA document register but is not extracted in the supplied evidence; therefore, building footprint, flats per floor, internal circulation, entrances, stairs, lifts, landscaped/open-space dimensions and any detailed floor-by-floor arrangement cannot be established here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 145.8 sq. m. | Software-measured median 95.1 sq. m.; range 88.0–102.7 sq. m. | 35% |
The 3BHK unit count, booking figures and 145.8 sq. m. saleable area are from the TG-RERA filing; the booking record has no as-of date. The carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed measurements, and the measured designs require review. Four flat designs were measured.
The drawing extraction for one second-floor plan shows a hall, kitchen, bedrooms, toilets, puja area, utility and a balcony. The drawing lists the utility and balcony separately from the carpet-area calculation. Room measurements are drawing-derived and should be checked against the plan. Saleable area and measured carpet area are different area measures; the supplied evidence does not provide a separate RERA-filed carpet-area figure.
5. Parking & vehicle circulation
The GHMC permit extraction records a 233.43 sq. m. stilt area and 233.4 sq. m. total parking area. Its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters. No basement parking level is identified in the supplied extracted configuration, and the record does not state a number of parking bays, two-wheeler spaces, visitor or accessible spaces, ramp arrangements, EV charging provision, or internal vehicle-circulation details.
Although the RERA inventory marks the listed homes as mortgaged, the supplied records do not document an exclusive parking allocation to any particular unit. A parking-area figure alone does not establish an individual buyer’s parking entitlement.
6. Amenities, recreation & open spaces
The following table separates RERA-filed amenity entries from the permit’s specified site provisions. The amenity record shows reported progress percentages, not independent verification of completion.
| Description / size | Listed as available; no size supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 0%; completion not independently verified |
| Description / size | Listed as available; no size or facility details supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 0%; completion not independently verified |
| Description / size | Listed as available; permit also specifies 6 rain water harvesting pits |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Availability marked “YES”; amenity progress 0%; installation not independently verified |
| Description / size | Facility listed; no capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Availability marked “YES”; progress 50%; completion not independently verified |
The supplied records do not provide a verified clubhouse, indoor-recreation, sports-facility or convenience-facility schedule for this project. The permit also requires a garbage house within the premises and greenery on the site periphery; these are permit conditions, not evidence that the works have been completed.
7. Utilities, building services & safety
The TG-RERA amenity record lists water supply and sewerage (including chamber, lines, septic tank, STP) as available, but gives 0% progress for both. It also lists treatment and disposal of sewage and sullage water, storm-water drains, solid-waste management and disposal, and energy management; the supplied record does not provide system capacities or verified completion status.
The GHMC permit requires rain-water-harvesting structures and lists six rain-water-harvesting pits, space for a transformer, and a garbage house. It also requires the contractor’s all-risk insurance until issue of an occupancy certificate and states that an Occupancy FIRE NOC is to be obtained before the occupancy certificate. These are permit requirements; the supplied material does not establish completion, fire clearance, water-storage capacity, backup power, lift provision, CCTV, access control, accessibility features or any operating utility service.
8. Location, access & connectivity
The project is registered in the LB Nagar / Saroornagar area, Ranga Reddy District, and the GHMC building-permit order locates it at New Maruthi Nagar (Kothapet-3C), Kothapet. The project identity fields record Saroornagar as the revenue village, while the permit and title-report material use Kothapet; the evidence supplied does not resolve that location-name distinction.
The supplied location record gives these mapped distances: SHINE CHILDREN'S HOSPITAL, 0.2 km; L. B. Nagar Metro Station, 0.3 km; State Bank of India, 0.3 km; Dmart, 0.4 km; an unnamed park, 0.5 km; T.S.R.T.C District Bus, 0.7 km; iON Digital Zone, iDZ L.B.Nagar, 0.7 km; little flower school, 0.7 km; and Narayana AIEEE boys hostel campus, 2.1 km. These are supplied location-record distances; no travel times or verified route conditions are provided.
9. Developer & development status
The registered promoter is SPRINT CONSTRUCTIONS, identified as a partnership in the project data. Its supplied corporate identifier is GSTIN 36AEJFS0577F1ZU. The project record names JAINI NARASIMHA RAJU as an authorized signatory. The promoter address in the project fields is SPRINT, ROCK TOWN COLONY, Kothapet Phanagiri Colony, LB Nagar, Saroornagar, Ranga Reddy, 500060; no official website or contact details are supplied.
The RERA record lists one building and ten 3BHK units. It gives a proposed and revised completion date of 31/07/2023, while Form B contains a promoter-declared completion undertaking of 30-08-2022. The supplied evidence does not establish present construction progress, a completion certificate, or an occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02400003797; issued 20/12/2021; valid to 30/10/2022 |
|---|---|
| Scope and evidence | Form C registers SPRINT S ELITE under section 5 and records a separate-account condition. No extension is recorded in the supplied certificate. |
| Identifier / date | 0423/GHMC/LBN/2021-BP; approved 29 September, 2021; File No. 000974/GHMC/0570/LBN2/2021-BP |
|---|---|
| Scope and evidence | Permit extraction for Building - A on Survey No. 20, covering a 508.3 sq. m. site and 1 Stilt + 5 upper floors. |
| Identifier / date | 0423/GHMC/LBN/2021-BP and 000974/GHMC/0570/LBN2/2021-BP |
|---|---|
| Scope and evidence | The first is the approval number filed in the project identity; the permit extraction identifies the file number separately. |
| Identifier / date | Dated 20 October 2021 |
|---|---|
| Scope and evidence | Promoter-declared title basis, encumbrance statement, project-fund undertakings and completion undertaking of 30-08-2022. |
| Identifier / date | Documents 191614 and 191615 |
|---|---|
| Scope and evidence | Filed title-report material includes a sale deed dated 30 June 2021 and a sale deed dated 4 January 1967, among other title-chain instruments described in the report. |
| Identifier / date | Document 191611 |
|---|---|
| Scope and evidence | Listed as a layout-plan document in the RERA filing; the supplied record does not include an extracted layout plan. |
| Identifier / date | Not supplied in reviewed evidence |
|---|---|
| Scope and evidence | The permit requires completion notice and an occupancy certificate before occupation; this review does not establish whether either has since been issued. |
Frequently asked questions
Is SPRINT S ELITE registered with Telangana RERA?
Yes. SPRINT S ELITE is registered with the Telangana Real Estate Regulatory Authority as P02400003797; the registration status is On-Going Project.
Who is the developer of SPRINT S ELITE?
The promoter named in the RERA registration is SPRINT CONSTRUCTIONS.
Where is SPRINT S ELITE located?
SPRINT S ELITE is in lb nagar, Saroornagar, Rangareddy, Telangana (500060).
When will SPRINT S ELITE be completed?
The promoter's proposed date of completion filed with RERA is 31/07/2023. This is the promoter's declaration, not a guarantee.