Sri Vishnu S Pullela Mansion
M/S SRI VISHNU DEVELOPERS · Hyderabad · RERA P02500006011
SRI VISHNU S PULLELA MANSION is a mixed-development project (Residential & Commercial) in Jubilee Hills Road, Shaikpet mandal, Hyderabad district, with commercial office units listed in the RERA schedule. The registered promoter is M/S SRI VISHNU DEVELOPERS, a partnership. The site area is 779.97 sq. m, and the project has one commercial building with an M1 Cellar + Ground + 4 upper floors and 10 office units: five OFFICE NO 1 and five OFFICE NO 2, each with a saleable area of 157.19 sq. m. Its TG-RERA registration number is P02500006011, and the promoter’s Form B undertakes completion by 06-SEP-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI VISHNU S PULLELA MANSION RERA record |
| Project type | Mixed Development (Residential & Commercial); the filed offering is commercial office units. RERA record RERA filing RERA unit details |
| Phase / registered portion | Phase is not separately identified in the supplied record; the registration and certificates refer to the project. RERA record |
| TG-RERA registration | P02500006011 |
| Registration validity | 04/04/2023 to 06/09/2025; the certificate says “2 years.” No extension is recorded on the supplied certificate. Registration validity is separate from the project completion date and occupancy certificate. |
| Registered promoter | M/S SRI VISHNU DEVELOPERS, a partnership. RERA record Corporate record RERA filing |
| RERA status | The supplied certificate records a grant of registration; its stated validity ended on 06/09/2025. A current registration status beyond that date is not established by the supplied certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / PIN | Jubilee Hills Road; 500096. RERA record RERA filing |
| Revenue village | The project filing leaves the village undisclosed. The building-permit extraction identifies Film Nagar; title documents refer to Shaikpet Village and Hakimpet Village, and other title-report descriptions use Hyderabad. These are the supplied descriptions, not a resolved single revenue-village identity. Land records |
| Mandal / district | Shaikpet / Hyderabad. RERA record RERA filing |
| Survey numbers and subdivisions | 403/1 OLD (120 NEW) and 102/1. The title materials also use forms including S.No. 403/1, New S.No. 120; S.No. 102/1, and Old 403/1, New 120, 102/1. RERA record |
| Registered site extent | 779.97 sq. m total site area; 757.81 sq. m net area; 22.16 sq. m road-affected area. RERA filing |
| Boundaries (RERA filing) | East: 120-WIDE ROAD; west: OPEN SPACE; north: OPEN SPACE; south: PLOT NO 213. RERA filing |
| Plot identifier | 212-III. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 1/C18/13430/2019, approved 06 September, 2019; file no. 1/C18/08812/2019. Approvals record |
| Approved built-up area | 2,107.30 sq. m in the project fields. The permit extraction separately lists 107.69 m² ground commercial area and 1,229.04 m² commercial area over four upper floors; these extracted components should not be treated as a replacement for the filed approved built-up-area figure. RERA filing |
| Building count and use | One building is recorded; the permit describes Building A-1, a commercial building. RERA filing |
| Sanctioned floor configuration | M1 Cellar + Ground + 4 upper floors; extracted building height 14.96 m. |
| Parking levels / provision | Cellar parking is referenced in the permit conditions. A sanctioned parking-space count, allocation schedule, or parking-level plan is not supplied here. |
| Units | The project fields record 1 total building unit; the RERA unit schedule lists 10 commercial office units across Office No. 1 and Office No. 2. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Unit types | Commercial offices: OFFICE NO 1 and OFFICE NO 2. RERA unit table RERA unit details |
| RERA saleable area | 157.19 sq. m per unit for each filed office type. RERA unit table |
| Booked / available | 0 booked; 10 available in the supplied RERA unit data, with no as-of date provided; treat counts as indicative. RERA unit table RERA unit table |
| Construction stage | An architect’s Form–1A certifies overall completion and identifies a GHMC occupancy certificate. This is a filed certification, not an independent site inspection. |
| Completion dates | The promoter’s Form B undertakes completion by 06-SEP-2025; the registration certificate also ends on 06/09/2025. The architect’s certificate records completion on 11 June, 2024. |
| Occupancy certificate | The architect’s certificate records OC 1564/GHMC/KHB/2024-OC, dated 11 June, 2024, for the registered project; the supplied extraction does not separately identify a phase or tower-specific scope. |
2. The project story
SRI VISHNU S PULLELA MANSION is registered as a mixed-development project, but the supplied RERA unit schedule describes a commercial offering: ten office units, listed under Office No. 1 and Office No. 2. The GHMC permit describes one commercial building, Building A-1, with a cellar, ground floor and four upper floors. RERA record RERA unit table
The project land is recorded at 779.97 sq. m, including 22.16 sq. m identified as road-affected and 757.81 sq. m net area. The permit states that the road-affected portion is to be surrendered to GHMC without compensation. The project filing gives Jubilee Hills Road, Shaikpet, Hyderabad as its location identifiers, while the supplied permit and title records use additional village descriptions; see the identity table for the full recorded forms. RERA filing RERA record
An architect’s Form–1A states that the project is complete and cites an occupancy certificate dated 11 June, 2024. This is a professional certificate filed with TG-RERA; the materials supplied for this overview do not independently verify the physical condition of the building.
3. Master plan, architecture & building design
The GHMC permit extraction describes a single commercial building, A-1, with M1 Cellar + Ground + 4 upper floors and a recorded height of 14.96 m. It lists ground-floor commercial area of 107.69 m² and commercial area of 1,229.04 m² over the four upper floors. Separately, the project fields state an approved built-up area of 2,107.30 sq. m; these are distinct supplied figures and are not interchangeable area measures. RERA filing
The permit extraction records a 98.76 m² TOT-lot, six trees, and a 165.38 RM compound wall. It also requires periphery greenery and tree planting. The available drawing record is not sufficient to describe the detailed floor-by-floor arrangement, building footprint, lifts, stairs, entrances, internal circulation or commercial/common-area distribution. Document index
No measured floor-plan data are available: the two drawing records are described as having no flats, and no software-measured carpet areas are supplied. Floor plans
4. Homes, configurations & floor plans
The RERA schedule lists commercial offices, not homes. Each filed type has five units; the recorded saleable area is 157.19 sq. m per unit. No measured carpet area or loading figure is available. The drawing data supplied for this review contain no measured floor-plan areas. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| OFFICE NO 1 | 5 | 0 | 5 | 157.19 sq. m | Not supplied | Not supplied |
| OFFICE NO 2 | 5 | 0 | 5 | 157.19 sq. m | Not supplied | Not supplied |
The booked and available counts are those in the supplied RERA unit record; it carries no as-of date, so the counts are indicative. No room dimensions or unit-level floor-plan measurements are available here. RERA unit table RERA unit table Floor plans
5. Parking & vehicle circulation
The permit conditions state that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The building configuration separately identifies an M1 cellar. The supplied evidence does not establish the sanctioned number of parking spaces, whether visitor or accessible spaces are provided, the ramp and driveway arrangement, or any legally documented unit-by-unit parking allocation. A drawn or described parking area alone does not establish exclusive ownership.
6. Amenities, recreation & open spaces
The GHMC permit extraction records a 98.76 m² TOT-lot, six trees, transformer space and a garbage house. Its conditions require the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and require rainwater-harvesting infrastructure. These are permit provisions; the supplied evidence does not independently confirm their present condition.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| TOT-lot | 98.76 m² | GHMC permit extraction | Sanctioned/conditioned; completion not independently verified. |
| Trees / periphery greenery | 6 trees recorded; planting and greenery maintenance required | GHMC permit extraction | Permit record; current provision not independently verified. |
| Transformer space | Space required on site | GHMC permit conditions | Required by permit; installation/status not established. |
| Garbage house | Required within the premises | GHMC permit conditions | Required by permit; completion/status not established. |
No project-specific RERA evidence supplied here establishes a clubhouse, pool, gym or children’s play area as sanctioned or delivered amenities.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, a transformer space, and a garbage house. It also makes provision for tree planting and a fenced tot-lot. These are approval conditions; the available record does not provide capacities or independent confirmation of installation.
The permit states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision, and assigns fire-fighting installations and structural/fire-safety requirements to the owner, builder/developer and relevant technical personnel. It also requires an occupancy certificate before occupation. The supplied evidence does not provide lift counts or capacities, water-storage or treatment capacities, backup power details, fire-system specifications, waste-management procedures, CCTV/security arrangements or accessible-circulation details.
8. Location, access & connectivity
The RERA project record identifies Jubilee Hills Road, Shaikpet mandal, Hyderabad district, Telangana, PIN 500096. The filed boundary description records a 120-WIDE ROAD on the east. The permit extraction identifies the site as Film Nagar and refers to an 18 mt. road; the supplied overview evidence does not provide an access-route description. RERA record RERA filing RERA filing
The supplied location data list Financial District (Nanakramguda), 1.2 km from the cadastral parcel centroid. Location record No other measured distances or verified public-transport details are supplied.
9. Developer & development status
The registered promoter is M/S SRI VISHNU DEVELOPERS, identified as a partnership, with GSTIN 36ACAFS2671K1ZX. The supplied promoter address is JAYA ENCLAVE, JAGADAMBA CENTRE, JUBILEE HILLS, JUBILEE HILLS ROAD, Shaikpet, Hyderabad, 500096. Individual official contact details are not provided in the supplied project record. Corporate record Parties record
The promoter’s Form B affidavit undertakes to complete the project by 06-SEP-2025. The architect’s Form–1A records project completion and cites an OC dated 11 June, 2024. Those statements are respectively a promoter declaration and an architect’s certificate filed with RERA; no independent construction-progress inspection is supplied here.
10. Approvals, official records & documents
| Supplied details | P02500006011, Form C; stated validity 04/04/2023–06/09/2025. |
|---|
| Supplied details | Building Permit Order 1/C18/13430/2019, approved 06 September, 2019; file no. 1/C18/08812/2019. |
|---|
| Supplied details | 1564/GHMC/KHB/2024-OC, dated 11 June, 2024, cited in the architect’s certificate. |
|---|
| Supplied details | Form–1A records overall completion of the registered project. |
|---|
| Supplied details | Declares the title basis, encumbrance position and completion undertaking; it is a promoter declaration. |
|---|
| Supplied details | Title-search report dated 07/06/2022 and related sale, development, mortgage and supplementary-agreement materials are supplied for detailed title review. |
|---|
The supplied project record also includes the GHMC permit conditions and extracted sanctioned parameters. Detailed title analysis, approval-condition review and any issues requiring further verification belong in the corresponding sections of this report.
1. Project at a glance
Project identity
Registered project name: SRI VISHNU S PULLELA MANSION
Project type: Mixed Development (Residential & Commercial); the filed offering is commercial office units.
Phase / registered portion: Phase is not separately identified in the supplied record; the registration and certificates refer to the project.
TG-RERA registration: P02500006011
Registration validity: 04/04/2023 to 06/09/2025; the certificate says “2 years.” No extension is recorded on the supplied certificate. Registration validity is separate from the project completion date and occupancy certificate.
Registered promoter: M/S SRI VISHNU DEVELOPERS, a partnership.
RERA status: The supplied certificate records a grant of registration; its stated validity ended on 06/09/2025. A current registration status beyond that date is not established by the supplied certificate.
Land and geographic identity
Locality / PIN: Jubilee Hills Road; 500096.
Revenue village: The project filing leaves the village undisclosed. The building-permit extraction identifies Film Nagar; title documents refer to Shaikpet Village and Hakimpet Village, and other title-report descriptions use Hyderabad. These are the supplied descriptions, not a resolved single revenue-village identity.
Mandal / district: Shaikpet / Hyderabad.
Survey numbers and subdivisions: 403/1 OLD (120 NEW) and 102/1. The title materials also use forms including S.No. 403/1, New S.No. 120; S.No. 102/1, and Old 403/1, New 120, 102/1.
Registered site extent: 779.97 sq. m total site area; 757.81 sq. m net area; 22.16 sq. m road-affected area.
Boundaries (RERA filing): East: 120-WIDE ROAD; west: OPEN SPACE; north: OPEN SPACE; south: PLOT NO 213.
Plot identifier: 212-III.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 1/C18/13430/2019, approved 06 September, 2019; file no. 1/C18/08812/2019.
Approved built-up area: 2,107.30 sq. m in the project fields. The permit extraction separately lists 107.69 m² ground commercial area and 1,229.04 m² commercial area over four upper floors; these extracted components should not be treated as a replacement for the filed approved built-up-area figure.
Building count and use: One building is recorded; the permit describes Building A-1, a commercial building.
Sanctioned floor configuration: M1 Cellar + Ground + 4 upper floors; extracted building height 14.96 m.
Parking levels / provision: Cellar parking is referenced in the permit conditions. A sanctioned parking-space count, allocation schedule, or parking-level plan is not supplied here.
Units: The project fields record 1 total building unit; the RERA unit schedule lists 10 commercial office units across Office No. 1 and Office No. 2.
Offering and status
Unit types: Commercial offices: OFFICE NO 1 and OFFICE NO 2.
RERA saleable area: 157.19 sq. m per unit for each filed office type.
Booked / available: 0 booked; 10 available in the supplied RERA unit data, with no as-of date provided; treat counts as indicative.
Construction stage: An architect’s Form–1A certifies overall completion and identifies a GHMC occupancy certificate. This is a filed certification, not an independent site inspection.
Completion dates: The promoter’s Form B undertakes completion by 06-SEP-2025; the registration certificate also ends on 06/09/2025. The architect’s certificate records completion on 11 June, 2024.
Occupancy certificate: The architect’s certificate records OC 1564/GHMC/KHB/2024-OC, dated 11 June, 2024, for the registered project; the supplied extraction does not separately identify a phase or tower-specific scope.
2. The project story
SRI VISHNU S PULLELA MANSION is registered as a mixed-development project, but the supplied RERA unit schedule describes a commercial offering: ten office units, listed under Office No. 1 and Office No. 2. The GHMC permit describes one commercial building, Building A-1, with a cellar, ground floor and four upper floors.
The project land is recorded at 779.97 sq. m, including 22.16 sq. m identified as road-affected and 757.81 sq. m net area. The permit states that the road-affected portion is to be surrendered to GHMC without compensation. The project filing gives Jubilee Hills Road, Shaikpet, Hyderabad as its location identifiers, while the supplied permit and title records use additional village descriptions; see the identity table for the full recorded forms.
An architect’s Form–1A states that the project is complete and cites an occupancy certificate dated 11 June, 2024. This is a professional certificate filed with TG-RERA; the materials supplied for this overview do not independently verify the physical condition of the building.
3. Master plan, architecture & building design
The GHMC permit extraction describes a single commercial building, A-1, with M1 Cellar + Ground + 4 upper floors and a recorded height of 14.96 m. It lists ground-floor commercial area of 107.69 m² and commercial area of 1,229.04 m² over the four upper floors. Separately, the project fields state an approved built-up area of 2,107.30 sq. m; these are distinct supplied figures and are not interchangeable area measures.
The permit extraction records a 98.76 m² TOT-lot, six trees, and a 165.38 RM compound wall. It also requires periphery greenery and tree planting. The available drawing record is not sufficient to describe the detailed floor-by-floor arrangement, building footprint, lifts, stairs, entrances, internal circulation or commercial/common-area distribution.
No measured floor-plan data are available: the two drawing records are described as having no flats, and no software-measured carpet areas are supplied.
4. Homes, configurations & floor plans
The RERA schedule lists commercial offices, not homes. Each filed type has five units; the recorded saleable area is 157.19 sq. m per unit. No measured carpet area or loading figure is available. The drawing data supplied for this review contain no measured floor-plan areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| OFFICE NO 1 | 5 | 0 | 5 | 157.19 sq. m | Not supplied | Not supplied |
| OFFICE NO 2 | 5 | 0 | 5 | 157.19 sq. m | Not supplied | Not supplied |
The booked and available counts are those in the supplied RERA unit record; it carries no as-of date, so the counts are indicative. No room dimensions or unit-level floor-plan measurements are available here.
5. Parking & vehicle circulation
The permit conditions state that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The building configuration separately identifies an M1 cellar. The supplied evidence does not establish the sanctioned number of parking spaces, whether visitor or accessible spaces are provided, the ramp and driveway arrangement, or any legally documented unit-by-unit parking allocation. A drawn or described parking area alone does not establish exclusive ownership.
6. Amenities, recreation & open spaces
The GHMC permit extraction records a 98.76 m² TOT-lot, six trees, transformer space and a garbage house. Its conditions require the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and require rainwater-harvesting infrastructure. These are permit provisions; the supplied evidence does not independently confirm their present condition.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| TOT-lot | 98.76 m² | GHMC permit extraction | Sanctioned/conditioned; completion not independently verified. |
| Trees / periphery greenery | 6 trees recorded; planting and greenery maintenance required | GHMC permit extraction | Permit record; current provision not independently verified. |
| Transformer space | Space required on site | GHMC permit conditions | Required by permit; installation/status not established. |
| Garbage house | Required within the premises | GHMC permit conditions | Required by permit; completion/status not established. |
No project-specific RERA evidence supplied here establishes a clubhouse, pool, gym or children’s play area as sanctioned or delivered amenities.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting structure, a transformer space, and a garbage house. It also makes provision for tree planting and a fenced tot-lot. These are approval conditions; the available record does not provide capacities or independent confirmation of installation.
The permit states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision, and assigns fire-fighting installations and structural/fire-safety requirements to the owner, builder/developer and relevant technical personnel. It also requires an occupancy certificate before occupation. The supplied evidence does not provide lift counts or capacities, water-storage or treatment capacities, backup power details, fire-system specifications, waste-management procedures, CCTV/security arrangements or accessible-circulation details.
8. Location, access & connectivity
The RERA project record identifies Jubilee Hills Road, Shaikpet mandal, Hyderabad district, Telangana, PIN 500096. The filed boundary description records a 120-WIDE ROAD on the east. The permit extraction identifies the site as Film Nagar and refers to an 18 mt. road; the supplied overview evidence does not provide an access-route description.
The supplied location data list Financial District (Nanakramguda), 1.2 km from the cadastral parcel centroid. No other measured distances or verified public-transport details are supplied.
9. Developer & development status
The registered promoter is M/S SRI VISHNU DEVELOPERS, identified as a partnership, with GSTIN 36ACAFS2671K1ZX. The supplied promoter address is JAYA ENCLAVE, JAGADAMBA CENTRE, JUBILEE HILLS, JUBILEE HILLS ROAD, Shaikpet, Hyderabad, 500096. Individual official contact details are not provided in the supplied project record.
The promoter’s Form B affidavit undertakes to complete the project by 06-SEP-2025. The architect’s Form–1A records project completion and cites an OC dated 11 June, 2024. Those statements are respectively a promoter declaration and an architect’s certificate filed with RERA; no independent construction-progress inspection is supplied here.
10. Approvals, official records & documents
| Supplied details | P02500006011, Form C; stated validity 04/04/2023–06/09/2025. |
|---|
| Supplied details | Building Permit Order 1/C18/13430/2019, approved 06 September, 2019; file no. 1/C18/08812/2019. |
|---|
| Supplied details | 1564/GHMC/KHB/2024-OC, dated 11 June, 2024, cited in the architect’s certificate. |
|---|
| Supplied details | Form–1A records overall completion of the registered project. |
|---|
| Supplied details | Declares the title basis, encumbrance position and completion undertaking; it is a promoter declaration. |
|---|
| Supplied details | Title-search report dated 07/06/2022 and related sale, development, mortgage and supplementary-agreement materials are supplied for detailed title review. |
|---|
The supplied project record also includes the GHMC permit conditions and extracted sanctioned parameters. Detailed title analysis, approval-condition review and any issues requiring further verification belong in the corresponding sections of this report.
Frequently asked questions
Is SRI VISHNU S PULLELA MANSION registered with Telangana RERA?
Yes. SRI VISHNU S PULLELA MANSION is registered with the Telangana Real Estate Regulatory Authority as P02500006011; the registration status is New Project.
Who is the developer of SRI VISHNU S PULLELA MANSION?
The promoter named in the RERA registration is M/S SRI VISHNU DEVELOPERS.
Where is SRI VISHNU S PULLELA MANSION located?
SRI VISHNU S PULLELA MANSION is in JUBILEE HILLS ROAD, Shaikpet, Hyderabad, Telangana (500096).
When will SRI VISHNU S PULLELA MANSION be completed?
The promoter's proposed date of completion filed with RERA is 06/09/2025. This is the promoter's declaration, not a guarantee.
More projects in Shaikpet