Orange Elite
ORANGE INFRASTRUCTURES · Rangareddy · RERA P02400005310
ORANGE ELITE is a residential apartment project in Nallagandla, Serilingampally mandal, Ranga Reddy district, developed by the registered promoter ORANGE INFRASTRUCTURES. The sanctioned site area is 3048.25 m², with one building comprising 1 Cellar + Stilt + 5 upper floors and 60 apartments: 2BHK and 3BHK configurations. The project is registered with TG-RERA under P02400005310, and the promoter’s completion undertaking states 25th July 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | ORANGE ELITE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Not separately named in the supplied record; registration is for the project identified as ORANGE ELITE RERA record |
| TG-RERA registration number | P02400005310 RERA record |
| Registration validity | 23/11/2022–17/03/2028, as stated on the certificate; this is registration validity, not the construction-completion deadline |
| Registered promoter | ORANGE INFRASTRUCTURES; the certificate also styles the name “Orange Infrastructures” RERA record |
| RERA status | Registered; the supplied certificate is Form C |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Nallagandla RERA record RERA filing |
| Revenue village | Nallagandla village RERA record Land records |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500019 RERA record RERA filing |
| Project survey number(s) | Survey No. 124 PART (also written “124 part” in the filed title material) RERA record Land records |
| Sanctioned site area | 3048.25 m² |
| Road-affected area | 23.85 m² |
| Net area | 3024.40 m² |
| Boundaries in RERA filing | North: 40 ft road; East, West and South: neighbours’ land RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Building permit / principal approval | Permit No. 1/C20/00215/2022, dated 17 March 2022 Approvals record |
| Related file number | 1/C20/02401/2020 |
| Approved built-up area | The RERA filing records 11066.13 m² as “Approved Built up Area”; the permit extraction separately states residential upper-floor area 7,326.09 m², cellar 1,789.20 m² and stilt 1,540.00 m². These are distinct labels in the supplied records. RERA filing |
| Building arrangement | One proposed residential building; one tower/block is recorded in the RERA unit summary RERA unit table |
| Sanctioned floor configuration | 1 Cellar + Stilt + 5 upper floors |
| Approved unit count | 60 units in the RERA unit record; the supplied permit extraction says sanctioned unit numbers must not be increased without GHMC’s prior approval, but does not provide a separate numerical unit count RERA unit table |
| Parking levels | Cellar and stilt are approved for parking under the permit conditions; a parking-space count is not supplied |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable area | 2BHK: 62.66 m²; 3BHK: 159.09 m² RERA unit table |
| Portal booking/availability snapshot | 2BHK: 40 total, 0 booked, 40 available; 3BHK: 20 total, 0 booked, 20 available. The portal record has no supplied as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress figure or current construction stage is supplied. Document index |
| Completion dates | The Form B declaration states 25th July 2027 as the promoter’s completion undertaking. The GHMC permit states construction is to be completed before 17 March 2028. These dates are recorded here with their respective document sources. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The permit requires an occupancy certificate before occupation. Document index |
2. The project story
- ORANGE ELITE is a registered residential apartment project on Survey No. 124 PART, Nallagandla village, in Serilingampally mandal, Ranga Reddy district. The RERA filing identifies a single building and lists 60 apartments: 40 two-bedroom and 20 three-bedroom units. RERA record Land records RERA unit table
- GHMC’s building permit describes a proposed residential building with one cellar, a stilt level and five upper floors. The permit also records a 23.85 m² road-affected portion and a 174.98 m² tot-lot. These are sanctioned-record details; the supplied evidence does not establish construction progress or independently verified completion of the building or its facilities.
- The project’s registration remains valid to 17 March 2028 according to its Form C certificate. The promoter’s Form B completion undertaking and the permit’s completion date are separate project-timeline disclosures; neither establishes that the project is complete. No occupancy certificate is supplied.
3. Master plan, architecture & building design
- The supplied GHMC permit describes one proposed residential building on a site of 3048.25 m², with a 3024.4 m² net area after recording 23.85 m² as road-affected. It lists 1,789.20 m² for the cellar, 1,540.00 m² for the stilt and 7,326.09 m² for the five residential upper floors. The RERA filing separately records 11066.13 m² as approved built-up area; the supplied evidence does not provide a drawing-based reconciliation of these distinct area figures. RERA filing RERA filing
- The permit identifies the floor stack as 1 Cellar + Stilt + 5 upper floors, and states a building height of 14.75 m. Its extracted conditions identify a 174.98 m² tot-lot, a transformer space, rainwater-harvesting structures and a garbage house. The permit requires the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.
- The supplied record does not establish the number of flats per floor, building footprint, lift or stair arrangement, internal circulation, detailed landscaping plan, or any phase-wise division. An approved drawing extraction for the layout-plan document is not available. Document index
4. Homes, configurations & floor plans
- The RERA record lists 60 apartments across two configurations. Saleable areas below are RERA-filed. Carpet-area figures are software measurements from the supplied approved floor-plan drawings, not RERA disclosures; the drawing-derived measurements are flagged as needing review. Saleable area and carpet area are different measures, and the supplied record does not provide a measured balcony/utility schedule for every unit design. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 62.66 m² | 59.8–60.5 m²; median 60.1 m² (software-measured) | Not supplied |
| 3BHK | 20 | 0 | 20 | 159.09 m² | 103.0–128.0 m²; median 103.3 m² (software-measured) | 35% (software record) |
- The 2BHK drawing sample includes a hall, kitchen, two bedrooms, toilets and a utility area. One measured 2BHK drawing identifies a utility area of 3.04 m², excluded from the measured carpet area. A measured 3BHK drawing includes a hall, kitchen, three bedrooms, toilets, a utility area and balconies; the displayed example records balcony areas of 8.67 m² and 1.74 m², and a utility area of 4.76 m², each excluded from measured carpet area. These room and area details are drawing-based measurements, not RERA-filed unit disclosures. RERA unit details
- The drawing record reports 2 measured 2BHK designs and 11 measured 3BHK designs. The supplied 2BHK measurements need review; the overall drawing measurement record also notes that software-measured carpet areas need review against the drawings. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as approved for vehicle parking and requires those areas to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use. The supplied documents do not state the number of car or two-wheeler spaces, visitor or accessible parking provision, parking allotments by apartment, ramps, or internal driveway arrangements. A parking count or exclusive unit allocation cannot therefore be established from the supplied evidence.
6. Amenities, recreation & open spaces
The GHMC permit contains project-specific conditions and facilities for the proposed building. The RERA amenities record lists common infrastructure items, but the supplied progress percentages are 0 and do not establish completed facilities. No independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | 174.98 m²; permit requires fencing and maintenance as greenery | GHMC permit | Sanctioned/conditioned; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenities RERA amenities | Listed “YES”; progress recorded as 0; completion not verified |
| Green strip / tot-lot / park | Permit also requires a peripheral green strip | RERA amenities RERA amenities; GHMC permit | Listed; progress recorded as 0; completion not verified |
| Street lighting | No description or size supplied | RERA amenities RERA amenities | Progress recorded as 0 |
| Community buildings | No description or size supplied | RERA amenities RERA amenities | Progress recorded as 0 |
| Water-conservation / rainwater harvesting | Permit requires a rainwater-harvesting structure; the permit extraction lists 4 RWHPs | GHMC permit; RERA amenities RERA amenities | Sanctioned/conditioned; completion not verified |
| Sewerage and sewage/sullage treatment | RERA amenities lists sewerage infrastructure and treatment/disposal; permit conditions require an ETP | RERA amenities RERA amenities; GHMC permit | Listed/conditioned; progress recorded as 0; completion not verified |
| Storm-water drains | No dimensions supplied | RERA amenities RERA amenities | Listed “YES”; progress recorded as 0 |
| Solid-waste management and disposal | Permit requires a garbage house within the premises | RERA amenities RERA amenities; GHMC permit | Listed/conditioned; completion not verified |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer | RERA amenities RERA amenities; GHMC permit | Listed/conditioned; completion not verified |
The supplied RERA amenity record also lists energy management, fire protection and fire-safety requirements, but gives no progress beyond 0. The GHMC permit includes fire-safety conditions; see Utilities, building services & safety for the stated items. RERA amenities
7. Utilities, building services & safety
- Water: The RERA amenities record lists water supply. The permit says public water-supply connections will be provided only on production of an occupancy certificate. It does not identify a project water source, storage capacity or treatment capacity. RERA amenities
- Sewerage and drainage: The RERA amenities record lists sewerage, storm-water drains and treatment/disposal of sewage and sullage. The GHMC permit requires an ETP. No capacities or completion evidence are supplied. RERA amenities
- Rainwater management: The permit requires a rainwater-harvesting structure/percolation pit and lists 4 RWHPs. Completion is not verified.
- Electrical: The permit identifies space for a transformer; the RERA amenities record lists an electrical meter room, sub-station and receiving station. No supply capacity or backup-power arrangement is established by the project-specific permit extraction. RERA amenities
- Fire and life safety: The permit requires an automatic sprinkler system in the cellar and other fire-safety systems as per Table 7 of Part 4 of the National Building Code of India, 2016. This is a stated permit condition, not evidence that installation or statutory clearance has been completed.
- Accessibility, lifts, security and waste: No project-specific evidence is supplied for accessible circulation, lift numbers or capacities, CCTV, access control, or waste-segregation arrangements. The permit does require a garbage house.
8. Location, access & connectivity
- The registered project location is Nallagandla village, Serilingampally mandal, Ranga Reddy district, PIN 500019. The RERA filing records a 40 ft road along the northern boundary; the other three stated boundaries are neighbours’ land. RERA record RERA filing
- The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 6.8 km. The coordinates provided are identified as a cadastral parcel centroid, not as a surveyed entrance or verified route point. No public-transport details or additional independently verified landmark distances are supplied. Location record
9. Developer & development status
- The registered promoter is ORANGE INFRASTRUCTURES. The RERA filing identifies it as a partnership and records GSTIN 36AAGFO7573C1Z5; the supplied registered-office information is incomplete, with the certificate giving only “Village: Mandal: District: Ranga Reddy, Pin: 500081.” RERA filing Corporate record
- The permit identifies the project applicants as B. Narsaiah and others, with ORANGE INFRASTRUCTURES acting as development agreement-cum-GPA holder, represented by managing partner Paduri Someshwar Reddy. The Form B affidavit is made by P. Someshwar Reddy as an authorised signatory and declares a completion undertaking of 25th July 2027. No construction-progress percentage or independent site inspection is supplied.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, registration P02400005310, issued 23/11/2022; validity stated to 17/03/2028 |
|---|---|
| Scope / note | ORANGE ELITE; Survey No. 124 PART |
| Supplied evidence | Permit 1/C20/00215/2022, dated 17 March 2022; file no. 1/C20/02401/2020 |
|---|---|
| Scope / note | Proposed residential building at Nallagandla, Survey No. 124 PART |
| Supplied evidence | Plan approval number 1/C20/00215/2022 Approvals record |
|---|---|
| Scope / note | Filed with TG-RERA; the supplied layout-plan document extraction is unavailable |
| Supplied evidence | Promoter declaration by authorised signatory, including completion undertaking and declared title basis |
|---|---|
| Scope / note | Promoter declaration; not an independent title or completion certificate |
| Supplied evidence | Advocate’s report dated 05-08-2022 |
|---|---|
| Scope / note | See Land & Title for the full title-document account |
| Supplied evidence | Not supplied Document index |
|---|---|
| Scope / note | The GHMC permit states that an occupancy certificate is required before occupation |
The supplied evidence includes no occupancy certificate or separately extracted approved layout plan. The GHMC permit sets out project-specific construction and facility conditions; this overview summarises only the relevant building and service details. Document index
1. Project at a glance
Project identity
Registered project name: ORANGE ELITE
Project type: Residential apartment project
Phase / registered portion: Not separately named in the supplied record; registration is for the project identified as ORANGE ELITE
TG-RERA registration number: P02400005310
Registration validity: 23/11/2022–17/03/2028, as stated on the certificate; this is registration validity, not the construction-completion deadline
Registered promoter: ORANGE INFRASTRUCTURES; the certificate also styles the name “Orange Infrastructures”
RERA status: Registered; the supplied certificate is Form C
Land and geographic identity
Locality: Nallagandla
Revenue village: Nallagandla village
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500019
Project survey number(s): Survey No. 124 PART (also written “124 part” in the filed title material)
Sanctioned site area: 3048.25 m²
Road-affected area: 23.85 m²
Net area: 3024.40 m²
Boundaries in RERA filing: North: 40 ft road; East, West and South: neighbours’ land
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Building permit / principal approval: Permit No. 1/C20/00215/2022, dated 17 March 2022
Related file number: 1/C20/02401/2020
Approved built-up area: The RERA filing records 11066.13 m² as “Approved Built up Area”; the permit extraction separately states residential upper-floor area 7,326.09 m², cellar 1,789.20 m² and stilt 1,540.00 m². These are distinct labels in the supplied records.
Building arrangement: One proposed residential building; one tower/block is recorded in the RERA unit summary
Sanctioned floor configuration: 1 Cellar + Stilt + 5 upper floors
Approved unit count: 60 units in the RERA unit record; the supplied permit extraction says sanctioned unit numbers must not be increased without GHMC’s prior approval, but does not provide a separate numerical unit count
Parking levels: Cellar and stilt are approved for parking under the permit conditions; a parking-space count is not supplied
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable area: 2BHK: 62.66 m²; 3BHK: 159.09 m²
Portal booking/availability snapshot: 2BHK: 40 total, 0 booked, 40 available; 3BHK: 20 total, 0 booked, 20 available. The portal record has no supplied as-of date, so counts are indicative.
Construction stage: No independently verified site-progress figure or current construction stage is supplied.
Completion dates: The Form B declaration states 25th July 2027 as the promoter’s completion undertaking. The GHMC permit states construction is to be completed before 17 March 2028. These dates are recorded here with their respective document sources.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The permit requires an occupancy certificate before occupation.
2. The project story
- ORANGE ELITE is a registered residential apartment project on Survey No. 124 PART, Nallagandla village, in Serilingampally mandal, Ranga Reddy district. The RERA filing identifies a single building and lists 60 apartments: 40 two-bedroom and 20 three-bedroom units.
- GHMC’s building permit describes a proposed residential building with one cellar, a stilt level and five upper floors. The permit also records a 23.85 m² road-affected portion and a 174.98 m² tot-lot. These are sanctioned-record details; the supplied evidence does not establish construction progress or independently verified completion of the building or its facilities.
- The project’s registration remains valid to 17 March 2028 according to its Form C certificate. The promoter’s Form B completion undertaking and the permit’s completion date are separate project-timeline disclosures; neither establishes that the project is complete. No occupancy certificate is supplied.
3. Master plan, architecture & building design
- The supplied GHMC permit describes one proposed residential building on a site of 3048.25 m², with a 3024.4 m² net area after recording 23.85 m² as road-affected. It lists 1,789.20 m² for the cellar, 1,540.00 m² for the stilt and 7,326.09 m² for the five residential upper floors. The RERA filing separately records 11066.13 m² as approved built-up area; the supplied evidence does not provide a drawing-based reconciliation of these distinct area figures.
- The permit identifies the floor stack as 1 Cellar + Stilt + 5 upper floors, and states a building height of 14.75 m. Its extracted conditions identify a 174.98 m² tot-lot, a transformer space, rainwater-harvesting structures and a garbage house. The permit requires the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.
- The supplied record does not establish the number of flats per floor, building footprint, lift or stair arrangement, internal circulation, detailed landscaping plan, or any phase-wise division. An approved drawing extraction for the layout-plan document is not available.
4. Homes, configurations & floor plans
- The RERA record lists 60 apartments across two configurations. Saleable areas below are RERA-filed. Carpet-area figures are software measurements from the supplied approved floor-plan drawings, not RERA disclosures; the drawing-derived measurements are flagged as needing review. Saleable area and carpet area are different measures, and the supplied record does not provide a measured balcony/utility schedule for every unit design.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 62.66 m² | 59.8–60.5 m²; median 60.1 m² (software-measured) | Not supplied |
| 3BHK | 20 | 0 | 20 | 159.09 m² | 103.0–128.0 m²; median 103.3 m² (software-measured) | 35% (software record) |
- The 2BHK drawing sample includes a hall, kitchen, two bedrooms, toilets and a utility area. One measured 2BHK drawing identifies a utility area of 3.04 m², excluded from the measured carpet area. A measured 3BHK drawing includes a hall, kitchen, three bedrooms, toilets, a utility area and balconies; the displayed example records balcony areas of 8.67 m² and 1.74 m², and a utility area of 4.76 m², each excluded from measured carpet area. These room and area details are drawing-based measurements, not RERA-filed unit disclosures.
- The drawing record reports 2 measured 2BHK designs and 11 measured 3BHK designs. The supplied 2BHK measurements need review; the overall drawing measurement record also notes that software-measured carpet areas need review against the drawings.
5. Parking & vehicle circulation
The GHMC permit identifies the cellar and stilt as approved for vehicle parking and requires those areas to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use. The supplied documents do not state the number of car or two-wheeler spaces, visitor or accessible parking provision, parking allotments by apartment, ramps, or internal driveway arrangements. A parking count or exclusive unit allocation cannot therefore be established from the supplied evidence.
6. Amenities, recreation & open spaces
The GHMC permit contains project-specific conditions and facilities for the proposed building. The RERA amenities record lists common infrastructure items, but the supplied progress percentages are 0 and do not establish completed facilities. No independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | 174.98 m²; permit requires fencing and maintenance as greenery | GHMC permit | Sanctioned/conditioned; completion not verified |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | Listed “YES”; progress recorded as 0; completion not verified |
| Green strip / tot-lot / park | Permit also requires a peripheral green strip | RERA amenities; GHMC permit | Listed; progress recorded as 0; completion not verified |
| Street lighting | No description or size supplied | RERA amenities | Progress recorded as 0 |
| Community buildings | No description or size supplied | RERA amenities | Progress recorded as 0 |
| Water-conservation / rainwater harvesting | Permit requires a rainwater-harvesting structure; the permit extraction lists 4 RWHPs | GHMC permit; RERA amenities | Sanctioned/conditioned; completion not verified |
| Sewerage and sewage/sullage treatment | RERA amenities lists sewerage infrastructure and treatment/disposal; permit conditions require an ETP | RERA amenities; GHMC permit | Listed/conditioned; progress recorded as 0; completion not verified |
| Storm-water drains | No dimensions supplied | RERA amenities | Listed “YES”; progress recorded as 0 |
| Solid-waste management and disposal | Permit requires a garbage house within the premises | RERA amenities; GHMC permit | Listed/conditioned; completion not verified |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer | RERA amenities; GHMC permit | Listed/conditioned; completion not verified |
The supplied RERA amenity record also lists energy management, fire protection and fire-safety requirements, but gives no progress beyond 0. The GHMC permit includes fire-safety conditions; see Utilities, building services & safety for the stated items.
7. Utilities, building services & safety
- Water: The RERA amenities record lists water supply. The permit says public water-supply connections will be provided only on production of an occupancy certificate. It does not identify a project water source, storage capacity or treatment capacity.
- Sewerage and drainage: The RERA amenities record lists sewerage, storm-water drains and treatment/disposal of sewage and sullage. The GHMC permit requires an ETP. No capacities or completion evidence are supplied.
- Rainwater management: The permit requires a rainwater-harvesting structure/percolation pit and lists 4 RWHPs. Completion is not verified.
- Electrical: The permit identifies space for a transformer; the RERA amenities record lists an electrical meter room, sub-station and receiving station. No supply capacity or backup-power arrangement is established by the project-specific permit extraction.
- Fire and life safety: The permit requires an automatic sprinkler system in the cellar and other fire-safety systems as per Table 7 of Part 4 of the National Building Code of India, 2016. This is a stated permit condition, not evidence that installation or statutory clearance has been completed.
- Accessibility, lifts, security and waste: No project-specific evidence is supplied for accessible circulation, lift numbers or capacities, CCTV, access control, or waste-segregation arrangements. The permit does require a garbage house.
8. Location, access & connectivity
- The registered project location is Nallagandla village, Serilingampally mandal, Ranga Reddy district, PIN 500019. The RERA filing records a 40 ft road along the northern boundary; the other three stated boundaries are neighbours’ land.
- The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 6.8 km. The coordinates provided are identified as a cadastral parcel centroid, not as a surveyed entrance or verified route point. No public-transport details or additional independently verified landmark distances are supplied.
9. Developer & development status
- The registered promoter is ORANGE INFRASTRUCTURES. The RERA filing identifies it as a partnership and records GSTIN 36AAGFO7573C1Z5; the supplied registered-office information is incomplete, with the certificate giving only “Village: Mandal: District: Ranga Reddy, Pin: 500081.”
- The permit identifies the project applicants as B. Narsaiah and others, with ORANGE INFRASTRUCTURES acting as development agreement-cum-GPA holder, represented by managing partner Paduri Someshwar Reddy. The Form B affidavit is made by P. Someshwar Reddy as an authorised signatory and declares a completion undertaking of 25th July 2027. No construction-progress percentage or independent site inspection is supplied.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, registration P02400005310, issued 23/11/2022; validity stated to 17/03/2028 |
|---|---|
| Scope / note | ORANGE ELITE; Survey No. 124 PART |
| Supplied evidence | Permit 1/C20/00215/2022, dated 17 March 2022; file no. 1/C20/02401/2020 |
|---|---|
| Scope / note | Proposed residential building at Nallagandla, Survey No. 124 PART |
| Supplied evidence | Plan approval number 1/C20/00215/2022 |
|---|---|
| Scope / note | Filed with TG-RERA; the supplied layout-plan document extraction is unavailable |
| Supplied evidence | Promoter declaration by authorised signatory, including completion undertaking and declared title basis |
|---|---|
| Scope / note | Promoter declaration; not an independent title or completion certificate |
| Supplied evidence | Advocate’s report dated 05-08-2022 |
|---|---|
| Scope / note | See Land & Title for the full title-document account |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | The GHMC permit states that an occupancy certificate is required before occupation |
The supplied evidence includes no occupancy certificate or separately extracted approved layout plan. The GHMC permit sets out project-specific construction and facility conditions; this overview summarises only the relevant building and service details.
Frequently asked questions
Is ORANGE ELITE registered with Telangana RERA?
Yes. ORANGE ELITE is registered with the Telangana Real Estate Regulatory Authority as P02400005310; the registration status is New Project.
Who is the developer of ORANGE ELITE?
The promoter named in the RERA registration is ORANGE INFRASTRUCTURES.
Where is ORANGE ELITE located?
ORANGE ELITE is in NALLAGANDLA, Serilingampally, Rangareddy, Telangana (500019).
When will ORANGE ELITE be completed?
The promoter's proposed date of completion filed with RERA is 17/07/2028. This is the promoter's declaration, not a guarantee.
More projects in Nallagandla







