Srinivasa Elite

AEDDLA · Yadadri Bhuvanagiri · RERA P02000009535

SRINIVASA ELITE is a plotted development of open plots at Nandanam, Bhongir mandal, Yadadri Bhuvanagiri district. The registered promoter is Aeddla Srinivas. The site area is 13297.53 sq.m; the supplied record does not provide a verified total plot count or plot-size configurations. Its TG-RERA registration is P02000009535, and the promoter-declared completion date is 11/10/2025.

01What we found

RegisteredTG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nandanam, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRINIVASA ELITE RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionNo separate phase designation is disclosed; the registration concerns the project on the listed survey numbers. RERA record
TG-RERA registrationP02000009535
Registration validity12/10/2022 to 11/10/2025; the supplied certificate says it is not extended. This is the registration period, not a construction or occupancy certification.
Registered promoterAeddla Srinivas; the project record also identifies the promoter as AEDDLA. RERA record
RERA status in supplied recordRegistered; the supplied certificate records the validity above. No later extension or current registration-status record is supplied.

Land and geographic identity

FieldRecord
Locality / addressNandanam; locality shown in the project header as BUVANAGIRI RERA record
Revenue villageNandanam RERA record
MandalBhongir RERA record
DistrictYadadri Bhuvanagiri RERA record
PIN508285 RERA record
Project survey numbers and subdivisions389/A1, 389/A2/1, 389/A2/2, 390/A, 390/AA/1, 390/AA/2 RERA record
Total site area13297.53 sq.m RERA filing
Area affected by road widening / net site area1131.57 sq.m affected; 12165.96 sq.m net site area RERA filing
Boundaries recordedEast: Railway Quarters; West: Existing 10M Wide Road; North: Existing 30 MM Wide Road; South: Railway Quarters RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalDraft Layout Permit No. 000197/LO/Plg/HMDA/2022, dated 12 October 2022 Approvals record
Layout application / file number055577/GHT/LT/U6/HMDA/04072022 Approvals record
Approved built-up area8110.62 sq.m is recorded in the project information as approved built-up area; the supplied material does not explain how this building-area field applies to the plotted layout. RERA filing
Plot count / building configurationThe supplied project record does not provide a verified total plot count or building configuration. The five mortgaged plots are identified as Plots 1–5; they are not the total plot count.
Floors and parking levelsNot disclosed in the supplied evidence; the project is a plotted layout, and no building-floor or parking-level schedule is provided. Document index
Approved versus RERA-declared unit countsNo unit inventory or plot count is supplied for comparison. RERA record Document index

Offering and status

FieldRecord
OfferingOpen plots in a plotted layout; plot-size range and plot-by-plot inventory are not disclosed in the supplied material. RERA record
Booked / available countsNot supplied. Document index
Construction / development stageNo independently verified site-progress record is supplied. The RERA Form B declares completion by 11/10/2025.
Completion deadlinePromoter-declared completion date: 11/10/2025. This is separate from registration validity.
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. The evidence concerns a plotted layout, not occupancy-certified buildings. Document index

2. The project story

SRINIVASA ELITE is registered as a plotted development at Nandanam village, Bhongir mandal, Yadadri Bhuvanagiri district. Its identified land comprises survey subdivisions 389/A1, 389/A2/1, 389/A2/2, 390/A, 390/AA/1 and 390/AA/2. RERA record

The HMDA record describes an open-plot layout with a total site area of 13297.53 sq.m, of which 1131.57 sq.m is identified as affected by a proposed 45 Mts wide Master Plan road; the recorded net site area is 12165.96 sq.m. The layout area statement identifies plots, roads, park/open space and social infrastructure. The supplied record does not establish a complete plot inventory, individual plot sizes, sales status or current on-site progress. Layout record

The promoter’s Form B declares a completion date of 11/10/2025. The HMDA draft layout letter also sets a development-works completion period of three years, but the available material does not establish the present physical stage or independently verify completion. No occupancy certificate is provided; an occupancy certificate is not shown as applicable to this plotted-layout record.

3. Master plan, architecture & building design

The supplied drawing-derived record describes a plotted layout rather than apartment blocks or villas. Its stated area breakdown is:

Layout componentAreaShare / record
Total site area13297.53 sq.mRecorded in the HMDA layout letter
Master Plan road-affected area1131.57 sq.mRecorded as affected area
Net site area12165.96 sq.mRecorded in the HMDA layout letter
Plotted area8110.62 sq.mLayout drawing extraction Layout record
Layout roads2668.58 sq.m21.93% in the approval extraction
Park / organized open space and utility area1082.18 sq.m8.90% in the approval extraction
Social infrastructure304.58 sq.m2.50% in the approval extraction
Amenities area0Approval extraction

The layout drawing extraction is software-read and notes that the plot count and sizes should be verified against the drawing; the plot list is incomplete, with no plot sizes available in the supplied record. Layout record The HMDA letter identifies Plots 1–5 as mortgaged to HMDA pending layout-development obligations.

No building footprint, floor configuration, tower arrangement, FSI-counted area, apartment carpet area, or building-height information is supplied. The recorded 8110.62 sq.m is the field labelled “Approved Built up Area”; it should not be treated as plot saleable area or apartment carpet area. RERA filing

4. Homes, configurations & floor plans

The RERA project is a plotted development, but the supplied evidence does not include a verified plot count, plot-size bands, booked/available plot counts, or a plot-by-plot schedule. The layout drawing extraction reports that plots are incomplete and no plot sizes were measured in the supplied record. RERA record Layout record

No apartment unit configurations, RERA saleable areas, measured carpet areas, or loading figures are provided. The supplied floor-plan extraction reports two layout sheets, with no flats identified and no measured areas; it does not provide a plot inventory. Floor plans

5. Parking & vehicle circulation

No project-wide parking count, visitor parking provision, accessible parking, parking allocation schedule, or parking-level plan is supplied. The HMDA letter records internal layout roads and requires roads to be opened for access to neighbouring sites; it does not establish parking provision or exclusive parking rights for any plot. Document index

6. Amenities, recreation & open spaces

The HMDA draft-layout extraction lists planned site infrastructure and amenity-related items. Its project amenities register marks several categories “YES” but records 0% progress; that is a filed status, not independent verification of delivery. RERA amenities

Park / organized open space
Description / size1082.18 sq.m in the layout area statement; the 2024 handover record separately identifies a park area of 913.63 sq.m.
Evidence sourceHMDA layout record and handover letter
Declared progress / verified statusThe handover letter records transfer to the Gram Panchayat; no independent inspection confirming current condition is supplied.
Social infrastructure area
Description / size304.58 sq.m
Evidence sourceHMDA layout record; handover letter
Declared progress / verified statusHandover is recorded; delivery or operation of a specific community facility is not documented.
Utility areas
Description / size82.33 sq.m and 86.22 sq.m
Evidence sourceHandover letter
Declared progress / verified statusHandover is recorded; no facility-specific completion or operating evidence is supplied.
Layout roads
Description / size2668.58 sq.m
Evidence sourceHMDA layout record; handover letter
Declared progress / verified statusHandover is recorded; current road condition is not independently verified.
Cycling tracks
Description / sizeNo dimensions supplied
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusListed as an amenity/utility; no progress or completion evidence supplied.
Indoor games / children’s play area
Description / sizeNo dimensions supplied Promoter website
Evidence sourceThird-party vendor listing, not a RERA or sanction record
Declared progress / verified statusNot established as sanctioned or delivered.

7. Utilities, building services & safety

The HMDA draft-layout letter lists common septic tank / STP, internal water-supply pipelines, an overhead tank, transformer, rainwater-harvesting pits, solid-waste and bio-compost facilities, and cycling tracks. These are recorded as proposed layout infrastructure; the supplied evidence does not state capacities or independently confirm installation or operation.

The RERA amenities register also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, solid-waste management, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station. Where the register indicates “YES,” it remains a filed declaration; the listed progress is 0%, and no completion or statutory-clearance evidence is supplied. RERA amenities

No specific water source, storage capacity, treatment capacity, reuse scheme, electricity-backup capacity, fire-system design, security system, accessibility provision, or operating service details are established in the supplied record. Document index RERA amenities

8. Location, access & connectivity

The registered location is Nandanam village, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508285; the project header identifies the locality as BUVANAGIRI. The site boundaries recorded in the project filing are Railway Quarters to the east and south, an existing 10M wide road to the west, and an existing 30 MM wide road to the north. RERA record RERA filing

The HMDA draft-layout letter refers to road widths of 45 Mts, 18 mts and 60 feet in its layout record and requires roads to be opened for neighbouring-site access. No public-transport route, transit distance or landmark distance is supplied in the official project evidence. The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 26.0 km. Location record

9. Developer & development status

The TG-RERA registration certificate names Aeddla Srinivas as promoter. The project header identifies the promoter as AEDDLA, while the legal-entity type and a verified corporate registration identifier are not established in the supplied project evidence. RERA record Corporate record

The RERA Form B is a promoter declaration that the project would be completed by 11/10/2025. No construction-progress measurements, current sales inventory, revised completion date, registration-extension order, or current site inspection is supplied. Registration validity ended on 11/10/2025 according to the certificate, which is distinct from the promoter-declared completion deadline.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02000009535; issued 28/04/2025; stated validity 12/10/2022–11/10/2025
Scope and evidenceForm C identifies SRINIVASA ELITE, promoter Aeddla Srinivas, PIN 508285, and the six project survey numbers.
HMDA draft layout approval letter
Identifier / dateDraft Layout Permit 000197/LO/Plg/HMDA/2022, dated 12 October 2022; application/file 055577/GHT/LT/U6/HMDA/04072022
Scope and evidenceOpen-plot layout at Nandanam on the six identified survey subdivisions; includes area statement and layout conditions.
Layout roads/open-space/social-infrastructure handover record
Identifier / dateGift Deed 6590/2024, dated 06-09-2024
Scope and evidenceLetter records A. Srinivas handing over layout roads, park/open space, utility and social-infrastructure areas to the Nandanam Gram Panchayat.
Panchayat letter concerning handover
Identifier / date06-09-2024
Scope and evidenceRequests that layout roads, park/public-utility areas and social-infrastructure area be made in favour of the Gram Panchayat; the letter itself does not establish transfer.
Promoter Form B declaration
Identifier / dateCompletion undertaking: 11/10/2025
Scope and evidencePromoter declares title and absence of encumbrances and undertakes the stated completion date and project obligations.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceNo certificate is identified in the supplied materials. Document index

Frequently asked questions

Is SRINIVASA ELITE registered with Telangana RERA?

Yes. SRINIVASA ELITE is registered with the Telangana Real Estate Regulatory Authority as P02000009535; the registration status is New Project.

Who is the developer of SRINIVASA ELITE?

The promoter named in the RERA registration is AEDDLA.

Where is SRINIVASA ELITE located?

SRINIVASA ELITE is in BUVANAGIRI, Nandanam, Bhongir, Yadadri Bhuvanagiri, Telangana (508285).

When will SRINIVASA ELITE be completed?

The promoter's proposed date of completion filed with RERA is 11/10/2025. This is the promoter's declaration, not a guarantee.