Sign in

Sindhu-Two

VIYA VENTURES · Medchal-Malkajgiri · RERA P02200003394

SINDHU-TWO is a residential apartment project in Sindhuvanam Layout, Keesara mandal, Medchal-Malkajgiri district, developed by registered promoter Viya Ventures. The site extent is 506.11 sq. m., and the approval record describes one residential building with stilt, ground and 5 upper floors. The project filing records 20 apartments: 15 1BHK units of 44.31 sq. m. saleable area each and 5 2BHK units of 63.27 sq. m. saleable area each. Its TG-RERA registration number is P02200003394, and its proposed completion date is 31/12/2024.

More from Viya Ventures · 7 projects →

01What we found

Period endedTG-RERA registration ran to 31 Dec 2024 - check its extension on TG-RERA
25documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Haridaspalle, Keesara, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameSINDHU-TWO RERA record
Project typeResidential apartment project RERA record
Phase / registered portionRegistration is for SINDHU-TWO; a separate phase name or phase-wise scope is not disclosed. The permit identifies the site as plot nos. 521 and 525.
TG-RERA registrationP02200003394 RERA record
Registration validity24/09/2021 through 31/12/2024, as recorded on the certificate. This is the registration period, not a statement of current validity.
RERA status in the supplied recordRegistered; the certificate states no extension. Current status should be confirmed on the TG-RERA portal.
Registered promoterViya Ventures (also shown in project filings as VIYA VENTURES), a partnership RERA record RERA filing Corporate record
Proposed completion date in project record31/12/2024 RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / layoutSindhuvanam Layout; locality also recorded as sindhuvanam RERA record
Revenue villageHaridaspalle / Haridaspally (as written in the supplied records) RERA record
MandalKeesara RERA record
DistrictMedchal-Malkajgiri RERA record
PIN501301 RERA record
Project survey numbers51/P, 52/P, 53/P, 54/P, 55/P, 56/P, 57/P, 58/P and 59/P RERA record
SubdivisionsThe project record lists the above /P survey identifiers; no further subdivision detail is disclosed. RERA record
Site extent506.11 sq. m. RERA filing
Net / total areaTotal area 506.11 sq. m.; net area 506.11 sq. m.; area recorded as affected by road widening/FTL/Nala widening: 0 sq. m. RERA filing
Boundaries as filedEast and west: 33-feet-wide road; north: plot nos. 524 and 522; south: Ahemad Guda village boundary. RERA filing
Plot numbers identified in the approval and registration records521 and 525

Development identity

FieldProject record
Principal planning authority / technical approvalHyderabad Metropolitan Development Authority (HMDA); technical approval no. 044378/GHT/R1/U6/HMDA/20032021, dated 05/06/2021 Approvals record
Building permitDammaiguda Municipality, BA.NO: 06/2020-21, dated 28.06.2021 Approvals record
Building arrangementThe HMDA letter identifies Block A; the municipal permit describes one residential building. A separate tower count is not stated in the approval extracts.
Floor configurationHMDA technical approval: 1 stilt plus 5 upper floors. Municipal permit: stilt, ground and 5 upper floors.
Approved area figuresHMDA approval extract lists built-up area 1003.45 sq. m. and total/proposed built-up area 1205.83 sq. m.; municipal permit extract lists ground residential area 506.11 sq. m., upper-floor built-up area 1003.44 sq. m., and stilt parking area 202.38 sq. m. These are the categories and figures as recorded in the respective approval extracts.
UnitsProject filing records 20 apartments: 15 one-bedroom and 5 two-bedroom units. The permit requires that sanctioned unit numbers not be increased without prior approval. RERA unit table
ParkingStilt parking is identified in the municipal permit; it does not give a verified total space count or unit-by-unit allocation.

Offering and status

FieldProject record
RERA-filed configurations1BHK: 15 units, 44.31 sq. m. saleable area each; 2BHK: 5 units, 63.27 sq. m. saleable area each RERA unit table
Booking / availabilityPortal-derived snapshot: 14 booked and 6 available (11 of 15 1BHKs and 3 of 5 2BHKs booked). The supplied record has no snapshot date, so counts are indicative. RERA unit table
Construction stageNo independently verified site-progress record is supplied. The RERA filing’s proposed completion date is 31/12/2024. RERA record
Original / revised completion datesProposed completion date: 31/12/2024. No revised date or extension is recorded in the supplied certificate. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The municipal permit says an occupancy certificate is required before occupation.

2. The project story

SINDHU-TWO is a registered residential apartment project on plot nos. 521 and 525 in Sindhuvanam Layout, Haridaspalle village, Keesara mandal, Medchal-Malkajgiri district. The project filing identifies survey nos. 51/P through 59/P and a site extent of 506.11 sq. m. RERA record RERA filing

The approval record describes a residential building, with HMDA identifying Block A and the municipal permit describing stilt, ground and five upper floors. The RERA filing lists 20 homes—15 1BHK and 5 2BHK. The supplied record does not establish construction progress through an independent site inspection, nor does it include an occupancy or completion certificate. Accordingly, the stated completion date of 31/12/2024 is a filed proposed date, not confirmation that construction or handover occurred by then. RERA unit table RERA record

3. Master plan, architecture & building design

The approval documents describe one residential building on the 506.11 sq. m. site. HMDA’s technical approval identifies Block A as 1 stilt plus 5 upper floors; the municipal permit describes stilt, ground and 5 upper floors. The approval extracts report distinct area categories, including 1003.45 sq. m. built-up area and 1205.83 sq. m. total/proposed built-up area in the HMDA extract, and 506.11 sq. m. ground residential area, 1003.44 sq. m. upper-floor built-up area and 202.38 sq. m. stilt parking area in the municipal extract.

The approval record also identifies setbacks of 3.05 m front, 3.51 m rear, 3.51 m on one side and 5.80, 3.51 m on the other side, as recorded in the permit. The supplied extracts do not provide a verified floor-by-floor unit arrangement, footprint drawing, lifts or stairs count, internal circulation plan, open-space area, or phase-wise building organization. The floor-plan drawings are scans pending measurement; no software-measured plan areas are available. Floor plans

4. Homes, configurations & floor plans

RERA filing records 20 homes across two configurations. Booked and available counts below are portal-derived and indicative because no as-of date accompanies the supplied snapshot. Saleable area is the RERA-filed figure. No drawing-based carpet-area measurement is available: the two floor-plan sheets remain scans pending measurement. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK1511444.31 sq. m.Not measuredNot supplied
2BHK53263.27 sq. m.Not measuredNot supplied

Saleable area and carpet area are different measures; the supplied record does not provide a drawing-derived carpet area or loading figure for either configuration. RERA unit details Floor plans

5. Parking & vehicle circulation

The municipal permit identifies a stilt parking area of 202.38 sq. m. and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The supplied approval extract does not establish the number of parking spaces, separate resident or visitor spaces, accessible bays, parking allocations to individual apartments, or a basement/cellar level for this project. The RERA filing does not provide a unit-level parking allocation in the supplied data.

6. Amenities, recreation & open spaces

The RERA-filed project information lists infrastructure and facility entries below with recorded progress percentages. These are filing entries, not independent verification of completed facilities. The approval documents separately name certain proposed utilities and site features. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not suppliedRERA filing RERA amenities100% declared; not independently verified
Green strip / tot-lot / parkSize not suppliedRERA filing RERA amenities0% declared; not independently verified
Street lightingSize not suppliedRERA filing RERA amenities100% declared; not independently verified
Community buildingsSize not suppliedRERA filing RERA amenities0% declared; not independently verified
Tot-lotArea not legible/supplied in approval extractMunicipal permitListed in permit extract; progress not supplied
Common gardenNo size or quantity suppliedVendor listing Promoter websiteMarketing/listing claim; no completion verification supplied

7. Utilities, building services & safety

The RERA filing records water supply, sewerage, storm-water drains, rainwater harvesting and electrical meter room/sub-station/receiving station at 100% declared progress. It records sewage/sullage treatment and disposal, solid-waste management, energy management, and fire-protection/fire-safety requirements at 0%. These percentages are portal declarations, not independent completion or compliance verification. RERA amenities

The HMDA approval extract lists a transformer, garbage house, ETP and rainwater-harvesting structure; the municipal permit also requires a rainwater-harvesting structure. The permit requires an occupancy certificate before occupation and says public water and electricity connections will be provided only on production of an occupancy certificate. No capacities, water sources, storage volumes, STP/ETP design or output, backup-power provision, lift details, fire-system specifications, security systems, or accessibility arrangements are supplied in the project approval extracts. Promoter website

8. Location, access & connectivity

The registered project location is Haridaspalle village, Keesara mandal, Medchal-Malkajgiri district, PIN 501301; the approval identifies Sindhuvanam Layout and plot nos. 521 and 525. The filed site boundaries identify 33-feet-wide roads on the east and west. RERA record RERA filing

The supplied location record gives these approximate distances: Outer Ring Road nearest sampled interchange, 8.5 km; KSR Degree College, 1.1 km; an unnamed hospital, 0.1 km; Melkote Park, 0.5 km; and an unnamed school, 0.4 km. These are location-data measurements; no travel times or public-transport details are supplied. Location record

9. Developer & development status

The registered promoter is VIYA VENTURES, identified in the filing as a partnership, with GSTIN 36AARFV8907E1ZN. The project record names Tandra Vinod Rao and Tandra Vineela Rao as authorised signatories. The RERA certificate lists the promoter office as Bachupally village, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090. Corporate record RERA filing

The proposed completion date in the project record is 31/12/2024. No revised completion date, extension certificate, verified construction-progress report or occupancy/completion certificate is supplied here; therefore the record does not establish the project’s present construction or handover stage. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200003394, issued 24/09/2021; validity through 31/12/2024
What the supplied record establishesRegistration of SINDHU-TWO for the listed location and survey numbers; certificate states no extension.
HMDA technical approval
Identifier / date044378/GHT/R1/U6/HMDA/20032021, dated 05/06/2021
What the supplied record establishesTechnical approval record for the residential building; it directs the applicant to obtain sanction from the Executive Authority.
Dammaiguda Municipality building permit
Identifier / dateBA.NO: 06/2020-21, dated 28.06.2021
What the supplied record establishesBuilding permit order with stated conditions, including following the sanctioned plan and obtaining an occupancy certificate before occupation.
Form B promoter declaration
Identifier / date20 July 2021
What the supplied record establishesPromoter declaration concerning title material, encumbrances, funds, audit, approvals and disclosures.
Project title report
Identifier / date23-06-2021
What the supplied record establishesAdvocate’s title-search report filed for the project land.
Encumbrance statements filed with RERA
Identifier / dateSearch period 01-10-2007 to 18-03-2021
What the supplied record establishesFiled encumbrance statements for the property; the supplied search period ends before the present date.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo such certificate is included in the reviewed project documents.

The HMDA technical approval and municipal building permit are separately identified above. The public HMDA layout lookup was unavailable in the supplied record, and no approved-layout document was extracted. HMDA Document index

Frequently asked questions

Is SINDHU-TWO registered with Telangana RERA?

Yes. SINDHU-TWO is registered with the Telangana Real Estate Regulatory Authority as P02200003394; the registration status is New Project.

Who is the developer of SINDHU-TWO?

The promoter named in the RERA registration is VIYA VENTURES.

Where is SINDHU-TWO located?

SINDHU-TWO is in sindhuvanam, Haridaspalle, Keesara, Medchal-Malkajgiri, Telangana (501301).

When will SINDHU-TWO be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Haridaspalle