Sagarpump
MERUGU · Rangareddy · RERA P02400009794
SAGARPUMP is a plotted development in Sagarpump, Abdullapurmet mandal, Ranga Reddy district. The registered promoter is MERUGU GOPAL YADAV. The site area is 9940.02 sq. m; the draft layout identifies plot numbers 1–28, with sizes extracted for 27 plots ranging from 147.99–334.45 sq. m. The project is registered with TG-RERA under P02400009794, and the promoter’s declared completion deadline is 20 November 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SAGARPUMP RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Phase not separately identified; registration is for SAGARPUMP RERA record |
| TG-RERA registration | P02400009794, granted under section 5; registration certificate records validity from 21/11/2022 to 20/11/2025. No extension is recorded on the supplied certificate. RERA record |
| Registered promoter | MERUGU GOPAL YADAV |
| RERA / completion status in supplied record | The certificate’s registration-validity end date and the promoter’s declared completion date are both 20/11/2025. The pack gives no occupancy or completion certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | SAGARPUMP / Sagarpump; the approval document also uses “Sagarpampu Village.” RERA record |
| Mandal / district / PIN | Abdullapurmet / Ranga Reddy / 501512 RERA record |
| Project survey numbers | 2/P, 3/P, 4/P RERA record |
| Other survey numbers printed in the approval document | 191/P, 201/P, 202/P, 203/P are also listed in the draft layout letter; their relationship to the registered project survey numbers is not further specified in the supplied material. |
| Total site area | 9940.02 sq. m RERA filing |
| Master-plan-road-affected area | 811.34 sq. m in the RERA land details; the draft letter separately records 811.31 Sq.mtrs for the proposed master plan roads affected area. RERA filing |
| Net site area | 9128.68 sq. m in the draft layout letter; RERA layout extraction reports 9128.69 sq. m as net layout area. Layout record |
| Boundaries recorded in RERA land details | North: Vagu; South: 40 wide road; East: Land Darshan Goud; West: Land Alli Venkatamma. RERA filing |
| Cadastral record | Bhu Bharati cadastral entry is for survey 2/P and describes its extent as the whole survey; it is not a parcel-level confirmation of the project’s exact extent. Cadastral map |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft layout permit 000234/LO/Plg/HMDA/2022, dated 21 November 2022; application number 051635/GHT/LT/U6/HMDA/11012022. Approvals record |
| Approved built-up area | 5683.50 sq. m is recorded in the RERA project fields as approved built-up area; the supplied material does not explain its measurement basis for this plotted project. RERA filing |
| Layout scale / buildings | Open-plot layout; no tower or residential-building count or floor configuration is provided. |
| RERA-filed plot count | Not stated in the supplied RERA registration material. The drawing-derived layout record identifies plot numbers 1–28, with sizes extracted for 27 plots; see “Homes, configurations & floor plans.” Layout record |
| Roads and open areas in draft approval | Layout roads 2401.05 sq. m (26.30%); park/open space 815.83 sq. m (8.94%); social infrastructure 228.30 sq. m (2.50%); plotted area 5683.50 sq. m. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; no RERA-filed plot-type or plot-size schedule is supplied in the registration fields. RERA record Document index |
| Plot numbers and sizes | Drawing-derived record identifies 28 plot numbers (1–28); software extracted sizes for 27 plots. Extracted range: 147.99–334.45 sq. m (177–400 sq. yd); median 168.9 sq. m (202 sq. yd). These are software-measured from the drawing, not RERA-filed unit data. Layout record |
| Booked / available counts | Not established by the supplied RERA data. Document index |
| Construction / development stage | No independently verified site progress is supplied. The HMDA letter requires layout development works to be completed within three years. |
| Completion deadline | Promoter’s Form B undertaking: on or before 20 November 2025. |
| Occupancy / completion certificate | Not provided. The supplied approval is a draft layout letter, not a final layout release or an occupancy/completion certificate. |
2. The project story
SAGARPUMP is registered as a plotted development in Sagarpump village, Abdullapurmet mandal, Ranga Reddy district. Its principal supplied approval record is HMDA’s draft layout letter for land identified in the registered project as survey numbers 2/P, 3/P and 4/P. The letter also prints survey numbers 191/P, 201/P, 202/P and 203/P, without explaining their connection to the registered parcel. RERA record
The draft layout sets out plots, internal roads, park/open space and a social-infrastructure area. The approval document states that plots 15, 26, 27 and 28, totalling 900.06 sq. m, are mortgaged to HMDA and are not to be sold while so mortgaged. It also states that roads, open space and social-infrastructure land are to be handed over to the local body by registered gift deed before release of final layout plans.
The promoter’s Form B declares a completion deadline of 20 November 2025. The evidence supplied does not establish how much layout infrastructure has been completed, whether final layout plans have been released, or whether a completion certificate has been issued; declared timelines should not be read as independently verified progress.
3. Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or tower scheme. The draft HMDA layout approval records total site area of 9940.02 sq. m, a master-plan-road-affected area of 811.34 sq. m, and net site area of 9128.68 sq. m. The drawing-derived layout record reports a net layout area of 9128.69 sq. m. Layout record
The layout area statement records 5683.50 sq. m for plots, 2401.05 sq. m for roads, 815.83 sq. m for park/open space, 228.30 sq. m for social infrastructure and 0 for amenities area. The draft letter identifies a proposed road width of 30m and says roads are to remain accessible to neighbouring sites. Layout record
The HMDA record is expressly a draft layout letter. It states that building construction in plots is not permitted until HMDA issues the final layout. No building elevations, residential floor plans, tower or building heights, floor configurations, or apartment arrangements are supplied.
4. Homes, configurations & floor plans
The project is offered as a plotted development. No RERA-filed plot inventory or RERA saleable-area schedule is present in the supplied records. The layout-drawing extraction identifies plot numbers 1 to 28, but sizes were successfully extracted for 27 plots; these are software-measured from the drawing and should not be treated as RERA-filed unit areas. RERA record Layout record
| Plot information | Supplied drawing-derived record |
|---|---|
| Plot numbers identified | 1–28; 28 plots by printed plot numbers |
| Plots with extracted size | 27 |
| Smallest / median / largest extracted size | 147.99 / 168.9 / 334.45 sq. m |
| Same range / median in square yards | 177 / 202 / 400 sq. yd |
| Size bands | 7 plots: 150–200 sq. yd; 13 plots: 200–250 sq. yd; 7 plots: 300–400 sq. yd |
| Common printed sizes | 5 plots at 200.00 sq. yd; 5 at 180.00 sq. yd; 2 at 400.00 sq. yd; 2 at 383.00 sq. yd; 2 at 365.00 sq. yd |
These figures describe the drawing extraction, not a complete RERA-filed unit schedule. The floor-plan record reports two drawings in total, one layout sheet and one scan pending; no carpet-area measurement was completed. Apartment-style carpet, balcony and common-area loading figures are therefore not available for this plotted offering. Layout record Floor plans
5. Parking & vehicle circulation
The supplied project records do not establish a sanctioned parking-space count, visitor parking provision, parking allocation to particular plots, or any exclusive parking rights. Document index
The draft HMDA letter requires internal roads and access, including roads being opened for access to neighbouring sites; it also calls for cycling tracks within the layout. It does not provide road-by-road dimensions beyond identifying a proposed 30m road, nor does the evidence establish completed circulation works.
6. Amenities, recreation & open spaces
The HMDA draft layout letter lists proposed layout infrastructure and records land areas for open space and social infrastructure. Its conditions describe requirements; they do not establish that the facilities have been completed. The RERA amenity list marks the listed categories “YES” but gives 0 for each progress percentage. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 815.83 sq. m (8.94%) | Draft HMDA layout letter; layout area statement Layout record | Proposed/approved in draft record; completion not verified |
| Social infrastructure | 228.30 sq. m (2.50%) | Draft HMDA layout letter | Land area recorded; facility details and completion not supplied |
| Internal roads | 2401.05 sq. m (26.30%) | Draft HMDA layout letter | Required for development and handover; completion not verified |
| Avenue plantation / park development | No dimensions supplied | Draft HMDA layout letter | Required/listed; completion not verified |
| Cycling tracks | No dimensions supplied | Draft HMDA layout letter | Required/listed; completion not verified |
| Community buildings | No size or capacity supplied | RERA amenity record RERA amenities | Marked “YES”; progress shown as 0; completion not verified |
The promoter/vendor list includes additional facilities such as a clubhouse, pool and gym, but the supplied HMDA layout record and RERA amenity record do not establish those as approved or delivered project facilities. They are not treated here as confirmed project amenities. Promoter website RERA amenities
7. Utilities, building services & safety
The draft HMDA letter specifies layout-level infrastructure: potable-water-supply connectivity, internal water-supply pipelines and an overhead tank; underground storm-water drainage and underground drainage lines; underground ducting for utilities; a transformer yard and street lighting; solid-waste disposal space and a garbage-segregation mechanism; and, for layouts under 10 acres, a septage-treatment mechanism in accordance with Telangana State FSSM policy. It also lists rainwater-harvesting pits and a bio-compost unit among the layout utilities. These are approval requirements or listed provisions, not evidence of completed or operational services.
| Evidence in the project record | Potable-water connectivity, internal supply pipelines and overhead tank required/listed; no source or capacity stated in the HMDA extract. |
|---|---|
| Status shown by supplied material | Completion and operating status not verified |
| Evidence in the project record | Common septic tank / STP and underground drainage listed; underground storm-water drainage required. |
|---|---|
| Status shown by supplied material | Capacity and completion not supplied |
| Evidence in the project record | Rainwater-harvesting pits listed. |
|---|---|
| Status shown by supplied material | Completion not verified |
| Evidence in the project record | Transformer yard, underground utility ducting and LED street lighting required/listed. |
|---|---|
| Status shown by supplied material | Capacity and completion not supplied |
| Evidence in the project record | Solid-waste disposal space, segregation mechanism and bio-compost unit listed. |
|---|---|
| Status shown by supplied material | Completion not verified |
| Evidence in the project record | RERA amenity record marks fire-protection/fire-safety requirements “YES”; project-specific systems, clearances and completion evidence are not supplied. RERA amenities |
|---|---|
| Status shown by supplied material | Not independently established |
8. Location, access & connectivity
The registered location is SAGARPUMP, revenue village Sagarpump, Abdullapurmet mandal, Ranga Reddy district, PIN 501512. The cadastral parcel centroid supplied for survey 2/P is 17.29660, 78.70007; it is a parcel-centroid reference, not a surveyed entrance coordinate. RERA record Cadastral map
The draft HMDA letter identifies a 40 wide road on the southern boundary and a proposed 30m road, and requires layout roads to be open for access to neighbouring sites. The location record gives the nearest sampled Outer Ring Road interchange as approximately 8.9 km. No public-transport detail or other verified landmark distances are supplied. RERA filing Location record
9. Developer & development status
The registered promoter is MERUGU GOPAL YADAV. Form B, dated 15 April 2025 at Hyderabad, is signed as his affidavit-cum-declaration and states that he has legal title to the project land, that the land is free from encumbrances, and that the project would be completed on or before 20 November 2025. These are promoter declarations. The supplied material does not identify an entity type, corporate registration number, official website or project contact details. Corporate record
HMDA’s draft letter names landowners Jakkireddy Rami Reddy and Jakkireddy Padma and identifies M. Gopal Yadav and Thotla Swamy as DAGPA representatives. The letter requires layout-development works to be completed within three years and records a mortgage over plots 15, 26, 27 and 28. The supplied material does not establish current construction progress, final layout release or completion certification.
10. Approvals, official records & documents
| Supplied evidence | Form C; P02400009794, granted under section 5; validity stated as 21/11/2022–20/11/2025 |
|---|---|
| Scope / note | SAGARPUMP; certificate records no extension |
| Supplied evidence | Draft layout permit 000234/LO/Plg/HMDA/2022, dated 21 November 2022; application 051635/GHT/LT/U6/HMDA/11012022 |
|---|---|
| Scope / note | Draft open-plot layout for Sagarpump; not a supplied final layout release |
| Supplied evidence | Dated 15 April 2025 |
|---|---|
| Scope / note | Promoter’s declarations, including title and completion undertaking |
| Supplied evidence | Layout plan document 554941 Document index Layout record |
|---|---|
| Scope / note | Drawing extraction is incomplete: 27 of 28 plot sizes extracted; one scan pending |
| Supplied evidence | Bhu Bharati survey entry for 2/P, recorded as whole-survey extent Cadastral map |
|---|---|
| Scope / note | Not a project-parcel confirmation for all registered survey numbers |
| Supplied evidence | Not supplied Document index |
|---|---|
| Scope / note | No certificate can be confirmed from the reviewed material |
1. Project at a glance
Project identity
Registered project name: SAGARPUMP
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase not separately identified; registration is for SAGARPUMP
TG-RERA registration: P02400009794, granted under section 5; registration certificate records validity from 21/11/2022 to 20/11/2025. No extension is recorded on the supplied certificate.
Registered promoter: MERUGU GOPAL YADAV
RERA / completion status in supplied record: The certificate’s registration-validity end date and the promoter’s declared completion date are both 20/11/2025. The pack gives no occupancy or completion certificate.
Land and geographic identity
Locality / revenue village: SAGARPUMP / Sagarpump; the approval document also uses “Sagarpampu Village.”
Mandal / district / PIN: Abdullapurmet / Ranga Reddy / 501512
Project survey numbers: 2/P, 3/P, 4/P
Other survey numbers printed in the approval document: 191/P, 201/P, 202/P, 203/P are also listed in the draft layout letter; their relationship to the registered project survey numbers is not further specified in the supplied material.
Total site area: 9940.02 sq. m
Master-plan-road-affected area: 811.34 sq. m in the RERA land details; the draft letter separately records 811.31 Sq.mtrs for the proposed master plan roads affected area.
Net site area: 9128.68 sq. m in the draft layout letter; RERA layout extraction reports 9128.69 sq. m as net layout area.
Boundaries recorded in RERA land details: North: Vagu; South: 40 wide road; East: Land Darshan Goud; West: Land Alli Venkatamma.
Cadastral record: Bhu Bharati cadastral entry is for survey 2/P and describes its extent as the whole survey; it is not a parcel-level confirmation of the project’s exact extent.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout permit 000234/LO/Plg/HMDA/2022, dated 21 November 2022; application number 051635/GHT/LT/U6/HMDA/11012022.
Approved built-up area: 5683.50 sq. m is recorded in the RERA project fields as approved built-up area; the supplied material does not explain its measurement basis for this plotted project.
Layout scale / buildings: Open-plot layout; no tower or residential-building count or floor configuration is provided.
RERA-filed plot count: Not stated in the supplied RERA registration material. The drawing-derived layout record identifies plot numbers 1–28, with sizes extracted for 27 plots; see “Homes, configurations & floor plans.”
Roads and open areas in draft approval: Layout roads 2401.05 sq. m (26.30%); park/open space 815.83 sq. m (8.94%); social infrastructure 228.30 sq. m (2.50%); plotted area 5683.50 sq. m.
Offering and status
Offering: Plots; no RERA-filed plot-type or plot-size schedule is supplied in the registration fields.
Plot numbers and sizes: Drawing-derived record identifies 28 plot numbers (1–28); software extracted sizes for 27 plots. Extracted range: 147.99–334.45 sq. m (177–400 sq. yd); median 168.9 sq. m (202 sq. yd). These are software-measured from the drawing, not RERA-filed unit data.
Booked / available counts: Not established by the supplied RERA data.
Construction / development stage: No independently verified site progress is supplied. The HMDA letter requires layout development works to be completed within three years.
Completion deadline: Promoter’s Form B undertaking: on or before 20 November 2025.
Occupancy / completion certificate: Not provided. The supplied approval is a draft layout letter, not a final layout release or an occupancy/completion certificate.
2. The project story
SAGARPUMP is registered as a plotted development in Sagarpump village, Abdullapurmet mandal, Ranga Reddy district. Its principal supplied approval record is HMDA’s draft layout letter for land identified in the registered project as survey numbers 2/P, 3/P and 4/P. The letter also prints survey numbers 191/P, 201/P, 202/P and 203/P, without explaining their connection to the registered parcel.
The draft layout sets out plots, internal roads, park/open space and a social-infrastructure area. The approval document states that plots 15, 26, 27 and 28, totalling 900.06 sq. m, are mortgaged to HMDA and are not to be sold while so mortgaged. It also states that roads, open space and social-infrastructure land are to be handed over to the local body by registered gift deed before release of final layout plans.
The promoter’s Form B declares a completion deadline of 20 November 2025. The evidence supplied does not establish how much layout infrastructure has been completed, whether final layout plans have been released, or whether a completion certificate has been issued; declared timelines should not be read as independently verified progress.
3. Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or tower scheme. The draft HMDA layout approval records total site area of 9940.02 sq. m, a master-plan-road-affected area of 811.34 sq. m, and net site area of 9128.68 sq. m. The drawing-derived layout record reports a net layout area of 9128.69 sq. m.
The layout area statement records 5683.50 sq. m for plots, 2401.05 sq. m for roads, 815.83 sq. m for park/open space, 228.30 sq. m for social infrastructure and 0 for amenities area. The draft letter identifies a proposed road width of 30m and says roads are to remain accessible to neighbouring sites.
The HMDA record is expressly a draft layout letter. It states that building construction in plots is not permitted until HMDA issues the final layout. No building elevations, residential floor plans, tower or building heights, floor configurations, or apartment arrangements are supplied.
4. Homes, configurations & floor plans
The project is offered as a plotted development. No RERA-filed plot inventory or RERA saleable-area schedule is present in the supplied records. The layout-drawing extraction identifies plot numbers 1 to 28, but sizes were successfully extracted for 27 plots; these are software-measured from the drawing and should not be treated as RERA-filed unit areas.
Plot numbers identified: 1–28; 28 plots by printed plot numbers
Plots with extracted size: 27
Smallest / median / largest extracted size: 147.99 / 168.9 / 334.45 sq. m
Same range / median in square yards: 177 / 202 / 400 sq. yd
Size bands: 7 plots: 150–200 sq. yd; 13 plots: 200–250 sq. yd; 7 plots: 300–400 sq. yd
Common printed sizes: 5 plots at 200.00 sq. yd; 5 at 180.00 sq. yd; 2 at 400.00 sq. yd; 2 at 383.00 sq. yd; 2 at 365.00 sq. yd
These figures describe the drawing extraction, not a complete RERA-filed unit schedule. The floor-plan record reports two drawings in total, one layout sheet and one scan pending; no carpet-area measurement was completed. Apartment-style carpet, balcony and common-area loading figures are therefore not available for this plotted offering.
5. Parking & vehicle circulation
The supplied project records do not establish a sanctioned parking-space count, visitor parking provision, parking allocation to particular plots, or any exclusive parking rights.
The draft HMDA letter requires internal roads and access, including roads being opened for access to neighbouring sites; it also calls for cycling tracks within the layout. It does not provide road-by-road dimensions beyond identifying a proposed 30m road, nor does the evidence establish completed circulation works.
6. Amenities, recreation & open spaces
The HMDA draft layout letter lists proposed layout infrastructure and records land areas for open space and social infrastructure. Its conditions describe requirements; they do not establish that the facilities have been completed. The RERA amenity list marks the listed categories “YES” but gives 0 for each progress percentage.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 815.83 sq. m (8.94%) | Draft HMDA layout letter; layout area statement | Proposed/approved in draft record; completion not verified |
| Social infrastructure | 228.30 sq. m (2.50%) | Draft HMDA layout letter | Land area recorded; facility details and completion not supplied |
| Internal roads | 2401.05 sq. m (26.30%) | Draft HMDA layout letter | Required for development and handover; completion not verified |
| Avenue plantation / park development | No dimensions supplied | Draft HMDA layout letter | Required/listed; completion not verified |
| Cycling tracks | No dimensions supplied | Draft HMDA layout letter | Required/listed; completion not verified |
| Community buildings | No size or capacity supplied | RERA amenity record | Marked “YES”; progress shown as 0; completion not verified |
The promoter/vendor list includes additional facilities such as a clubhouse, pool and gym, but the supplied HMDA layout record and RERA amenity record do not establish those as approved or delivered project facilities. They are not treated here as confirmed project amenities.
7. Utilities, building services & safety
The draft HMDA letter specifies layout-level infrastructure: potable-water-supply connectivity, internal water-supply pipelines and an overhead tank; underground storm-water drainage and underground drainage lines; underground ducting for utilities; a transformer yard and street lighting; solid-waste disposal space and a garbage-segregation mechanism; and, for layouts under 10 acres, a septage-treatment mechanism in accordance with Telangana State FSSM policy. It also lists rainwater-harvesting pits and a bio-compost unit among the layout utilities. These are approval requirements or listed provisions, not evidence of completed or operational services.
| Evidence in the project record | Potable-water connectivity, internal supply pipelines and overhead tank required/listed; no source or capacity stated in the HMDA extract. |
|---|---|
| Status shown by supplied material | Completion and operating status not verified |
| Evidence in the project record | Common septic tank / STP and underground drainage listed; underground storm-water drainage required. |
|---|---|
| Status shown by supplied material | Capacity and completion not supplied |
| Evidence in the project record | Rainwater-harvesting pits listed. |
|---|---|
| Status shown by supplied material | Completion not verified |
| Evidence in the project record | Transformer yard, underground utility ducting and LED street lighting required/listed. |
|---|---|
| Status shown by supplied material | Capacity and completion not supplied |
| Evidence in the project record | Solid-waste disposal space, segregation mechanism and bio-compost unit listed. |
|---|---|
| Status shown by supplied material | Completion not verified |
| Evidence in the project record | RERA amenity record marks fire-protection/fire-safety requirements “YES”; project-specific systems, clearances and completion evidence are not supplied. |
|---|---|
| Status shown by supplied material | Not independently established |
8. Location, access & connectivity
The registered location is SAGARPUMP, revenue village Sagarpump, Abdullapurmet mandal, Ranga Reddy district, PIN 501512. The cadastral parcel centroid supplied for survey 2/P is 17.29660, 78.70007; it is a parcel-centroid reference, not a surveyed entrance coordinate.
The draft HMDA letter identifies a 40 wide road on the southern boundary and a proposed 30m road, and requires layout roads to be open for access to neighbouring sites. The location record gives the nearest sampled Outer Ring Road interchange as approximately 8.9 km. No public-transport detail or other verified landmark distances are supplied.
9. Developer & development status
The registered promoter is MERUGU GOPAL YADAV. Form B, dated 15 April 2025 at Hyderabad, is signed as his affidavit-cum-declaration and states that he has legal title to the project land, that the land is free from encumbrances, and that the project would be completed on or before 20 November 2025. These are promoter declarations. The supplied material does not identify an entity type, corporate registration number, official website or project contact details.
HMDA’s draft letter names landowners Jakkireddy Rami Reddy and Jakkireddy Padma and identifies M. Gopal Yadav and Thotla Swamy as DAGPA representatives. The letter requires layout-development works to be completed within three years and records a mortgage over plots 15, 26, 27 and 28. The supplied material does not establish current construction progress, final layout release or completion certification.
10. Approvals, official records & documents
| Supplied evidence | Form C; P02400009794, granted under section 5; validity stated as 21/11/2022–20/11/2025 |
|---|---|
| Scope / note | SAGARPUMP; certificate records no extension |
| Supplied evidence | Draft layout permit 000234/LO/Plg/HMDA/2022, dated 21 November 2022; application 051635/GHT/LT/U6/HMDA/11012022 |
|---|---|
| Scope / note | Draft open-plot layout for Sagarpump; not a supplied final layout release |
| Supplied evidence | Dated 15 April 2025 |
|---|---|
| Scope / note | Promoter’s declarations, including title and completion undertaking |
| Supplied evidence | Layout plan document 554941 |
|---|---|
| Scope / note | Drawing extraction is incomplete: 27 of 28 plot sizes extracted; one scan pending |
| Supplied evidence | Bhu Bharati survey entry for 2/P, recorded as whole-survey extent |
|---|---|
| Scope / note | Not a project-parcel confirmation for all registered survey numbers |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | No certificate can be confirmed from the reviewed material |
Frequently asked questions
Is SAGARPUMP registered with Telangana RERA?
Yes. SAGARPUMP is registered with the Telangana Real Estate Regulatory Authority as P02400009794; the registration status is New Project.
Who is the developer of SAGARPUMP?
The promoter named in the RERA registration is MERUGU.
Where is SAGARPUMP located?
SAGARPUMP is in SAGARPUMP, Abdullapurmet, Rangareddy, Telangana (501512).
When will SAGARPUMP be completed?
The promoter's proposed date of completion filed with RERA is 20/11/2025. This is the promoter's declaration, not a guarantee.
More projects in Abdullapurmet