Kamala Castle
SAI VARSHITH CONSTRUCTIONS · Rangareddy · RERA P02400000060
KAMALA CASTLE is a residential apartment project in KARMANGHAT, Saroornagar mandal, Ranga Reddy district, being developed by registered promoter SAI VARSHITH CONSTRUCTIONS. The registered site area is 635.28 m², with one residential building of Stilt + 5 floors and 15 homes: 10 2BHK units and 5 3BHK units. Its TG-RERA registration number is P02400000060, and its proposed completion date is 16/11/2023.
More from Sai Varshith Constructions · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | KAMALA CASTLE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single registered project is identified; a separate phase name is not disclosed. The sanctioned record describes one building. RERA record RERA filing |
| TG-RERA registration | P02400000060 RERA record |
| Registration validity | 30/11/2018 to 16/11/2023; the supplied certificate says registration was not extended. This is the registration period, not a statement of the completion or occupancy status. RERA record |
| Registered promoter | SAI VARSHITH CONSTRUCTIONS; entity type recorded as Partnership. RERA record Corporate record RERA filing |
| TG-RERA status | “On-Going Project” in the project record. RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / plot | KARMANGHAT; Plot No. 37 RERA record RERA filing |
| Revenue village | Karmanghat RERA record Land records |
| Mandal | Saroornagar RERA record Land records |
| District | Ranga Reddy RERA record Land records |
| PIN | 500079 RERA record |
| Survey numbers and subdivisions | 7/1, 7/2, 8, 9 and 10; no further project subdivisions are specified in the registered identity. RERA record Land records |
| Registered site extent | 635.28 m² total area; net area 635.28 m²; recorded road-affected area 0 m². RERA filing |
| Boundaries | East: Plot No. 38; West: Plot No. 36; North: Plot Nos. 30 and 31; South: 40 ft road. RERA filing |
| Registered plan / approval identifier | 1/C23/10847/2017 RERA record Approvals record |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | Approval No. 1/C23/10847/2017, approved 16 November 2017; file No. 1/C23/11038/2017. Approvals record |
| Approved building form | One residential building, Stilt + 5 floors; five residential upper floors and one stilt parking level. RERA filing |
| Approved built-up area | 1,568.85 m² is recorded for residential upper floors in the permit extraction. The same extraction separately lists “Proposed Covered builtup area 110,320.00”; the meaning or unit of that latter entry is not established here. RERA filing |
| Building height | 14.99 m, as recorded in the permit extraction. |
| Units | 15 units in the TG-RERA filing; the permit conditions state that the number of sanctioned units must not be increased without GHMC approval. A separate sanctioned unit count is not supplied. RERA unit table |
| Site / other sanctioned provisions | Stilt parking area 438.26 m²; 4 rainwater-harvesting structures, 30 trees, tot-lot, transformer space and garbage house are listed in the permit extraction. |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 2BHK: 10 units; 3BHK: 5 units. RERA unit table |
| RERA-filed saleable areas | 2BHK: 109.16 m²; 3BHK: 157.9 m². RERA unit table |
| Booked / available | 1 booked and 14 available as last read from the TG-RERA portal; the record provides no as-of date, so counts are indicative. RERA unit table |
| RERA completion dates | Original and revised proposed completion dates are both 16/11/2023. RERA record RERA filing |
| Construction stage | TG-RERA amenity/infrastructure record reports water supply at 65%; the other listed infrastructure items show 0% or no progress figure. This is a filed progress record, not an independent site inspection. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The available GHMC permit requires an occupancy certificate before occupation. The certificate status is therefore not established by the supplied evidence. Document index |
2. The project story
KAMALA CASTLE is registered as a residential apartment project on Plot No. 37 at Karmanghat, in Saroornagar mandal, Ranga Reddy district. Its registered land identity covers survey numbers 7/1, 7/2, 8, 9 and 10. The GHMC permit describes one Stilt + 5 residential building on a 635.28 m² site. RERA record Land records
The TG-RERA filing lists 15 homes: ten 2BHK units and five 3BHK units. One unit is reported booked and 14 available, but the portal record does not provide an as-of date. RERA unit table
The registration certificate ran from 30/11/2018 through 16/11/2023 and records no extension; the project record also gives 16/11/2023 as the proposed completion date. These dates do not establish whether construction was completed or an occupancy certificate issued. RERA record
The available progress record lists water supply at 65% and 0% for the other specified infrastructure categories. That is a portal-filed status, not independently verified construction progress. No current site inspection or occupancy certificate is supplied. RERA amenities Document index
3. Master plan, architecture & building design
The GHMC building permit describes one residential building with a stilt level and five residential upper floors, height 14.99 m, on a site of 635.28 m². It separately records 1,568.85 m² for residential upper floors and 438.26 m² for stilt parking. These are permit-extraction figures; the evidence does not identify them as carpet area or saleable area.
A building count of one is recorded in the registered land details, and the permit extraction names one building. The supplied record does not provide a reliable floor-by-floor plan description of apartment placement, a building footprint, flats per floor, lift or stair details, or the extent and arrangement of common areas and open space. RERA filing
The permit extraction lists a tot-lot, 30 trees, four rainwater-harvesting structures, transformer space and a garbage house. It also states that the tot-lot is to be fenced and maintained as greenery, and that peripheral greenery is to be maintained. These are sanctioned provisions or conditions, not confirmation that they have been delivered.
The permit extraction separately contains “Proposed Covered builtup area 110,320.00”; its unit and meaning cannot be confirmed from the supplied material, so it is not used as an approved area measure.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are presented below. For 2BHKs, carpet area is measured by software from approved floor-plan drawing geometry and is not a RERA disclosure. No measured drawing carpet area is supplied for 3BHKs. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 109.16 m² | 73.3–88.3 m²; median 75.5 m² (software-measured from drawings; review against drawing) | 31% (supplied for drawing-measured 2BHKs) |
| 3BHK | 5 | 1 | 4 | 157.9 m² | Not supplied | Not supplied |
The 2BHK drawing measurement covers six flat designs. One drawing panel identifies a typical floor plan and flat “02,” with bedroom, living/dining, kitchen, toilets, wash area and a balcony. The balcony is excluded from the measured carpet area. The supplied data does not provide a complete or verified room schedule for every design. RERA unit details Floor plans
Carpet area and saleable area are different measures: the drawing-based carpet measurement excludes the balcony and does not represent the home’s share of common areas; RERA saleable area is the filed figure. The drawing measurements are software-derived, not RERA-filed, and should be checked against the approved drawing. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit identifies a stilt parking level with 438.26 m² recorded as stilt parking and requires the approved stilt parking area to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied evidence does not establish the number of sanctioned parking bays, the number of two-wheeler spaces, visitor or accessible parking, or parking allocations to particular units. A drawn or permitted parking area does not by itself establish an exclusive unit entitlement.
No parking ramp, internal vehicle circulation plan, pedestrian separation, mechanical parking or EV charging provision is established in the supplied records. Document index
6. Amenities, recreation & open spaces
The following combines GHMC-permit provisions with the TG-RERA progress record. No independent completion verification is supplied. RERA amenities
| Description / size | Tot-lot and peripheral greenery are listed; the permit requires the tot-lot to be fenced and maintained as greenery. No area is supplied. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit provision; RERA progress record: 0%; delivery not independently verified. |
| Description / size | 30 trees listed in the permit extraction; plantation required along the periphery and in front of the premises. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit provision; completion not independently verified. |
| Description / size | Listed in the RERA progress categories; no facility description or size supplied. |
|---|---|
| Evidence source | TG-RERA progress record |
| Declared progress / verified status | 0% recorded. |
| Description / size | No TG-RERA or permit evidence of a clubhouse or indoor recreation facility is supplied. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
| Description / size | No evidence of sports facilities is supplied. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
| Description / size | No additional community or convenience facility is established beyond the tot-lot and listed site provisions. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
7. Utilities, building services & safety
| Evidence in the supplied record | Water supply appears in the TG-RERA progress categories at 65%; the permit says public water connections are provided only on production of an occupancy certificate. |
|---|---|
| Status / limitation | Filed progress figure; source, storage capacity and treatment arrangements are not specified. RERA amenities |
| Evidence in the supplied record | RERA categories include sewerage, storm-water drains and treatment/disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Each is recorded at 0%; no STP capacity, reuse arrangement or drainage design is supplied. RERA amenities |
| Evidence in the supplied record | The permit lists four rainwater-harvesting structures and requires a percolation pit. |
|---|---|
| Status / limitation | Sanctioned provision; installation or operation is not independently verified. |
| Evidence in the supplied record | Transformer space is listed in the permit. |
|---|---|
| Status / limitation | No supply capacity, backup system or EV charging provision is supplied. |
| Evidence in the supplied record | The permit refers to lifts among services to be executed under qualified technical supervision. |
|---|---|
| Status / limitation | Number, type and capacity are not supplied. |
| Evidence in the supplied record | The permit places responsibility for structural and fire safety on the owner/developer and technical professionals and refers to required firefighting installations. |
|---|---|
| Status / limitation | No detailed fire-system specification or clearance is supplied; the permit condition alone does not establish completed or independently verified compliance. |
| Evidence in the supplied record | The permit requires a garbage house. RERA categories include solid-waste management and disposal, recorded at 0%. |
|---|---|
| Status / limitation | A permitted provision is identified; operation or completion is not verified. RERA amenities |
| Evidence in the supplied record | The permit includes a condition concerning facilities for physically handicapped persons in public and semi-public buildings above 300 m². |
|---|---|
| Status / limitation | No project-specific accessible route, ramp or facility details are supplied. |
| Evidence in the supplied record | No project-specific security or CCTV installation is established in the permit or TG-RERA progress data supplied. |
|---|---|
| Status / limitation | Not established. |
The GHMC permit requires an occupancy certificate before occupation and states that public water and electricity connections are to be provided only on production of that certificate.
8. Location, access & connectivity
The registered project location is Karmanghat, Saroornagar mandal, Ranga Reddy district, PIN 500079. The site boundaries recorded in the project filing are Plot No. 38 to the east, Plot No. 36 to the west, Plot Nos. 30 and 31 to the north, and a 40 ft road to the south. RERA record RERA filing
The supplied location record lists L. B. Nagar Metro Station at 1.9 km, Emlibun bus station at 0.8 km, an unnamed hospital at 0.5 km, an unnamed park at 0.5 km, an unnamed college at 0.9 km, iON Digital Zone, iDZ Karmanghat at 0.6 km, Dmart at 1.8 km, State Bank ATM at 1.2 km and Little Flower School at 1.5 km. These are supplied location-record distances; no travel times or route measurements are provided. Location record
9. Developer & development status
The registered promoter is SAI VARSHITH CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABPFS5081D1ZX. The project record identifies VEERABOMMA SRIDEVI as Partner and VEERABOMMA BHIKSHAPATHY as Authorized Signatory. Corporate record RERA filing
The registered project record gives the promoter address as Vijetha Majestic Apartments, Saleem Nagar, Defence Colony, Karmanghat, Saroornagar, Ranga Reddy, 500079. The registration certificate separately records a promoter-office location of Hyderabad, PIN 500036. No official promoter website or contact details are supplied. Parties record
The promoter’s Form B declaration, verified in Hyderabad on 19 November 2018, undertakes completion by 30/03/2020. The TG-RERA project record gives original and revised proposed completion dates of 16/11/2023. These are recorded declarations/dates; neither establishes actual completion. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for KAMALA CASTLE, P02400000060, issued 30/11/2018; validity through 16/11/2023. The certificate records no extension. |
| GHMC building permit | Building Permit Order for one Stilt + 5 residential building, approval No. 1/C23/10847/2017, file No. 1/C23/11038/2017, approved 16 November 2017; permit validity through 16 November 2023. |
| Layout identifier | The GHMC permit extraction lists Layout / Sub Divn. No. L.P.NO.79/1968. An approved-layout lookup result is not supplied. HMDA |
| Legal title report | Title report dated 12-11-2018 concerning Plot No. 37, 760 square yards, Karmanghat; the report is listed as document 6046. Document index |
| Development agreement / GPA | Document 6110 is described as a registered Development Agreement cum GPA dated 26 October 2017 between KOLAN NIRMALA REDDY and SAI VARSHITH CONSTRUCTIONS. Document index |
| Form B declaration | Promoter declaration dated 19 November 2018, including a completion undertaking and project-fund declarations. |
| Occupancy / completion certificate | No such certificate is present in the supplied documents; occupancy status is not established. Document index |
| Layout lookup limitation | The supplied HMDA DPMS lookup is unavailable through the public channel described in the record; this does not establish whether an approval exists beyond the filed identifiers. HMDA |
1. Project at a glance
Project identity
Registered project name: KAMALA CASTLE
Project type: Residential apartment project
Phase / registered portion: A single registered project is identified; a separate phase name is not disclosed. The sanctioned record describes one building.
TG-RERA registration: P02400000060
Registration validity: 30/11/2018 to 16/11/2023; the supplied certificate says registration was not extended. This is the registration period, not a statement of the completion or occupancy status.
Registered promoter: SAI VARSHITH CONSTRUCTIONS; entity type recorded as Partnership.
TG-RERA status: “On-Going Project” in the project record.
Land and geographic identity
Locality / plot: KARMANGHAT; Plot No. 37
Revenue village: Karmanghat
Mandal: Saroornagar
District: Ranga Reddy
PIN: 500079
Survey numbers and subdivisions: 7/1, 7/2, 8, 9 and 10; no further project subdivisions are specified in the registered identity.
Registered site extent: 635.28 m² total area; net area 635.28 m²; recorded road-affected area 0 m².
Boundaries: East: Plot No. 38; West: Plot No. 36; North: Plot Nos. 30 and 31; South: 40 ft road.
Registered plan / approval identifier: 1/C23/10847/2017
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: Approval No. 1/C23/10847/2017, approved 16 November 2017; file No. 1/C23/11038/2017.
Approved building form: One residential building, Stilt + 5 floors; five residential upper floors and one stilt parking level.
Approved built-up area: 1,568.85 m² is recorded for residential upper floors in the permit extraction. The same extraction separately lists “Proposed Covered builtup area 110,320.00”; the meaning or unit of that latter entry is not established here.
Building height: 14.99 m, as recorded in the permit extraction.
Units: 15 units in the TG-RERA filing; the permit conditions state that the number of sanctioned units must not be increased without GHMC approval. A separate sanctioned unit count is not supplied.
Site / other sanctioned provisions: Stilt parking area 438.26 m²; 4 rainwater-harvesting structures, 30 trees, tot-lot, transformer space and garbage house are listed in the permit extraction.
Offering and status
Configurations: 2BHK: 10 units; 3BHK: 5 units.
RERA-filed saleable areas: 2BHK: 109.16 m²; 3BHK: 157.9 m².
Booked / available: 1 booked and 14 available as last read from the TG-RERA portal; the record provides no as-of date, so counts are indicative.
RERA completion dates: Original and revised proposed completion dates are both 16/11/2023.
Construction stage: TG-RERA amenity/infrastructure record reports water supply at 65%; the other listed infrastructure items show 0% or no progress figure. This is a filed progress record, not an independent site inspection.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The available GHMC permit requires an occupancy certificate before occupation. The certificate status is therefore not established by the supplied evidence.
2. The project story
KAMALA CASTLE is registered as a residential apartment project on Plot No. 37 at Karmanghat, in Saroornagar mandal, Ranga Reddy district. Its registered land identity covers survey numbers 7/1, 7/2, 8, 9 and 10. The GHMC permit describes one Stilt + 5 residential building on a 635.28 m² site.
The TG-RERA filing lists 15 homes: ten 2BHK units and five 3BHK units. One unit is reported booked and 14 available, but the portal record does not provide an as-of date.
The registration certificate ran from 30/11/2018 through 16/11/2023 and records no extension; the project record also gives 16/11/2023 as the proposed completion date. These dates do not establish whether construction was completed or an occupancy certificate issued.
The available progress record lists water supply at 65% and 0% for the other specified infrastructure categories. That is a portal-filed status, not independently verified construction progress. No current site inspection or occupancy certificate is supplied.
3. Master plan, architecture & building design
The GHMC building permit describes one residential building with a stilt level and five residential upper floors, height 14.99 m, on a site of 635.28 m². It separately records 1,568.85 m² for residential upper floors and 438.26 m² for stilt parking. These are permit-extraction figures; the evidence does not identify them as carpet area or saleable area.
A building count of one is recorded in the registered land details, and the permit extraction names one building. The supplied record does not provide a reliable floor-by-floor plan description of apartment placement, a building footprint, flats per floor, lift or stair details, or the extent and arrangement of common areas and open space.
The permit extraction lists a tot-lot, 30 trees, four rainwater-harvesting structures, transformer space and a garbage house. It also states that the tot-lot is to be fenced and maintained as greenery, and that peripheral greenery is to be maintained. These are sanctioned provisions or conditions, not confirmation that they have been delivered.
The permit extraction separately contains “Proposed Covered builtup area 110,320.00”; its unit and meaning cannot be confirmed from the supplied material, so it is not used as an approved area measure.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are presented below. For 2BHKs, carpet area is measured by software from approved floor-plan drawing geometry and is not a RERA disclosure. No measured drawing carpet area is supplied for 3BHKs.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 109.16 m² | 73.3–88.3 m²; median 75.5 m² (software-measured from drawings; review against drawing) | 31% (supplied for drawing-measured 2BHKs) |
| 3BHK | 5 | 1 | 4 | 157.9 m² | Not supplied | Not supplied |
The 2BHK drawing measurement covers six flat designs. One drawing panel identifies a typical floor plan and flat “02,” with bedroom, living/dining, kitchen, toilets, wash area and a balcony. The balcony is excluded from the measured carpet area. The supplied data does not provide a complete or verified room schedule for every design.
Carpet area and saleable area are different measures: the drawing-based carpet measurement excludes the balcony and does not represent the home’s share of common areas; RERA saleable area is the filed figure. The drawing measurements are software-derived, not RERA-filed, and should be checked against the approved drawing.
5. Parking & vehicle circulation
The GHMC permit identifies a stilt parking level with 438.26 m² recorded as stilt parking and requires the approved stilt parking area to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied evidence does not establish the number of sanctioned parking bays, the number of two-wheeler spaces, visitor or accessible parking, or parking allocations to particular units. A drawn or permitted parking area does not by itself establish an exclusive unit entitlement.
No parking ramp, internal vehicle circulation plan, pedestrian separation, mechanical parking or EV charging provision is established in the supplied records.
6. Amenities, recreation & open spaces
The following combines GHMC-permit provisions with the TG-RERA progress record. No independent completion verification is supplied.
| Description / size | Tot-lot and peripheral greenery are listed; the permit requires the tot-lot to be fenced and maintained as greenery. No area is supplied. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit provision; RERA progress record: 0%; delivery not independently verified. |
| Description / size | 30 trees listed in the permit extraction; plantation required along the periphery and in front of the premises. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit provision; completion not independently verified. |
| Description / size | Listed in the RERA progress categories; no facility description or size supplied. |
|---|---|
| Evidence source | TG-RERA progress record |
| Declared progress / verified status | 0% recorded. |
| Description / size | No TG-RERA or permit evidence of a clubhouse or indoor recreation facility is supplied. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
| Description / size | No evidence of sports facilities is supplied. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
| Description / size | No additional community or convenience facility is established beyond the tot-lot and listed site provisions. |
|---|---|
| Evidence source | Supplied project documents |
| Declared progress / verified status | Not established. |
7. Utilities, building services & safety
| Evidence in the supplied record | Water supply appears in the TG-RERA progress categories at 65%; the permit says public water connections are provided only on production of an occupancy certificate. |
|---|---|
| Status / limitation | Filed progress figure; source, storage capacity and treatment arrangements are not specified. |
| Evidence in the supplied record | RERA categories include sewerage, storm-water drains and treatment/disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Each is recorded at 0%; no STP capacity, reuse arrangement or drainage design is supplied. |
| Evidence in the supplied record | The permit lists four rainwater-harvesting structures and requires a percolation pit. |
|---|---|
| Status / limitation | Sanctioned provision; installation or operation is not independently verified. |
| Evidence in the supplied record | Transformer space is listed in the permit. |
|---|---|
| Status / limitation | No supply capacity, backup system or EV charging provision is supplied. |
| Evidence in the supplied record | The permit refers to lifts among services to be executed under qualified technical supervision. |
|---|---|
| Status / limitation | Number, type and capacity are not supplied. |
| Evidence in the supplied record | The permit places responsibility for structural and fire safety on the owner/developer and technical professionals and refers to required firefighting installations. |
|---|---|
| Status / limitation | No detailed fire-system specification or clearance is supplied; the permit condition alone does not establish completed or independently verified compliance. |
| Evidence in the supplied record | The permit requires a garbage house. RERA categories include solid-waste management and disposal, recorded at 0%. |
|---|---|
| Status / limitation | A permitted provision is identified; operation or completion is not verified. |
| Evidence in the supplied record | The permit includes a condition concerning facilities for physically handicapped persons in public and semi-public buildings above 300 m². |
|---|---|
| Status / limitation | No project-specific accessible route, ramp or facility details are supplied. |
| Evidence in the supplied record | No project-specific security or CCTV installation is established in the permit or TG-RERA progress data supplied. |
|---|---|
| Status / limitation | Not established. |
The GHMC permit requires an occupancy certificate before occupation and states that public water and electricity connections are to be provided only on production of that certificate.
8. Location, access & connectivity
The registered project location is Karmanghat, Saroornagar mandal, Ranga Reddy district, PIN 500079. The site boundaries recorded in the project filing are Plot No. 38 to the east, Plot No. 36 to the west, Plot Nos. 30 and 31 to the north, and a 40 ft road to the south.
The supplied location record lists L. B. Nagar Metro Station at 1.9 km, Emlibun bus station at 0.8 km, an unnamed hospital at 0.5 km, an unnamed park at 0.5 km, an unnamed college at 0.9 km, iON Digital Zone, iDZ Karmanghat at 0.6 km, Dmart at 1.8 km, State Bank ATM at 1.2 km and Little Flower School at 1.5 km. These are supplied location-record distances; no travel times or route measurements are provided.
9. Developer & development status
The registered promoter is SAI VARSHITH CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABPFS5081D1ZX. The project record identifies VEERABOMMA SRIDEVI as Partner and VEERABOMMA BHIKSHAPATHY as Authorized Signatory.
The registered project record gives the promoter address as Vijetha Majestic Apartments, Saleem Nagar, Defence Colony, Karmanghat, Saroornagar, Ranga Reddy, 500079. The registration certificate separately records a promoter-office location of Hyderabad, PIN 500036. No official promoter website or contact details are supplied.
The promoter’s Form B declaration, verified in Hyderabad on 19 November 2018, undertakes completion by 30/03/2020. The TG-RERA project record gives original and revised proposed completion dates of 16/11/2023. These are recorded declarations/dates; neither establishes actual completion.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for KAMALA CASTLE, P02400000060, issued 30/11/2018; validity through 16/11/2023. The certificate records no extension.
GHMC building permit: Building Permit Order for one Stilt + 5 residential building, approval No. 1/C23/10847/2017, file No. 1/C23/11038/2017, approved 16 November 2017; permit validity through 16 November 2023.
Layout identifier: The GHMC permit extraction lists Layout / Sub Divn. No. L.P.NO.79/1968. An approved-layout lookup result is not supplied.
Legal title report: Title report dated 12-11-2018 concerning Plot No. 37, 760 square yards, Karmanghat; the report is listed as document 6046.
Development agreement / GPA: Document 6110 is described as a registered Development Agreement cum GPA dated 26 October 2017 between KOLAN NIRMALA REDDY and SAI VARSHITH CONSTRUCTIONS.
Form B declaration: Promoter declaration dated 19 November 2018, including a completion undertaking and project-fund declarations.
Occupancy / completion certificate: No such certificate is present in the supplied documents; occupancy status is not established.
Layout lookup limitation: The supplied HMDA DPMS lookup is unavailable through the public channel described in the record; this does not establish whether an approval exists beyond the filed identifiers.
Frequently asked questions
Is KAMALA CASTLE registered with Telangana RERA?
Yes. KAMALA CASTLE is registered with the Telangana Real Estate Regulatory Authority as P02400000060; the registration status is On-Going Project.
Who is the developer of KAMALA CASTLE?
The promoter named in the RERA registration is SAI VARSHITH CONSTRUCTIONS.
Where is KAMALA CASTLE located?
KAMALA CASTLE is in KARMANGHAT, Saroornagar, Rangareddy, Telangana (500079).
When will KAMALA CASTLE be completed?
The promoter's proposed date of completion filed with RERA is 16/11/2023. This is the promoter's declaration, not a guarantee.